[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901860":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},901860,583,2,"多选题","(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，下列项目中属于安全文明施工及其他措施项目的有()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","已完工程及设备保护",true,{"key":16,"text":17,"correct":18},"B","有害化合物防护",false,{"key":20,"text":21,"correct":18},"C","高浓度氧气防护",{"key":23,"text":24,"correct":14},"D","高层施工增加","AD","该题主要考察的是：安全文明施工及其他措施项目。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]