[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901858":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},901858,583,2,"多选题","(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，脚手架搭拆措施项目包括的工作内容有()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","场内、场外相关材料搬运",true,{"key":16,"text":17,"correct":14},"B","搭设、拆除脚手架",{"key":19,"text":20,"correct":21},"C","搭设、超出围护网",false,{"key":23,"text":24,"correct":14},"D","拆除脚手架后材料的堆放","ABD","该题主要考察的是：脚手架搭拆措施项目包括工作内容，脚手架搭设：场内、场外材料搬运；搭、拆脚手架；拆除脚手架后材料的堆放。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]