[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901857":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},901857,583,2,"多选题","(2015年)依据《通用安装工程工程量计算规范》(GB 50856—2013)，附录H工业管道工程中低压碳钢管安装的“工程内容”有安装、压力试验、吹扫，还包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","清洗",true,{"key":16,"text":17,"correct":14},"B","脱脂",{"key":19,"text":20,"correct":21},"C","钝化",false,{"key":23,"text":24,"correct":21},"D","预膜","AB","该题主要考察的是：安装工程应按《安装工程计量规范》附录A～附录N的规定， 结合技术规范、标准图集、施工图纸， 按照工程结构、使用材质及规格或安装位置等， 予以详细而准确的表述和说明清单项目内容。如030801001 低压碳钢管， 项目特征有： 材质， 规格， 连接形式、焊接方法， 压力试验、吹扫与清洗设计要求， 脱脂设计要求。”",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]