[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901739":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},901739,583,1,"单选题","（2016年考题）变配电工程中，硬母线的连接方式应为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","扭纹链接",false,{"key":16,"text":17,"correct":14},"B","咬口链接",{"key":19,"text":20,"correct":21},"C","螺栓链接",true,{"key":23,"text":24,"correct":14},"D","铆接链接","本题考查的是变配电工程安装。母线的连接有焊接和螺拴连接两种。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]