[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901248":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},901248,583,1,"单选题","依据《通用安装工程工程量计算规范》GB50856-2013的规定，执行“工业管道工程”相关项目的有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","厂区范围内的各种生产用介质输送管道安装",true,{"key":16,"text":17,"correct":18},"B","厂区范围内的各种生活用介质输送管道安装",false,{"key":20,"text":21,"correct":18},"C","厂区范围内生产，生活共用介质输送管道安装",{"key":23,"text":24,"correct":18},"D","厂区范围内的管道除锈，刷油及保温工程","2020版教材P314 工业管道工程计量，“工业管道工程”适用于厂区范围内的车间、装置、站、罐区及其相互之间各种生产用介质输送管道和厂区第一个连接点以内生产、生活共用的输送给水、排水、蒸汽、燃气的管道安装工程。 C 没有前提条件",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]