[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901046":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},901046,583,1,"单选题","在自动喷水灭火系统管道安装中，下列做法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","管道穿过楼板时加设套管，套管应高出楼面50mm",true,{"key":16,"text":17,"correct":18},"B","管道安装顺序为先支管，后配水管和干管",false,{"key":20,"text":21,"correct":18},"C","管道弯头处应采用补芯",{"key":23,"text":24,"correct":18},"D","管道横向安装宜设1‰~2‰的坡度，坡向立管","2020版教材P178 喷水灭火系统 B错：管道的安装顺序为先配水干管、后配水管和水支管。 C错：在管道弯头处不得采用补芯；当需要采用补芯时，三通上可用1个，四通上不应超过2个；公称通径大于50mm的管道上不宜采用活接头。 D错，“管道横向安装宜设2‰～5‰的坡度，坡向排水管正确答案是A。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]