[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900978":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},900978,583,1,"单选题","当拟建工程中有15MPa 的高压管道敷设时，措施项目清单可列项（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","平台铺设、拆除",false,{"key":16,"text":17,"correct":18},"B","工程系统检测、检验",true,{"key":20,"text":21,"correct":14},"C","管道安拆后的充气保护",{"key":23,"text":24,"correct":14},"D","设备、管道施工的防冻和焊接保护","教材p121-122。（1）当拟建工程中有工艺钢结构预制安装和工业管道预制安装时，措施项目清单可列项“平台铺设、拆除”。（2）当拟建工程中有设备、管道冬雨季施工，有易燃易爆、有害环境施工，或设备、管道焊接质量要求较高时，措施项目清单可列项“设备、管道施工的防冻和焊接保护”。（3）当拟建工程中有三类容器制作安装，有超过10MPa 的高压管道敷设时，措施项目清单可列项“工程系统检测、检验”。（5）当拟建工程中有洁净度、防腐要求较高的管道安装，措施项目清单可列项“管道安拆后的充气保护”。（7）当拟建工程有大于40t 设备安装时，措施项目清单可列项“金属抱杆安装、拆除、移位”。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]