[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900971":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},900971,583,1,"单选题","在安装工程中，措施项目能够计算工程量的，编制措施项目清单宜采用的编制方式是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","其他项目清单方式",false,{"key":16,"text":17,"correct":18},"B","分部分项工程量清单",true,{"key":20,"text":21,"correct":14},"C","暂估定额方式",{"key":23,"text":24,"correct":14},"D","套用定额方式","编制安装工程措施项目时，可以计算工程量项目，计量宜采用分部分项工程量清单方式编制。 2020版教材P118-121",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]