[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900965":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},900965,583,1,"单选题","依据《通用安装工程工程量计算规范》GB 50856——2013的规定，编码0310所表示的项目名称为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","消防工程",false,{"key":16,"text":17,"correct":18},"B","给排水、采暖、燃气工程",true,{"key":20,"text":21,"correct":14},"C","通风空调工程",{"key":23,"text":24,"correct":14},"D","工业管道工程","2020版教材P113 安装工程计量项目的附录，“附录A机械设备安装工程（编码：0301）附录B热力设备安装工程（编码：0302）附录C静置设备与工艺金属结构制作安装工程（编码：0303）附录D电气设备安装工程（编码：0304）附录E建筑智能化工程（编码：0305）附录F自动化控制仪表安装工程（编码：0306）附录G通风空调工程（编码：0307）附录H工业管道工程（编码：0308）附录J消防工程（编码：0309）附录K给排水、采暖、燃气工程（编码：0310）附录L通信设备及线路工程（编码：0311）附录M刷油、防腐蚀、绝热工程（编码：0312）附录N措施项目（编码：0313）”",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]