[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900953":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},900953,583,1,"单选题","根据《通用安装工程工程量计算规范》GB50856-2013有关项目编码规定，第四级编码采用（ ）数字表示。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一位",false,{"key":16,"text":17,"correct":14},"B","二位",{"key":19,"text":20,"correct":21},"C","三位",true,{"key":23,"text":24,"correct":14},"D","四位","2020版教材P111 中国的分类编码体系，第四级编码为分项工程项目名称顺序码，采用三位数字（即第七、八、九位数字）表示。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]