[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900609":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},900609,583,1,"单选题","根据《通用安装工程工程量计算规范》（GB50856-2013）规定，属于安装专业措施项目的有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","冬雨季施工增加",false,{"key":16,"text":17,"correct":14},"B","已完工程及设备保护",{"key":19,"text":20,"correct":14},"C","建筑工地起重机械的检验检测",{"key":22,"text":23,"correct":24},"D","起重机等特种设备安装质量监督检验检测",true,"起重机等特种设备安装质量监督检验检测：归属于专业措施项目一览表中（12）工程系统检测、检验。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]