[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900608":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},900608,583,1,"单选题","依据《通用安装工程工程量计算规范》（GB50856-2013）,项目安装高度若超过基本高度时，应在“项目特征”中描述，对于附录G 通风空调工程，其基本安装高度为（---）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3.6m",false,{"key":16,"text":17,"correct":14},"B","5m",{"key":19,"text":20,"correct":21},"C","6m",true,{"key":23,"text":24,"correct":14},"D","10m","附录 G 通风空调工程 6m；",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]