[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900459":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},900459,583,1,"单选题","(2013年)根据《通用安装工程工程量计算规范》，单独安装的铁壳开关、自动开关、箱式电阻器、交阻器的外部进出线预留长度应从()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","安装对象最远端子接口算起",false,{"key":16,"text":17,"correct":14},"B","安装对象最近端子接口算起",{"key":19,"text":20,"correct":14},"C","安装对象下端往上2\u002F3处算起",{"key":22,"text":23,"correct":24},"D","安装对象中心算起",true,"5 ）盘、箱、柜的外部进出电线预留长度见表6. 1. 9 。单独安装的铁壳开关、自动开关、刀开关、启动器、箱式电阻器、变阻器，从安装对象中心算起。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]