[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900387":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},900387,583,1,"单选题","(2013年)根据《通用安装工程工程量计算规范》，下列静置设备安装工程量的计量单位为“座”的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","球形罐组对安装",false,{"key":16,"text":17,"correct":18},"B","气柜制作安装",true,{"key":20,"text":21,"correct":14},"C","整体塔器安装",{"key":23,"text":24,"correct":14},"D","热交换器类设备安装","该题主要考察的是静置设备安装工程量计量，火炬及排气筒制作安装（项目编码：03030700的， 应根据项目特征（名称，构造形式，材质， 质量，筒体直径，高度，灌浆配合比）， 以“座” 为计量单位， 按设计图示数量计算。故正确答案是火炬及排气筒制作安装。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]