[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900321":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},900321,583,1,"单选题","(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，中压锅炉本体设备安装工程量计量时，按图示数量以“套”计算的项目是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","旋风分离器",false,{"key":16,"text":17,"correct":14},"B","省煤器",{"key":19,"text":20,"correct":14},"C","管式空气预热器",{"key":22,"text":23,"correct":24},"D","炉排及燃烧装置",true,"该题主要考察的是：中压锅炉本体设备安装工程量计量，中压锅炉本体设备安装工程量计量时，炉排及燃烧装置区分结构形式、蒸汽出率(t\u002Fh)，按设计图示数量以“套”计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]