[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900267":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},900267,583,1,"单选题","(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，“给排水、采暖、燃气工程”的编码为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0310",true,{"key":16,"text":17,"correct":18},"B","0311",false,{"key":20,"text":21,"correct":18},"C","0312",{"key":23,"text":24,"correct":18},"D","0313","该题主要考察的是：工程项目编码定义，第一级编码表示工程类别，第二级编码表示各专业工程顺序码。根据《通用安装工程工程量计算规范》GB50856-2013的规定，“给排水、采暖、燃气工程”的编码为0310。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]