[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900264":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},900264,583,1,"单选题","(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，项目安装高度若超过基本高度时，应在“项目特征”中描述。对于附录G通风空调工程，其基本安装高度为()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3.6m",false,{"key":16,"text":17,"correct":14},"B","5m",{"key":19,"text":20,"correct":21},"C","6m",true,{"key":23,"text":24,"correct":14},"D","10m","该题主要考察的是：基本安装高度，《通用安装工程工程量计算规范》GB50856-2013各附录基本安装高度为：附录A机械设备安装工程10m，附录D电气设备安装工程5m，附录E建筑智能化工程5m,附录G通风空调工程6m，附录J消防工程5m，附录K给排水、采暖、燃气工程3.6m，附录M刷油、防腐蚀、绝热工程6m。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]