[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900254":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},900254,583,1,"单选题","(2013年)根据《通用安装工程工程量计算规范》有关项目编码规定，第四级编码表示()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","各专业工程顺序码",false,{"key":16,"text":17,"correct":18},"B","各分项工程顺序码",true,{"key":20,"text":21,"correct":14},"C","各分部工程顺序码",{"key":23,"text":24,"correct":14},"D","清单项目名称顺序码","该题主要考察的是安装工程分类编码体系，第一级编码表示工程类别。第二级编码表示各专业工程顺序码。第三级编码表示各专业工程下的各分部工程顺序码。第四级编码表示各分部工程的各分项工程顺序码，即表示清单项目。第五级编码表示清单项目名称顺序码。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（安装)","建筑工程",0]