[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,9,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},898226,1,"单选题","(2015年)根据FIDIC《施工合同条件》（1999版），关于合同价款调整的规定，下列说法中正确的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程量的变更与对应费率的乘积超过了中标总金额的1%时才予调整",false,{"key":24,"text":25,"correct":26},"B","实际测量工程量比工程量表中工程量变动大于10%时，可调整相应单价",true,{"key":28,"text":29,"correct":22},"C","工程师要求改变施工顺序的，不应调整合同价款",{"key":31,"text":32,"correct":22},"D","承包人配合工程检验所发生的剥露和覆盖，不应调整合同价款","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},898227,"(2016年)根据《建设项目工程总承包合同示范文本》（GF-2011-0216），下列变更事项中属于设计变更的是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"基准控制点的调整",{"key":24,"text":41,"correct":22},"备品备件采购数量的调整",{"key":28,"text":43,"correct":22},"新增加的施工障碍处理",{"key":31,"text":45,"correct":22},"增加的附加试验",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},898228,"(2018年)根据 FIDIC《施工合同条件》（1999 年版）通用条款，因工程量变更可以调整合同规定费率或价格的必要条件是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"实际分项工程量变化大于15％",{"key":24,"text":53,"correct":26},"该分项工程量的变更与相对应费率的乘积超过了中标金额的0.01％",{"key":28,"text":55,"correct":22},"工程量的变更直接导致了该部分工程每单位工程费用的变动超过了2％",{"key":31,"text":57,"correct":22},"该部分工程量变更导致直接费受到损失",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},898229,"（2019年真题）对于工程总承包合同中质量保证金的扣留与返还,下列做法正确的是（）．",[62,64,66,68],{"key":20,"text":63,"correct":22},"扣留金额的计算中应考虑预付款的支付、扣回及价格调整的金额",{"key":24,"text":65,"correct":22},"不论是否缴纳履约保证金,均需扣留质量保证金",{"key":28,"text":67,"correct":22},"缺陷责任期满即须返还剩余质量保证金",{"key":31,"text":69,"correct":26},"延长缺陷责任期时,应相应延长剩余质量保证金的返还期限",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},898230,"（2019年真题）根据2017版FIDIC《施工合同条件》，关于物价波动引起的价格调整，下列说法正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"在通用条款中规定了调价公式",{"key":24,"text":77,"correct":26},"调价公式不适用于基于实际费用或现行价格计算价值的工程",{"key":28,"text":79,"correct":22},"调价公式中所列各项费用要求的权重已经约定,合同实施过程中不得调整",{"key":31,"text":81,"correct":22},"调价公式中的固定系数,在合同实施过程中可视情况调整",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},898233,"(2018年)竣工决算文件中，主要反映竣工工程建设成果和经验，全面考核分析工程投资与造价的书面总结文件是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"竣工财务决算说明书",{"key":24,"text":89,"correct":22},"竣工财务决算报表",{"key":28,"text":91,"correct":22},"工程竣工造价对比分析",{"key":31,"text":93,"correct":22},"工程竣工验收报告",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},898234,"(2018年)某工业项目及其中Ⅰ车间的有关建设费用如下表所示，则Ⅰ车间应分摊的生产工艺设计费应为（ ）万元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"112.0",{"key":24,"text":101,"correct":22},"137.1",{"key":28,"text":103,"correct":26},"160.0",{"key":31,"text":105,"correct":22},"186.7",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},898236,"（2019年真题）在新增固定资产价值时，仅计算建筑、安装或采购成本，不计分摊的待摊投资的固定资产是（）",[110,112,114,116],{"key":20,"text":111,"correct":22},"管道和线路工程",{"key":24,"text":113,"correct":22},"需安装的动力设备",{"key":28,"text":115,"correct":26},"运输设备",{"key":31,"text":117,"correct":22},"附属辅助工程",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},898238,"(2014年)建设项目竣工财务决算应编制基本建设项目概况表，下列选项中应计入“基本建设项目概况表”非经营项目输出投资的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"水土保持.城市绿化费用",{"key":24,"text":125,"correct":26},"产权不归属本单位的专用道路建设费",{"key":28,"text":127,"correct":22},"报废工程建设费",{"key":31,"text":129,"correct":22},"产权归本单位的地下管道建设费",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},898239,"(2016年)关于建设工程竣工图的绘制和形成，下列说法中正确的是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"凡按图竣工没有变动的，由发包人在原施工图上加盖“竣工图”标志",{"key":24,"text":137,"correct":22},"凡在施工过程中发生设计变更的，一律重新绘制竣工图",{"key":28,"text":139,"correct":22},"平面布置发生重大改变的，一律由设计单位负责重新绘制竣工图",{"key":31,"text":141,"correct":26},"重新绘制的新图，应加盖“竣工图”标志",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},898240,"(2016年)某建设项目有两个单项工程组成，其竣工结算的有关费用如下表所示。已知该项目建设单位管理费、土地征用费、建筑设计费、工艺设计费分别为100、120、60、40万元。则该单项工程B的新增固定资产价值是（ ）万元。",[146,148,150,152],{"key":20,"text":147,"correct":22},"3132.5",{"key":24,"text":149,"correct":26},"3135",{"key":28,"text":151,"correct":22},"3137.5",{"key":31,"text":153,"correct":22},"3165",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},898241,"(2015年)关于建设项目竣工验收，下列说法正确的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"单位工程的验收由施工单位组织",{"key":24,"text":161,"correct":22},"大型项目单位工程的验收由国家发改委组织",{"key":28,"text":163,"correct":26},"小型项目的整体验收由项目主管部门组织",{"key":31,"text":165,"correct":22},"工程保修书不属于竣工验收的条件",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},898242,"(2013年)下列资料中，不属于竣工验收报告附有文件的是()。",[170,172,174,176],{"key":20,"text":171,"correct":26},"工程竣工验收备案表",{"key":24,"text":173,"correct":22},"施工许可证",{"key":28,"text":175,"correct":22},"施工图设计文件审查意见",{"key":31,"text":177,"correct":22},"施工单位签署的工程质量保修书",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},898243,"(2013年)完整的竣工决算所包含的内容是()。",[182,184,186,188],{"key":20,"text":183,"correct":26},"竣工财务决算说明书、竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"key":24,"text":185,"correct":22},"竣工财务决算报表、竣工决算、工程竣工图、工程竣工造价对比分析",{"key":28,"text":187,"correct":22},"竣工财务决算说明书、竣工决算、竣工验收报告、工程竣工造价对比分析",{"key":31,"text":189,"correct":22},"竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},898244,"(2013年)编制大中型建设项目竣工财务决算报表时，下列属于资金占用的项目是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"待冲基建支出",{"key":24,"text":197,"correct":22},"应付款",{"key":28,"text":199,"correct":26},"预付及应收款",{"key":31,"text":201,"correct":22},"未交款",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},898245,"(2014年)大中型和限额以上建设项目及技术改造项目，工程整体验收的组织单位可以是（）",[206,208,210,212],{"key":20,"text":207,"correct":22},"监理单位",{"key":24,"text":209,"correct":22},"业主单位",{"key":28,"text":211,"correct":22},"使用单位",{"key":31,"text":213,"correct":26},"国家发改委",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},898246,"(2015年)关于建设项目竣工运营后的新增资产，下列说法正确的是( )。",[218,220,222,224],{"key":20,"text":219,"correct":22},"新增资产按资产性质分为固定资产、流动资产和无形资产三大类",{"key":24,"text":221,"correct":22},"分期分批交付生产或使用的工程，待工程全部交付使用后，一次性计算新增固定资产增值",{"key":28,"text":223,"correct":26},"凡购置的达到固定资产标准不需安装的工器具，应在交付使用后计入新增固定资产",{"key":31,"text":225,"correct":22},"企业库存现金、存货及建设单位管理费中未计入固定资产的各项费用等，应在交付使用后计入新增流动资产价值",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},898247,"(2016年)竣工财务决算的基本建设项目概况表中，应列入非经营性项目转出投资支出的项目是()。",[230,232,234,236],{"key":20,"text":231,"correct":22},"产权属于本单位的城市绿化",{"key":24,"text":233,"correct":22},"不能形成资产的城市绿化",{"key":28,"text":235,"correct":22},"产权属于本单位的专用道路",{"key":31,"text":237,"correct":26},"产权不属于本单位的专用道路",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},898248,"（2017年考题）某工业建设项目及其中 K车间的各项建设费用如下表所示。则 K 车间应分摊的建设单位管理费为（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"70",{"key":24,"text":245,"correct":22},"75",{"key":28,"text":247,"correct":26},"84",{"key":31,"text":249,"correct":22},"105",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},898249,"（2019年真题）在建设项目竣工决算报表中，用于考核和分析投资效果，落实结余资金，并作为报告上级核销基本建设支出依据的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"基本建设项目概况表",{"key":24,"text":257,"correct":26},"基本建设项目竣工财务决算表",{"key":28,"text":259,"correct":22},"基本建设项目交付使用资产总表",{"key":31,"text":261,"correct":22},"基本建设项目交付使用资产明细表",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},898250,"关于我国现行建设项目总投资与工程造价的构成的说法中，正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"生产性建设项目总投资为建设投资和流动资产投资之和",{"key":24,"text":269,"correct":22},"工程造价为工程费用、工程建设其他费用和预备费之和",{"key":28,"text":271,"correct":22},"建设投资为固定资产投资和建设期利息之和",{"key":31,"text":273,"correct":26},"工程造价包括用于建设单位自身进行项目筹建和项目管理所花费的费用",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},898252,"根据世界银行对建设工程造价构成的规定，只能作为一种储备可能不动用的费用是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"未明确项目准备金",{"key":24,"text":281,"correct":22},"基本预备费",{"key":28,"text":283,"correct":26},"不可预见准备金",{"key":31,"text":285,"correct":22},"建设成本上升费用",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},898253,"根据世界银行工程项目总建设成本的构成，以下各项中属于直接建设成本的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"前期研究、勘查费用",{"key":24,"text":293,"correct":22},"施工现场监督的费用",{"key":28,"text":295,"correct":22},"工厂投料试车必需的材料费用",{"key":31,"text":297,"correct":26},"建筑保险和债券",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},898254,"为完成工程项目并达到使用要求或生产条件，在建设期内预计或实际投入的全部费用总和为（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"建设项目总投资",{"key":24,"text":305,"correct":22},"固定资产投资",{"key":28,"text":307,"correct":22},"建设投资",{"key":31,"text":309,"correct":22},"工程费用",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},898255,"已知某进口工程设备FOB 为200 万美元，美元与人民币汇率为1：7，银行财务费率为5%，外贸手续费率为15%，关税税率为22%，增值税率为17%，无其它费用。若该进口设备抵岸价为2360.70 万元人民币，则该进口工程设备到岸价为（ ）万元人民币。",[314,316,318,320],{"key":20,"text":315,"correct":22},"1452.02",{"key":24,"text":317,"correct":22},"1452.18",{"key":28,"text":319,"correct":26},"1452.20",{"key":31,"text":321,"correct":22},"1453.20",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},898256,"已知国内制造厂生产某非标准设备所用材料费、加工费、辅助材料费、专用工具费、废品损失费共20 万元，外购配套件费3 万元，非标准设备设计费1 万元，包装费率为1%，利润率为8%，若其他费用不考虑，则该设备的原价为（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"25.82 万元",{"key":24,"text":329,"correct":26},"25.85 万元",{"key":28,"text":331,"correct":22},"26.09 万元",{"key":31,"text":333,"correct":22},"29.09 万元",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},898257,"对外贸易运输保险费的计算公式是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"运输保险费=【（FOB+国际运输费）\u002F（1-保险费率）】*保险费率",{"key":24,"text":341,"correct":22},"运输保险费=【（CIF+国际运输费）\u002F（1-保险费率）】*保险费率",{"key":28,"text":343,"correct":22},"运输保险费=【（FOB+国际运输费）\u002F（1+保险费率）】*保险费率",{"key":31,"text":345,"correct":22},"运输保险费=【（CFR+国际运输费）\u002F（1-保险费率）】*保险费率",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},898258,"根据我国现行建设安装工程费用项目组成的规定，下列有关费用表述中不正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"人工费是指支付给直接从事建筑安装工程施工作业的生产工人和附属生产单位工人的各项费用",{"key":24,"text":353,"correct":26},"材料费中的材料单价由材料原价、材料运杂费、材料损耗费、采购及保管费五项组成",{"key":28,"text":355,"correct":22},"材料费包含构成或计划构成永久工程一部分的工程设备费",{"key":31,"text":357,"correct":22},"施工机具使用费包含仪器仪表使用费",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},898259,"关于建筑安装工程费用中的税金，下列说法中正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"当事人可以自主选择一般计税法或简易计税法计税",{"key":24,"text":365,"correct":22},"一般计税法的税前造价包括人、材、机、企业管理费、利润",{"key":28,"text":367,"correct":22},"采用简易计税法时，税前造价不包含增值税的进项税额",{"key":31,"text":369,"correct":26},"采用一般计税法时，税前造价不包含增值税的进项税额",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},898260,"根据国外建筑安装工程费用构成，下列说法错误的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"招雇解雇费应计入单项工程开办费",{"key":24,"text":377,"correct":22},"管理费包括现场管理费与公司管理费",{"key":28,"text":379,"correct":22},"暂定金额包括在合同价格中，只有工程师批准后才能动用",{"key":31,"text":381,"correct":22},"驻工地工程师的现场办公费及所需设备的费用应单独列项，不分摊进单价",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},898261,"在国外建筑安装工程费用构成中，承包商投标报价时不计入和分摊进单价，而需单独列项的是（ ）",[386,388,390,392],{"key":20,"text":387,"correct":26},"临时设施费",{"key":24,"text":389,"correct":22},"总部管理费",{"key":28,"text":391,"correct":22},"利润",{"key":31,"text":393,"correct":22},"税金",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},898263,"关于各应计量措施费的计算以下表述中正确的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"混凝土模板及支架费通常是按照模板面积以“m2”计算",{"key":24,"text":401,"correct":22},"排水、降水费通常按照排、降水日历天数按“天”计算",{"key":28,"text":403,"correct":22},"超高施工增加费通常按照建筑面积按“m2”计算",{"key":31,"text":405,"correct":26},"脚手架费可按照建筑面积“m2”计算",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},898264,"关于建设用地的取得及使用年限，下列说法中正确的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":26},"获取建设用地使用权的方式可以是租赁或转让",{"key":24,"text":413,"correct":22},"通过协议出让获取土地使用权的方式分为投标、竞标、挂牌三种",{"key":28,"text":415,"correct":22},"城市公益事业用地不得以划拨方式取得",{"key":31,"text":417,"correct":22},"将土地使用权无偿交付给使用者的，其土地使用年限最高为70 年",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},898265,"采用工程总承包方式发包的工程，其工程总承包管理费应从（ ）中支出。",[422,424,426,428],{"key":20,"text":423,"correct":26},"建设管理费",{"key":24,"text":425,"correct":22},"建设单位管理费",{"key":28,"text":427,"correct":22},"建筑安装工程费",{"key":31,"text":281,"correct":22},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},898267,"某项目共需要贷款资金900 万元，建设期为3 年，按年度均衡筹资，第1 年贷款为300 万元，第二年贷款为400 万元，建设期内只计利息但不支付，年利率为10%，则第2 年的建设期利息应为（ ）万元。",[433,435,437,439],{"key":20,"text":434,"correct":22},"50.0",{"key":24,"text":436,"correct":26},"51.5",{"key":28,"text":438,"correct":22},"71.5",{"key":31,"text":440,"correct":22},"86.65",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},898268,"某建设项目建安工程费1500 万元，设备购置费200 万元，工程建设其他费用300 万元。已知基本预备费率6%，项目建设前期年限是1 年，建设期为2 年，每年完成投资的50%，年均投资价格上涨率为5%，则该项目建设期的预备费为（ ）万元。",[445,447,449,451],{"key":20,"text":446,"correct":22},"338.11",{"key":24,"text":448,"correct":26},"337.80",{"key":28,"text":450,"correct":22},"237.99",{"key":31,"text":452,"correct":22},"338.21",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},898269,"在下列各项中属于基本预备费的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"超出初步设计范围的设计变更所增加的费用",{"key":24,"text":460,"correct":22},"实行工程保险的费用",{"key":28,"text":462,"correct":26},"超规超限设备运输而增加的费用",{"key":31,"text":464,"correct":22},"为鉴定工程质量所进行的隐蔽工程中间验收的费用",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},898270,"在编制工程量清单时，主要的步骤包括有①招标文件②编制工程量清单③计算工程量④确定项目特征⑤确定项目编码⑥确定项目名称⑦确定计量单位，下列排列顺序正确的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"①③④⑤⑥⑦②",{"key":24,"text":472,"correct":22},"①③⑥⑤④⑦②",{"key":28,"text":474,"correct":26},"①⑥⑤④⑦③②",{"key":31,"text":476,"correct":22},"①⑦⑥⑤④③②",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},898272,"下列关于工程计价的说法中，正确的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"工程造价的计价包括计算工程量和套定额两个环节",{"key":24,"text":484,"correct":22},"工程计价的基本原理在于项目的分解和组价",{"key":28,"text":486,"correct":26},"工程计价包括工程单价的确定和总价的计算",{"key":31,"text":488,"correct":22},"工程计价中的工程单价仅指综合单价",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},898274,"关于工程定额，下列说法正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"劳动定额主要表现形式为时间定额，机械消耗定额主要表现形式为产量定额",{"key":24,"text":496,"correct":22},"企业定额是企业内部使用的预算定额",{"key":28,"text":498,"correct":26},"补充定额只能在指定范围内使用",{"key":31,"text":500,"correct":22},"地区统一定额应依据地区工程技术特点、施工生产和管理水平独立编制",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},898277,"在工程量清单中，最能体现分部分项工程项目自身价值本质的是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":26},"项目特征",{"key":24,"text":508,"correct":22},"项目编码",{"key":28,"text":510,"correct":22},"项目名称",{"key":31,"text":512,"correct":22},"项目计量单位",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},898279,"招标工程量清单应以（ ）为单位编制。",[517,519,521,523],{"key":20,"text":518,"correct":22},"建设项目",{"key":24,"text":520,"correct":26},"单位工程",{"key":28,"text":522,"correct":22},"分部工程",{"key":31,"text":524,"correct":22},"分项工程",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},898282,"在工人的工作时间消耗中，属于有效工作时间且和工作量大小有关的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":26},"辅助工作时间",{"key":24,"text":532,"correct":22},"准备与结束工作时间",{"key":28,"text":534,"correct":22},"休息时间",{"key":31,"text":536,"correct":22},"不可避免的中断时间",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},898284,"通过计时观察，完成某工程的基本工时为7h\u002F m3，辅助工作时间为工序作业时间的8%，规范时间占工作时间的13%，则完成该工程的时间定额是（ ）工日\u002F m3。",[541,543,545,547],{"key":20,"text":542,"correct":22},"1.03",{"key":24,"text":544,"correct":22},"1.04",{"key":28,"text":546,"correct":22},"0.98",{"key":31,"text":548,"correct":26},"1.09",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},898286,"出料容量为600L 的砂浆搅拌机，每循环工作一次，需要装料、搅拌、卸料和中断的时间分别为80s、130s、110s、60s，其中运料与其他循环组成部分交叠的时间为20s。机械正常利用系数为0.92，则600L 砂浆搅拌机的产量定额为（ ）m3\u002F台班。",[553,555,557,559],{"key":20,"text":554,"correct":26},"44.16",{"key":24,"text":556,"correct":22},"41.93",{"key":28,"text":558,"correct":22},"44.00",{"key":31,"text":560,"correct":22},"44.59",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},898287,"某施工机械设备司机2 人，当年制度工作日为254 天，年工作台班为250 台班，人工日工资单价为80 元，则该施工机械的台班人工费为（ ）元\u002F台班。",[565,567,569,571],{"key":20,"text":566,"correct":22},"78.72",{"key":24,"text":568,"correct":22},"81.28",{"key":28,"text":570,"correct":22},"157.44",{"key":31,"text":572,"correct":26},"162.56",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},898289,"某材料自甲、乙两地采购（适用16%增值税率），甲地采购量为500t，原价为300 元\u002Ft，运杂费为40 元\u002Ft；乙地采购量为400t，原价为230 元\u002Ft，运杂费为32 元\u002Ft（适用10%增值税率），该材料运输损耗率和采购保管费费率分别为1%、3%，则该材料的单价（原价与运杂费均为含税价格，且材料采用两票制支付方式）为（ ）元\u002Ft。",[577,579,581,583],{"key":20,"text":578,"correct":22},"275.60",{"key":24,"text":580,"correct":22},"274.60",{"key":28,"text":582,"correct":22},"275.62",{"key":31,"text":584,"correct":26},"275.61",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},898290,"正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为1.70kg，已知该材料的损耗率为6.30%，则所需这种材料的总消耗量为（ ）kg。",[589,591,593,595],{"key":20,"text":590,"correct":22},"28.28",{"key":24,"text":592,"correct":26},"28.68",{"key":28,"text":594,"correct":22},"28.25",{"key":31,"text":596,"correct":22},"27.27",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},898292,"完成某单位分部分项工程需要基本用工4.2 工日，超运距用工0.3 工日，辅助用工1 工日，人工幅度差系数为10%，则该单位分部分项工程预算定额人工消耗量为（ ）工日。",[601,603,605,607],{"key":20,"text":602,"correct":22},"5.92",{"key":24,"text":604,"correct":22},"5.95",{"key":28,"text":606,"correct":22},"6.02",{"key":31,"text":608,"correct":26},"6.05",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":28,"analysis":33},898293,"根据统计学一般原理，关于确定同度量因素原则的说法，正确的是（ ）。",[613,615,617,619],{"key":20,"text":614,"correct":22},"质量指标指数应以报告期的质量指标作为同度量因素",{"key":24,"text":616,"correct":22},"数量指标指数应以报告期的数量指标作为同度量因素",{"key":28,"text":618,"correct":26},"质量指标指数应以报告期的数量指标作为同度量因素",{"key":31,"text":620,"correct":22},"数量指标指数应以基期的数量指标作为同度量因素",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]