[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,8,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},898165,1,"单选题","（2019年真题）某市政工程投标截止日期为2019年4月20日，确定中标人后，工程于2019年6月1日开工。施工合同约定，工程价款结算时人工、钢材、水泥、砂石料及施工机具使用费采用价格指数法调差，各项权重系数及价格指数见下表。2019年8月， 承包人当月完成清单子目价款2000万元，当月按已标价工程量清单价格确认的变更金额为200万元，则本工程2019年8月的价格调整金额为( )万元。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","57．80",false,{"key":24,"text":25,"correct":22},"B","63．58",{"key":27,"text":28,"correct":29},"C","75．40",true,{"key":31,"text":32,"correct":22},"D","82．94","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},898166,"（2019年真题）某招标工程项目执行《建设工程工程量清单计价规范》(GB 50500—2013)，招标工程量清单中某分项工程的工程量为1500m3，施工中由于设计变更调增1900m3,该分项工程最高投标限价综合单价为40元\u002Fm3，投标报价为47元\u002Fm3，则该分项工程的结算价为（）元",[38,40,42,44],{"key":20,"text":39,"correct":22},"87400",{"key":24,"text":41,"correct":22},"88900",{"key":27,"text":43,"correct":29},"89125",{"key":31,"text":45,"correct":22},"89300",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},898167,"（2019年真题）下列发承包双方在约定调整合同价款的事项中属于工程变更的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":29},"工程量清单缺项",{"key":24,"text":53,"correct":22},"不可抗力",{"key":27,"text":55,"correct":22},"物价波动",{"key":31,"text":57,"correct":22},"提前竣工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},898168,"（2019年真题）关于工程索赔的相关论述,下列说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工程索赔指承包人向发包人提出工期和(或)费用补偿的行为",{"key":24,"text":65,"correct":22},"由发包人原因导致分包人承受经济损失，分包人可直接向发包人提出索赔",{"key":27,"text":67,"correct":29},"承包人提出的工期补偿索赔经发包人批准后，可免除承包人非自身原因拖期违约责任",{"key":31,"text":69,"correct":22},"由于不可抗力事件造成合同非正常终止，承包人不能向发包人提出索赔",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},898169,"（2019年真题）根据《标准施工招标文件》(2007年版)通用合同条款，下列引起承包人索赔的事件中,可以同时获得工期、费用和利润补偿的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工中发现文物、古迹",{"key":24,"text":77,"correct":29},"发包人延迟提供建筑材料",{"key":27,"text":79,"correct":22},"承包人提前竣工",{"key":31,"text":81,"correct":22},"因不可抗力造成工期延误",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},898173,"（2020年真题）某市政工程施工合同中约定:（1）基准日为2020年2月20日;（2）竣工日期为2020年7月30日;（3）工程价款结算时人工单价、钢材、商品混凝土及施工机具使用费采用价格指数法调差，各项权重系数及价格指数见下表，工程开工后，由于发包人原因导致原计划7月施工的工程延误至8月实施，2020年8月承包人当月完成清单子目价款3000万元，当月按已标价工程量清单价格确认的变更金额为100万元，则本工程2020年8月的价格调整金额为（ ）万元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"60.18",{"key":24,"text":89,"correct":22},"62.24",{"key":27,"text":91,"correct":22},"67.46",{"key":31,"text":93,"correct":29},"88.94",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},898176,"(2014年)施工合同履行期间，下列不属于工程计量范围的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程变更修改的工程量清单内容",{"key":24,"text":101,"correct":22},"合同文件中规定的各种费用支付项目",{"key":27,"text":103,"correct":22},"暂列金额中的专业工程",{"key":31,"text":105,"correct":29},"擅自超出施工图纸施工的工程",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},898177,"(2014年)某工程合同总价为5000万元，合同工期180天，材料费占合同总价的60%，材料储备定额天数为25天。材料供应在途天数为5天。用公式计算法来求得该工程的预付款为（）万元。",[110,112,114,116],{"key":20,"text":111,"correct":29},"417",{"key":24,"text":113,"correct":22},"500",{"key":27,"text":115,"correct":22},"694",{"key":31,"text":117,"correct":22},"833",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},898178,"(2014年)关于最终结清，下列说法中正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"最终结清是在工程保修期满后对剩余质量保证金的最终结清",{"key":24,"text":125,"correct":22},"最终结清支付证书一经签发，承包人对合同内享有的索赔权利即自行终止",{"key":27,"text":127,"correct":22},"质量保证金不足以抵减发包人工程缺陷修复费用的，应按合同约定的争议解决方式处理",{"key":31,"text":129,"correct":29},"最终结清付款涉及政府投资的，应按国家集中支付相关规定和专用合同条款约定办理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},898179,"(2014年)某工程施工合同对于工程款付款时间约定不明、工程尚未交付、工程价款也未结算，现承包人起诉，发包人工程欠款利息应从（）之日计付。",[134,136,138,140],{"key":20,"text":135,"correct":22},"工程计划交付",{"key":24,"text":137,"correct":22},"提交竣工结算文件",{"key":27,"text":139,"correct":29},"当事人起诉",{"key":31,"text":141,"correct":22},"监理工程师暂定付款",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},898180,"(2016年)已知某建筑工程施工合同总额为8000万元，工程预付款按合同金额的20%计取，主要材料及构件造价占合同额的50%。预付款起扣点为（ ）万元。",[146,148,150,152],{"key":20,"text":147,"correct":22},"1600",{"key":24,"text":149,"correct":22},"4000",{"key":27,"text":151,"correct":29},"4800",{"key":31,"text":153,"correct":22},"6400",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},898181,"(2016年)建设工程已实际交付，但施工合同没有约定付款时间，则拖欠工程款利息的起算日起为()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"提交竣工结算文件之日",{"key":24,"text":161,"correct":22},"确认竣工结算文件之日",{"key":27,"text":163,"correct":22},"竣工验收合格之日",{"key":31,"text":165,"correct":29},"工程实际交付之日",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},898182,"(2015年)根据《建设工程工程量清单计价规范》（GB50500-2013），发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"30%",{"key":24,"text":173,"correct":22},"40%",{"key":27,"text":175,"correct":22},"50%",{"key":31,"text":177,"correct":29},"60%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},898183,"(2015年)关于建设工程竣工结算审核，下列说法中正确的是( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"非国有企业投资的建设工程，不应委托工程造价咨询机构审核",{"key":24,"text":185,"correct":29},"国有资金投资的建设工程，应当委托工程造价咨询机构审核",{"key":27,"text":187,"correct":22},"承包人不同意造价咨询机构的结算审核结论时，造价咨询机构不得出具审核报告",{"key":31,"text":189,"correct":22},"工程造价咨询机构的核对结论与承包人竣工结算文件不一致的，以造价机构核对结论为准",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},898184,"(2013年)在用起扣点计算法扣回预付款时，起扣点计算公式为T=P-M\u002FN，则式中N是指()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"工程预付款总额",{"key":24,"text":197,"correct":22},"工程合同总额",{"key":27,"text":199,"correct":29},"主要材料及构件所占比重",{"key":31,"text":201,"correct":22},"累计完成工程金额",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},898185,"(2013年)发包人应当开始支付不低于当年施工进度计划的安全文明施工费总额60%的期限是工程开工后的()天内。",[206,208,210,212],{"key":20,"text":207,"correct":22},"7",{"key":24,"text":209,"correct":22},"14",{"key":27,"text":211,"correct":22},"21",{"key":31,"text":213,"correct":29},"28",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},898186,"(2013年)关于工程计量的方法，下列说法正确的是()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"按照合同文件中规定的工程量予以计量",{"key":24,"text":221,"correct":29},"不符合合同文件要求的工程不予计量",{"key":27,"text":223,"correct":22},"单价合同工程量必须按现行定额规定的工程量计算规则计量",{"key":31,"text":225,"correct":22},"总价合同各项目的工程量是予以计量的最终工程量",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},898187,"(2013年)根据最高人民法院有关司法解释，下列不予支持的诉讼请求是()。",[230,232,234,236],{"key":20,"text":231,"correct":29},"垫资工程款利息没有约定的情况下，承包人请求支付利息",{"key":24,"text":233,"correct":22},"施工合同无效，但工程竣工验收合格，承包人请求合同约定支付工程价款",{"key":27,"text":235,"correct":22},"施工合同无效，已完工程质量合格，承包人请求合同约定支付工程价款",{"key":31,"text":237,"correct":22},"施工合同无效，已完工程质量不合格但修复后工程验收合格，发包人请求承包人承担修复费用",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},898188,"(2014年)关于施工合同履行期间的期中支付，下列说法中正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"双方对工程计量结果的争议，不影响发包人对已完工工程的期中支付",{"key":24,"text":245,"correct":22},"对已签发支付证书中的计算错误。发包人不得再予修正",{"key":27,"text":247,"correct":29},"进度款制度申请中应包括累计已完成的合同价款",{"key":31,"text":249,"correct":22},"本周起实际支付的合同额为本期完成的合同价款合计",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},898189,"(2014年)关于办理有质量争议工程的竣工结算，下列说法中错误的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"已实际投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":24,"text":257,"correct":29},"已竣工未投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":27,"text":259,"correct":22},"停工、停建工程的质量争议可在执行工程质量监督机构处理决定后办理竣工结算",{"key":31,"text":261,"correct":22},"已竣工未验收并且为实际投入使用，其无质量争议部分的工程，进攻结算按合同约定办理",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},898190,"(2014年)关于垫资施工合同价款纠纷处理，下列说法正确的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"合同约定垫资利率高于中国人民银行发布的同期同类贷款利率的，按合同约定返还垫资利息",{"key":24,"text":269,"correct":29},"当事人对垫资没有约定的，按照工程欠款处理",{"key":27,"text":271,"correct":22},"当事人对垫资利息没有约定的，按中国人民银行发布的同期同类贷款利率计算利息",{"key":31,"text":273,"correct":22},"垫资达到合同综合一定比例以上时为无效合同",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},898191,"(2015年)下列文件和资料中，可作为建设工程工程量计量依据的是( )。",[278,280,282,284],{"key":20,"text":279,"correct":22},"造价管理机构发布的调价文件",{"key":24,"text":281,"correct":22},"造价管理机构发布的价格信息",{"key":27,"text":283,"correct":29},"质量合格证书",{"key":31,"text":285,"correct":22},"各种预付款支付凭证",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},898192,"(2015年)关于建筑安装工程结算的编制，下列说法中正确的是( )。",[290,292,294,296],{"key":20,"text":291,"correct":22},"采用固定总价合同的，暂列金额不得调整",{"key":24,"text":293,"correct":22},"采用固定总价合同的，税率可不按政府部门新公布的税率调整",{"key":27,"text":295,"correct":22},"规费应按县级建设主管部门规定的费率计算",{"key":31,"text":297,"correct":29},"现场签证费用应依据点承包双方签证资料确认的金额计算",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},898193,"(2015年)关于建设工程施工合同价款纠纷的处理，下列说法中正确的是( )。",[302,304,306,308],{"key":20,"text":303,"correct":22},"竣工验收不合格，经承包人修复后合格的，承包人支付修复费用的要求应予支持",{"key":24,"text":305,"correct":29},"竣工验收不合格，经承包人修复后合格的，修复费用应由承包人承担",{"key":27,"text":307,"correct":22},"竣工验收不合格，多次修复后仍不合格的，发包人应酌情给予承包人部分人修复费用",{"key":31,"text":309,"correct":22},"安装后发现甲供设备存在质量问题，但承包人参与进场验收的，发包人不应支付承包人设备拆除、重新安装的费用",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},898194,"(2015年)关于工程造价咨询人从事工程造价鉴定工作，下列做法中正确的是( )。",[314,316,318,320],{"key":20,"text":315,"correct":22},"不需收集施工过程中的施工组织、质量、工期等资料",{"key":24,"text":317,"correct":22},"可以安排经验丰富的造价员独立承担鉴定工作",{"key":27,"text":319,"correct":29},"应收集鉴定项目同时期、同类型工程的技术经济指标",{"key":31,"text":321,"correct":22},"工程造价鉴定书中可不对鉴定过程中使用的技术手段进行描进",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},898195,"(2016年)由发包人提供的工程材料、工程设备的金额，应在合同价款的期中支付和结算中予以扣出。具体的扣出标准是()。",[326,328,330,332],{"key":20,"text":327,"correct":29},"按签约单价和签约数量",{"key":24,"text":329,"correct":22},"按实际采购单价和实际数量",{"key":27,"text":331,"correct":22},"按签约单价和实际数量",{"key":31,"text":333,"correct":22},"按实际采购单价和签约数量",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},898196,"(2016年)关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是()。",[338,340,342,344],{"key":20,"text":339,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":341,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":27,"text":343,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":31,"text":345,"correct":29},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},898197,"(2016年)施工合同价款纠纷处理中，一方当事人拒不履行，另一方当事人可以请求人民法院执行的文书是()。",[350,352,354,356],{"key":20,"text":351,"correct":22},"和解协议书",{"key":24,"text":353,"correct":22},"造价认定书",{"key":27,"text":355,"correct":22},"行政调解书",{"key":31,"text":357,"correct":29},"仲裁调解书",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},898198,"(2018年)某国内工程合同对欠付工程利息计付标准和付款时间没有约定，若发生了欠款事件时，下列利息支付的说法中错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":29},"按照中国人民银行发布的同期各类贷款利率中的高值计息",{"key":24,"text":365,"correct":22},"建设工程已实际交付的，计息日为交付之日",{"key":27,"text":367,"correct":22},"建设工程没有交付的，计息日为提交竣工结算文件之日",{"key":31,"text":369,"correct":22},"建设工程未交付，工程价款也未结算的，计息日为当事人起诉之日",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},898199,"(2018年)因不可抗力解除合同的，发包人不应向承包人支付的费用是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"临时工程拆除费",{"key":24,"text":377,"correct":29},"承包人未交付材料的货款",{"key":27,"text":379,"correct":22},"已实施的措施项目应付价款",{"key":31,"text":381,"correct":22},"承包人施工设备运离现场的费用",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},898200,"(2018年)关于政府投资项目竣工结算的审核，下列说法正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"单位工程竣工结算由承包人审核",{"key":24,"text":389,"correct":22},"单项工程竣工结算由承包人审核",{"key":27,"text":391,"correct":22},"建设项目竣工总结算由发包人委托造价工程师审核",{"key":31,"text":393,"correct":29},"竣工结算文件由发包人委托具有相应资质的工程造价咨询机构审核",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},898201,"(2018年)工程量清单计价项目采用单价合同的，工程竣工结算编制中一般不允许调整的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"分部分项工程的清单数量",{"key":24,"text":401,"correct":22},"安全文明施工费的清单总额",{"key":27,"text":403,"correct":29},"已标价工程量清单综合单价",{"key":31,"text":405,"correct":22},"总承包服务费清单总额",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},898202,"(2018年)关于安全文明施工费的支付，下列说法正确的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"按施工工期平均分摊安全文明施工费，与进度款同期支付",{"key":24,"text":413,"correct":22},"按合同建筑安装工程费分摊安全文明施工费，与进度款同期支付",{"key":27,"text":415,"correct":29},"在开工后28 天内预付不低于当年施工进度计划的安全文明施工费总额的60%，其余部分与进度款同期支付",{"key":31,"text":417,"correct":22},"在正式开工前预付不低于当年施工进度计划的安全文明施工费总额的60%，其余部分与进度款同期支付",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},898203,"(2018年)采用起扣点计算法扣回预付款的正确做法是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"从已完工程的累计合同额相当于工程预付款数额时起扣",{"key":24,"text":425,"correct":22},"从已完工程所用的主要材料及构件的价值相当于工程预付款数额时起扣",{"key":27,"text":427,"correct":29},"从未完工程所需的主要材料及构件的价值相当于工程预付款数额时起扣",{"key":31,"text":429,"correct":22},"从未完工程的剩余合同额相当于工程预付款数额时起扣",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},898204,"（2019年真题）根据《建设工程质量保证金管理办法》(建质【2017】138号)，质量保证金总预留比例不得高于工程价款结算总额的（ ）",[434,436,438,440],{"key":20,"text":435,"correct":22},"19%",{"key":24,"text":437,"correct":22},"2%",{"key":27,"text":439,"correct":29},"3%",{"key":31,"text":441,"correct":22},"5%",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},898205,"（2019年真题）发包人收到承包人提交的最终结清申请单，并在规定时间内予以核实后，向承包人签发（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"工程接收证书",{"key":24,"text":449,"correct":22},"竣工结算支付书",{"key":27,"text":451,"correct":22},"缺陷责任期终止证书",{"key":31,"text":453,"correct":29},"最终支付证书",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},898206,"（2019年真题）关于合同价款的期中支付,下列说法正确的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"进度款支付周期应与发包人实际的工程计量周期一致",{"key":24,"text":461,"correct":22},"已标价工程量清单中单价项目结算价款应按承包人确认的工程量计算",{"key":27,"text":463,"correct":22},"承包人现场签证金额不应列入期中支付进度款，在竣工结算时一并处理",{"key":31,"text":465,"correct":29},"进度款的支付按期中结算价款总额和约定比例计算，一般不低于60%，不高于90%",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},898207,"（2019年真题）编制竣工结算文件时，应按国家、省级或行业建设主管部门的规定计价的是（）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"劳动保险费",{"key":24,"text":473,"correct":22},"总承包服务费",{"key":27,"text":475,"correct":29},"安全文明施工费",{"key":31,"text":477,"correct":22},"现场签证费",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},898208,"（2019年真题）下列有关合同价款纠纷的处理，人民法院应予支持的是 （）",[482,484,486,488],{"key":20,"text":483,"correct":29},"施工合同无效，但工程验收合格，承包人请求支付工程价款的",{"key":24,"text":485,"correct":22},"发包人与承包人对垫资利息没有约定，承包人请求支付利息的",{"key":27,"text":487,"correct":22},"施工合同解除后，已完工程质量不合格，承包人请求支付工程价款的",{"key":31,"text":489,"correct":22},"未经竣工验收，发包人擅自使用工程后，以使用部分的工程质量不合格为由主张权利的",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},898209,"（2019年真题）关于预付款担保的说法,正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"预付款担保的形式必须为银行保函",{"key":24,"text":497,"correct":22},"预付款担保的担保金额必须高于预付款",{"key":27,"text":499,"correct":22},"在预付款的扣回进程中担保金额保持不变",{"key":31,"text":501,"correct":29},"预付款保函在预付款扣回之前必须保持有效",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},898216,"(2014年)根据《建设项目工程总承包合同示范文本》（GF-2011-0126)，下列属于施工变更的是（）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"对区域内标准标高的调整",{"key":24,"text":509,"correct":22},"对备品备件采购数量的增减",{"key":27,"text":511,"correct":29},"发包人对竣工试验合格的项目重新进行竣工试验",{"key":31,"text":513,"correct":22},"因发包人原因暂停工程超过45天，调减收影响的部分工程",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},898217,"(2014年)根据《建设项目工程总承包合同示范文本》（GF-2011-0126)，发包人按付款计划表付款时，如承包人的实际进度比约定的目标进度落后30日及以上，发包人有权（）",[518,520,522,524],{"key":20,"text":519,"correct":22},"停止当期结算",{"key":24,"text":521,"correct":22},"自行调整付款计划表",{"key":27,"text":523,"correct":29},"与承包人商定减少当期付款额",{"key":31,"text":525,"correct":22},"与承包人协商抵减合同总额",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},898218,"(2015年)关于建设工程施工合同索赔，下列说法中正确的是( )",[530,532,534,536],{"key":20,"text":531,"correct":22},"发包人可以在索赔事件发生后暂不通知承包人，待工程结算时一并处理",{"key":24,"text":533,"correct":22},"发包人向承包人提出索赔，承包人无权要求发包人补充提供索赔理由和证据",{"key":27,"text":535,"correct":29},"承包人在收到发包人的索赔资料后，未在规定时间内作出答复，视为该索赔事件成立",{"key":31,"text":537,"correct":22},"承包人未在索赔事件发生后的规定时间内发出索赔通知的，应免除发包人的一切责任",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},898219,"(2015年)关于建设工程总承包合同价款的支付，下列说法正确的是( )。",[542,544,546,548],{"key":20,"text":543,"correct":22},"预付款扣完后，由于工程尚未竣工，发包人可以不退还预付款保函",{"key":24,"text":545,"correct":29},"未约定预付款保函的，发包人在合同生效后规定时间内向承包人支付预付款金额",{"key":27,"text":547,"correct":22},"发包人延误付款，应自延误之日起按同期存款利率向承包人支付延期付款利息",{"key":31,"text":549,"correct":22},"发包人延误付款的，承包人有权直接暂停施工",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},898220,"(2016年)FIDIC施工合同条件规定，如果承包商不能按时收到业主的付款，承包商有权就未付款额收取延误支付期间的融资费。融资费计息方式是()。",[554,556,558,560],{"key":20,"text":555,"correct":22},"按星期计算单利",{"key":24,"text":557,"correct":22},"按星期计算复利",{"key":27,"text":559,"correct":22},"按月计算单利",{"key":31,"text":561,"correct":29},"按月计算复利",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},898221,"(2011年)根据《建设工程工程量清单计价规范》(GB50500-2008)，关于索赔时限的规定的说法，错误的是()。",[566,568,570,572],{"key":20,"text":567,"correct":22},",承包人应在确认引起索赔事件发生后28天内向发包人发出索赔通知",{"key":24,"text":569,"correct":22},"承包人应在确认引起索赔事件发生后42天内向发包人递交一份详细的索赔报告",{"key":27,"text":571,"correct":29},"对于具有连续影响的索赔事件，承包人应在该事件产生的影响结束后42天内，递交一份最终索赔报告",{"key":31,"text":573,"correct":22},"发包人在收到最终索赔报告的28天内未作答复即视为该索赔报告已经认可",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},898222,"(2013年)根据《建设项目工程总承包合同示范文本GF-2011-0216》，下列属于施工变更的是()。",[578,580,582,584],{"key":20,"text":579,"correct":22},"对配套工程系统的工艺调整",{"key":24,"text":581,"correct":29},"发包人要求增加的附加试验",{"key":27,"text":583,"correct":22},"对区域内基准控制点的调整",{"key":31,"text":585,"correct":22},"对实施赶工指令所作的调整",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},898223,"(2013年)根据《建设项目工程总承包合同示范文本GF-2011-0216》，下列说法正确的是()。",[590,592,594,596],{"key":20,"text":591,"correct":22},"预付款支付的时间和额度在通用条款中约定",{"key":24,"text":593,"correct":22},"预付款抵扣完后，承包人应及时向发包人退还预付款保函",{"key":27,"text":595,"correct":22},"发包人延误付款20天以上经催告仍不付款的，承包人即可停工",{"key":31,"text":597,"correct":29},"合同解除发包人有权要求承包人支付尚未扣完的预付款",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},898224,"(2013年)国际工程中，当承包商提交书面结清单后的一定期限内，由工程师向业主发出的证书是()。",[602,604,605,607],{"key":20,"text":603,"correct":22},"期中支付证书",{"key":24,"text":453,"correct":29},{"key":27,"text":606,"correct":22},"履约证书",{"key":31,"text":447,"correct":22},{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":31,"analysis":33},898225,"(2014年)在FIDIC合同条件中，工程是确认用于永久工程的材料和设备符合预支条件，在确定其实际费用后，其中支付证书中应增加改费用的（）作为工程材料和预备预支款。",[612,613,614,616],{"key":20,"text":175,"correct":22},{"key":24,"text":177,"correct":22},{"key":27,"text":615,"correct":22},"70%",{"key":31,"text":617,"correct":29},"80%",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]