[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,7,50,2160,[13,34,46,58,70,82,94,104,113,125,137,149,161,173,185,195,205,217,229,241,253,265,277,289,301,313,325,337,349,361,373,385,397,409,421,433,445,457,467,479,491,503,513,525,537,549,561,573,585,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},898112,1,"单选题","(2015年)关于世界银行贷款项目采用国际竞争性招标，下列说法中正确的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","借款人向世界银行送交总采购通告的时间，最晚不应迟于公开发售招标文件前90天",false,{"key":24,"text":25,"correct":22},"B","一个项目的具体采购合同是否需要资格预审，由借款人自主决定",{"key":27,"text":28,"correct":29},"C","未进行资格预审的，评标后应对标价最低并拟授予合同的投标人进行资格定审",true,{"key":31,"text":32,"correct":22},"D","招标文件公开发售前，无需得到世界银行的意见","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},898113,"(2015年)按照世界银行有关规定进行的国际竞争性招标，在中标人确定后还应进行合同谈判。下列主题中属于合同谈判内容的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"合同价格的优惠",{"key":24,"text":41,"correct":22},"合同双方的权利和义务",{"key":27,"text":43,"correct":29},"合同标的物数量增减引起的价格变化",{"key":31,"text":45,"correct":22},"投标人承担技术规格书中设有规定的额外任务",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},898114,"(2013年)工程总承包的投标文件中应包含的内容是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"地下管线资料、气象和水文观测资料",{"key":24,"text":53,"correct":22},"定位放线的基准点和基准标高",{"key":27,"text":55,"correct":22},"经审批的规划许可证",{"key":31,"text":57,"correct":29},"承包人建议书",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},898115,"(2013年)工程总承包项目通常比较复杂，其投标有效期一般为()天",[62,64,66,68],{"key":20,"text":63,"correct":22},"60",{"key":24,"text":65,"correct":22},"90",{"key":27,"text":67,"correct":29},"120",{"key":31,"text":69,"correct":22},"150",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},898116,"(2013年)关于国际工程招标，下列说法中正确的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"投交标书的方式须加以限制，如规定必须寄交某邮政信箱以免延误",{"key":24,"text":77,"correct":22},"开标时若标书未附投标保证金则拒绝开启",{"key":27,"text":79,"correct":22},"开标时允许投标人提问但不允许录音",{"key":31,"text":81,"correct":29},"采用“两个信封制度”的，技术上不符合要求的标书则第二个信封不再开启",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},898117,"(2014年)管理者不直接与承包人签订合同，但委托监督承包人履行合同的工程总承包方式是（）",[86,88,90,92],{"key":20,"text":87,"correct":22},"EPC总承包",{"key":24,"text":89,"correct":22},"交钥匙总承包",{"key":27,"text":91,"correct":22},"设计-采购总承包",{"key":31,"text":93,"correct":29},"工程项目管理总承包",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},898118,"(2015年)总承包企业不仅承包工程项目的建设实施任务，而且提供建设项目的前期工作和运营准备工作的综合任务，该类总承包合同的类型是( )。",[98,100,101,103],{"key":20,"text":99,"correct":22},"设计采购施工总承包",{"key":24,"text":89,"correct":29},{"key":27,"text":102,"correct":22},"设计—施工总承包",{"key":31,"text":93,"correct":22},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},898119,"(2015年)根据《标准设计施工总承包招标文件》，除投标人须知前附表另有规定外，工程总承包招标的投标有效期为()天。",[108,109,110,111],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":29},{"key":31,"text":112,"correct":22},"180",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":20,"analysis":33},898120,"(2015年)工程总承包投标报价成本分析过程中，被归为公司本部费用的是( )。",[117,119,121,123],{"key":20,"text":118,"correct":29},"勘察设计费",{"key":24,"text":120,"correct":22},"施工费用",{"key":27,"text":122,"correct":22},"分包合同费用",{"key":31,"text":124,"correct":22},"调试、开车服务费",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":24,"analysis":33},898121,"(2016年)关于工程总承包投标报价中的标高金，下列说法中正确的是()。",[129,131,133,135],{"key":20,"text":130,"correct":22},"标高金分析首先应对风险进行评估",{"key":24,"text":132,"correct":29},"标高金分析应进行价值增值分析",{"key":27,"text":134,"correct":22},"标高金中不包括利润和风险费",{"key":31,"text":136,"correct":22},"标高金中的管理费主要指公司本部费用",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":27,"analysis":33},898122,"(2016年)国际工程投标报价中，若将分包费列入直接费，则对分包商的管理费通常应列入()中。",[141,143,145,147],{"key":20,"text":142,"correct":22},"直接费",{"key":24,"text":144,"correct":22},"分包费",{"key":27,"text":146,"correct":29},"间接费",{"key":31,"text":148,"correct":22},"暂定金额",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":31,"analysis":33},898123,"(2018年)国内派出参与国际工程的工人工资构成中应包括（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"国内标准工资，不包括国内附加工资和补贴",{"key":24,"text":156,"correct":22},"国内、国际差旅费，不包括派出工人的企业收取的管理费",{"key":27,"text":158,"correct":22},"按当地市场预测的工资预涨费",{"key":31,"text":160,"correct":29},"按当地工人保险费标准计算的保险费",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},898124,"(2018年)工程总承包投标人进行标高金报价决策时，首先要进行的工作是（ ）",[165,167,169,171],{"key":20,"text":166,"correct":22},"对风险进行评估",{"key":24,"text":168,"correct":29},"价值增值分析",{"key":27,"text":170,"correct":22},"选择合理的风险费率",{"key":31,"text":172,"correct":22},"进行成本分析",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},898125,"(2018年)工程总承包的签约合同价中不包括暂估价，且发包人在价格清单中给定暂估价的专业工程依法必须招标的，该专业工程应由（ ）招标确定分包人。",[177,179,181,183],{"key":20,"text":178,"correct":22},"项目主管部门",{"key":24,"text":180,"correct":22},"发包人",{"key":27,"text":182,"correct":22},"承包人",{"key":31,"text":184,"correct":29},"发包人和承包人",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},898126,"（2019年真题）国际工程分包费与直接费、间接费平行并列时，总包商对分包商的管理费应列入（ ）。",[189,190,191,193],{"key":20,"text":146,"correct":22},{"key":24,"text":144,"correct":29},{"key":27,"text":192,"correct":22},"盈余",{"key":31,"text":194,"correct":22},"上级单位管理费",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},898127,"（2019年真题）下列工程总承包类型中，总承包商需要履行试运行工作职责的是（ ）",[199,200,202,204],{"key":20,"text":99,"correct":29},{"key":24,"text":201,"correct":22},"设计-施工总承包",{"key":27,"text":203,"correct":22},"采购-施工总承包",{"key":31,"text":91,"correct":22},{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":31,"analysis":33},898128,"（2019年真题）国际工程投标报价时，对于当地采购的材料，其单价应为（）",[209,211,213,215],{"key":20,"text":210,"correct":22},"市场价格+运杂费",{"key":24,"text":212,"correct":22},"市场价格+运杂费+运输保管损耗费",{"key":27,"text":214,"correct":22},"市场价格+运杂费+采购保管费",{"key":31,"text":216,"correct":29},"市场价格+运杂费+采购保管费+运输保管损耗费",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":27,"analysis":33},898132,"(2013年)因不可抗力造成的损失，应由承包人承担的情形是()。",[221,223,225,227],{"key":20,"text":222,"correct":22},"因工程损害导致第三方财产损失",{"key":24,"text":224,"correct":22},"运至施工场地用于施工的材料的损害",{"key":27,"text":226,"correct":29},"承包人的停工损失",{"key":31,"text":228,"correct":22},"工程所需清理费用",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},898133,"(2014年)施工合同履行期间，关于计日工费用的处理，下列说法中正确的是（）",[233,235,237,239],{"key":20,"text":234,"correct":29},"已招标价工程量清单中无某项计日工单价时候，应按工程变更有关规定商定计日工单价",{"key":24,"text":236,"correct":22},"承包人通知发包人以计日方式实施的零量工作，双方应按计日工方式予以结算",{"key":27,"text":238,"correct":22},"现场签证的计日工数量与招标工程量清单中所列不同时，应按工程变更有关规定进行价款调整",{"key":31,"text":240,"correct":22},"施工各期间发生的计日工费用应在竣工结算时一并支付",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":20,"analysis":33},898134,"(2015年)某建筑工程钢筋综合用量1000t。施工合同中约定，结算时对钢筋综合价格涨幅5%以上部分依据造价处发布的基准价调整价格差额。承包人投标报价2400元\u002Ft，投标期、施工期间造价管理机构发布的钢筋综合基准价格为2500元\u002Ft、2800元\u002Ft，则需调增钢筋材料费用为( )万元。",[245,247,249,251],{"key":20,"text":246,"correct":29},"17.5",{"key":24,"text":248,"correct":22},"28.0",{"key":27,"text":250,"correct":22},"30.0",{"key":31,"text":252,"correct":22},"40.0",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":27,"analysis":33},898135,"(2016年)根据《建设工程工程量清单计价规范》（GB50500--2013），当实际增加的工程量超过清单工程量15%以上，且造成按总价方式计价的措施项目发生变化的，应将()。",[257,259,261,263],{"key":20,"text":258,"correct":22},"综合单价调高，措施项目调增",{"key":24,"text":260,"correct":22},"综合单价调高，措施项目调减",{"key":27,"text":262,"correct":29},"综合单价调低，措施项目调增",{"key":31,"text":264,"correct":22},"综合单价调低，措施项目调减",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},898136,"(2014年)某工程施工合同约定采用价格指数法调整合同价款，各项费用权重及价格如表所示。已知该工程9月份完成的工程合同价款为3000万元，则9月份合同价款调整金额为（）万元。",[269,271,273,275],{"key":20,"text":270,"correct":22},"22.5",{"key":24,"text":272,"correct":22},"61.46",{"key":27,"text":274,"correct":22},"75",{"key":31,"text":276,"correct":29},"97.5",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":27,"analysis":33},898137,"(2016年)当施工机械停工导致费用索赔成立时，台班停滞费用正确的计算方法是()。",[281,283,285,287],{"key":20,"text":282,"correct":22},"按照机械设备台班费计算",{"key":24,"text":284,"correct":22},"按照台班费中的设备使用费计算",{"key":27,"text":286,"correct":29},"台班折旧费、人工费与其他费之和计算",{"key":31,"text":288,"correct":22},"租赁设备按照台班租金计算",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},898138,"(2013年)对于实行招标的建设工程，因法律法规政策变化引起合同价款调整的，调价基准日期一般为()。",[293,295,297,299],{"key":20,"text":294,"correct":22},"施工合同签订前的第28天",{"key":24,"text":296,"correct":29},"提交投标文件的截止时间前的第28天",{"key":27,"text":298,"correct":22},"施工合同签订前的第56天",{"key":31,"text":300,"correct":22},"提交投标文件截止时间前的第56天",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},898139,"(2013年)由于发包人原因导致工期延误的，对于计划进度日期后续施工的工程，在使用价格调整公式时，现行价格指数应采用()。",[305,307,309,311],{"key":20,"text":306,"correct":22},"计划进度日期的价格指数",{"key":24,"text":308,"correct":22},"实际进度日期的价格指数",{"key":27,"text":310,"correct":22},"A和B中较低者",{"key":31,"text":312,"correct":29},"A和B中较高者",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},898140,"(2013年)关于共同延误的处理原则，下列说法中正确的是()。",[317,319,321,323],{"key":20,"text":318,"correct":22},"初始延误者负主要责任，并发延误者负次要责任",{"key":24,"text":320,"correct":22},"初始延误者属发包人原因的，承包人可得工期补偿，但无经济补偿",{"key":27,"text":322,"correct":29},"初始延误者属客观原因的，承包人可得工期补偿，但很难得到费用补偿",{"key":31,"text":324,"correct":22},"初始延误者属发包人原因的，承包人可获得工期和费用补偿，但无利润补偿",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},898141,"(2013年)根据规定，因工程量偏差引起的可以调整措施项目费的前提是()。",[329,331,333,335],{"key":20,"text":330,"correct":22},"合同工程量偏差超过15%",{"key":24,"text":332,"correct":29},"合同工程量偏差超过15%，且引起措施项目相应变化",{"key":27,"text":334,"correct":22},"措施项目工程量超过10%",{"key":31,"text":336,"correct":22},"措施项目工程量超过10%，且引起施工方案发生变化",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},898142,"(2013年)某施工现场有塔吊1台，由施工企业租得，台班单价5000元台班，租赁费为2000元／台班。人工工资为80元／工日，窝工补贴25元／工日，以人工费和机械费合计为计算基础的综合费率为30%，在施工过程中发生了如下事件：监理人对已经覆盖的隐蔽工程要求重新检查且检查结果合格，配合用工10工日，塔吊1台班，为此，施工企业可向业主索赔的费用为()元。",[341,343,345,347],{"key":20,"text":342,"correct":22},"2250",{"key":24,"text":344,"correct":22},"2925",{"key":27,"text":346,"correct":22},"5800",{"key":31,"text":348,"correct":29},"7540",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},898143,"(2014年)为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日。对于实行招标的建设工程，一般以（）前的第28\u002F天作为基准日",[353,355,357,359],{"key":20,"text":354,"correct":29},"投标截止时间",{"key":24,"text":356,"correct":22},"招标截止日",{"key":27,"text":358,"correct":22},"中标通知书发出",{"key":31,"text":360,"correct":22},"合同签订",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},898144,"(2014年)关于招标工程量清单缺项、漏项的处理，下列说法中正确的是（）",[365,367,369,371],{"key":20,"text":366,"correct":22},"工程量清单缺项、漏项及计算错误带来的风险由发承包双方共同承担",{"key":24,"text":368,"correct":29},"分部分项工程量清单漏项造成新增工程量的，应按变更事件的有关方法调整合同价款",{"key":27,"text":370,"correct":22},"分部分项工程量清单缺项引起措施项目发生变化的，应按与分部分项工程相同的方法进行调整",{"key":31,"text":372,"correct":22},"招标工程量清单中措施工项目缺项，招标人在投标时未予以填报的，合同实施期间不予增加",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},898145,"(2014年)下列在施工合同履行期间由不可抗力造成的损失中，应有承包人承担的是（）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"因工程损害导致的第三方人员伤亡",{"key":24,"text":380,"correct":29},"因工程损害导致的承包人人员伤亡",{"key":27,"text":382,"correct":22},"工程设备的损害",{"key":31,"text":384,"correct":22},"应监理人要求承包人照管工程的费用",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},898146,"(2014年)某工程合同价格为5000万元，计划工期是200天，施工期间因非承包人原因导致工期延误10天，若同期该公司承揽的所有工程合同总价为2.5亿元，计划总部管理费为1250万元，则承包人可以索赔的总部管理费为（）万元。",[389,391,393,395],{"key":20,"text":390,"correct":22},"7.5",{"key":24,"text":392,"correct":22},"10",{"key":27,"text":394,"correct":29},"12.5",{"key":31,"text":396,"correct":22},"15",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},898147,"(2014年)工程在施工合同履行期间发生共同延误事件，正确的处理方式是（）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"按照延误时间的长短，由责任方共同分担延误带来的损失",{"key":24,"text":404,"correct":22},"发包人是初始延误者，承包人可得到工期和费用补偿，但得不到利润补偿",{"key":27,"text":406,"correct":22},"承包人是初始延误者，承包人只能得到工期补偿，但得不到费用补偿",{"key":31,"text":408,"correct":29},"客观原因造成的初始延误，承包人可得到工期补偿，但很难得到费用补偿",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},898148,"(2015年)对某招标工程进行报价分析，在不考虑安全文明施工费的前提下，承包人中标价为1500万元，招标控制价为1600万元，设计院编制的施工图预算为1550万元，承包人认为的合理报价值为1540万元，则承包人的报价浮动率是( )。",[413,415,417,419],{"key":20,"text":414,"correct":22},"0.65%",{"key":24,"text":416,"correct":29},"6.25%",{"key":27,"text":418,"correct":22},"93.75%",{"key":31,"text":420,"correct":22},"96.25%",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},898149,"(2015年)关于施工合同履行过程中暂估价的确定，下列说法中正确的是()。",[425,427,429,431],{"key":20,"text":426,"correct":22},"不属于依法必须招标的材料，以承包人自行采购的价格取代暂估价",{"key":24,"text":428,"correct":29},"属于依法必须招标的暂估价设备，由发承包双方以招标方式选择供应商，以中标价取代暂估价",{"key":27,"text":430,"correct":22},"不属于依法必须招标的暂估价专业工程，不应按工程变更确定工程价款而应另行签订补充协议确定工程价款",{"key":31,"text":432,"correct":22},"属于依法必须招标的暂估价专业工程，承包人不得参加招标",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},898150,"(2015年)根据《标准施工招标文件》（2007年版）的合同通用条件，承包人通常只能获得费用补偿，但不能得到利润补偿和工期顺延的事件是( )。",[437,439,441,443],{"key":20,"text":438,"correct":22},"施工中遇到不利物质条件",{"key":24,"text":440,"correct":22},"因发包人的原因导致工程试运行失败",{"key":27,"text":442,"correct":22},"发包人更换其提供的不合格材料",{"key":31,"text":444,"correct":29},"基准日后法律的变化",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},898151,"(2016年)施工合同中约定，承包人承担的钢筋价格风险幅度为±5%，超出部分依据《建设工程工程量清单计价规范》（GB50500--2013）造价信息法调差。已知承包人投标价格、基准期发布价格分别为2400元\u002Ft、2200元\u002Ft，2015年12月、2016年7月的造价信息发布价为2000元\u002Ft，2600元\u002Ft。则该两月钢筋的实际结算价格应分别为()元\u002Ft。",[449,451,453,455],{"key":20,"text":450,"correct":22},"2280，2520",{"key":24,"text":452,"correct":22},"2310，2690",{"key":27,"text":454,"correct":29},"2310，2480",{"key":31,"text":456,"correct":22},"2280，2480",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},898152,"(2016年)根据《招标施工招标文件》（2007年版）通用合同条款，承包人最有可能同时获得工期、费用和利润补偿的索赔事件是()。",[461,462,463,465],{"key":20,"text":444,"correct":22},{"key":24,"text":442,"correct":22},{"key":27,"text":464,"correct":22},"发包人提前向承包人提供工程设备",{"key":31,"text":466,"correct":29},"发包人在工程竣工前占用工程",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},898153,"(2016年)某工程施工过程中发生如下事件：①因异常恶劣气候条件导致工程停工2天，人员窝工20个工日；②遇到不利地质条件导致工程停工1天，人员窝工10个工日，处理不利地质条件用工15个工日。若人工工资为200元\u002F工日，窝工补贴为100元\u002F工日，不考虑其他因素。根据《标准施工招标文件》（2007年版）通用合同条款，施工企业可向业主索赔的工期和费用分别是()。",[471,473,475,477],{"key":20,"text":472,"correct":22},"3天，6000元",{"key":24,"text":474,"correct":22},"1天，3000元",{"key":27,"text":476,"correct":29},"3天，4000元",{"key":31,"text":478,"correct":22},"1天，4000元",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},898154,"(2016年)采用网络图分析法处理可原谅延期，下列说法中正确的是()。",[483,485,487,489],{"key":20,"text":484,"correct":22},"只有在关键线路上的工作延误，才能索赔工期",{"key":24,"text":486,"correct":22},"非关键线路上的工作延误，不应索赔工期",{"key":27,"text":488,"correct":29},"如延误的工作为关键工作，则延误的时间为工期索赔值",{"key":31,"text":490,"correct":22},"该方法不适用于多种干扰事件共同作用所引起的工期索赔",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},898155,"（2017年考题）某分项工程招标工程量清单数量为 4000㎡，施工中由于设计变更调减为 3000㎡，该项目招标控制价综合单价为 600元\u002F㎡，投标报价为 450元\u002F㎡。合同约定实际工程量与招标工程量偏差超过±15%时，综合单价以招标控制价为基础调整。若承包人报价浮动率为 10%，该分项工程费结算价为（ ）万元。",[495,497,499,501],{"key":20,"text":496,"correct":29},"137.70",{"key":24,"text":498,"correct":22},"155.25",{"key":27,"text":500,"correct":22},"186.30",{"key":31,"text":502,"correct":22},"207.00",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},898156,"(2018年)某工程进度计划网络图上的工作X（在关键线路上）与工作Y（在非关键线路上）同时受到异常恶劣气候条件的影响，导致X 工作延误10 天，Y 工作延误35 天，该气候条件未对其他工作造成影响，若Y 工作的自由时差为20 天，则承包人可以向发包人索赔的工期是（ ）天。",[507,508,509,511],{"key":20,"text":392,"correct":29},{"key":24,"text":396,"correct":22},{"key":27,"text":510,"correct":22},"25",{"key":31,"text":512,"correct":22},"35",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},898157,"(2018年)根据《标准施工招标文件》（2007 年版）通用合同条款，下列引起承包人索赔的事件中，只能获得费用补偿的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":29},"发包人提前向承包人提供材料、工程设备",{"key":24,"text":520,"correct":22},"因发包人提供的材料、工程设备造成工程不合格",{"key":27,"text":522,"correct":22},"发包人在工程竣工前提前占用工程",{"key":31,"text":524,"correct":22},"异常器劣的气候条件，导致工期延误",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":27,"analysis":33},898158,"(2018年)因不可抗力造成的下列损失，应由承包人承担的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"工程所需清理、修复费用",{"key":24,"text":532,"correct":22},"运至施工场地待安装设备的损失",{"key":27,"text":534,"correct":29},"承包人的施工机械设备损坏及停工损失",{"key":31,"text":536,"correct":22},"停工期间，发包人要求承包人留在工地的保卫人员费用",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},898159,"(2018年)发包人在招标工程量清单中给定某工程设备暂估价，下列关于该工程设备价款调整的说法正确的是（ ）",[541,543,545,547],{"key":20,"text":542,"correct":22},"依法可不招标的项目，应由发包人组织采购，以采购价格取代暂估价",{"key":24,"text":544,"correct":29},"依法可不招标的项目，应由承包人按合同约定采购，以发包人确认后的价格取代暂估价",{"key":27,"text":546,"correct":22},"依法必须招标的项目，应由发包人招标选择供应商，以中标价格取代暂估价",{"key":31,"text":548,"correct":22},"依法必须招标的项目，应由承包人招标选择供应商，以中标价格取代暂估价",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},898160,"(2018年)某项目施工合同约定，承包人承担的水泥价格风险幅度为±5%，超出部分采用造价信息法调差，已知投标人投标价格、基准期发布价格为440 元\u002Ft、450 元\u002Ft，2018 年3 月的造价信息发布价为430 元\u002Ft，则该月水泥的实际结算价格为（ ）元\u002Ft。",[553,555,557,559],{"key":20,"text":554,"correct":22},"418",{"key":24,"text":556,"correct":22},"427.5",{"key":27,"text":558,"correct":22},"430",{"key":31,"text":560,"correct":29},"440",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},898161,"(2018年)关于计日工费用的确认和支付，下列说法正确的是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":29},"承包人应按照确认的计日工现场签证报告提出计日工项目的数量",{"key":24,"text":568,"correct":22},"发包人应根据已标价工程量清单中的工程数量和计日工单价确定应付价款",{"key":27,"text":570,"correct":22},"已标价工程量清单中没有计日工单价的，由发包人确定价格",{"key":31,"text":572,"correct":22},"已标价工程量清单中没有计日工单价的，由承包人确定价格",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":27,"analysis":33},898162,"(2018年)关于法规变化类合同价款的调整，下列说法正确的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"不实行招标的工程，一般以施工合同签订前的第42 天为基准日",{"key":24,"text":580,"correct":22},"基准日之前国家颁布的法规对合同价款有影响的，应予调整",{"key":27,"text":582,"correct":29},"基准日之后国家政策对材料价格的影响，如已包含在物价波动调价公式中不再予以考虑",{"key":31,"text":584,"correct":22},"承包人原因导致的工期延误期间，国家政策变化引起工程造价变化的，合同价款不予调整",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},898163,"(2018年)某施工合同中的工程内容由主体工程与附属工程两部分组成，两部分工程的合同额分别为800万元知200万元。合同中对误期赔偿费的约定是：每延误一个日历天应赔偿2万元，且总赔偿费不超过合同总价款的5%.该工程主体工程按期通过竣工验收，附属工程延误30日历天后通过竣工验收，则该工程的误期赔偿费为（ ）万元。",[589,590,592,594],{"key":20,"text":392,"correct":29},{"key":24,"text":591,"correct":22},"12",{"key":27,"text":593,"correct":22},"50",{"key":31,"text":63,"correct":22},{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},898164,"（2019年真题）某施工现场主导施工机械一台，由承包人租得，施工合同约定，当发生索赔事件时，施工机械台班单价、租赁费分别按900元\u002F台班、400元\u002F台班计；人工工资、窝工费分别按100元\u002F工日、50元\u002F工日计，以人工费与机械费之和为基数的综合费率为30%，在施工过程中，发生如下事件：①出现异常恶劣天气导致工程停工2天，人员窝工20个工日；②因恶劣天气导致工程修复用工10个工日，主导小机械1个台班，为此承包人可向发包人索赔的费用为（）元",[599,601,603,605],{"key":20,"text":600,"correct":22},"1820",{"key":24,"text":602,"correct":29},"2470",{"key":27,"text":604,"correct":22},"2820",{"key":31,"text":606,"correct":22},"3470",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]