[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,6,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,378,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},898052,1,"单选题","(2016年)关于招标控制价的相关规定，下列说法中正确的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","国有资金投资的工程建设项目，应编制招标控制价",true,{"key":24,"text":25,"correct":26},"B","招标控制价应在招标文件中公布，仅需公布总价",false,{"key":28,"text":29,"correct":26},"C","招标控制价超过批准概算3%以内时，招标人不必将其报原概算审核部门审核",{"key":31,"text":32,"correct":26},"D","当招标控制价复查结论超高原公布的招标控制价3%以内时，应责成招标人改正","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},898053,"(2016年)招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"专业工程估算造价",{"key":24,"text":41,"correct":26},"投标报价总额",{"key":28,"text":43,"correct":26},"分部分项工程费用",{"key":31,"text":45,"correct":26},"分部分项工程费与措施费之和",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},898054,"(2018年)根据《建设工程工程量清单计价规范》(GB50500-2013)中对招标控制价的相关规定，下列说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"招标控制价公布后根据需要可以上浮或下调",{"key":24,"text":53,"correct":26},"招标人可以只公布招标控制价总价，也可以只公布单价",{"key":28,"text":55,"correct":26},"招标控制价可以在招标文件中公布，也可以在开标时公布",{"key":31,"text":57,"correct":22},"高于招标控制价的投标报价应被拒绝",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},898055,"(2018年)根据《建设工程工程量清单计价规范》(GB 50500-2013)，关于招标工程量清单中暂列金额的编制，下列说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"应详列其项目名称、计量单位，不列明金额",{"key":24,"text":65,"correct":26},"应列明暂定金额总额，不详列项目名称等",{"key":28,"text":67,"correct":22},"不同专业预留的暂列金额应分别列项",{"key":31,"text":69,"correct":26},"没有特殊要求一般不列暂列金额",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},898056,"(2018年)关于工程量清单“量价分离”和“风险分担”的编制原则，下列说法正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"招标人对已标价工程量清单中各分部分项工程量的准确性和完整性负责",{"key":24,"text":77,"correct":26},"招标人对已标价工程量清单中措施项目工程量的准确性和完整性负责",{"key":28,"text":79,"correct":26},"投标人对已标价工程量清单中各分部分项工程量的准确性和完整性负责",{"key":31,"text":81,"correct":26},"投标人对已标价工程量清单中措施项目工程量的准确性和完整性负责",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},898057,"(2018年)关于施工招标文件的疑问和澄清，下列说法正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"投标人可以口头方式提出疑问",{"key":24,"text":89,"correct":26},"投标人不得在投标截止前的15 天内提出疑问",{"key":28,"text":91,"correct":26},"投标人收到澄清后的确认时间应按绝对时间设置",{"key":31,"text":93,"correct":22},"招标文件的书面澄清应发给所有投标人",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},898058,"（2019年真题）依据工程所在地区颁发的计价定额等编制最高投标限价、进行分项工程综合单价组价时,首先应确定的是（ ）",[98,100,102,104],{"key":20,"text":99,"correct":26},"风险范围与幅度",{"key":24,"text":101,"correct":26},"工程造价信息确定的人工单价等",{"key":28,"text":103,"correct":22},"定额项目名称及工程量",{"key":31,"text":105,"correct":26},"管理费率和利润率",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},898059,"（2019年真题）关于工程量清单中分部分项工程量清单的编制,下列说法正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"所列项目应该是施工过程中以其本身构成工程实体的分项工程或可以精确计量的措施分项项目",{"key":24,"text":113,"correct":26},"拟建施工图纸有体现，但专业工程量计算规范附录中没有相对应项目的，则必须编制这些分项工程的补充项目",{"key":28,"text":115,"correct":22},"补充项目的工程量计算规则，应符合“计算规则要具有可计算性”且“计算结果要具有唯一性”的原则",{"key":31,"text":117,"correct":26},"采用标准图集的分项工程，其特征描述应直接采用“详见××图集”方式",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},898060,"（2019年真题）关于编制最高投标限价总承包服务费的可参考标准，下列说法正确的是",[122,124,126,128],{"key":20,"text":123,"correct":26},"招标人仅要求对分包专业工程进行总承包管理和协调时，按分包专业工程估算造价的0.5%计算",{"key":24,"text":125,"correct":26},"招标人仅要求对分包专业工程进行总承包管理和协调时，按分包专业工程估算造价的1%计算",{"key":28,"text":127,"correct":26},"招标人要求对分包专业工程进行总承包管理和协调，且要求提供配合服务时，按分包专业工程估算造价的1%~3%计算",{"key":31,"text":129,"correct":22},"招标人要求对分包专业工程进行总承包管理和协调，且要求提供配合服务时，按分包专业工程估算造价的3%~5%计算",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},898061,"（2019年真题）投标报价时，投标人需严格按照招标人所列项目明细进行自主报价的是（ ）",[134,136,138,140],{"key":20,"text":135,"correct":26},"总价措施项目",{"key":24,"text":137,"correct":26},"专业工程暂估价",{"key":28,"text":139,"correct":22},"计日工",{"key":31,"text":141,"correct":26},"规费",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},898067,"(2010年)投标人针对工程量清单中工程量的遗漏或错误，可以采取的正确做法是()。",[146,148,150,152],{"key":20,"text":147,"correct":26},"即向招标人提出异议，要求招标人修改",{"key":24,"text":149,"correct":26},"不向招标人提出异议，风险自留",{"key":28,"text":151,"correct":22},"是否向招标人提出修改意见取决于投标策略",{"key":31,"text":153,"correct":26},"等中标后，要求招标人按实调整",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},898068,"(2014年)施工投标报价的主要工作有：①复核工程量，②研究招标文件，③确定基础标价，④编制投标文件，其正确的工作流程是（）",[158,160,162,164],{"key":20,"text":159,"correct":26},"①②③④",{"key":24,"text":161,"correct":26},"②③①④",{"key":28,"text":163,"correct":26},"①②④③",{"key":31,"text":165,"correct":22},"②①③④",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},898069,"(2016年)根据《建设工程工程量清单计价规范》（GB50500--2013），允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是()。",[170,172,174,176],{"key":20,"text":171,"correct":26},"分部分项工程量清单",{"key":24,"text":173,"correct":22},"措施项目清单",{"key":28,"text":175,"correct":26},"暂列金额",{"key":31,"text":139,"correct":26},{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},898070,"(2016年)施工项目投标报价的工作包括：①收集投标信息；②选择报价策略；③组建投标班子；④确定基础标价；⑤确定投标报价；⑥研究招标文件，以上工作正确的先后顺序是()。",[181,183,185,187],{"key":20,"text":182,"correct":26},"⑥①③②④⑤",{"key":24,"text":184,"correct":22},"③⑥①④②⑤",{"key":28,"text":186,"correct":26},"③①⑥②④⑤",{"key":31,"text":188,"correct":26},"⑥③①④②⑤",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},898071,"(2014年)投标人为使报价具有竞争力，下列有关生产要素询价的做法中，正确的是（）",[193,195,197,199],{"key":20,"text":194,"correct":26},"在通过资格预审前进行询价",{"key":24,"text":196,"correct":22},"尽量向咨询公司进行询价",{"key":28,"text":198,"correct":26},"不论何时何地尽量使用自有机械",{"key":31,"text":200,"correct":26},"劳务市场招募零散工有利于管理",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},898072,"(2010年)工程量清单计价模式下，确定分部分项工程单价的工作包括：①分析各清单项目的工程内容，②确定计算基础，③计算人工、材料、机械费用，④计算工程内容的工程量与清单单位含量，⑤计算综合单价。对上述工作先后顺序的排列，正确的是()。",[205,207,209,211],{"key":20,"text":206,"correct":26},"①②④⑤③",{"key":24,"text":208,"correct":22},"②①④③⑤",{"key":28,"text":210,"correct":26},"①②④⑧⑤",{"key":31,"text":212,"correct":26},"②①④⑤③",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},898073,"(2013年)关于投标保证金，下列说法中正确的是()。",[217,219,221,223],{"key":20,"text":218,"correct":26},"投标保证金的数额不得少于投标总价的2%",{"key":24,"text":220,"correct":26},"招标人应当在签订合同后的30日内退还未中标人的投标保证金",{"key":28,"text":222,"correct":26},"投标人拒绝延长投标有效期的，投标人无权收回其投标保证金",{"key":31,"text":224,"correct":22},"投标保证金的有效期应与投标有效期相同",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},898074,"(2013年)下列情形中，属于投标人相互串通投标的是()。",[229,231,233,235],{"key":20,"text":230,"correct":26},"不同投标人的投标报价呈现规律性差异",{"key":24,"text":232,"correct":26},"不同投标人的投标文件由同一单位或个人编制",{"key":28,"text":234,"correct":26},"不同投标人委托了同一单位或个人办理某项投标事宜",{"key":31,"text":236,"correct":22},"投标人之间约定中标人",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},898075,"(2014年)对于其他项目中的计日工，投标人正确的报价方式是（）",[241,243,245,247],{"key":20,"text":242,"correct":26},"按政策规定标准估算报价",{"key":24,"text":244,"correct":26},"按招标文件提供的金额报价",{"key":28,"text":246,"correct":22},"自主报价",{"key":31,"text":248,"correct":26},"待签证时报价",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},898076,"(2014年)关于工程量清单方式招标工程合同价格风险及风险分担，下列说法中正确的是（）",[253,255,257,259],{"key":20,"text":254,"correct":22},"当出现的风险内容及幅度在招标文件规定的范围内时，综合单价不变",{"key":24,"text":256,"correct":26},"市场价格波动导致施工机具使用费发生变化时，承包人只承担5%以内的价格风险",{"key":28,"text":258,"correct":26},"人工费变化发生的风险全部由发包人承担",{"key":31,"text":260,"correct":26},"承包人管理费的风险一般由发承包双方共同承担",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},898077,"(2015年)关于投标报价时综合单价的确定，下列做法中正确的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":22},"以项目特征描述为依据确定综合单价",{"key":24,"text":268,"correct":26},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":28,"text":270,"correct":26},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":31,"text":272,"correct":26},"消耗量指标的计算应以地区或行业定额为依据",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},898078,"(2015年)关于投标报价，下列说法中正确的是( )。",[277,279,281,283],{"key":20,"text":278,"correct":26},"总价措施项目由投标人自主报价",{"key":24,"text":280,"correct":26},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":28,"text":282,"correct":26},"暂估价依据询价情况填报",{"key":31,"text":284,"correct":22},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},898079,"(2016年)投标人在投标前期研究招标文件时，对合同形式进行分析的主要内容为()。",[289,291,293,295],{"key":20,"text":290,"correct":26},"承包商任务",{"key":24,"text":292,"correct":22},"计价方式",{"key":28,"text":294,"correct":26},"付款办法",{"key":31,"text":296,"correct":26},"合同价款调整",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},898080,"(2016年)投标人在投标报价时，应优先被采用为综合单价编制依据的是()。",[301,303,305,307],{"key":20,"text":302,"correct":22},"企业定额",{"key":24,"text":304,"correct":26},"地区定额",{"key":28,"text":306,"correct":26},"行业定额",{"key":31,"text":308,"correct":26},"国家定额",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},898081,"(2009年)某施工企业投标一城市基础设施项目，该企业报价为5000万元，则其应交的投标保证金最高数额为()万元。",[313,315,317,319],{"key":20,"text":314,"correct":26},"50",{"key":24,"text":316,"correct":22},"80",{"key":28,"text":318,"correct":26},"100",{"key":31,"text":320,"correct":26},"150",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},898082,"(2014年)下列情形中，不属于视为投标人相互串通投标的是（）",[325,327,329,331],{"key":20,"text":326,"correct":26},"投标人A与B的项目经理为同一人",{"key":24,"text":328,"correct":26},"投标人C与D的投标文件相互错装",{"key":28,"text":330,"correct":22},"投标人E和F在同一时刻提前递交投标文件",{"key":31,"text":332,"correct":26},"投标人G与H作为暗标的技术标由同一人编制",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},898083,"(2018年)招标工程量清单中某分部分项清单细目与单一计价定额子目的工作内容与计量规则一致，则确定该清单细目综合单价不可或缺的工作是（ ）",[337,339,341,343],{"key":20,"text":338,"correct":26},"计算工程内容的工程数量",{"key":24,"text":340,"correct":26},"计算工程内容的清单单位含量",{"key":28,"text":342,"correct":26},"计算措施项目的费用",{"key":31,"text":344,"correct":22},"计算管理费、利润和风险费用",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},898084,"(2018年)相较于在劳务市场招募零散劳动力，承包人选用成建制劳务公司的劳务具有（ ）的特点。",[349,351,353,355],{"key":20,"text":350,"correct":26},"价格低，管理强度低",{"key":24,"text":352,"correct":22},"价格高，管理强度低",{"key":28,"text":354,"correct":26},"价格低，管理强度高",{"key":31,"text":356,"correct":26},"价格高，管理强度高",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},898085,"(2018年)施工投标报价工作包括：①工程现场调查；②组建投标报价班子；③确定基础标价；④制订项目管理规划；⑤复核清单工程量。下列工作排序正确的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":26},"①④②③⑤",{"key":24,"text":364,"correct":26},"②③④①⑤",{"key":28,"text":366,"correct":26},"①②③④⑤",{"key":31,"text":368,"correct":22},"②①⑤④③",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},898086,"(2011年)某投标人在递交投标文件的同时，按规定递交了投标保证金，其投标总价为5000万元，则其投标保证金数额最高为()万元。",[373,374,375,376],{"key":20,"text":314,"correct":26},{"key":24,"text":316,"correct":26},{"key":28,"text":318,"correct":22},{"key":31,"text":377,"correct":26},"160",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},898087,"(2010年)某施工企业参加一市政道路工程投标，该企业的投标报价为6000万元，则其应交的投标保证金为()万元。",[382,384,386,387],{"key":20,"text":383,"correct":26},"30",{"key":24,"text":385,"correct":26},"60",{"key":28,"text":316,"correct":26},{"key":31,"text":388,"correct":22},"120",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":28,"analysis":33},898088,"(2018年)关于工程施工投标报价过程中的工程量的复核，下列说法正确的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"复核的准确程度不会影响施工方法的选用",{"key":24,"text":396,"correct":26},"复核的目的在于修改工程量清单中的工程量",{"key":28,"text":398,"correct":22},"复核有助于防止由于物资少购带来的停工待料",{"key":31,"text":400,"correct":26},"复核中发现的遗漏和错误须向招标人提出",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},898089,"（2019年真题）在投标报价确定分部分项工程综合单价时，应根据所选的计算基础计算工程内容的工程量，该数量应为（ ）",[405,407,409,411],{"key":20,"text":406,"correct":26},"实物工程量",{"key":24,"text":408,"correct":26},"施工工程量",{"key":28,"text":410,"correct":22},"定额工程量",{"key":31,"text":412,"correct":26},"复核的清单工程量",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},898090,"（2019年真题）投标人复核招标工程量清单时发现了遗漏,是否向招标人提出修改意见取决于（）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"招标文件规定是否允许提出增补",{"key":24,"text":420,"correct":26},"遗漏工程量的大小",{"key":28,"text":422,"correct":22},"投标人的投标策略",{"key":31,"text":424,"correct":26},"遗漏项目是否在工程量计算规范附录中有列项",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},898094,"(2014年)采用经评审的最低投标价法评标时，下列说法中正确的是（）",[429,431,433,435],{"key":20,"text":430,"correct":26},"经评审的最低投标价法通常采用百分制",{"key":24,"text":432,"correct":26},"具有通用技术的招标项目不宜采用经评审的最低投标价法",{"key":28,"text":434,"correct":26},"当出现经评审的投标价相等且报价也相等时，中标人由招标监管机构确定",{"key":31,"text":436,"correct":22},"采用经评审的最低投标价法工作结束时，应拟定“价格比较一览表”提交招标人",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},898095,"(2016年)下列评标时所遇情形中，评标委员会应当否决其投标的是()。",[441,443,445,447],{"key":20,"text":442,"correct":26},"投标文件中大写金额与小写金额不一致",{"key":24,"text":444,"correct":26},"投标文件总价金额与依据单价计算出的结果不一致",{"key":28,"text":446,"correct":22},"投标文件未经投标单位盖章和单位负责人签字",{"key":31,"text":448,"correct":26},"对不同文字文本投标文件的解释有异议的",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},898096,"(2016年)关于建设工程施工评标，下列说法中正确的是()。",[453,455,457,459],{"key":20,"text":454,"correct":26},"评标委员会按照公平、公正、公开的原则评标",{"key":24,"text":456,"correct":26},"评标委员会可以接受投标人主动提出的澄清",{"key":28,"text":458,"correct":22},"评标委员会可以要求投标人澄清投标文件疑问直至满足评标委员会的要求",{"key":31,"text":460,"correct":26},"评标委员会有权直接确定中标人",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},898097,"(2013年)关于经评审的最低投标价法的适用范围，下列说法中正确的是()。",[465,467,469,471],{"key":20,"text":466,"correct":26},"适用于资格后审而不适用于资格预审的项目",{"key":24,"text":468,"correct":26},"使用与依法必须招标的项目而不适用于一般项目",{"key":28,"text":470,"correct":22},"适用于具有通用技术性能标准或招标人对其技术、性能没有特殊要求的项目",{"key":31,"text":472,"correct":26},"适用于凡不宜采用综合评估法评审的项目",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},898098,"(2013年)关于合同价款与合同类型，下列说法正确的是()。",[477,479,481,483],{"key":20,"text":478,"correct":26},"招标文件与投标文件不一致的地方，以招标文件为准",{"key":24,"text":480,"correct":26},"中标人应当自中标通知书收到之日起30天内与招标人订立书面合同",{"key":28,"text":482,"correct":26},"工期特别近、技术特别复杂的项目应采用总价合同",{"key":31,"text":484,"correct":22},"实行工程量清单计价的工程，应采用单价合同",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},898099,"(2014年)招标工程未进行资格预审，评审委员会按规定对投标人安全生产许可证的有效性进行的评审属于（）",[489,491,493,495],{"key":20,"text":490,"correct":26},"形式评审",{"key":24,"text":492,"correct":22},"资格评审",{"key":28,"text":494,"correct":26},"响应性评审",{"key":31,"text":496,"correct":26},"商务评审",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},898100,"(2015年)关于依法必须招标工程中标候选人的公示，下列说法中正确的是( )。",[501,503,505,507],{"key":20,"text":502,"correct":26},"评标结果只能在交易场所公示",{"key":24,"text":504,"correct":22},"公示对象是全部中标候选人",{"key":28,"text":506,"correct":26},"公示对象是所有投标人",{"key":31,"text":508,"correct":26},"公示的内容包括各评分要素的得分",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},898101,"(2015年)关于施工招标工程的履约担保，下列说法中正确的是( )。",[513,515,517,519],{"key":20,"text":514,"correct":26},"中标人应在签订合同后向招标人提交履约担保",{"key":24,"text":516,"correct":26},"履约保证金不得超过中标合同金额的5%",{"key":28,"text":518,"correct":26},"招标人仅对现金形式的履约担保，向中标人提供工程款支付担保",{"key":31,"text":520,"correct":22},"发包人应在工程接收证书颁发后28天内将履约保证金退还给承包人",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},898102,"(2016年)某招标项目采用经评审的最低投标价法评标，招标文件规定对同时投多个标段的评标修正率为5%，投标人甲同时投标1#、2#标段，报价分别为5000万元、4000万元。若甲在1#标段中标，则其在2#标段的评标为()万元。",[525,527,529,531],{"key":20,"text":526,"correct":26},"3750",{"key":24,"text":528,"correct":22},"3800",{"key":28,"text":530,"correct":26},"4200",{"key":31,"text":532,"correct":26},"4250",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},898103,"（2017 年考题）我国某世界银行货款项目采用经评审的最低投标价法评标，招标文件规定借款国內投标人有 7.5%的评标优惠，若投标工期提前，则按每月 25万美元进行报价修正，现国內甲投标人报价 5000万美元，承诺较投标要求工期提前 2个月，则甲投标人评价标为（ ）万美元。",[537,539,541,543],{"key":20,"text":538,"correct":26},"5000",{"key":24,"text":540,"correct":26},"4625",{"key":28,"text":542,"correct":26},"4600",{"key":31,"text":544,"correct":22},"4575",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},898104,"(2018年)依法必须招标的项目，中标公示应包含的内容是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":26},"评标委员会全体成员名单",{"key":24,"text":552,"correct":26},"所有投标人名单及排名情况",{"key":28,"text":554,"correct":26},"投标人的各评分要素的得分情况",{"key":31,"text":556,"correct":22},"中标候选人投标报名或开标时提供的业绩信誉情况（有业绩信誉条件的）",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},898105,"(2018年)某招标工程采用综合评估法评标，报价越低的报价得分越高。评分因素、权重及各投标人得分情况见下表，则推荐的第一中标候选人应为（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"甲",{"key":24,"text":564,"correct":26},"乙",{"key":28,"text":566,"correct":26},"丙",{"key":31,"text":568,"correct":26},"甲或乙",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},898106,"(2018年)根据《评标委员会和评标方法暂行规定》等，评标委员会评标发现的投标报价算术错误，应由（ ）进行修正",[573,575,577,579],{"key":20,"text":574,"correct":22},"评标委员会",{"key":24,"text":576,"correct":26},"招标监督机构",{"key":28,"text":578,"correct":26},"招标人",{"key":31,"text":580,"correct":26},"投标人",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},898107,"（2019年真题）某高速公路项目招标采用经评审的最低投标价法评标，招标文件规定对同时投多个标段的评标修正率为4%。现有投标人甲同时投标1#、2#标段，其报价依次为7000万元、6000万元，若甲在1#标段已被确定为中标，则其在2#标段的评标价是（ ）万元。",[585,587,589,591],{"key":20,"text":586,"correct":26},"5720",{"key":24,"text":588,"correct":26},"6240",{"key":28,"text":590,"correct":22},"5760",{"key":31,"text":592,"correct":26},"6280",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},898108,"（2019年真题）根据《建设工程造价咨询规范》GB\u002FT 51095-2015 规定，下列对投标文件的评审内容，属于清标工作的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":26},"营业执照的有效性",{"key":24,"text":600,"correct":26},"营业执照、资质证书、安全生产许可证的一致性",{"key":28,"text":602,"correct":26},"投标函上签字与盖章的合法性",{"key":31,"text":604,"correct":22},"投标文件是否实质性响应招标文件",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},898111,"(2014年)关于世界银行贷款项目的投标资格审查，下列说法中正确的是（）",[609,611,613,615],{"key":20,"text":610,"correct":22},"凡采购大而复杂的工程宜采用资格预审",{"key":24,"text":612,"correct":26},"资格定审有利于缩小投标人的范围",{"key":28,"text":614,"correct":26},"资格预审的标准应严于资格定审",{"key":31,"text":616,"correct":26},"资格定审的标准应严于资格预审",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]