[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,5,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},897995,1,"单选题","(2015年)关于建筑设计对民用住宅项目工程造价的影响，下列说法中正确的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","加大住宅宽度，不利于降低单方造价",false,{"key":24,"text":25,"correct":26},"B","降低住宅层高，有利于降低单方造价",true,{"key":28,"text":29,"correct":22},"C","结构面积系数越大，越有利于降低单方造价",{"key":31,"text":32,"correct":22},"D","住宅层数越多，越有利于降低单方造价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},897996,"(2015年)当建设项目为一个单项工程时，其设计概算应采用的编制形式是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"单位工程概算、单项工程综合概算和建设项目总概算二级",{"key":24,"text":41,"correct":22},"单位工程概算和单项工程综合概算二级",{"key":28,"text":43,"correct":22},"单项工程综合概算和建设项目总概算二级",{"key":31,"text":45,"correct":26},"单位工程概算和建设项目总概算二级",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},897997,"(2015年)在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"概算定额法",{"key":24,"text":53,"correct":26},"概算指标法",{"key":28,"text":55,"correct":22},"预算单价法",{"key":31,"text":57,"correct":22},"综合吨位指标法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},897998,"(2015年)设计概算一经批准一般不得进行调整，其总投资反映( )时的价格水平。",[62,64,66,68],{"key":20,"text":63,"correct":22},"项目立项",{"key":24,"text":65,"correct":22},"可行性研究",{"key":28,"text":67,"correct":26},"概算编制",{"key":31,"text":69,"correct":22},"项目施工",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},897999,"(2016年)某地拟建一办公楼，当地类似工程的单位工程概算指标为3600元\u002F㎡。概算指标为瓷砖地面，拟建工程为复合木地板，每100㎡该类建筑中铺贴地面面积为50㎡，当地预算定额中瓷砖地面和复合木地板的预算单价分别为128元\u002F㎡、190元\u002F㎡。假定以人、材、机费用之和为基数取费，综合费率为25%。则用概算指标法计算的拟建工程造价指标为()元\u002F㎡。",[74,76,78,80],{"key":20,"text":75,"correct":22},"2918.75",{"key":24,"text":77,"correct":22},"3413.75",{"key":28,"text":79,"correct":22},"3631.00",{"key":31,"text":81,"correct":26},"3638.75",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},898000,"(2018年)关于设计概算的编制，下列计算式正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"单位工程概算=人工费+材料费+施工机具使用费+企业管理费+利润",{"key":24,"text":89,"correct":26},"单项工程综合概算=建筑工程费+安装工程费+设备及工器具购置费",{"key":28,"text":91,"correct":22},"单项工程综合概算=建筑工程费+安装工程费+设备及工器具购置费+工程建设其他费用",{"key":31,"text":93,"correct":22},"建设项目总概算=各单项工程综合概算+建设期利息+预备费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},898001,"(2018年)采用概算定额法编制设计概算的主要工作有：①列出分部分项工程项目名称并计算工程量；②搜集基础资料；③编写概算编制说明；④计算措施项目费；⑤确定各分部分项工程费；⑥汇总单位工程概算造价。下列工作排序正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"②①⑤④⑥③",{"key":24,"text":101,"correct":22},"②③①⑤④⑥",{"key":28,"text":103,"correct":22},"③②①④⑤⑥",{"key":31,"text":105,"correct":22},"②①③⑤④⑥",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},898002,"(2018年)关于设计概算的作用，下列说法正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"设计概算是确定建设规模的依据",{"key":24,"text":113,"correct":26},"设计概算是编制固定资产投资计划的依据",{"key":28,"text":115,"correct":22},"政府投资项目设计概算经批准后，不得进行调整",{"key":31,"text":117,"correct":22},"设计概算不应作为签订贷款合同的依据",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},898003,"（2019年真题）某地市政道路工程,已知与其类似已完工程造价指标为600元\u002Fm2，人、材、机占工程造价10%、50%、20%,拟建工程与类似工程人、材、机差异系数为1.1、1.05、1.05。假定以人、材、机为基数取费，综合费率为25%，则该工程综合单价为（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"507",{"key":24,"text":125,"correct":22},"608.4",{"key":28,"text":127,"correct":26},"633.75",{"key":31,"text":129,"correct":22},"657",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},898004,"（2019年真题）在满足住宅功能和质量的前提下，下列设计方法中，可降低单位建筑面积造价的是（）",[134,136,138,140],{"key":20,"text":135,"correct":22},"增加住宅层高",{"key":24,"text":137,"correct":22},"分散布置公共设施",{"key":28,"text":139,"correct":22},"增大墙体面积系数",{"key":31,"text":141,"correct":26},"减少结构面积系数",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},898005,"（2019年真题）编制工程建设其他费用概算表时，下列其他费用中，一般按“工程费用×费率”计算是（ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"征地补偿费",{"key":24,"text":149,"correct":22},"拆迁补偿费",{"key":28,"text":151,"correct":22},"研究试验费",{"key":31,"text":153,"correct":26},"工程监理费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},898011,"(2013年)采用定额单价发编制施工图预算时，下列做法正确的是()。",[158,160,162,164],{"key":20,"text":159,"correct":26},"若分项工程主要材料品种与预算单价规定材料不一致，需要按实际使用材料价格换算预算单价",{"key":24,"text":161,"correct":22},"因施工工艺条件与预算单价的不一致而致工人、机械的数量增加，只调价不调量",{"key":28,"text":163,"correct":22},"因施工工艺条件与预算单价的不一致而致工人、机械的数量减少，既调价也调量",{"key":31,"text":165,"correct":22},"对于定额项目计价中未包括的主材费用，应按造价管理机构发布的造价信息价补充进定额基价",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},898012,"(2014年)关于建设工程预算，符合组合与分解层次关系的是（）",[170,172,174,176],{"key":20,"text":171,"correct":22},"单位工程预算、单位工程综合预算、类似工程预算",{"key":24,"text":173,"correct":22},"单位工程预算、类似工程预算、建设项目总预算",{"key":28,"text":175,"correct":26},"单位工程预算、单项工程综合预算、建设项目总预算",{"key":31,"text":177,"correct":22},"单位工程综合预算、类似工程预算、建设项目总预算",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},898013,"(2015年)单位建筑工程预算的费用项目包括( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"建筑安装工程费用、设备及工器具购置费、建设单位管理费",{"key":24,"text":185,"correct":26},"人、才、机费用及企业管理费、利润、规费、税金",{"key":28,"text":187,"correct":22},"人、才、机费用及企业管理费、工程建设其他费用",{"key":31,"text":189,"correct":22},"分部分项工程费、措施费、规费、税金、工程建设其他费用",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},898014,"(2016年)关于施工图预算的含义，下列说法中正确的是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"是设计阶段对工程建设所需资金的粗略计算",{"key":24,"text":197,"correct":22},"其成果文件一般不属于设计文件的组成部分",{"key":28,"text":199,"correct":26},"可以由施工企业根据企业定额考虑自身实力计算",{"key":31,"text":201,"correct":22},"其价格性质为预期，不具有市场性质",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},898015,"(2015年)关于各级施工图预算的构成内容，下列说法中正确的是( )。",[206,208,210,212],{"key":20,"text":207,"correct":26},"建设项目总预算反映施工图设计阶段建设项目的预算总投资",{"key":24,"text":209,"correct":22},"建设项目总预算由组成该项目的各个单项工程综合预算费用相加而成",{"key":28,"text":211,"correct":22},"单项工程综合预算由单项工程的建筑工程费和设备及工器具购置费组成",{"key":31,"text":213,"correct":22},"单位工程预算由单位建筑工程预算和单位安装工程预算费用组成",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},898016,"(2010年)应用预算单价法编制施工图预算时，在套用定额单价后，紧接的工作是()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"计算工程量",{"key":24,"text":221,"correct":26},"工料分析",{"key":28,"text":223,"correct":22},"编写编制说明",{"key":31,"text":225,"correct":22},"计算造价",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},898017,"(2013年)关于施工图预算的作用，下列说法中正确的是()。",[230,232,234,236],{"key":20,"text":231,"correct":26},"施工图预算可以作为业主拨付工程进度款的基础",{"key":24,"text":233,"correct":22},"施工图预算是工程造价管理部门制定招标控制价的依据",{"key":28,"text":235,"correct":22},"施工图预算是业主方进行施工图预算与施工预算“两算”对比的依据",{"key":31,"text":237,"correct":22},"施工图预算是施工单位安排建设资金计划的依据",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},898018,"(2014年)未达到固定资产标准的工器具购置费的计算基数一般为（）",[242,244,246,248],{"key":20,"text":243,"correct":22},"工程建设其他费",{"key":24,"text":245,"correct":22},"建设安装工程费",{"key":28,"text":247,"correct":26},"设备购置费",{"key":31,"text":249,"correct":22},"设备及安装工程费",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},898019,"(2014年)建设工程预算编制中的总预算由（）组成。",[254,256,258,260],{"key":20,"text":255,"correct":22},"综合预算和工程建设其他费、预备费",{"key":24,"text":257,"correct":22},"预备费、建设期利息及铺底流动资金",{"key":28,"text":259,"correct":22},"综合预算和工程建设其他费、铺底流动资金",{"key":31,"text":261,"correct":26},"综合预算和工程建设其他费、预备费、建设期利息及铺底流动资金",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},898020,"(2016年)某单项工程的单位建筑工程预算为1000万元，单位安装工程预算为500万元，设备购置预算为600万元，未达到固定资产标准的工器具购置预算为60万元，若预备费率费5%，则该单项工程施工图预算为()万元。",[266,268,270,272],{"key":20,"text":267,"correct":22},"1500",{"key":24,"text":269,"correct":22},"2100",{"key":28,"text":271,"correct":26},"2160",{"key":31,"text":273,"correct":22},"2268",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},898021,"(2013年)关于施工图预算文件的组成，下列说法中错误的是()。",[278,280,282,284],{"key":20,"text":279,"correct":22},"当建设项目有多个单项工程时，应采用三级预算编制形式",{"key":24,"text":281,"correct":22},"三级预算编制形式由建设项目总预算、单项工程综合预算、单位工程预算组成",{"key":28,"text":283,"correct":22},"当建设项目仅有一个单项工程时，应采用二级预算编制形式",{"key":31,"text":285,"correct":26},"二级预算编制形式的施工图预算文件包括综合预算表和单位工程预算表两个主要报表",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},898022,"(2018年)采用全费用综合单价建筑施工图预算，下列说法正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"综合单价应由人材机费、管理费、综合计取的措施项目费、规费和税金构成",{"key":24,"text":293,"correct":26},"可以计量的措施项目费与分部分项工程费的计算方法相同",{"key":28,"text":295,"correct":22},"人工费、材料费、施工机具使用费应按预算定额发布时期的价格确定",{"key":31,"text":297,"correct":22},"综合计取的措施项目费应以分部分项工程费为基数乘以相应费率计算",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},898023,"(2018年)用工料单价法计算建筑安装工程费时需套用定额预算单价，下列做法正确的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"分项工程名称与定额名称完全一致时，直接套用定额预算单价",{"key":24,"text":305,"correct":22},"分项工程计量单位与定额计量单位完全一致时，直接套用定额预算单价",{"key":28,"text":307,"correct":22},"分项工程主要材料品种与预算定额不一致时，直接套用定额预算单价",{"key":31,"text":309,"correct":26},"分项工程施工工艺条件与预算定额不一致时，调整定额预算单价后套用",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},898024,"(2018年)直接发承包项目如按初步设计总概算投资包干，其签约合同费应以（ ）为准。",[314,316,318,320],{"key":20,"text":315,"correct":22},"经审批的概算投资总额",{"key":24,"text":317,"correct":22},"经审批的概算投资相对应的建筑安装费用",{"key":28,"text":319,"correct":26},"经审批的概算投资中与承包内容相对应部分的投资",{"key":31,"text":321,"correct":22},"经审批的概算投资中相对应的工程费用",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},898025,"（2019年真题）采用实物量法与工料单价法编制预算，其工作步骤的差异体现在（）",[326,328,330,332],{"key":20,"text":327,"correct":22},"工程量的计算",{"key":24,"text":329,"correct":26},"直接费的计算",{"key":28,"text":331,"correct":22},"企业管理费的计算",{"key":31,"text":333,"correct":22},"税金的计算",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},898026,"（2019年真题）施工图预算以二级预算编制形成（）",[338,340,342,344],{"key":20,"text":339,"correct":26},"总预算和单位工程预算",{"key":24,"text":341,"correct":22},"单位工程综合预算和单位工程预算",{"key":28,"text":343,"correct":22},"总预算和单位工程综合预算",{"key":31,"text":345,"correct":22},"建筑工程预算和设备安装工程预算",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},898029,"(2013年)关于招标文件的编制，下列说法中错误的是()。",[350,352,354,356],{"key":20,"text":351,"correct":22},"当未进行资格预审时招标文件应包括招标公告",{"key":24,"text":353,"correct":22},"应规定重新招标和不再招标的条件",{"key":28,"text":355,"correct":22},"招标控制价应在招标时(或在招标文件中)一并公布",{"key":31,"text":357,"correct":26},"投标人须知前附表与投标人须知正文内容有抵触的以投标人须知前附表为准",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},898030,"(2013年)关于招标文件的澄清，下列说法中错误的是()。",[362,364,366,368],{"key":20,"text":363,"correct":22},"投标人应以信函、电报等可以有形地表现所载内容的形式向招标人提出疑问",{"key":24,"text":365,"correct":26},"招标文件的澄清应发给所有投标人并指明澄清问题的来源",{"key":28,"text":367,"correct":22},"澄清发出的时间距投标截止日不足15天的应推迟投标截止时间",{"key":31,"text":369,"correct":22},"投标人收到澄清的确认时间可以是相对时间，也可以是绝对时间",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},898031,"(2014年)在招标投标过程中，载明招标文件获取方式的应是（）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"招标公告",{"key":24,"text":377,"correct":22},"资格预审公告",{"key":28,"text":379,"correct":22},"招标文件",{"key":31,"text":381,"correct":22},"投标文件",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},898032,"(2014年)下列内容中，属于招标工程量清单编制依据的是（）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"分部分项工程清单",{"key":24,"text":389,"correct":26},"拟定的招标文件",{"key":28,"text":391,"correct":22},"招标控制价",{"key":31,"text":393,"correct":22},"潜在招标人的潜质及能力",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},898033,"(2014年)招标工程量清单应根据常规施工方案编制，拟定常规施工方案时（）",[398,400,402,404],{"key":20,"text":399,"correct":26},"应对主要项目进行估算，如土方石.混凝土",{"key":24,"text":401,"correct":22},"需对施工总方案中的重大问题及关键工艺作明确具体的规定",{"key":28,"text":403,"correct":22},"不需计算人、材、机资源需要量",{"key":31,"text":405,"correct":22},"不比考虑节假日与气候对工期的影响",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},898034,"(2015年)招标工程量清单是招标文件的组成部分，其准确性由()负责。",[410,412,414,416],{"key":20,"text":411,"correct":22},"招标代理机构",{"key":24,"text":413,"correct":26},"招标人",{"key":28,"text":415,"correct":22},"编制工程量清单的造价咨询机构",{"key":31,"text":417,"correct":22},"招标工程量清单的编制人",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":28,"analysis":33},898035,"(2016年)关于工程量清单编制总说明的内容，下列说法中正确的是()。",[422,424,426,428],{"key":20,"text":423,"correct":22},"建设规模是指工程投资总额",{"key":24,"text":425,"correct":22},"工程特征是指结构类型及主要施工方案",{"key":28,"text":427,"correct":26},"环境保护要求包括避免材料运输影响周边环境的防护要求",{"key":31,"text":429,"correct":22},"施工现场实际情况是指自然地理条件",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},898036,"(2016年)关于暂列金额，下列说法中正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"用于必须要发生但暂时不能确定价格的项目",{"key":24,"text":437,"correct":22},"由承包人支配，按签证价格结算",{"key":28,"text":439,"correct":22},"不能用于因工程变更而发生的索赔支付",{"key":31,"text":441,"correct":26},"不同专业预留的暂列金额应分别列项",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},898037,"(2016年)关于依法必须招标工程的标底和招标控制价，下列说法中正确的是()。",[446,448,450,452],{"key":20,"text":447,"correct":22},"招标人有权自行决定是否采用设标底招标、无标底招标以及招标控制价招标",{"key":24,"text":449,"correct":22},"采用设标底招标的，招标人有权决定标底是否在招标文件中公开",{"key":28,"text":451,"correct":22},"采用招标控制价招标的，招标人应在招标文件中明确最高招标限价，也可以规定最低投标限价",{"key":31,"text":453,"correct":26},"公布招标控制价时，还应公布各单位工程的分部分项工程费、措施项目费、其他项目费、规费和税金",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},898038,"(2015年)拟定施工总方案是编制招标工程量清单的一项准备工作，下列选项中属于拟定施工总方案范畴的是( )。",[458,460,462,464],{"key":20,"text":459,"correct":26},"对关键工艺的原则性规定",{"key":24,"text":461,"correct":22},"拟定施工步骤和施工顺序",{"key":28,"text":463,"correct":22},"估算整体工程量",{"key":31,"text":465,"correct":22},"编制施工进度计划",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},898039,"(2015年)招标控制价中暂列金额一般按分部分项工程费的一定比率参考计算，这一比率的范围是( )。",[470,472,474,476],{"key":20,"text":471,"correct":22},"3%～5%",{"key":24,"text":473,"correct":22},"5%～10%",{"key":28,"text":475,"correct":26},"10%～15%",{"key":31,"text":477,"correct":22},"15%～20%",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},898040,"(2010年)关于工程招标的性质，下列说法中正确的是()。",[482,484,486,488],{"key":20,"text":483,"correct":22},"招标是要约",{"key":24,"text":485,"correct":22},"投标是承诺",{"key":28,"text":487,"correct":22},"招标公告是要约",{"key":31,"text":489,"correct":26},"中标通知书是承诺",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},898041,"(2010年)关于招标文件的澄清，下列说法中错误的是()。",[494,496,498,500],{"key":20,"text":495,"correct":26},"招标文件的澄清应在投标截止时间14天前发出",{"key":24,"text":497,"correct":22},"招标文件的澄清应不指明所澄清问题的来源",{"key":28,"text":499,"correct":22},"投标人收到澄清后的确认时间可以采用一个相对的时间",{"key":31,"text":501,"correct":22},"投标人收到澄清后的确认时间可以采用一个绝对的时间",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},898042,"(2010年)下列关于招标控制价的说法中，正确的是()。",[506,508,510,512],{"key":20,"text":507,"correct":22},"招标控制价必须由招标人编制",{"key":24,"text":509,"correct":22},"招标控制价只需公布总价",{"key":28,"text":511,"correct":22},"招标人不得对招标控制价提出异议",{"key":31,"text":513,"correct":26},"招标控制价不应上调或下浮",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},898043,"(2013年)关于标底与招标控制价的编制，下列说法中正确的是()。",[518,520,522,524],{"key":20,"text":519,"correct":22},"招标人不得自行决定是否编制标底",{"key":24,"text":521,"correct":26},"招标人不得规定最低投标限价",{"key":28,"text":523,"correct":22},"编制标底时必须同时设有最高投标限价",{"key":31,"text":525,"correct":22},"招标人不编制标底时应规定最低投标限价",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},898044,"(2013年)关于招标控制价，下列说法中正确的是()。",[530,532,534,536],{"key":20,"text":531,"correct":22},"招标人不得拒绝高于招标控制价的投标报价",{"key":24,"text":533,"correct":22},"利润可按建筑施工企业平均利润率计算",{"key":28,"text":535,"correct":22},"招标控制价超过批准概算10%时，应报原概算审批部门审核",{"key":31,"text":537,"correct":26},"经复查的招标控制价与原招标控制价误差＞±3%的应责成招标人改正",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},898045,"(2013年)招标控制价综合单价的组价包括如下工作：①根据政策规定或造价信息确定工料机单价；②根据工程所在地的定额规定计算工程量；③将定额项目的合价除以清单项目的工程量；④根据费率和利率计算出组价定额项目的合价，则正确的工作顺序是()。",[542,544,546,548],{"key":20,"text":543,"correct":22},"①④②③",{"key":24,"text":545,"correct":22},"①③②④",{"key":28,"text":547,"correct":22},"②①③④",{"key":31,"text":549,"correct":26},"②①④③",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},898046,"(2014年)编制钢筋工程量清单时，适宜采用暂估量加签证处理的钢筋是（）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"支撑双层钢筋用的“铁马”",{"key":24,"text":557,"correct":22},"伸出构件的锚固钢筋",{"key":28,"text":559,"correct":22},"设计注明的搭接钢筋",{"key":31,"text":561,"correct":22},"规范规定的搭接钢筋",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},898047,"(2014年)关于招标控制价及其编制，下列说法中正确的是（）",[566,567,569,571],{"key":20,"text":531,"correct":22},{"key":24,"text":568,"correct":22},"当重新公布招标控制价时，原投标截止期不变",{"key":28,"text":570,"correct":22},"经复核认为招标控制价误差大于±3%时，投标人应责成招标人改正",{"key":31,"text":572,"correct":26},"投标人经复核认为招标控制价未按规定编制的，应在招标控制价公布后5日内提出投诉",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},898048,"(2015年)招标人对已发出的招标文件进行的必要修改，应当在投标截止时间( )天内发出。",[577,579,581,583],{"key":20,"text":578,"correct":22},"7",{"key":24,"text":580,"correct":22},"10",{"key":28,"text":582,"correct":22},"14",{"key":31,"text":584,"correct":26},"15",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},898049,"(2015年)关于招标工程量清单中分部分项工程量清单的编制，下列说法中错误的是( )。",[589,591,593,595],{"key":20,"text":590,"correct":26},"招标人只负责项目编码、项目名称、计量单位和工程量四项内容的填写",{"key":24,"text":592,"correct":22},"同一招标工程的项目编码不得有重复",{"key":28,"text":594,"correct":22},"清单所列项目应是在单位工程施工过程中以其本身构成该工程实体的分项工程",{"key":31,"text":596,"correct":22},"当清单计价规范附录中有两个计量单位时，应结合实际情况选择其中一个",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},898050,"(2015年)关于依法必须招标的工程，下列说法中正确的是( )。",[601,603,605,607],{"key":20,"text":602,"correct":22},"国有资金投资的建筑工程招标可不设招标控制价",{"key":24,"text":604,"correct":26},"招标人可以自行决定是否编制标底，标底必须保密",{"key":28,"text":606,"correct":22},"招标人设有最高投标限价的，应当在开标时公布",{"key":31,"text":608,"correct":22},"招标人也可以根据需要，规定最低投标限价",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":24,"analysis":33},898051,"(2016年)根据《标准施工招标文件》（2007年版），关于“分包和偏差问题处理”的内容应包括于（ ）之中。",[613,614,616,618],{"key":20,"text":375,"correct":22},{"key":24,"text":615,"correct":26},"投标人须知",{"key":28,"text":617,"correct":22},"评标办法",{"key":31,"text":619,"correct":22},"合同条款与格式",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]