[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-42":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":714},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,42,50,2160,[13,38,53,67,82,97,112,127,141,155,170,184,198,212,226,236,246,260,275,289,303,315,330,344,354,368,382,396,410,425,437,452,466,480,494,509,518,533,547,561,575,590,604,619,632,646,660,674,688,702],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899979,2,"多选题","（2020年真题）关于设备购置费中的设备原价，下列说法正确的有（）",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","包含随设备同时订购的首套备品备件费",true,{"key":24,"text":25,"correct":26},"B","包括施工现场自制设备的制造费",false,{"key":28,"text":29,"correct":26},"C","包括达到固定资产标准的办公家具购置费",{"key":31,"text":32,"correct":22},"D","包括进口设备从来源地到买方边境的运输费",{"key":34,"text":35,"correct":26},"E","包括设备采购、保管人员的工资费","AD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899980,"（2017年考题）下列建设用地取得费用中，属于征地补偿费的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"土地补偿费",{"key":24,"text":45,"correct":22},"安置补助费",{"key":28,"text":47,"correct":26},"报迁补助",{"key":31,"text":49,"correct":22},"土地管理费",{"key":34,"text":51,"correct":26},"土地转让金","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},899981,"（2019年考题）下列项目费用项目，属于征地补偿费的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"拆迁补偿金",{"key":24,"text":60,"correct":22},"安置补偿费",{"key":28,"text":62,"correct":22},"地上附着物补偿费",{"key":31,"text":64,"correct":26},"迁移补偿费",{"key":34,"text":49,"correct":22},"BCE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},899982,"（2020年真题）下列费用中，应计入工程建设其他费用中用地与工程准备费的有（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"建设场地大型土石方工程费",{"key":24,"text":74,"correct":22},"土地使用费和补偿费",{"key":28,"text":76,"correct":22},"场地准备费",{"key":31,"text":78,"correct":22},"建设单位临时设施费",{"key":34,"text":80,"correct":26},"施工单位平整场地费","BCD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},899983,"（2016年考题）关于生产准备及开办费，下列说法中正确的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"包括自行组织培训和委托其他单位培训的相关费用",{"key":24,"text":89,"correct":22},"包括正常生产所需的生产办公家具用具的购置费用",{"key":28,"text":91,"correct":26},"包括正常生活所需的生活家具用具的购置费用",{"key":31,"text":93,"correct":26},"包括含备品备件在内的第一套不够固定资产标准的生产工具购置费用",{"key":34,"text":95,"correct":26},"可按设计定员乘以人均生产准备费指标计算","AB",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},899984,"（2017年考题）根据现行建筑安装工程费用项目组成规定，下列费用项目中，属于建筑安装工程企业管理的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"仪器仪表使用费",{"key":24,"text":104,"correct":22},"工具用具使用",{"key":28,"text":106,"correct":26},"建筑安装工程一切险",{"key":31,"text":108,"correct":22},"地方教育附加费",{"key":34,"text":110,"correct":22},"劳动保险费","BDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},899985,"（2016年考题）应予计量的措施项目费包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"垂直运输费",{"key":24,"text":119,"correct":22},"排水、降水费",{"key":28,"text":121,"correct":26},"冬雨季施工增加费",{"key":31,"text":123,"correct":26},"临时设施费",{"key":34,"text":125,"correct":22},"超高施工增加费","ABE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":126,"analysis":37},899986,"（2018年考题）按照费用构成要素划分的建筑安装工程费用项目组成规定，下列费用项目应列入材料费的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"周转材料的摊销，租赁费用",{"key":24,"text":134,"correct":22},"材料运输损耗费用",{"key":28,"text":136,"correct":26},"施工企业对材料进行一般鉴定，检查发生的费用",{"key":31,"text":138,"correct":26},"材料运杂费中的增值税进项税额",{"key":34,"text":140,"correct":22},"材料采购及保管费用",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},899987,"（2015年考题）根据我国现行建筑安装工程费用项目组成的规定，下列费用中属于安全文明施工中临时设施费的有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"现场采用砖砌围挡的安砌费用",{"key":24,"text":148,"correct":26},"现场围挡的墙面美化费用",{"key":28,"text":150,"correct":26},"施工现场的操作场地的硬化费用",{"key":31,"text":152,"correct":22},"施工现场规定范围内临时简易道路的铺设费用",{"key":34,"text":154,"correct":26},"地下室施工时所采用的照明设备的安拆费用",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},899988,"（2015年考题）根据我国现行建筑安装工程费用项目组成的规定，下列人工费中能够计入分部分项工程费的有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"保管建筑材料人员的工资",{"key":24,"text":162,"correct":22},"绑扎钢筋人员的工资",{"key":28,"text":164,"correct":22},"操作施工机械人员的工资",{"key":31,"text":166,"correct":26},"现场临时设施搭设人员的工资",{"key":34,"text":168,"correct":26},"施工排水、降水作业人员的工资","ABC",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":52,"analysis":37},899989,"（2016年考题）根据我国现行建筑安装工程费用项目组成规定，下列施工企业发生的费用中，应计入企业管理费的是（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"建筑材料、构件一般性鉴定检查费",{"key":24,"text":177,"correct":22},"支付给企业离休干部的经费",{"key":28,"text":179,"correct":26},"施工现场工程排污费",{"key":31,"text":181,"correct":22},"履约担保所发生的费用",{"key":34,"text":183,"correct":26},"施工生产用仪器仪表使用费",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":36,"analysis":37},899990,"（2017年考题）国外建筑安装工程费用中的开办费一股包括（ ）等。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"工地淸理费",{"key":24,"text":191,"correct":26},"现场管理费",{"key":28,"text":193,"correct":26},"材料预涨费",{"key":31,"text":195,"correct":22},"周转材料费",{"key":34,"text":197,"correct":26},"暂定金额",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":211,"analysis":37},899991,"（2020年真题）下列费用中，属于建筑安装工程费中企业管理费的有（）。",[202,204,205,207,209],{"key":20,"text":203,"correct":26},"施工机械年保险费",{"key":24,"text":110,"correct":22},{"key":28,"text":206,"correct":26},"工伤保险费",{"key":31,"text":208,"correct":22},"财产保险费",{"key":34,"text":210,"correct":26},"工程保险费","BD",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":96,"analysis":37},899992,"（2020年真题）下列材料损耗中，因损耗而产生的费用包含在材料单价中的有（）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"场外运输损耗",{"key":24,"text":219,"correct":22},"工地仓储损耗",{"key":28,"text":221,"correct":26},"出工地料库后的搬运损耗",{"key":31,"text":223,"correct":26},"材料加工损耗",{"key":34,"text":225,"correct":26},"材料施工损耗",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":235,"analysis":37},899993,"（2019年考题）根据我国现行《建设工程造价计价方法》，下列情況可用简易计税方法的是（ ）。 A.小规纳税人发生的应税行为 B.般纳人以清包工方式提供的建筑服务 C.一般纳税人以甲供工程货提供的建筑服务 D.《施工许可证》注明的开工日期在2016年4月30日前E实际开工日期在2016年4月30日前的建筑服务",[230,231,232,233,234],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":34,"text":34,"correct":26},"ABCD",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":245,"analysis":37},899994,"（2018年考题）关于国外建筑安装工程费用中的开办费，下列说法正确的有（ ）。 A.开办费项目可以按单项工程分别单独列出 B.单项工程建筑安装工程量越大，开办费在工程价格中的比例越大 C.开办费包括的内容因国家和工程的不同而异D开办费项目可以采用分摊进单价的方式报价 E.第三者责任险投保费一般应作为开办费的构成内容",[240,241,242,243,244],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":34,"text":34,"correct":26},"ACD",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":169,"analysis":37},899995,"（2017年考题）根据分部组合计价原理，单位施工可依据（ ）等的不同分解为分部工程。",[250,252,254,256,258],{"key":20,"text":251,"correct":22},"结构部位",{"key":24,"text":253,"correct":22},"路段长度",{"key":28,"text":255,"correct":22},"施工特点",{"key":31,"text":257,"correct":26},"材料",{"key":34,"text":259,"correct":26},"工序",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},899996,"（2016年考题）关于工程量清单计价的定额计价，下列计价公式中正确的有（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":26},"单位工程直接费=Σ（假定建筑安装产品工程量×工料单价）+措施费",{"key":24,"text":267,"correct":26},"单位工程概预算费=单位工程直接费+企业管理费+利润+税金",{"key":28,"text":269,"correct":22},"分部分项工程费=Σ（分部分项工程量×分部分项工程综合单价）",{"key":31,"text":271,"correct":22},"措施项目费=Σ按“项”计算的措施项目费+Σ（措施项目工程量×措施项目综合单价）",{"key":34,"text":273,"correct":22},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金","CDE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":66,"analysis":37},899997,"（2015年考题）关于投资估算指标，下列说法中正确的有（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":26},"应以单项工程为编制对象",{"key":24,"text":282,"correct":22},"是反映建设总投资的经济指标",{"key":28,"text":284,"correct":22},"概略程度与可行性研究工作深度相适应",{"key":31,"text":286,"correct":26},"编制基础包括概算定额，不包括预算定额",{"key":34,"text":288,"correct":22},"可根据历史预算资料和价格变动资料等编制",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":211,"analysis":37},899998,"（2018年考题）关于工程量清单计价的基本程序和方法，下列说法正确的有（ ）。",[293,295,297,299,301],{"key":20,"text":294,"correct":26},"单位工程造价通过直接费、间接费、利润汇总",{"key":24,"text":296,"correct":22},"计价过程包括工程量清单的编制和应用两个阶段",{"key":28,"text":298,"correct":26},"项目特征和计量单位的确定与施工组织设计无关",{"key":31,"text":300,"correct":22},"招标文件中划分的由投标人承担的风险费用纳入综合单价中",{"key":34,"text":302,"correct":26},"工程量清单计价活动伴随竣工结算而结束",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":274,"analysis":37},899999,"（2018年考题）为有利于措施费的确定和调整，根据现行工程量计算规范。适宜采用单价措施项目计价的有（ ）。",[307,309,311,313,314],{"key":20,"text":308,"correct":26},"夜间施工增加费",{"key":24,"text":310,"correct":26},"二次搬运费",{"key":28,"text":312,"correct":22},"施工排水、降水费",{"key":31,"text":125,"correct":22},{"key":34,"text":117,"correct":22},{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},900000,"（2018年考题）下列费用中，由招标人填写金额，投标人直接计入投标总价的有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"材料设备暂估价",{"key":24,"text":322,"correct":22},"专业工程暂估价",{"key":28,"text":324,"correct":22},"暂列金额",{"key":31,"text":326,"correct":26},"计日工合价",{"key":34,"text":328,"correct":26},"总承包服务费","BC",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":36,"analysis":37},900001,"（2019年考题）关于分部分项工程项目清单的编制，下列说法正确的有（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"项目编码第7-9位为分项工程项目名称顺序码",{"key":24,"text":337,"correct":26},"项目名称应按工程量计算规范附录中给定的名称确定",{"key":28,"text":339,"correct":26},"项目特征应按工程量计算规范附录中规定的项目特征予以描述",{"key":31,"text":341,"correct":22},"计量单位应按工程量计算规范附录中给定的，选用最适宜表现项国特征并方便计量的单位",{"key":34,"text":343,"correct":26},"工程量位按实际完成的工程量计算",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":353,"analysis":37},900002,"（2019年考题）在工程量清单编制中，施工组织设计、施工范围和验收规范可以用于确定（ ）。 A.项目名称B项目编码C项目特征 D.计量单位 E.工程数量",[348,349,350,351,352],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"key":34,"text":34,"correct":22},"ACE",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":329,"analysis":37},900003,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程量清清单计价的有关要求，下列说法中正确的有（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":26},"事业单位自有资金投资的建设工程发承包，可以不采用工程量清单计价",{"key":24,"text":361,"correct":22},"使用国有资金投资的建设工程发承包，必须采用工程量清单计价",{"key":28,"text":363,"correct":22},"招标工程量清单应以单位工程为单位编制",{"key":31,"text":365,"correct":26},"工程量清单计价方式下，必须采用单价合同",{"key":34,"text":367,"correct":26},"招标工程量清单的准确性和完整性由编制人负责",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":245,"analysis":37},900004,"（2016年考题）关于分部分项工程量清单的编制，下列说法中正确的有（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"以清单计算规范附录中的名称为基础，结合具体工作内容补充细化项目名称",{"key":24,"text":375,"correct":26},"清单项目的工作内容在招标工程量清单的项目特征中加以描述",{"key":28,"text":377,"correct":22},"有两个或以上计量单位时，选择最适宜表现项目特征并方便计算的单位",{"key":31,"text":379,"correct":22},"除另有说明外，清单项目的工程量应以实体工程量为准，各种施工中的损耗和需要增加的工程量应在单价中考虑",{"key":34,"text":381,"correct":26},"在工程量清单中应附补充项目的项目名称、项目特征、计量单位和工程量",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":126,"analysis":37},900005,"（2017年考题）根据建设工程工程量清单计价规范》（GB-50500-2013），关于分部分项工程量清单的编制，下列说法正确的有（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"以重量计算的项目，其计量单位应为吨或千克",{"key":24,"text":389,"correct":22},"以吨为计量单位时，其计算结果应保留三位小数",{"key":28,"text":391,"correct":26},"以立方米为计量单位时，其计算结果应保留三位小数",{"key":31,"text":393,"correct":26},"以千克为计量单位时，其计算结果应保留一位小数",{"key":34,"text":395,"correct":22},"以“个”、“项”为单位的，应取整数",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":126,"analysis":37},900006,"（2015年考题）为了便于措施项目费的确定和调整，通常采用分部分项工程量清单方式编制的措施项目有（ ）。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"脚手架工程",{"key":24,"text":403,"correct":22},"垂直运输工程",{"key":28,"text":405,"correct":26},"二次搬运工程",{"key":31,"text":407,"correct":26},"已完工程及设备保护",{"key":34,"text":409,"correct":22},"施工排水降水",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},900007,"（2016年考题）关于暂估价的计算和填写，下列说法中正确的有（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"暂估价数量和拟用项目应结合工程量清单中“暂估价表”予以补充说明",{"key":24,"text":417,"correct":26},"材料暂估价应由招标人填写暂估单价，无须指出拟用于哪些清单项目",{"key":28,"text":419,"correct":26},"工程设备暂估价不应纳入分部分项工程综合单价",{"key":31,"text":421,"correct":22},"专业工程暂估价应分不同专业，列出明细表",{"key":34,"text":423,"correct":22},"专业工程暂估价由招标人填写，并计入投标总价","ADE",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":436,"analysis":37},900008,"（2015年考题）根据《建设工程工程量清单计价规范》（GB10500-2013），在其他项目清单中，应由投标人自主确定价格的有（ ）。",[429,430,431,433,435],{"key":20,"text":324,"correct":26},{"key":24,"text":322,"correct":26},{"key":28,"text":432,"correct":26},"材料暂估价单价",{"key":31,"text":434,"correct":22},"计日工单价",{"key":34,"text":328,"correct":22},"DE",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},900009,"（2020年真题）关于其他项目清单与计价表的编制，下列说法正确的有（）.",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"材料暂估单价进入清单项目综合单价，不汇总到其他项目清单计价表总额",{"key":24,"text":444,"correct":26},"暂列金额归招标人所有，投标人应将其扣除后再做投标报价",{"key":28,"text":446,"correct":22},"专业工程暂估价的费用构成类别应与分部分项工程综合单价的构成保持一致",{"key":31,"text":448,"correct":26},"计日工的名称和数量应由投标人填写",{"key":34,"text":450,"correct":26},"总承包服务费的内容和金额应由投标人填写","AC",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":96,"analysis":37},900010,"（2020年真题）根据现行《建设工程工程量清单计价规范》，关于工程量清单的特点和应用，下列说法正确的有（）。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"分为招标工程量清单和已标价工程量清单",{"key":24,"text":459,"correct":22},"以单位（项）工程为单位编制",{"key":28,"text":461,"correct":26},"是招标文件的组成部分",{"key":31,"text":463,"correct":26},"是载明发包工程内容和数量的清单，不涉及金额",{"key":34,"text":465,"correct":26},"仅用于最高投标限价和投标报价的编制",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":353,"analysis":37},900011,"（2017年考题）下列工人工作时间中，属于有效工作时间的有（ ）。",[470,472,474,476,478],{"key":20,"text":471,"correct":22},"基本工作时间",{"key":24,"text":473,"correct":26},"不可避免中断时间",{"key":28,"text":475,"correct":22},"辅助工作时间",{"key":31,"text":477,"correct":26},"偶然工作时间",{"key":34,"text":479,"correct":22},"准备与结束工作时间",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":211,"analysis":37},900012,"（2016年考题）下列定额测定方法中，主要用于测定材料净用量的有（ ）。",[484,486,488,490,492],{"key":20,"text":485,"correct":26},"现场技术测定法",{"key":24,"text":487,"correct":22},"实验室试验法",{"key":28,"text":489,"correct":26},"现场统计法",{"key":31,"text":491,"correct":22},"理论计算法",{"key":34,"text":493,"correct":26},"写实记录法",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":508,"analysis":37},900013,"（2018年考题）关于计时观察法测定定额，下列表述正确的有（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"计时观察法能为进一步挖掘生产潜力提供技术依据",{"key":24,"text":501,"correct":22},"计时观察前需选定的正常施工条件中包括了对工人技术等级的选定",{"key":28,"text":503,"correct":22},"测时法主要用来测定定时重复的循环工作的时间消耗",{"key":31,"text":505,"correct":26},"写实记录法是研究整个工作班内各种工时消耗的方法",{"key":34,"text":507,"correct":22},"工作日写实法可以用于检查定额的执行情况","ABCE",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":245,"analysis":37},900014,"（2019年考题）下列入工、材料、机械台班的消耗，应计入定额消耗量的有（ ）。 A.准备与结束工作时间 B.施工本身原因造成的工人停工时间 C.措施性材料的合理消耗量D不可避免的施工废料 E.低负荷下的机械工作时间",[513,514,515,516,517],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":34,"text":34,"correct":26},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":532,"analysis":37},900015,"（2020年真题）关于人工定额消耗量的确定，下列算式正确的有（）",[522,524,526,528,530],{"key":20,"text":523,"correct":26},"工序作业时间=基本工作时间×[1+辅助工作时间占比（%）]",{"key":24,"text":525,"correct":26},"工序作业时间=基本工作时间+辅助工作时间+不可避免中断时间",{"key":28,"text":527,"correct":22},"规范时间=准备与结束时间+不可避免中断时间+休息时间",{"key":31,"text":529,"correct":26},"定额时间=基本工作时间\u002F（1-辅助工作时间占比（%））",{"key":34,"text":531,"correct":22},"定额时间=（基本工作时间+辅助工作时间）\u002F（1-规范时间占比（%））","CE",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":211,"analysis":37},900016,"（2017年考题）确定预算定额人工工日消耗量过程中，应计入其他用工的有（ ）。",[537,539,541,543,545],{"key":20,"text":538,"correct":26},"材料二次搬运用工",{"key":24,"text":540,"correct":22},"电焊点火用工",{"key":28,"text":542,"correct":26},"按劳动定额规定应增（减）计算的用工",{"key":31,"text":544,"correct":22},"临时水电线移动造成的停工",{"key":34,"text":546,"correct":26},"完成其一分项工程所需消耗的技术工种用工",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":81,"analysis":37},900017,"（2015年考题）下列与施工机械工作相关的时间中，应包括在预算定额机械台班消耗量中，但不包括在施工定额中的有（ ）。",[551,553,555,557,559],{"key":20,"text":552,"correct":26},"低负荷下工作时间",{"key":24,"text":554,"correct":22},"机械施工不可避免的工序间歇",{"key":28,"text":556,"correct":22},"机械维修引起的停歇时间",{"key":31,"text":558,"correct":22},"开工时工作量不饱满所损失的时间",{"key":34,"text":560,"correct":26},"不可避免的中断时间",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":211,"analysis":37},900018,"（2015年考题）下列有关概算定额与概算指标关系的表述中，正确的是（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":26},"概算定额以单位工程为对象，概算指标以单项工程为对象",{"key":24,"text":568,"correct":22},"概算定额以预算定额为基础，概算指标主要来自各种预算和结算资料",{"key":28,"text":570,"correct":26},"概算定额适用于初步设计阶段，概算指标不适用于初步设计阶段",{"key":31,"text":572,"correct":22},"概算指标比概算定额更加综合与扩大",{"key":34,"text":574,"correct":26},"概算定额是编制概算指标的依据",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":589,"analysis":37},900019,"（2016年考题）关于投资估算指标反映的费用内容和计价单位，下列说法中正确的有（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":22},"单位工程指标反映建筑安装工程费，以每m2、m3、m、座等单位投资表示",{"key":24,"text":582,"correct":26},"单项工程指标反映工程费用，以每m2、m3、m、座等单位投资表示",{"key":28,"text":584,"correct":26},"单项工程指标反映建筑安装工程费，以单项工程生产能力单位投资表示",{"key":31,"text":586,"correct":26},"建设项目综合指标反映项目固定资产投资，以项目综合生产能力单位投资表示",{"key":34,"text":588,"correct":22},"建设项目综合指标反映项目总投资，以项目综合生产能力单位投资表示","AE",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":451,"analysis":37},900020,"（2020年真题）关于投资估算指标，下列说法正确的有（）。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"以独立的建设项目、单位工程或单位工程为对象",{"key":24,"text":597,"correct":26},"费用和消耗量指标主要来自概算指标",{"key":28,"text":599,"correct":22},"一般分为建设项目综合指标，单项工程指标和单位工程指标三个层次",{"key":31,"text":601,"correct":26},"单位工程指标一般以单位生产能力投资表示",{"key":34,"text":603,"correct":26},"建设项目综合指标表示的建设项目的静态投资指标",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":618,"analysis":37},900021,"（2015年考题）关于工程造价指数，下列说法中正确的有（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":26},"工程造价指数可以反映建筑市场的供求关系",{"key":24,"text":611,"correct":22},"工程造价指数可以反映报告期与基期相比的价格变动趋势",{"key":28,"text":613,"correct":26},"建筑安装工程造价指数是一种单项指数",{"key":31,"text":615,"correct":26},"设备、工器具价格指数是一种数量指标指数",{"key":34,"text":617,"correct":22},"单项工程造价指数一般用平均数指数的形式表示","BE",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":353,"analysis":37},900022,"（2019年考题）建设工程造价指标测算常用的方法包括（ ）。",[623,625,627,629,630],{"key":20,"text":624,"correct":22},"数据统计法",{"key":24,"text":626,"correct":26},"现场测算法",{"key":28,"text":628,"correct":22},"典型工程法",{"key":31,"text":493,"correct":26},{"key":34,"text":631,"correct":22},"汇总计算法",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":508,"analysis":37},900023,"（2020年真题）按照用途的不同，建设工程造价指标可分为（）",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"工料价格指标",{"key":24,"text":639,"correct":22},"工程经济指标",{"key":28,"text":641,"correct":22},"工程量指标",{"key":31,"text":643,"correct":26},"单位工程造价指标",{"key":34,"text":645,"correct":22},"消耗量指标",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":52,"analysis":37},900024,"（2015年考题）下列费用项目中，应计入人工日工资单价的有（ ）。",[650,652,654,656,658],{"key":20,"text":651,"correct":22},"计件工资",{"key":24,"text":653,"correct":22},"劳动竞赛奖金",{"key":28,"text":655,"correct":26},"劳动保护费",{"key":31,"text":657,"correct":22},"流动施工津贴",{"key":34,"text":659,"correct":26},"职工福利费",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":353,"analysis":37},900025,"（2017年考题）下列费用项目中，构成施工仪器仪表台班单价的有（ ）。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"折旧费",{"key":24,"text":667,"correct":26},"检修费",{"key":28,"text":669,"correct":22},"维护费",{"key":31,"text":671,"correct":26},"人工费",{"key":34,"text":673,"correct":22},"校验费",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":329,"analysis":37},900026,"（2019年考题）下列费用中，不计入机械台班单价而单独列项计算的有（ ）。",[678,680,682,684,686],{"key":20,"text":679,"correct":26},"安拆简单、移动需要起重及运输机械的轻型施工机械的安拆费及场外运费",{"key":24,"text":681,"correct":22},"安拆复杂、移动需要起重及运输机械的重型施工机械的安拆费及场外运费",{"key":28,"text":683,"correct":22},"利用辅助设施移动的施工机械的辅助设施相关费用",{"key":31,"text":685,"correct":26},"不需相关机械辅助运输的自行移动机械的场外运费",{"key":34,"text":687,"correct":26},"固定在车间的施工机械的安拆费及场外运费",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":274,"analysis":37},900027,"（2016年考题）关于材料单价的构成和计算，下列说法中正确的有（ ）。",[692,694,696,698,700],{"key":20,"text":693,"correct":26},"材料单价指材料由其来源地运达工地仓库的入库价",{"key":24,"text":695,"correct":26},"运输损耗指材料在场外运输装卸及施工现场内搬运发生的不可避免损耗",{"key":28,"text":697,"correct":22},"采购及保管费包括组织材料检验、供应过程中发生的费用",{"key":31,"text":699,"correct":22},"材料单价中包括材料仓储费和工地管理费",{"key":34,"text":701,"correct":22},"材料生产成本的变动直接影响材料单价的波动",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":508,"analysis":37},900028,"（2018年考题）根据现行建筑安装工程费用项目组成规定，下列费用项目已包括在人工日工资单价内的有（ ）。",[706,708,709,711,712],{"key":20,"text":707,"correct":22},"节约奖",{"key":24,"text":657,"correct":22},{"key":28,"text":710,"correct":22},"高温作业临时津贴",{"key":31,"text":655,"correct":26},{"key":34,"text":713,"correct":22},"探亲假期间工资",[715,719,722,725,728,731],{"id":716,"name":717,"category":7,"favorite":718},1,"领导干部任职前廉政法规知识测试题",92,{"id":720,"name":721,"category":7,"favorite":716},595,"建筑结构与设备",{"id":723,"name":724,"category":7,"favorite":716},715,"招标采购专业知识与法律法规",{"id":726,"name":727,"category":7,"favorite":716},848,"市政方向-通用基础",{"id":729,"name":730,"category":7,"favorite":8},534,"BIM工程师",{"id":732,"name":730,"category":7,"favorite":8},535]