[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-41":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,41,50,2160,[13,38,53,68,83,97,112,126,141,156,171,186,200,214,229,243,258,272,286,300,315,329,344,358,373,387,401,416,430,444,459,473,487,502,515,529,543,556,570,585,599,612,626,641,655,669,683,697,711,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899928,2,"多选题","招标工程量清单是招标文件的重要组成部分，以下有关其缺项漏项引起的价款调整说法正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","招标工程量清单是否准确和完整，其责任应当由提供工程量清单的发包人负责",true,{"key":24,"text":25,"correct":26},"B","作为投标人的承包人，投标时未检查出招标工程量清单的缺项漏项，承担连带责任",false,{"key":28,"text":29,"correct":22},"C","分部分项工程出现缺项漏项，造成新增工程清单项目的，应按照工程变更事件中关于分部分项工程费的调整方法，调整合同价款",{"key":31,"text":32,"correct":22},"D","分部分项工程出现缺项漏项，引起措施项目发生变化的，按照工程变更事件中关于措施项目费的调整方法，在承包人提交的实施方案被发包人批准后，调整合同价款",{"key":34,"text":35,"correct":22},"E","措施项目漏项，承包人应将新增措施项目实施方案提交发包人批准后，按照工程变更事件中的有关规定调整合同价款","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899929,"下列关于现场签证的说法，正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"施工中遇到不利物质条件，承包商可提出现场签证",{"key":24,"text":45,"correct":26},"施工中遇到法律法规变化，承包商可提出现场签证",{"key":28,"text":47,"correct":22},"承包商被要求完成合同以外的零星项目，可提出现场签证",{"key":31,"text":49,"correct":22},"施工中合同工程内容与发包人要求不一致时，承包商可提出现场签证",{"key":34,"text":51,"correct":26},"现场签证工作完成7天后，承包人按现场签证内容计算价款，确认后作为增加合同价款","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},899930,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于计日工费用的确认和支付，下列说法中正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"承包人应按照确认的计日工现场签证报告核实该类项目的工程数量和单价",{"key":24,"text":60,"correct":22},"已标价工程量清单中有该类计日工单价的，按该单价计算",{"key":28,"text":62,"correct":26},"已标价工程量清单中没有该类计日工单价的，按承包人报价计算",{"key":31,"text":64,"correct":22},"计日工价款应列入同期进度款支付",{"key":34,"text":66,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人应予执行","BDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},899931,"施工合同履行期间出现现场签证事件的，发承包双方应调整合同价款，以下说法正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"承包人应发包人要求完成合同以外的零星项目、非承包人责任事件等工作的，发包人可口头向承包人发出指令",{"key":24,"text":75,"correct":22},"现场签证的工作如果已有相应的计日工单价，现场签证报告中仅列明完成该签证工作所需的人工、材料、工程设备和施工机械台班的数量",{"key":28,"text":77,"correct":22},"如果现场签证的工作没有相应的计日工单价，应当在现场签证报告中列明完成该签证工作所需的人工、材料、工程设备和施工机械台班的数量及其单价",{"key":31,"text":79,"correct":22},"承包人应按照现场签证内容计算价款，报送发包人确认后，作为增加合同价款，与进度款同期支付。",{"key":34,"text":81,"correct":22},"合同工程发生现场签证事项，未经发包人签证确认，承包人便擅自实施相关工作，除非征得发包人书面同意，否则发生的费用由承包人承担","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},899932,"关于施工期间合同暂估价的调整，下列做法中正确的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"不属于依法必须招标的材料，应直接按承包人自主采购的价格调整暂估价",{"key":24,"text":90,"correct":22},"属于依法必须招标的工程设备，以中标价取代暂估价",{"key":28,"text":92,"correct":26},"属于依法必须招标的专业工程，承包人不参加投标的，应由承包人作为招标人，组织招标的费用一般由发包人另行支付",{"key":31,"text":94,"correct":22},"属于依法必须招标的专业工程，承包人参加投标的，应由发包人作为招标人，同等条件下优先选择承包人中标",{"key":34,"text":96,"correct":22},"不属于依法必须招标的专业工程，应按工程变更事件的合同价款调整方法确定专业工程价款",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},899933,"支持承包人工程索赔成立的基本条件有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"合同履行过程中承包人没有违约行为",{"key":24,"text":104,"correct":22},"索赔事件已造成承包人直接经济损失或工期延误",{"key":28,"text":106,"correct":22},"索赔事件是因非承包人的原因引起的",{"key":31,"text":108,"correct":22},"承包人已按合同规定提交了索赔意向通知、索赔报告及相关证明材料",{"key":34,"text":110,"correct":26},"发包人已按合同规定给予了承包人答复","BCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":52,"analysis":37},899934,"根据《建设工程工程量清单计价规范》GB 50500--2013，关于工程变更价款的调整方法，下列说法中正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"工程变更导致已标价工程量清单项目的工程量变化小于15％，仍采用原单价",{"key":24,"text":119,"correct":26},"已标价的工程量清单中没有相同或类似的工程变更项目，由发包人提出变更工程项目的总价和单价",{"key":28,"text":121,"correct":22},"安全文明施工费按照实际发生变化的措施项目并依据国家或省级、行业建设主管部门的规定进行调整",{"key":31,"text":123,"correct":22},"采用单价方式计算的措施费，按照分部分项工程费的调整方法确定变更单价",{"key":34,"text":125,"correct":26},"按系数计算的措施项目费均应按照实际发生变化的措施项目调整，系数不得浮动",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},899935,"某施工合同约定，现场主导施工机械一台，由承包人租得，台班单价为200元／台班，租赁费100元／天，人工工资为50元／工日，窝工补贴20元／工日，以人工费和机械费为基数的综合费率为30％。在施工过程中，发生了如下事件：①遇异常恶劣天气导致停工2天，人员窝工30工日，机械窝工2天；②发包人增加合同工作，用工20工日，使用机械1台班；③场外大范围停电致停工1天，人员窝工20工日，机械窝工1天。据此，下列选项正确的有()。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"因异常恶劣天气停工可得的费用索赔额为800元",{"key":24,"text":133,"correct":26},"因异常恶劣天气停工可得的费用索赔额为1040元",{"key":28,"text":135,"correct":22},"因发包人增加合同工作，承包人可得的费用索赔额为1560元",{"key":31,"text":137,"correct":22},"因停电所致停工，承包人可得的费用索赔额为500元",{"key":34,"text":139,"correct":26},"承包人可得的总索赔费用为2500元","CD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},899936,"下列各概念中，属于按照索赔事件性质分类的是()。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"工期索赔",{"key":24,"text":148,"correct":26},"费用索赔",{"key":28,"text":150,"correct":22},"工程延误索赔",{"key":31,"text":152,"correct":22},"加速施工索赔",{"key":34,"text":154,"correct":22},"合同终止的索赔","CDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},899937,"根据《标准施工招标文件》的规定，承包人只能获得“工期+费用”补偿的事件有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"基准日后法律的变化",{"key":24,"text":163,"correct":22},"施工中发现文物、古迹",{"key":28,"text":165,"correct":26},"发包人提供的材料、工程设备造成工程质量不合格",{"key":31,"text":167,"correct":22},"施工中遇到不利的物质条件",{"key":34,"text":169,"correct":26},"因发包人原因导致承包人工程返工","BD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},899938,"根据《标准施工招标文件》(2007年版)通用合同条款，承包人可能同时获得工期和费用补偿，但不能获得利润补偿的索赔事件有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"发包人提供材料、工程设备不合格",{"key":24,"text":178,"correct":26},"发包人负责的材料延迟提供",{"key":28,"text":180,"correct":26},"迟延提供施工场地",{"key":31,"text":182,"correct":22},"施工中发现文物",{"key":34,"text":184,"correct":22},"施工中遇到不利物质条件","DE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":36,"analysis":37},899939,"工程量必须按照相关工程现行国家计量规范规定的工程量计算规则计算。以下说法正确的是（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"因承包人原因造成的超出合同工程范围施工或返工的工程量，发包人不予计量",{"key":24,"text":193,"correct":26},"规定单价合同、总价合同、成本加酬金合同适用一样的计量方法",{"key":28,"text":195,"correct":22},"成本加酬金合同按照单价合同的计量规定进行计量",{"key":31,"text":197,"correct":22},"单价合同若发现招标工程量清单中出现缺项、工程量偏差，或因工程变更引起工程量的增减，应按承包人在履行合同义务中完成的工程量计算",{"key":34,"text":199,"correct":22},"总价合同除按照工程变更规定引起的工程量增减外，总价合同各项目的工程量是承包人用于结算的最终工程量",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":36,"analysis":37},899940,"关于合同价款纠纷的处理，下列说法中正确的有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"借用有资质的建筑施工企业名义与他人签订建设工程施工合同的行为无效",{"key":24,"text":207,"correct":26},"当事人对垫资利息有约定且约定的利息高于同期同类贷款利率的应予支持",{"key":28,"text":209,"correct":22},"当事人对建筑工程的计价标准或计价方法有约定的按约定结算工程价款",{"key":31,"text":211,"correct":22},"对于阴阳合同，其价款结算应以备案的中标合同作为依据",{"key":34,"text":213,"correct":22},"建设工程未交付，工程价款也未结算的，则工程欠款的计算日为当事人的起诉之日",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},899941,"下列有关工程欠款的利息支付说法正确的是（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"当事人对欠付工程价款利息计付标准有约定的，按照约定处理；没有约定的，按照中国人民银行发布的同期同类贷款利率计息",{"key":24,"text":221,"correct":22},"利息从应付工程价款之日计付",{"key":28,"text":223,"correct":22},"建设工程已实际交付的，计息日为交付之日",{"key":31,"text":225,"correct":22},"建设工程没有交付的，计息日为提交竣工结算文件之日",{"key":34,"text":227,"correct":26},"建设工程未交付，工程价款也未结算的，计息日为开工日期","ABCD",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":52,"analysis":37},899942,"采用双方约定争议调解人方式解决合同价款纠纷，其程序正确的有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"发承包双方可以在合同签订后共同约定争议调解人",{"key":24,"text":236,"correct":26},"发生争议，应由承包人将该争议以书面形式提交调解人，并将副本抄送发包人",{"key":28,"text":238,"correct":22},"调解人收到调解委托后28天内提出调解书",{"key":31,"text":240,"correct":22},"发承包双方接受调解书的，经双方签字后作为合同的补充文件",{"key":34,"text":242,"correct":26},"若发承包任一方对调解有异议，应在收到调解书14天内向另一方发出异议通知",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},899943,"发包人对工程质量有异议，竣工结算仍应按合同约定办理的情形有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"工程已竣工验收的",{"key":24,"text":250,"correct":22},"工程已竣工未验收，但实际投入使用的",{"key":28,"text":252,"correct":26},"工程已竣工未验收，且未实际投入使用的",{"key":31,"text":254,"correct":22},"工程停建，对无质量争议的部分",{"key":34,"text":256,"correct":26},"工程停建，对有质量争议的部分","ABD",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":111,"analysis":37},899944,"关于预付款担保，下列说法中正确的有（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"预付款担保应在施工合同签订后、预付款支付后提供",{"key":24,"text":265,"correct":22},"预付款担保可以采用银行保函的形式",{"key":28,"text":267,"correct":22},"承包人中途毁约，中止工程，发包人有权从预付款担保金额中获得预付款补偿",{"key":31,"text":269,"correct":22},"发包人应在预付款扣完后将预付款保函退还承包人",{"key":34,"text":271,"correct":26},"在预付款全部扣回之前，预付款保函应始终保持有效，且担保金额应始终保持不变",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":82,"analysis":37},899945,"在合同履行过程中因不可抗力解除合同的价款结算与支付说法正确的是（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":26},"由于不可抗力解除合同的，承包人应自行支付撤离现场所需的费用",{"key":24,"text":279,"correct":22},"发包人应向承包人支付已实施或部分实施的措施项目应付价款",{"key":28,"text":281,"correct":22},"发包人应向承包人支付承包人为合同工程合理订购且已交付的材料和工程设备货款",{"key":31,"text":283,"correct":22},"发包人一经支付材料和工程设备货款，则该材料和工程设备成为发包人的财产",{"key":34,"text":285,"correct":22},"发包人应向承包人支付承包人为完成合同工程而预期开支的任何合理费用",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":155,"analysis":37},899946,"以下关于合同价款纠纷处理的说法，正确的有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"承包人在合同约定的期限内没有完工，发包人可请求解除合同，应予支持",{"key":24,"text":293,"correct":26},"发包人未按约定支付工程价款的，承包人可请求解除合同，应予支持",{"key":28,"text":295,"correct":22},"发包人提供的主要建筑材料不符合强制性标准，致使承包人无法施工，且经催告仍未履行相应义务的，承包人可请求解除合同，应予支持",{"key":31,"text":297,"correct":22},"承包人超越资质等级许可的业务范围签订施工合同，在竣工前取得相应资质等级，当事人请求按照无效合同处理的，不予支持",{"key":34,"text":299,"correct":22},"建设工程未经竣工验收，发包人擅自使用后，又以使用部分质量不符合约定为由主张权利的，不予支持",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},899947,"下列属于承包人提交的进度款支付申请内容的有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"累计已完成的合同价款",{"key":24,"text":307,"correct":22},"累计已实际支付的合同价款",{"key":28,"text":309,"correct":22},"本周期应支付的安全文明施工费",{"key":31,"text":311,"correct":26},"实际应支付的竣工结算款",{"key":34,"text":313,"correct":22},"本周期应扣回的预付款","ABCE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":328,"analysis":37},899948,"承包人应在每个计量周期到期后，向发包人提交已完成工程进度款支付申请，支付申请包括的内容有（ ）。",[319,320,322,324,326],{"key":20,"text":305,"correct":22},{"key":24,"text":321,"correct":22},"本期合计完成的合同价款",{"key":28,"text":323,"correct":22},"本期合计应扣减的金额",{"key":31,"text":325,"correct":26},"累计已调整的合同金额",{"key":34,"text":327,"correct":26},"预计下期将完成的合同价款","ABC",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},899949,"采用工程量清单计价的工程，在办理建设工程结算时，工程量计算的原则和方法有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"不符合质量要求的工程不予计量",{"key":24,"text":336,"correct":26},"只按工程量清单计量规范的要求进行计量",{"key":28,"text":338,"correct":26},"无论何种原因，超出合同工程范围的工程均不予计量",{"key":31,"text":340,"correct":22},"因承包人原因造成的返工的工程量，发包人不予计量",{"key":34,"text":342,"correct":22},"应按合同的约定对承包人完成合同工程的数量进行计算和确认","ADE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":343,"analysis":37},899950,"关于建设工程竣工结算的办理，下列说法中正确的有（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"竣工结算文件经发承包人双方签字确认的，应当作为工程结算的依据",{"key":24,"text":351,"correct":26},"竣工结算文件由发包人组织编制，承包人组织核对",{"key":28,"text":353,"correct":26},"工程造价咨询机构审核结论与承包人竣工结算文件不一致时，以造价咨询机构审核意见为准",{"key":31,"text":355,"correct":22},"合同双方对复核后的竣工结算有异议时，可以就无异议部分的工程办理不完全竣工结算",{"key":34,"text":357,"correct":22},"有异议部分由发承包双方协商解决，协商不成的,按照合同约定的争议解决方式处理",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":372,"analysis":37},899951,"工程造价咨询人在进行工程造价鉴定时，应自行收集而非由委托人提供的鉴定资料有（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"适用于鉴定项目的规章、规范性文件",{"key":24,"text":365,"correct":22},"鉴定项目同期同类型工程的技术经济指标",{"key":28,"text":367,"correct":26},"鉴定项目施工过程中的施工组织、质量、工期等工程资料",{"key":31,"text":369,"correct":26},"鉴定项目的施工合同及补充协议",{"key":34,"text":371,"correct":26},"鉴定项目所涉及实物标的的现场勘验资料","AB",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":82,"analysis":37},899952,"由于不可抗力解除合同的，承包人通常可以获得支付的金额包括()。",[377,379,381,383,385],{"key":20,"text":378,"correct":26},"承包人施工机械设备的损坏",{"key":24,"text":380,"correct":22},"解除日之前已完成工程但尚未支付的合同价款",{"key":28,"text":382,"correct":22},"运至施工场地用于施工的材料和待安装设备的损害",{"key":31,"text":384,"correct":22},"实施或部分实施的措施项目应付价款",{"key":34,"text":386,"correct":22},"承包人为完成合同工程而预期开支的任何合理费用，且该项费用未包括在本款其他各项支付之内",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":67,"analysis":37},899953,"国际工程合同价款结算中，关于预付款下列说法中正确的有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":26},"首次预付款的支付时间以收到预付款保函和颁发中标函之日两者中较早者为准",{"key":24,"text":394,"correct":22},"预付款应在支付证书中按百分比扣减的方式偿还",{"key":28,"text":396,"correct":26},"当期中支付证书中累计总额超过中标合同价（含暂定金额）的10％开始扣减",{"key":31,"text":398,"correct":22},"在预付款完全偿还之前承包商应保证预付款保函一直有效",{"key":34,"text":400,"correct":22},"如在预付款保函截止日期前28天预付款还未完全偿还，则承包商应相应延长保函期限",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},899954,"根据《标准设计施工总承包合同招标文件》（2012版），关于暂估价的说法正确的有（ ） A.暂估价是指招标文件中给定的，用于支付必然发生但暂时不能确定价格的专业服务、村料、设备专业工程的金额 B.暂估价A条款中，属于依法必须招标的范围并达到规定的规模标准的，由发包人和承包人以招标的方式选择供应商或分包人",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"对于暂估价是否调整价差，只能按暂估价",{"key":24,"text":408,"correct":22},"条款执行",{"key":28,"text":410,"correct":26},"暂估价A条款中，属于依法必须招标的范围并达到规定的规模标准的，中标金额与价格清单中所列的暂估价的金额差以及相应的税金等其他费用列入合同价格",{"key":31,"text":412,"correct":22},"暂估价",{"key":34,"text":414,"correct":22},"条款，签约合同价中包括暂估价的，按合同约定进行支付，不予以调整价差","ABDE",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":328,"analysis":37},899955,"承包商采购的用于永久工程的材料和设备，合同通用条款规定，期中支付证书中应包括一笔用于预支已运至现场用于永久工程的材料和设备款额，下列有关说法正确的是（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"装运后付款的材料和设备，要求此类材料和设备已经运至工程所在国，并正在运往现场的途中",{"key":24,"text":423,"correct":22},"装运后付款的材料和设备，承包商应提交保函金额与应付的预支总额相等的银行保函",{"key":28,"text":425,"correct":22},"装运后付款的材料和设备，承包商提交的保函有效期持续到此类材料和设备已经运至现场并妥善存放，而且承包商已经采取了防护措施为止",{"key":31,"text":427,"correct":26},"运至现场后付款的材料和设备，要求此类材料和设备已经运至现场，但可先不安排存放",{"key":34,"text":429,"correct":26},"工程师确认用于永久工程的材料和设备符合预支条件后，应当根据审查承包商提交的相关文件确定此类材料和设备的实际费用，作为期中支付证书中应增加的款额",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":314,"analysis":37},899956,"根据《标准设计施工总承包招标文件》（2012年版），以下情形中，属于工程总承包价款调整原因的有（ ）",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"物价波动引起的价格调整",{"key":24,"text":437,"correct":22},"计日工引起的价格调整",{"key":28,"text":439,"correct":22},"暂估价引起的价格调整",{"key":31,"text":441,"correct":26},"监理人确定撤销变更意向书引起的价格调整",{"key":34,"text":443,"correct":22},"变更引起的价格调整",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":458,"analysis":37},899957,"根据FIDIC《施工合同条件》的规定，以下有关合同价款的结算说法正确的是()。",[448,450,452,454,456],{"key":20,"text":449,"correct":26},"如果在预付款保函截止日期前28天预付款还未完全偿还，应立即偿还剩余预付款",{"key":24,"text":451,"correct":22},"除非合同中另有规定，无论工程所在地惯例如何，对每部分永久工程的计量应以实际完成的净值进行",{"key":28,"text":453,"correct":26},"期中支付证书一经签发，不予更改",{"key":31,"text":455,"correct":26},"在工程的最后一个缺陷通知期期满后，发包人应立即将全部保留金一次性支付给承包商",{"key":34,"text":457,"correct":22},"在工程的最后一个缺陷通知期结束后28天内，工程师应当签发履约证书","BE",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":67,"analysis":37},899958,"FIDIC条件下，工程变更的范围包括（ ）。",[463,465,467,469,471],{"key":20,"text":464,"correct":26},"删除某项工程，转由他人实施",{"key":24,"text":466,"correct":22},"任何部分标高、尺寸、位置变化",{"key":28,"text":468,"correct":26},"因施工需要，施工机械日常检修时间变更",{"key":31,"text":470,"correct":22},"工程质量改变",{"key":34,"text":472,"correct":22},"合同中的任何工程内容的数量改变",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":257,"analysis":37},899959,"下列资金项目中，属于“基本建设项目竣工财务决算表”中资金来源的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"基建拨款",{"key":24,"text":480,"correct":22},"项目资本金",{"key":28,"text":482,"correct":26},"应收生产单位投资借款",{"key":31,"text":484,"correct":22},"基建借款,",{"key":34,"text":486,"correct":26},"待核销基建支出,",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":501,"analysis":37},899960,"下列内容中，属于竣工决算的编制依据的有（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"项目计划任务书及立项批复文件",{"key":24,"text":494,"correct":26},"工程量清单",{"key":28,"text":496,"correct":22},"会计核算及财务管理资料",{"key":31,"text":498,"correct":26},"工程建设其他费用定额",{"key":34,"text":500,"correct":22},"工程签证、工程索赔等合同价款调整文件","ACE",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":228,"analysis":37},899961,"按照财办建[2008]91号文的规定，竣工决算的编制依据有（ ）。",[506,508,509,511,513],{"key":20,"text":507,"correct":22},"经批准的设计文件及设计交底、图纸会审资料",{"key":24,"text":492,"correct":22},{"key":28,"text":510,"correct":22},"项目总概算书和单项工程概算书文件",{"key":31,"text":512,"correct":22},"项目竣工结算文件",{"key":34,"text":514,"correct":26},"双方签订的建筑安装工程承包合同终结凭证",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":228,"analysis":37},899962,"按照财政部、国家发展改革委和住房城乡建设部的有关文件规定，竣工决算是由（ ）组成。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"竣工财务决算说明书",{"key":24,"text":522,"correct":22},"竣工财务决算报表",{"key":28,"text":524,"correct":22},"工程竣工图",{"key":31,"text":526,"correct":22},"工程竣工造价对比分析",{"key":34,"text":528,"correct":26},"工程结算文件",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":82,"analysis":37},899963,"根据国家现行有关竣工结算的规定，建设项目财务决算报表包括（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":26},"建设项目竣工财务决算审批表",{"key":24,"text":536,"correct":22},"建设项目概况表",{"key":28,"text":538,"correct":22},"基本建设项目竣工财务决算表",{"key":31,"text":540,"correct":22},"建设项目交付使用资产明细表",{"key":34,"text":542,"correct":22},"建设项目交付使用资产总表",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":328,"analysis":37},899964,"在新增资产固定资产价值的确定过程中，建设单位管理通常按照下列（ ）总额按比例计算。",[547,548,550,552,554],{"key":20,"text":7,"correct":22},{"key":24,"text":549,"correct":22},"安装工程",{"key":28,"text":551,"correct":22},"需安装设备价值总额",{"key":31,"text":553,"correct":26},"不需安装设备价值总额",{"key":34,"text":555,"correct":26},"设备购置费总额",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":170,"analysis":37},899965,"下列关于新增固定资产价值确定方法的描述，正确的是（ ）。",[560,562,564,566,568],{"key":20,"text":561,"correct":26},"新增固定资产价值计算的对象是独立发挥生产能力的单位工程",{"key":24,"text":563,"correct":22},"在建的附属辅助工程，交付使用后计入新增固定资产价值",{"key":28,"text":565,"correct":26},"独立发挥效益的非生产性项目，建成后计入新增固定资产价值",{"key":31,"text":567,"correct":22},"属于新增固定资产价值的其他投资应随受益工程交付使用的同时一并计入",{"key":34,"text":569,"correct":26},"凡购置达到固定资产标准不需要安装的工器具不应计入新增固定资产价值",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":584,"analysis":37},899966,"下列关于共同费用分摊计入新增固定资产价值的表述，正确的是（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":26},"建设单位管理费按建筑、安装工程造价总额作比例分摊",{"key":24,"text":577,"correct":22},"土地征用费按建筑工程造价比例分摊",{"key":28,"text":579,"correct":22},"建筑工程设计费按建筑工程造价比例分摊",{"key":31,"text":581,"correct":26},"生产工艺流程系统设计费按需安装设备价值总额作比例分摊",{"key":34,"text":583,"correct":22},"地质勘查费按建筑工程造价比例分摊","BCE",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":501,"analysis":37},899967,"关于新增固定资产价值的确定，下列表述中正确的有（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"新增固定资产价值的计算是以单项工程为对象的",{"key":24,"text":592,"correct":26},"计算新增固定资产价值，应在生产和使用的工程全部交付后进行",{"key":28,"text":594,"correct":22},"建设单位管理费按单项工程的建筑工程、安装工程、需安装设备价值总额的比例分摊",{"key":31,"text":596,"correct":26},"土地征用费、勘察设计费用按单项工程的建筑、安装工程造价总额比例分摊",{"key":34,"text":598,"correct":22},"运输设备及其他不需安装设备不计人分摊的“待摊投资”",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":52,"analysis":37},899968,"有关新增固定资产价值，以下说法正确的是（ ）。",[603,605,607,609,610],{"key":20,"text":604,"correct":22},"对于单项工程中不构成生产系统，但能独立发挥效益的非生产性项目，在建成并交付使用后，也要计算新增固定资产价值",{"key":24,"text":606,"correct":26},"生产设备一般仅计算采购成本，不计分摊的“待摊投资”",{"key":28,"text":608,"correct":22},"属于新增固定资产价值的其他投资，应在受益工程交付使用的同时一并计入",{"key":31,"text":579,"correct":22},{"key":34,"text":611,"correct":26},"分批交付生产的工程，应待全部交付完毕后一次性计入新增固定资产价值",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":343,"analysis":37},899969,"下列关于新增无形资产价值确定的表述中，正确的有（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"非专利技术具有使用价值和价值",{"key":24,"text":619,"correct":26},"专利权的转让价格按成本估价",{"key":28,"text":621,"correct":26},"自创的非专利技术按自创过程中发生的费用计入无形资产账户",{"key":31,"text":623,"correct":22},"如果商标权是自创的，一般不作为无形资产入账",{"key":34,"text":625,"correct":22},"专利权分为自创和外购两类",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":640,"analysis":37},899970,"土地使用权的取得方式影响竣工决算新增资产的核定，下列土地使用权的作价应作为无形资产核算的有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"通过支付土地出让金取得的土地使用权",{"key":24,"text":633,"correct":26},"通过行政划拨取得的土地使用权",{"key":28,"text":635,"correct":26},"通过有偿转让取得的出让土地使用权",{"key":31,"text":637,"correct":22},"已补交土地让价款，作价入股的土地使用权",{"key":34,"text":639,"correct":26},"租借房屋的土地使用权","AD",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":257,"analysis":37},899971,"建设项目竣工投入运营后，所花费的总投资形成相应的资产，新增资产按资产性质可分为（ ）。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"固定资产",{"key":24,"text":648,"correct":22},"流动资产",{"key":28,"text":650,"correct":26},"实体资产",{"key":31,"text":652,"correct":22},"无形资产",{"key":34,"text":654,"correct":26},"其他资产",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":415,"analysis":37},899973,"关于无形资产的计价，以下说法中正确的有（ ）。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"购入的无形资产，按实际支付的价款计价",{"key":24,"text":662,"correct":22},"自创专利权的价值为开发过程中的实际支出",{"key":28,"text":664,"correct":26},"自创的商标权价值，应按照其设计、制作、注册、广告宣传的费用作为无形资产价值",{"key":31,"text":666,"correct":22},"外购非专利技术可通过收益法进行估价",{"key":34,"text":668,"correct":22},"无偿划拨的土地使用权通常不能作为无形资产入账",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":67,"analysis":37},899974,"（2017年考题）计算设备进口环节增值税时，作为计算基数的计税价格包括（ ）。",[673,675,677,679,681],{"key":20,"text":674,"correct":26},"外贸手续费",{"key":24,"text":676,"correct":22},"到岸价",{"key":28,"text":678,"correct":26},"设备运杂费",{"key":31,"text":680,"correct":22},"关税",{"key":34,"text":682,"correct":22},"消费税",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":415,"analysis":37},899975,"（2016年考题）下列费用中应计入到设备运杂费的有（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"设备保管人员的工资",{"key":24,"text":690,"correct":22},"设备采购人员的工资",{"key":28,"text":692,"correct":26},"设备自生产厂家运至工地仓库的运费、装卸费",{"key":31,"text":694,"correct":22},"运输中的设备包装支出",{"key":34,"text":696,"correct":22},"设备仓库所占的固定资产使用费",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":314,"analysis":37},899976,"（2019年考题）非标准设备原价中，能作为利润取费基数的是（ ）。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"辅助材料费",{"key":24,"text":704,"correct":22},"废品损失费",{"key":28,"text":706,"correct":22},"包装费",{"key":31,"text":708,"correct":26},"外购配套件费",{"key":34,"text":710,"correct":22},"专用工具费",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":67,"analysis":37},899977,"（2015年考题）关于设备购置费的构成和计算，下列说法中正确的有（ ）。",[715,717,719,721,723],{"key":20,"text":716,"correct":26},"国产标准设备的原价中，一般不包含备件的价格",{"key":24,"text":718,"correct":22},"成本计算估价法适用于非标准设备原价的价格",{"key":28,"text":720,"correct":26},"进口设备原价是指进口设备到岸价",{"key":31,"text":722,"correct":22},"国产非标准设备原价中包含非标准设备设计费",{"key":34,"text":724,"correct":22},"达到固定资产标准的工器具，其购置费用应计入设备购置费中",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":185,"analysis":37},899978,"（2018年考题）构成进口设备原价的费用中，应以到岸价为计算基数的有（ ）。",[729,731,733,735,736],{"key":20,"text":730,"correct":26},"国际运费",{"key":24,"text":732,"correct":26},"进口环节增值税",{"key":28,"text":734,"correct":26},"银行财务费",{"key":31,"text":674,"correct":22},{"key":34,"text":737,"correct":22},"进口关税",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]