[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,40,50,2160,[13,38,53,67,82,97,112,127,141,155,170,184,198,213,228,243,257,271,286,300,314,328,343,357,371,386,400,415,429,444,458,471,485,498,513,526,540,554,568,583,597,611,626,640,654,668,682,696,710,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899878,2,"多选题","下列关于施工图预算对施工企业的作用，表述正确的是（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","施工图预算是进行“两算”对比的依据",true,{"key":24,"text":25,"correct":22},"B","施工图预算是建筑工程预算包干的依据",{"key":27,"text":28,"correct":29},"C","施工图是控制造价及资金合理使用的依据",false,{"key":31,"text":32,"correct":29},"D","施工图预算是确定工程招标控制价的依据",{"key":34,"text":35,"correct":29},"E","施工图预算是施工图设计不突破设计概算的重要措施","AB","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899879,"施工图预算是建设程序中一个重要的技术经济文件，下列各项中属于施工图预算对投资方的作用的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"调配施工力量、组织材料供应的依据",{"key":24,"text":45,"correct":22},"控制造价及资金合理使用的依据",{"key":27,"text":47,"correct":22},"确定合同价款、拨付工程进度款的依据",{"key":31,"text":49,"correct":29},"建筑工程预算包干的依据",{"key":34,"text":51,"correct":22},"确定工程招标控制价的依据","BCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},899880,"关于施工图预算对投资方的作用，下列说法中正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"是控制施工图设计不突破设计概算的重要措施",{"key":24,"text":60,"correct":22},"是控制造价及资金合理使用的依据",{"key":27,"text":62,"correct":29},"是投标报价的基础",{"key":31,"text":64,"correct":29},"是与施工预算进行“两算”对比的依据",{"key":34,"text":66,"correct":29},"是调配施工力量、组织材料供应的依据",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},899881,"下列内容中，属于建筑安装工程施工图预算编制依据的是（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"国家、行业和地方有关规定",{"key":24,"text":74,"correct":22},"相应工程造价管理机构发布的预算定额",{"key":27,"text":76,"correct":22},"施工图设计文件及相关标准图集和规范",{"key":31,"text":78,"correct":29},"工程建设其他费定额",{"key":34,"text":80,"correct":29},"工程分析表","ABC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},899882,"采用工料单价法编制施工图预算造价时，以下工作内容属于列项并计算工程量阶段的是()。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"根据工程内容和定额项目，列出需计算工程量的分部分项工程",{"key":24,"text":89,"correct":29},"熟悉施工图等基础资料",{"key":27,"text":91,"correct":22},"根据一定的计算顺序和计算规则，列出分部分项工程量的计算式",{"key":31,"text":93,"correct":22},"根据施工图纸上的设计尺寸及有关数据，代入计算式进行数值计算",{"key":34,"text":95,"correct":22},"对计算结果的计量单位进行调整，使之与定额中相应的分部分项工程的计量单位保持一致","ACDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},899883,"下列费用项目中，属于单项工程施工图预算编制范围之内的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"特殊构筑物的土建工程费",{"key":24,"text":104,"correct":22},"采暖工程的安装工程费",{"key":27,"text":106,"correct":29},"厂房贷款的建设期利息费用",{"key":31,"text":108,"correct":22},"工器具和生产家具购置费",{"key":34,"text":110,"correct":22},"空调工程的调试工程费","ABDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},899884,"关于施工招标文件，下列说法中正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"招标文件应包括拟签合同的主要条款",{"key":24,"text":119,"correct":22},"当进行资格预审时，招标文件中应包括投标邀请书",{"key":27,"text":121,"correct":29},"自招标文件开始发出之日起至投标截止之日最短不得少于15天",{"key":31,"text":123,"correct":29},"招标文件不得说明评标委员会的组建方法",{"key":34,"text":125,"correct":22},"招标文件应明确评标方法","ABE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":111,"analysis":37},899885,"关于招标工程量清单的编制，下列说法正确的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"若采用标准图集能够全部满足项目特征描述的要求，项目特征描述可直接采用“详见××图集”的方式",{"key":24,"text":134,"correct":22},"措施项目清单的编制需考虑工程本身、水文、气象、环境、安全等多种因素",{"key":27,"text":136,"correct":29},"以“项”为计量单位的专业工程暂估价一般应包括管理费、规费、利润、税金等",{"key":31,"text":138,"correct":22},"工程量清单总说明应对工程概况、工程招标及分包范围、工程质量要求等进行描述",{"key":34,"text":140,"correct":22},"工程量清单编制依据包括设计文件、拟定的招标文件、施工现场情况、常规施工方案等",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":111,"analysis":37},899886,"关于工程量清单中的项目特征描述，下列表述正确的是（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"应符合工程量计算规范附录的规定",{"key":24,"text":148,"correct":22},"应能满足确定综合单价的需要",{"key":27,"text":150,"correct":29},"不能直接采用详见XX图集的方式",{"key":31,"text":152,"correct":22},"可以采用文字描述和详见XX图号的方式",{"key":34,"text":154,"correct":22},"应结合拟建工程实际",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},899887,"根据《建设工程工程量清单计价规范》GB50500—2013，招标控制价中综合单价中应考虑的风险因素包括（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"项目管理的复杂性",{"key":24,"text":162,"correct":22},"项目的技术难度",{"key":27,"text":164,"correct":29},"人工单价的市场变化",{"key":31,"text":166,"correct":22},"材料价格的市场风险",{"key":34,"text":168,"correct":29},"税金、规费的政策变化","ABD",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":169,"analysis":37},899888,"下列关于招标工程量清单的描述，说法正确的有（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"招标工程量清单是招标文件的组成部分，可以由招标人委托的工程造价咨询人编制",{"key":24,"text":177,"correct":22},"招标人对工程量清单中各分部分项工程工程量的准确性和完整性负责",{"key":27,"text":179,"correct":29},"由于措施项目投标人可自行选择，因此招标人无须对措施项目工程量的准确性和完整性负责",{"key":31,"text":181,"correct":22},"招标工程量清单编制前也要进行现场踏勘",{"key":34,"text":183,"correct":29},"招标工程量清单编制时需进行先进施工组织设计方案的编制，以提高施工水平",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":81,"analysis":37},899889,"下列有关暂列金额的表述，正确的是（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购",{"key":24,"text":191,"correct":22},"用于施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整",{"key":27,"text":193,"correct":22},"用于发生的索赔、现场签证确认等的费用",{"key":31,"text":195,"correct":29},"用于支付必然发生但暂时不能确定价格的材料的单价",{"key":34,"text":197,"correct":29},"指招标人在工程量清单中暂定但未包括在合同价款中的一笔款项",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},899890,"关于招标工程量清单与招标控制价，下列说法中正确的有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"专业工程暂估价应包括除规费税金以外的管理费和利润等",{"key":24,"text":205,"correct":29},"招标控制价必须公布其总价而不得公布各组成部分的详细内容",{"key":27,"text":207,"correct":22},"投标报价若超过公布的招标控制价则应否决其投标",{"key":31,"text":209,"correct":22},"国有资金投资的工程，招标控制价原则上不得超过批准的设计概算",{"key":34,"text":211,"correct":29},"招标人仅要求对分包的专业工程进行总承包管理和协调时，总承包服务费按专业工程估算的3%～5%计算","ACD",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},899891,"关于其他项目清单的编制，说法正确的有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":29},"暂列金额是预见肯定要发生而暂时无法明确数额的费用项目",{"key":24,"text":220,"correct":29},"专业工程暂估价应包括除规费以外的所有综合单价构成内容",{"key":27,"text":222,"correct":22},"暂估价中的材料、工程设备单价应按招标工程量清单中列出的单价计入综合单价",{"key":31,"text":224,"correct":22},"总承包服务费包括对发包人自行采购的材料、工程设备等进行保管以及施工现场管理、竣工资料汇总整理等服务所需的费用",{"key":34,"text":226,"correct":22},"招标人应预计总承包服务费并按投标人的投标报价向投标人支付该项费用","CDE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},899892,"在分部分项工程量清单编制计算工程量时，应依据的计算原则包括（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"计算口径一致",{"key":24,"text":235,"correct":22},"按工程量计算规则计算",{"key":27,"text":237,"correct":22},"按图纸计算",{"key":31,"text":239,"correct":22},"按一定顺序计算",{"key":34,"text":241,"correct":29},"根据工程内容和定额项目计算","ABCD",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":81,"analysis":37},899893,"关于招标分部分项工程量清单的项目特征描述，应遵循的编制原则有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"按专业工程量计算规范附录的规定，结合拟建工程实际描述",{"key":24,"text":250,"correct":22},"其他独有特征，由清单编制人视项目具体情况确定",{"key":27,"text":252,"correct":22},"要满足确定综合单价的需要",{"key":31,"text":254,"correct":29},"应详细描述分部分项工程的施工工艺和方法",{"key":34,"text":256,"correct":29},"对于采用标准图集的项目，可直接描述为“详见××图集”",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":52,"analysis":37},899894,"当编制招标工程量清单时，需要合理考虑施工顺序，通常需要考虑的内容包括()。",[261,263,265,267,269],{"key":20,"text":262,"correct":29},"施工进度计划要满足合同对工期的要求",{"key":24,"text":264,"correct":22},"各分部分项工程之间的关系",{"key":27,"text":266,"correct":22},"当地的气候条件和水文要求",{"key":31,"text":268,"correct":29},"现场的平面布置及各种技术措施",{"key":34,"text":270,"correct":22},"施工方法和施工机械的要求",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},899895,"下列行为中属于串通投标的有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":29},"不同投标人的投标文件异常一致或者投标报价呈规律性差异",{"key":24,"text":278,"correct":22},"投标人之间就投标文件的实质性内容进行沟通",{"key":27,"text":280,"correct":29},"不同投标人的投标保证金从同一单位或者个人的账户转出",{"key":31,"text":282,"correct":22},"招标人在开标前开启投标文件并将有关信息泄露给其他投标人",{"key":34,"text":284,"correct":22},"属于同一集团、协会、商会等组织成员的投标人按照该组织要求协同投标","BDE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":126,"analysis":37},899896,"下列关于投标文件的递交，描述正确的有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"在招标文件要求提交投标文件的截止时间后送达或未送达指定地点的投标文件，为无效的投标文件",{"key":24,"text":293,"correct":22},"联合体投标的，投标保证金由牵头人或联合体各方提交",{"key":27,"text":295,"correct":29},"投标保证金的数额不得超过项目估算价的2%，且最高不超过80万元",{"key":31,"text":297,"correct":29},"一般项目投标有效期为120天左右",{"key":34,"text":299,"correct":22},"在招标文件规定的投标有效期内，投标人要求撤销或修改其投标文件，投标保证金不予返还",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":242,"analysis":37},899897,"关于联合体投标，下列说法正确的有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"联合体各方应当指定牵头人",{"key":24,"text":307,"correct":22},"各方签订共同投标协议后不得再以自己的名义在同一项目单独投标",{"key":27,"text":309,"correct":22},"联合体投标应当向招标人提交由所有联合体成员法定代表人签署的授权书",{"key":31,"text":311,"correct":22},"同一专业的单位组成联合体，资质等级就低不就高",{"key":34,"text":313,"correct":29},"提交投标保证金必须由牵头人实施",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":212,"analysis":37},899898,"下列选项中，属于投标文件的有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"投标保证金",{"key":24,"text":321,"correct":29},"工程量清单",{"key":27,"text":323,"correct":22},"联合体协议书",{"key":31,"text":325,"correct":22},"资格审查资料",{"key":34,"text":327,"correct":29},"评标办法",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},899899,"根据我国现行施工招标投标管理规定，投标有效期的确定一般应考虑的因素有（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":29},"投标报价需要的时间",{"key":24,"text":335,"correct":22},"组织评标需要的时间",{"key":27,"text":337,"correct":22},"确定中标人需要的时间",{"key":31,"text":339,"correct":22},"签订合同需要的时间",{"key":34,"text":341,"correct":29},"提交履约保证金需要的时间","BCD",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":96,"analysis":37},899900,"关于施工投标报价中下列说法中正确的有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"投标人应认真根据招标说明、图纸、地质资料等招标文件资料，计算主要清单工程量，复核工程量清单",{"key":24,"text":350,"correct":29},"投标人应修改错误的工程量，并通知招标人",{"key":27,"text":352,"correct":22},"投标人可以不向招标人提出复核工程量中发现的遗漏",{"key":31,"text":354,"correct":22},"投标人可以通过复核防止由于订货超量带来的浪费",{"key":34,"text":356,"correct":22},"投标人应根据复核工程量的结果选择适用的施工设备",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":242,"analysis":37},899901,"复核工程量是投标人编制投标报价前的一项重要工作。通过复核工程量，便于投标人（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"决定报价尺度",{"key":24,"text":364,"correct":22},"采取合适的施工方法",{"key":27,"text":366,"correct":22},"选用合适的施工机具",{"key":31,"text":368,"correct":22},"决定投入劳动力数量",{"key":34,"text":370,"correct":29},"选用合适的承包方法",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},899902,"投标文件应当对招标文件作出实质性响应的内容有（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":29},"报价",{"key":24,"text":378,"correct":22},"工期",{"key":27,"text":380,"correct":22},"投标有效期",{"key":31,"text":382,"correct":22},"质量要求",{"key":34,"text":384,"correct":22},"招标范围","BCDE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":285,"analysis":37},899903,"关于投标文件的编制与递交，下列说法中正确的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":29},"投标函附录中可以提出比招标文件要求更能吸引招标人的承诺",{"key":24,"text":393,"correct":22},"当投标文件的正本与副本不一致时以正本为准",{"key":27,"text":395,"correct":29},"允许递交备选投标方案时，所有投标人的备选方案应同等对待",{"key":31,"text":397,"correct":22},"在要求提交投标文件的截止时间后送达的投标文件为无效的投标文件",{"key":34,"text":399,"correct":22},"境内投标人以现金形式提交的投标保证金应当出自投标人的基本账户",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":414,"analysis":37},899904,"关于发承包双方在工程施工阶段的风险分摊原则，下列说法正确的有（ ）。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"发承包双方应当在合同中对市场价格波动导致风险的范围和幅度予以约定",{"key":24,"text":407,"correct":29},"承包人承担5％以内的材料价格风险和10％以内的工程设备、施工机具使用费风险",{"key":27,"text":409,"correct":29},"对于政府定价或政府指导价管理的原材料价格发生变动的风险，承包人应适当承担",{"key":31,"text":411,"correct":22},"对于承包人根据自身技术水平、管理、经营状况能够自主控制的风险，发包人不予承担",{"key":34,"text":413,"correct":22},"承包人的管理费、利润的风险应由承包人自己承担","ADE",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":227,"analysis":37},899905,"下列各项内容属于响应性评审标准的有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":29},"安全生产许可证的有效性",{"key":24,"text":422,"correct":29},"施工方案与技术措施的标准性",{"key":27,"text":424,"correct":22},"投标保证金应符合招标文件的有关要求",{"key":31,"text":426,"correct":22},"投标有效期应符合招标文件的有关要求",{"key":34,"text":428,"correct":22},"已标价工程量清单的有关要求",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":443,"analysis":37},899906,"为维护公开、公平、公正的市场环境，对中标候选人的公示，下列做法中正确的有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":29},"依法必须进行招标的项目，是否公开中标候选人由招标人自定",{"key":24,"text":436,"correct":22},"招标人应当自收到评标报告之日起3日内公示中标候选人。公示期不得少于3日",{"key":27,"text":438,"correct":29},"一般只公示排名第一的中标候选人而不必公示中标候选人全部名单",{"key":31,"text":440,"correct":22},"对有业绩信誉条件的项目，在开标时提供的资格或业绩信誉证明资料一并予以公示",{"key":34,"text":442,"correct":29},"中标候选人的各评分要素的得分情况需一并公示","BD",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":414,"analysis":37},899907,"关于履约担保，下列说法中正确的有（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"履约担保有现金、支票、汇票、履约担保书和银行保函等形式",{"key":24,"text":451,"correct":29},"履约保证金不得超过中标合同金额的5%",{"key":27,"text":453,"correct":29},"中标人不能按要求提交履约保证金的，视为放弃中标，其投标保证金应予退还",{"key":31,"text":455,"correct":22},"招标人要求中标人提供履约担保的，招标人应同时向中标人提供工程款支付担保",{"key":34,"text":457,"correct":22},"履约保证金的有效期需保持至工程接收证书颁发之时",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":227,"analysis":37},899908,"依法必须进行招标的项目，招标人应当向有关行政监督部门提交招标投标情况的书面报告，书面报告包括的内容有（ ）。",[462,463,465,467,469],{"key":20,"text":384,"correct":29},{"key":24,"text":464,"correct":29},"合同签订方式",{"key":27,"text":466,"correct":22},"招标文件中投标人须知的内容",{"key":31,"text":468,"correct":22},"评标委员会的组成",{"key":34,"text":470,"correct":22},"中标结果",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":96,"analysis":37},899909,"经初步评审后，评标委员会否决投标人投标的情形包括（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"投标联合体没有提交共同投标协议",{"key":24,"text":478,"correct":29},"招标文件要求提交备选投标方案时，投标人可以提交两个以上不同的投标文件或者投标报价",{"key":27,"text":480,"correct":22},"投标人不符合国家或者招标文件规定的资格条件",{"key":31,"text":482,"correct":22},"投标文件没有对招标文件的实质性要求和条件作出响应",{"key":34,"text":484,"correct":22},"投标报价低于成本或者高于招标文件设定的最高投标限价",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":497,"analysis":37},899910,"下列关于公示中标候选人的说法，正确的是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"招标人应当自收到评标报告之日起3日内公示中标候选人，公示期不得少于3日",{"key":24,"text":492,"correct":29},"招标人应当自收到评标报告之日起5日内公示中标候选人",{"key":27,"text":494,"correct":29},"不但公示中标候选人的排名，还要公示投标人的各评分要素的得分情况",{"key":31,"text":496,"correct":22},"对有业绩信誉条件的项目，在投标报名或开标时提供的作为资格条件或业绩信誉情况，应一并公示","AD",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":512,"analysis":37},899911,"根据《招标投标法实施条例》，关于依法必须招标项目中标候选人的公示，下列说法中正确的有（ ）。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"应公示中标候选人",{"key":24,"text":505,"correct":22},"公示对象是全部中标候选人",{"key":27,"text":507,"correct":22},"公示期不得少于3日",{"key":31,"text":509,"correct":29},"公示在开标后的第二天发布",{"key":34,"text":511,"correct":22},"对有业绩信誉条件的项目，其业绩信誉情况应一并进行公示","ABCE",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":512,"analysis":37},899912,"经初步评审后，未能在实质上响应的投标，评标委员会应当否决其投标，具体情形包括()。",[517,519,520,522,524],{"key":20,"text":518,"correct":22},"同一投标人提交两个以上不同的投标报价，且招标文件不允许提交备选投标",{"key":24,"text":480,"correct":22},{"key":27,"text":521,"correct":22},"投标人提交的投标保证金不符合招标文件的有关要求",{"key":31,"text":523,"correct":29},"投标人提交的施工方案与技术措施不是最优方案",{"key":34,"text":525,"correct":22},"投标报价低于成本",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":285,"analysis":37},899913,"在评标工作的初步评审阶段，投标文件的形式评审的内容包括()。",[530,532,534,536,538],{"key":20,"text":531,"correct":29},"报价构成的合理性",{"key":24,"text":533,"correct":22},"投标人名称与营业执照、资质证书、安全生产许可证一致",{"key":27,"text":535,"correct":29},"环境保护管理体系与措施",{"key":31,"text":537,"correct":22},"投标函上有法定代表人或其委托代理人签字或加盖单位章",{"key":34,"text":539,"correct":22},"报价唯一，即只能有一个有效报价",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":342,"analysis":37},899914,"在评标过程中，评标委员会可以要求投标人对投标文件有关内容作出必要澄清、说明和补充的情形包括（ ）。",[544,546,548,550,552],{"key":20,"text":545,"correct":29},"投标文件未经单位负责人签字",{"key":24,"text":547,"correct":22},"对同类问题表述不一致",{"key":27,"text":549,"correct":22},"投标文件中有含义不明确的内容",{"key":31,"text":551,"correct":22},"有明显的计算错误",{"key":34,"text":553,"correct":29},"投标人主动提出的澄清说明",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":497,"analysis":37},899915,"下列选项中属于工程总承包投标文件编制内容的有（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"承包人建议书",{"key":24,"text":561,"correct":29},"已标价工程量清单",{"key":27,"text":563,"correct":29},"项目管理机构",{"key":31,"text":565,"correct":22},"价格清单",{"key":34,"text":567,"correct":29},"施工组织设计",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":37},899916,"下列总承包范围涉及试运行阶段的总承包类型是（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":22},"设计—采购—施工总承包",{"key":24,"text":575,"correct":29},"设计—施工总承包",{"key":27,"text":577,"correct":22},"交钥匙总承包",{"key":31,"text":579,"correct":29},"设计—采购总承包",{"key":34,"text":581,"correct":29},"采购—施工总承包","AC",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":81,"analysis":37},899917,"下列关于承揽国际工程时投标报价计算的表述，正确的有（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"人工工日单价应是考虑工效的综合人工工日单价",{"key":24,"text":590,"correct":22},"工期较长时，材料单价应考虑材料预涨费",{"key":27,"text":592,"correct":22},"施工机械台班单价不包含大修理费",{"key":31,"text":594,"correct":29},"上级单位管理费一般按工程直接费的5%-10%计取",{"key":34,"text":596,"correct":29},"盈余就是利润，一般毛利定在5%-10%",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":242,"analysis":37},899918,"在工程总承包投标报价分析中，工程总承包项目的成本费用按阶段可以分解成（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"勘察费用",{"key":24,"text":604,"correct":22},"设计费用",{"key":27,"text":606,"correct":22},"采购费用",{"key":31,"text":608,"correct":22},"施工费用",{"key":34,"text":610,"correct":29},"其他费用",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":625,"analysis":37},899919,"工程总承包的主要特点包括（ ）。",[615,617,619,621,623],{"key":20,"text":616,"correct":29},"合同结构复杂",{"key":24,"text":618,"correct":29},"承包商利润高",{"key":27,"text":620,"correct":22},"承包商积极性高",{"key":31,"text":622,"correct":22},"项目整体效果好",{"key":34,"text":624,"correct":29},"总投资较低","CD",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":443,"analysis":37},899920,"根据《标准施工招标文件》（2007年版）的规定，承包人只能获得“工期+费用”补偿的事件有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":29},"基准日后法律的变化",{"key":24,"text":633,"correct":22},"施工中发现文物、古迹",{"key":27,"text":635,"correct":29},"发包人提供的材料、工程设备造成工程质量不合格",{"key":31,"text":637,"correct":22},"施工中遇到不利的物质条件",{"key":34,"text":639,"correct":29},"延期提供图纸",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":96,"analysis":37},899921,"根据《标准施工招标文件》（2007）版，承包人有可能同时获得工期和费用补偿的事件有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"发包方延期提供图纸",{"key":24,"text":647,"correct":29},"因不可抗力造成的工期延误",{"key":27,"text":649,"correct":22},"甲供设备未按时进场导致停工",{"key":31,"text":651,"correct":22},"监理对覆盖的隐蔽工程重新检查且结果合格",{"key":34,"text":653,"correct":22},"施工中发现文物古迹",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":169,"analysis":37},899922,"根据《建设工程工程量清单计价规范》GB50500-2013，关于单价合同措施项目费的调整，下列说法中正确的有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"设计变更引起措施项目发生变化的，可以调整措施项目费",{"key":24,"text":661,"correct":22},"招标工程量清单分部分项工程漏项引起措施项目发生变化的，可以调整措施项目费",{"key":27,"text":663,"correct":29},"招标工程量清单措施项目缺项的，不应调整措施项目费",{"key":31,"text":665,"correct":22},"承包人提出调整措施项目费的，应事先将实施方案报发包人批准",{"key":34,"text":667,"correct":29},"措施项目费的调整方法与分部分项工程费的调整方法相同",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":342,"analysis":37},899923,"下列资料中，可以作为施工发承包双方提出和处理索赔直接依据的有（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":29},"未在合同中约定的工程所在地的地方性法规",{"key":24,"text":675,"correct":22},"工程施工合同文件",{"key":27,"text":677,"correct":22},"合同中约定的非强制性标准",{"key":31,"text":679,"correct":22},"工程施工合同履行过程中与索赔事件有关的各种凭证",{"key":34,"text":681,"correct":29},"合同中未明确规定的地方定额",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":512,"analysis":37},899924,"以下有关提前竣工的说法正确的是（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"发包人应当依据相关工程的工期定额合理计算工期，压缩的工期天数不得超过定额工期的20％，超过的，应在招标文件中明示增加赶工费用",{"key":24,"text":689,"correct":22},"约定提前竣工奖励的，如果承包人的实际竣工日期早于计划竣工日期，承包人有权向发包人提出并得到提前竣工天数和合同约定的每日历天应奖励额度的乘积计算的提前竣工奖励",{"key":27,"text":691,"correct":22},"双方应当在合同中约定提前竣工奖励的最高限额",{"key":31,"text":693,"correct":29},"发包人要求合同工程提前竣工，发包人无须征得承包人同意",{"key":34,"text":695,"correct":22},"发包人要求合同工程提前竣工，发包人应承担承包人由此增加的赶工费",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":414,"analysis":37},899925,"下列事件的发生，已经或将造成工期延误，则按照《标准施工招标文件》中相关合同条件，可以获得工期补偿的有（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"延迟提供图纸",{"key":24,"text":703,"correct":29},"监理人对已覆盖的隐蔽工程要求重新检查且检查结果不合格",{"key":27,"text":705,"correct":29},"承包人的设备故障",{"key":31,"text":707,"correct":22},"发包人提供工程设备不合格",{"key":34,"text":709,"correct":22},"异常恶劣的气候条件",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":443,"analysis":37},899926,"下列索赔事件引起的费用索赔中，可以获得利润补偿的有（ ）。",[714,716,718,720,721],{"key":20,"text":715,"correct":29},"施工中发现文物",{"key":24,"text":717,"correct":22},"延迟提供施工场地",{"key":27,"text":719,"correct":29},"承包人提前竣工",{"key":31,"text":701,"correct":22},{"key":34,"text":631,"correct":29},{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":414,"analysis":37},899927,"施工合同履行期间，材料、工程设备价格变化的价款调整，应按照承包人提供主要材料和工程设备一览表，根据发承包双方约定的风险范围予以调整，以下规定正确的是（ ）。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"如果承包人投标报价中材料单价低于基准单价，工程施工期间材料单价涨幅以基准单价为基础超过合同约定的风险幅度值时，超过部分按实调整",{"key":24,"text":729,"correct":29},"如果承包人投标报价中材料单价低于基准单价，工程施工期间材料单价跌幅以基准单价为基础超过合同约定的风险幅度值时，超过部分按实调整",{"key":27,"text":731,"correct":29},"如果承包人投标报价中材料单价高于基准单价，工程施工期间材料单价跌幅以投标报价为基础超过合同约定的风险幅度值时，超过部分按实调整",{"key":31,"text":733,"correct":22},"如果承包人投标报价中材料单价高于基准单价，工程施工期间材料单价涨幅以投标报价为基础超过合同约定的风险幅度值时，超过部分按实调整",{"key":34,"text":735,"correct":22},"如果承包人投标报价中材料单价等于基准单价，工程施工期间材料单价涨、跌幅以基准单价为基础超过合同约定的风险幅度值时",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]