[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,4,50,2160,[13,34,46,58,70,78,90,102,114,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,447,459,471,483,495,507,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},897938,1,"单选题","(2018年)下列工程造价信息中，最能体现市场机制下信息动态性变化特征的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程价格信息",true,{"key":24,"text":25,"correct":26},"B","政策性文件",false,{"key":28,"text":29,"correct":26},"C","计价标准和规范",{"key":31,"text":32,"correct":26},"D","工程定额","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},897939,"（2019年真题）关于工程造价指数的计算,下列表达式正确的是（）",[38,40,42,44],{"key":20,"text":39,"correct":26},"村料费价格指数=∑(同期各种材料单价x所有材料费用之和）",{"key":24,"text":41,"correct":26},"单位工程价格指数=∑(同期各分部工程价格指数×各分部工程费用单位工程费用)",{"key":28,"text":43,"correct":22},"单项工程造价指数=报告期单项工程造价指标\u002F基期单项工程造价指标",{"key":31,"text":45,"correct":26},"建设工程造价综合指数=报告期建设造价综合指标\u002F基期建设工程造价综合指标",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},897940,"（2019年真题）工程造价指标测算中，各类造价数据的时间需求符合造价指标的时间要求。下列造价数据的时间选取符合规定的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"投资估算采用投资估算书编制完成日期",{"key":24,"text":53,"correct":26},"最高投标限价采用投标截止日期",{"key":28,"text":55,"correct":26},"合同价采用合同签订日期",{"key":31,"text":57,"correct":26},"结算价采用工程结算日期",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},897943,"（2016 年考题）从甲、乙两地采购某工程材料，采购量及有关费用如下表所示，该工程材料的材料单价为（ ）元\u002Ft。",[62,64,66,68],{"key":20,"text":63,"correct":26},"262.08",{"key":24,"text":65,"correct":22},"262.16",{"key":28,"text":67,"correct":26},"262.42",{"key":31,"text":69,"correct":26},"262.50",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},897944,"(2018年)关于施工机械台班单价的确定,下列表达式正确的是（ ）。",[74,75,76,77],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":28,"analysis":33},897945,"(2018年)某材料原价为300 元\u002Ft，运杂费及运输损耗费合计为50 元\u002Ft,采购及保管费费率为3%,则该材料预算单价为（ ）元\u002Ft。",[82,84,86,88],{"key":20,"text":83,"correct":26},"350.0",{"key":24,"text":85,"correct":26},"359.0",{"key":28,"text":87,"correct":22},"360.5",{"key":31,"text":89,"correct":26},"360.8",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},897946,"（2019年真题）某工程采用两票制支付方式采购某种材料，已知材料原价和运杂费的含税价格分别为500元\u002Ft、30元\u002Ft，材料运输损耗率、采购及保管费率分别为0.5%、3.5%。材料采购和运输的增值税率分别为13%、9%。则该材料的不含税单价为（）元\u002Ft。",[94,96,98,100],{"key":20,"text":95,"correct":26},"480.87",{"key":24,"text":97,"correct":26},"481.47",{"key":28,"text":99,"correct":22},"488.88",{"key":31,"text":101,"correct":26},"489.49",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":28,"analysis":33},897949,"(2011年)预计某年度应收账款1800万元，应付账款1300万元，预收账款700万元，预付款500万元，存货1000万元，现金400万元。则该年度流动资金估算额为()万元。",[106,108,110,112],{"key":20,"text":107,"correct":26},"700",{"key":24,"text":109,"correct":26},"1100",{"key":28,"text":111,"correct":22},"1700",{"key":31,"text":113,"correct":26},"2100",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},897950,"(2013年)关于生产技术方案的选择，下列说法中正确的是()。",[118,120,122,124],{"key":20,"text":119,"correct":26},"应结合市场需求确定建设规模",{"key":24,"text":121,"correct":22},"生产方法应与拟采用的原材料相适应",{"key":28,"text":123,"correct":26},"工艺流程宜具有刚性安排",{"key":31,"text":125,"correct":26},"应选择最先进的生产方法",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},897951,"(2014年)对于技术密集型建设项目，选择建设地区应遵循的原则是（）",[130,132,134,136],{"key":20,"text":131,"correct":22},"选择在大中型发达城市",{"key":24,"text":133,"correct":26},"靠近原料产地",{"key":28,"text":135,"correct":26},"靠近产地消费地",{"key":31,"text":137,"correct":26},"靠近电（能）源地",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":31,"analysis":33},897952,"(2014年)某地拟于2015年新建一年产60万吨产品的生产线，该地区2013年建成的年产50万吨相同产品的生产线的建设投资额为5000万元。假定2013年至2015年该地区工程造价年均递增5%。则该生产线的建设投资为（）万元。",[142,144,146,148],{"key":20,"text":143,"correct":26},"6000",{"key":24,"text":145,"correct":26},"6300",{"key":28,"text":147,"correct":26},"6600",{"key":31,"text":149,"correct":22},"6615",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},897953,"(2010年)关于生产技术方案选择的基本原则，下列说法中错误的是()。",[154,156,158,160],{"key":20,"text":155,"correct":26},"先进适用",{"key":24,"text":157,"correct":22},"节约土地",{"key":28,"text":159,"correct":26},"安全可靠",{"key":31,"text":161,"correct":26},"经济合理",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},897954,"(2010年)下列流动资金分项详细估算的计算式中，正确的是()。",[166,168,170,172],{"key":20,"text":167,"correct":26},"应收账款=年营业收入／应收账款周转次数",{"key":24,"text":169,"correct":26},"预收账款=年经营成本／预收账款周转次数",{"key":28,"text":171,"correct":22},"产成品=（年经营成本-年其他营业费用）／产成品周转次数",{"key":31,"text":173,"correct":26},"预付账款=存贷／预付账款周转次数",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},897955,"(2013年)采用分项详细估算法估算项目流动资金时，流动资产的正确构成是()。",[178,180,182,184],{"key":20,"text":179,"correct":26},"应付账款+预付账款+存货+年其他费用",{"key":24,"text":181,"correct":26},"应付账款+应收账款－存货+现金",{"key":28,"text":183,"correct":26},"应付账款+存货+预收账款+现金",{"key":31,"text":185,"correct":22},"预付账款+现金+应收账款+存货",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},897956,"(2014年)关于项目决策和工程造价的关系，下列说法中正确的是（）",[190,192,194,196],{"key":20,"text":191,"correct":26},"工程造价的正确性是项目决策合理性的前提",{"key":24,"text":193,"correct":22},"项目决策的内容是决定工程造价的基础",{"key":28,"text":195,"correct":26},"投资估算的深度影响项目决策的精确度",{"key":31,"text":197,"correct":26},"投资决策阶段对工程造价的影响程度不大",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},897957,"(2014年)可行性研究阶段投资估算的精确度的要求为：误差控制在±（）%以内。",[202,204,206,208],{"key":20,"text":203,"correct":26},"5",{"key":24,"text":205,"correct":22},"10",{"key":28,"text":207,"correct":26},"15",{"key":31,"text":209,"correct":26},"20",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},897958,"(2015年)建设地点选择时需进行费用分析，下列费用中应列入项目投资费用比较的是( )。",[214,216,218,220],{"key":20,"text":215,"correct":26},"动力供应费",{"key":24,"text":217,"correct":26},"燃料运入费",{"key":28,"text":219,"correct":26},"产品运出费",{"key":31,"text":221,"correct":22},"建材运输费",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},897959,"(2015年)世界银行贷款项目的投资估算常采用朗格系数法推算建设项目的静态投资，该方法的计算基数是()。",[226,228,230,232],{"key":20,"text":227,"correct":26},"主体工程费",{"key":24,"text":229,"correct":22},"设备购置费",{"key":28,"text":231,"correct":26},"其他工程费",{"key":31,"text":233,"correct":26},"安装工程费",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},897960,"(2015年)按照形成资产法编制建设投资估算表，下列费用中应列入无形资产费用的是()。",[238,240,242,244],{"key":20,"text":239,"correct":26},"建设单位管理费",{"key":24,"text":241,"correct":26},"土地使用权",{"key":28,"text":243,"correct":26},"生产设备及开办费",{"key":31,"text":245,"correct":22},"非专利技术",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},897961,"(2016年)建设项目投资决策阶段，在技术方案中选择生产方法时应重点关注()。",[250,252,254,256],{"key":20,"text":251,"correct":26},"是否选择了合理的物料消耗定额",{"key":24,"text":253,"correct":26},"是否符合工艺流程的柔性安排",{"key":28,"text":255,"correct":26},"是否使工艺流程中的工序合理衔接",{"key":31,"text":257,"correct":22},"是否符合节能清洁要求",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},897962,"(2016年)某地2016年拟建一年产50万吨产品的工业项目，预计建设期为3年，该地区2013年已建年产40万吨的类似项目投资为2亿元。已知生产能力指数为0.9，该地区2013、2016年同类工程造价指数分别为108、112，预计拟建项目建设期内工程造价年上涨率为5%。用生产能力指数法估算的拟建项目静态投资为()亿元。",[262,264,266,268],{"key":20,"text":263,"correct":22},"2.54",{"key":24,"text":265,"correct":26},"2.74",{"key":28,"text":267,"correct":26},"2.75",{"key":31,"text":269,"correct":26},"2.94",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},897963,"(2016年)下列安装工程费估算公式中，适用于估算工业炉窑砌筑和工艺保温或绝热工程安装工程费的是()。",[274,276,278,280],{"key":20,"text":275,"correct":26},"设备原价×设备安装费率（%）",{"key":24,"text":277,"correct":22},"重量（体积、面积）总量×单位重量（体积、面积）安装费指标",{"key":28,"text":279,"correct":26},"设备原价×材料费占设备费百分比×材料安装费率（%）",{"key":31,"text":281,"correct":26},"安装工程功能总量×功能单位安装工程费指标",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":28,"analysis":33},897964,"(2015年)投资估算的主要工作包括：①估算预备费；②估算工程建设其他费；③估算工程费用；④估算设备购置费。其正确的工作步骤是()。",[286,288,290,292],{"key":20,"text":287,"correct":26},"③④②①",{"key":24,"text":289,"correct":26},"③④①②",{"key":28,"text":291,"correct":22},"④③②①",{"key":31,"text":293,"correct":26},"④③①②",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":28,"analysis":33},897965,"(2016年)按照形成资产法编制建设项目投资估算表，下列费用中可计入固定资产其他费用的是( )。",[298,300,302,304],{"key":20,"text":299,"correct":26},"开办费",{"key":24,"text":301,"correct":26},"非专利技术使用费",{"key":28,"text":303,"correct":22},"土地使用权取得费",{"key":31,"text":305,"correct":26},"生产准备费",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":28,"analysis":33},897966,"(2018年)某建设项目投资估算中，建设管理费2000 万元，可行性研究费100 万元，勘察设计费5000万元，引进技术和引进设备其他费400 万元。市政公用设施建设及绿化费2000 万元，专利权使用费200 万元。非专利技术使用费100 万元，生产准备及开办费500 万元，则按形成资产法编制建设投资估算表，计入固定资产其他费用、无形资产费用和其他资产费用的金额分别为（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":26},"10000 万元、300 万元、0 万元",{"key":24,"text":313,"correct":26},"9600 万元、700 万元、0 万元",{"key":28,"text":315,"correct":22},"9500 万元、300 万元、500 万元",{"key":31,"text":317,"correct":26},"9100 万元、700 万元，500 万元",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},897967,"(2018年)采用分项详细估算法进行流动资金估算时，应计入流动负债的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"预收账款",{"key":24,"text":325,"correct":26},"存货",{"key":28,"text":327,"correct":26},"库存资金",{"key":31,"text":329,"correct":26},"应收账款",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},897968,"(2018年)某地2017 年拟建一座年产20 万吨的化工厂。该地区2015 年建成的年产15 万吨相同产品的类似项目实际建设投资为6000 万元。2015 年和2017 年该地区的工程造价指数(定基指数)分别为1.12、1.15， 生产能力指数为0.7，预计该项目建设期的两年内工程造价仍将年均上涨5%。则该项目的静态投资为（ ）万元",[334,336,338,340],{"key":20,"text":335,"correct":26},"7147.08",{"key":24,"text":337,"correct":22},"7535.09",{"key":28,"text":339,"correct":26},"7911.84",{"key":31,"text":341,"correct":26},"8307.43",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},897969,"(2018年)关于建设项目投资估算的编制，下列说法正确的是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":26},"应直接委托造价工程师编制",{"key":24,"text":349,"correct":26},"应做到费用构成齐全，并适当降低估算标准，节省投资",{"key":28,"text":351,"correct":26},"项目建设书阶段的投资估算精度误差应控制在±20%以内",{"key":31,"text":353,"correct":22},"应对影响造价变动的因素进行敏感性分析",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},897970,"(2018年)关于工业项目建设地点的选择，下列说法正确的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"应远离其他工业项目，减少环境保护费用",{"key":24,"text":361,"correct":26},"应远离铁路、公路、水路，减少运营干扰",{"key":28,"text":363,"correct":26},"应靠近城镇和居民密集区，减少生活设施费",{"key":31,"text":365,"correct":22},"应少占耕地，降低土地补偿费用",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},897971,"(2018年)关于项目建设规模，下列说法正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":26},"建设规模越大，产生的效益越高",{"key":24,"text":373,"correct":26},"国家不对行业的建设规模设定规模界限",{"key":28,"text":375,"correct":22},"资金市场条件对建设规模的选择起着制约作用",{"key":31,"text":377,"correct":26},"技术因素是确定建设规模需考虑的首要因素",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},897972,"（2019年真题）某地2019年拟建一座年产40万吨某产品的化工厂。根据调查，该地区2017年已建年产30万吨相同产品项目的建筑工程费为4000万元，安装工程费为2000万元，设备购置费为8000万元。已知按2019年该地区价格计算的拟建项目设备购置费为9500万元，征地拆迁等其他费用为1000万元，且该区2017年至2019年建筑安装工程费平均每年递增4%，则该拟建项目的静态投资估算为( )万元。",[382,384,386,388],{"key":20,"text":383,"correct":26},"16989.6",{"key":24,"text":385,"correct":26},"17910.0",{"key":28,"text":387,"correct":26},"18206.4",{"key":31,"text":389,"correct":22},"19152.8",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},897973,"（2019年真题）在进行建设厂址多方案全寿命周期技术经济分析时，应计入项目投产后生产经营费用的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":26},"拆迁补偿费",{"key":24,"text":397,"correct":26},"生活设施费",{"key":28,"text":399,"correct":26},"动力设施费",{"key":31,"text":401,"correct":22},"原材料运输费",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},897974,"（2019年真题）若外币对人民币贬值，则关于该汇率变化对涉外项目投资额产生的影响，下列说法正确的是（ ）",[406,408,410,412],{"key":20,"text":407,"correct":26},"从国外购买材料，所支付的外币金额减少",{"key":24,"text":409,"correct":22},"从国外购买材料，换算成人民币所支付的金额减少",{"key":28,"text":411,"correct":26},"从国外借款，本息所支付的外币金额增加",{"key":31,"text":413,"correct":26},"从国外借款，换算成人民币所支付的本息金额增加",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},897975,"(2013年)某地2012年拟建年产30万t化工产品项目。根据调查，某生产相同产品的已建成项目，年产量为10万t，建设投资为12000万元。若生产能力指数为0．9，综合调整系数为1．15，则该拟建项目的建设投资是（）万元。",[418,420,422,424],{"key":20,"text":419,"correct":26},"28047",{"key":24,"text":421,"correct":26},"36578",{"key":28,"text":423,"correct":22},"37093",{"key":31,"text":425,"correct":26},"37260",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},897979,"(2010年)下列概算编制方法中，用于设备及安装工程概算编制的方法为()",[430,432,434,436],{"key":20,"text":431,"correct":26},"概算定额法",{"key":24,"text":433,"correct":26},"类似工程预算法",{"key":28,"text":435,"correct":22},"扩大单价法",{"key":31,"text":437,"correct":26},"概算指标法",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},897980,"(2013年)某拟建工程初步设计已达到必要的深度，能够据此计算出扩大分项工程的工程量，则能较为准确地编制拟建工程概算的方法是()。",[442,443,444,445],{"key":20,"text":437,"correct":26},{"key":24,"text":433,"correct":26},{"key":28,"text":431,"correct":22},{"key":31,"text":446,"correct":26},"综合吨位指标法",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},897981,"(2014年)下列建筑设计影响工程造价的选项中，属于影响工业建筑但一般不影响民用建筑的因素是（）",[451,453,455,457],{"key":20,"text":452,"correct":26},"建筑物平面形状",{"key":24,"text":454,"correct":26},"项目利益相关者",{"key":28,"text":456,"correct":22},"柱网布置",{"key":31,"text":458,"correct":26},"风险因素",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},897982,"(2014年)单位工程概算按其工作性质可分为单位建设工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（）。",[463,465,467,469],{"key":20,"text":464,"correct":26},"通风、空调工程概算",{"key":24,"text":466,"correct":22},"工器具及生产家具购置费概算",{"key":28,"text":468,"correct":26},"电气、照明工程概算",{"key":31,"text":470,"correct":26},"弱电工程概算",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},897983,"(2016年)关于住宅建筑设计中的结构面积系数，下列说法中正确的是()。",[475,477,479,481],{"key":20,"text":476,"correct":26},"结构面积系数越大，设计方案越经济",{"key":24,"text":478,"correct":22},"房间平均面积越大，结构面积系数越小",{"key":28,"text":480,"correct":26},"结构面积系数与房间户型组成有关，与房屋长度.宽度无关",{"key":31,"text":482,"correct":26},"结构面积系数与房屋结构有关，与房屋外形无关",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},897984,"(2016年)下列原因中，不能据以调整设计概算的是()。",[487,489,491,493],{"key":20,"text":488,"correct":26},"超出原设计范围的重大变更",{"key":24,"text":490,"correct":22},"超出承包人预期的货币贬值和汇率变化",{"key":28,"text":492,"correct":26},"超出基本预备费规定范围的不可抗拒重大自然灾害引起的工程变动和费用增加",{"key":31,"text":494,"correct":26},"超出价差预备费的国家重大政策性调整",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},897985,"(2016年)某地拟建一工程，与其类似的已完工程单方工程造价为4500元\u002F㎡，其中人、材料、施工机具使用费分别占工程造价的15%、55%和10%，拟建工程地区与类似工程地区人工、材料、施工机具使用费差异系数分别为1.05、1.03和0.98。假定以人、材、机费用之和为基数取费，综合费率为25%。用类似工程预算法计算的拟建工程造价指标为()元\u002F㎡。",[499,501,503,505],{"key":20,"text":500,"correct":26},"3699.00",{"key":24,"text":502,"correct":26},"4590.75",{"key":28,"text":504,"correct":26},"4599.00",{"key":31,"text":506,"correct":22},"4623.75",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},897986,"(2009年)当初步设计达到一定深度、建筑结构比较明确、能结合图纸计算工程量时，编制单位工程概算宜采用()。",[511,512,513,514],{"key":20,"text":435,"correct":22},{"key":24,"text":437,"correct":26},{"key":28,"text":433,"correct":26},{"key":31,"text":515,"correct":26},"综合单价法",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},897987,"(2009年)柱网布置是否合理，对工程造价和面积的利用效率都有较大影响。建筑设计中对柱网布置应注意()。",[520,522,524,526],{"key":20,"text":521,"correct":22},"适当扩大柱距和跨度能使厂房有更大的灵活性",{"key":24,"text":523,"correct":26},"单跨厂房跨度不变时，层数越多越经济",{"key":28,"text":525,"correct":26},"多跨厂房柱间距不变时，跨度越大造价越低",{"key":31,"text":527,"correct":26},"柱网布置与厂房的高度无关",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},897988,"(2010年)下列关于建筑设计评价的说法中，错误的是()。",[532,534,536,538],{"key":20,"text":533,"correct":22},"建筑物周长与建筑面积之比越高越经济",{"key":24,"text":535,"correct":26},"厂房展开面积主要用于确定多层厂房的经济层数",{"key":28,"text":537,"correct":26},"厂房有效面积与建筑面积之比主要用于评价柱网布置的合理性",{"key":31,"text":539,"correct":26},"工程全寿命成本用于评价建筑物功能水平的合理性",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},897989,"(2013年)工业项目总平面设计中，影响工程造价的主要因素包括()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"现场条件、占地面积、功能分区、运输方式",{"key":24,"text":547,"correct":26},"现场条件、产品方案、运输方式、柱网布置",{"key":28,"text":549,"correct":26},"占地面积、功能分区、空间组合、建筑材料",{"key":31,"text":551,"correct":26},"功能分区、空间组合、设备选型、厂址方案",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},897990,"(2013年)关于多层民用住宅工程造价与其影响因素的关系，下列说法中正确的是()。",[556,558,560,562],{"key":20,"text":557,"correct":26},"层数增加，单位造价降低",{"key":24,"text":559,"correct":26},"层高增加，单位造价降低",{"key":28,"text":561,"correct":22},"建筑物周长系数越低，造价越低",{"key":31,"text":563,"correct":26},"宽度增加，单位造价上升",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},897991,"(2013年)照国家有关规定，作为年度固定资产投资计划、计划投资总额及构成数额的编制和确定依据的是()。",[568,570,572,574],{"key":20,"text":569,"correct":26},"经批准的投资估算",{"key":24,"text":571,"correct":22},"经批准的设计概算",{"key":28,"text":573,"correct":26},"经批准的施工图预算",{"key":31,"text":575,"correct":26},"经批准的工程决算",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},897992,"(2013年)关于建设项目总概算的编制，下列说法中正确的是()。",[580,582,584,586],{"key":20,"text":581,"correct":26},"项目总概算应按照建设单位规定的统一表格进行编制",{"key":24,"text":583,"correct":22},"对工程建设其他费的各组成项目应分别列项计算",{"key":28,"text":585,"correct":26},"主要建筑安装材料汇总表只需列出建设项目的钢筋、水泥等主要材料各自的总消耗量",{"key":31,"text":587,"correct":26},"总概算编制说明应装订于总概算文件最后",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},897993,"(2014年)在建设项目各阶段的工程造价中，一经批准将作为控制建设项目投资最高限额的是（）",[592,594,596,598],{"key":20,"text":593,"correct":26},"投资估算",{"key":24,"text":595,"correct":22},"设计概算",{"key":28,"text":597,"correct":26},"施工图预算",{"key":31,"text":599,"correct":26},"竣工结算",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},897994,"(2014年)当初步设计深度较深.有详细的设备清单时，最能精确的编制设备安装工程费概算的方法是（）",[604,606,607,609],{"key":20,"text":605,"correct":22},"预算单价法",{"key":24,"text":435,"correct":26},{"key":28,"text":608,"correct":26},"设备价值百分比法",{"key":31,"text":446,"correct":26},[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]