[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":715},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,39,50,2160,[13,38,53,68,83,97,111,125,139,154,169,184,199,213,227,242,256,270,283,298,313,323,336,350,365,380,394,409,422,436,450,465,479,493,507,521,535,549,563,576,590,604,618,629,643,657,670,681,693,705],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899828,2,"多选题","投资估算指标包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","概算指标",false,{"key":24,"text":25,"correct":26},"B","建设项目综合指标",true,{"key":28,"text":29,"correct":26},"C","单项工程指标",{"key":31,"text":32,"correct":22},"D","工程单价指标",{"key":34,"text":35,"correct":26},"E","单位工程指标","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899829,"机械台班产量定额应通过（ ）确定。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"机械1h纯工作正常生产率",{"key":24,"text":45,"correct":26},"工作班延续时间",{"key":28,"text":47,"correct":26},"机械正常利用系数",{"key":31,"text":49,"correct":22},"劳动定额",{"key":34,"text":51,"correct":22},"多余工作时间","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},899830,"建筑安装工程概算指标通常是（ ）和造价指标。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"以整个建筑物和构筑物为对象",{"key":24,"text":60,"correct":26},"以建筑面积、体积为单位",{"key":28,"text":62,"correct":26},"以成套设备装置的台或组为计量单位",{"key":31,"text":64,"correct":26},"人工、材料和机械台班的消耗量标准",{"key":34,"text":66,"correct":22},"以部分建筑物或构筑物为对象","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},899831,"下列有关概算定额与概算指标关系的表述中，正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"概算定额以单位工程为对象，概算指标以单项工程为对象",{"key":24,"text":75,"correct":26},"概算定额以预算定额为基础，概算指标主要来自各种预算和结算资料",{"key":28,"text":77,"correct":22},"概算定额适用于初步设计阶段，概算指标不适用于初步设计阶段",{"key":31,"text":79,"correct":26},"概算指标比概算定额更加综合与扩大",{"key":34,"text":81,"correct":26},"概算定额是编制概算指标的依据","BDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},899832,"下列与施工机械工作相关的时间中，应包括在预算定额机械台班消耗量中，但不包括在施工定额中的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"低负荷下工作时间",{"key":24,"text":90,"correct":26},"正常施工时机械施工不可避免的工序间歇",{"key":28,"text":92,"correct":26},"机械维修引起的停歇时间",{"key":31,"text":94,"correct":26},"开工时工作量不饱满所损失的时间",{"key":34,"text":96,"correct":22},"不可避免的中断时间",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":110,"analysis":37},899833,"下列属于预算定额机械台班消耗量中机械幅度差的是（ ）。",[101,103,104,106,108],{"key":20,"text":102,"correct":26},"施工机械转移工作面及配套机械相互影响损失的时间",{"key":24,"text":92,"correct":26},{"key":28,"text":105,"correct":26},"工程收尾时工作量不饱满造成的机械停歇时间",{"key":31,"text":107,"correct":26},"在正常施工条件下，机械在施工中不可避免的工序间歇时间",{"key":34,"text":109,"correct":22},"运输车辆在装货和卸货时的停车时间","ABCD",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":110,"analysis":37},899834,"对于概算指标的组成内容，一般来说列表形式包括（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"示意图",{"key":24,"text":118,"correct":26},"工程特征",{"key":28,"text":120,"correct":26},"经济指标",{"key":31,"text":122,"correct":26},"构造内容及工程量指标",{"key":34,"text":124,"correct":22},"综合概算指标或单项概算指标",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":138,"analysis":37},899835,"下列各项内容中属于机械台班幅度差的有（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":26},"正常施工条件下，机械在施工中不可避免的工序间歇",{"key":24,"text":132,"correct":22},"工人进行准备与结束工作时，机器停止工作而引起的中断时间",{"key":28,"text":134,"correct":26},"工程开工或收尾时工作量不饱满所损失的时间",{"key":31,"text":136,"correct":26},"检查工程质量影响机械操作的时间",{"key":34,"text":92,"correct":26},"ACDE",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},899836,"下列关于工程造价信息的说法中，正确的有（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":26},"建筑工种人工成本信息是按照建筑工人的工种分类",{"key":24,"text":146,"correct":26},"材料价格信息的发布应披露供货单位",{"key":28,"text":148,"correct":22},"机械价格信息包括设备市场价格信息和设备租赁市场价格信息两部分，前者对于工程计价更重要",{"key":31,"text":150,"correct":22},"指数包括已完成或在建工程的各种造价信息",{"key":34,"text":152,"correct":22},"人工成本不能作为处理建筑工人劳动工资纠纷的依据","AB",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},899837,"下列关于制约项目建设规模合理化因素的表述中，正确的是（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"确定项目生产规模的前提是项目资金供应情况",{"key":24,"text":161,"correct":22},"先进适用的生产技术及技术装备是项目规模效益实现的保证",{"key":28,"text":163,"correct":26},"市场价格分析是制定营销策略和影响竞争力的主要因素",{"key":31,"text":165,"correct":26},"原材料市场、资金市场和劳动力市场对项目规模的选择起到制约作用",{"key":34,"text":167,"correct":26},"市场风险分析是确定项目建设规模的重要依据","CDE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},899838,"项目规模合理化的制约因素有（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":26},"技术因素",{"key":24,"text":176,"correct":22},"经济因素",{"key":28,"text":178,"correct":26},"市场因素",{"key":31,"text":180,"correct":26},"环境因素",{"key":34,"text":182,"correct":22},"人才因素","ACD",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},899839,"下列内容中，属于投资估算编制依据的是（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"国家、行业和地方政府的有关法律、法规或规定",{"key":24,"text":191,"correct":22},"招标文件",{"key":28,"text":193,"correct":22},"施工组织设计文件",{"key":31,"text":195,"correct":26},"类似工程的各种技术经济指标和参数",{"key":34,"text":197,"correct":26},"委托单位提供的其他技术经济资料","ADE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":52,"analysis":37},899840,"在建设项目决策阶段，技术方案影响着工程造价，因此，选择技术方案应坚持的基本原则是（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"先进适用",{"key":24,"text":206,"correct":26},"安全可靠",{"key":28,"text":208,"correct":26},"经济合理",{"key":31,"text":210,"correct":22},"简明适用",{"key":34,"text":212,"correct":22},"平均先进",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":183,"analysis":37},899841,"下列关于建设项目决策阶段设备方案选择的说法，正确的有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":26},"设备选择应符合政府部门的技术标准要求",{"key":24,"text":220,"correct":22},"尽量选用质量高的进口设备",{"key":28,"text":222,"correct":26},"在保证设备性能前提下，力求经济合理",{"key":31,"text":224,"correct":26},"注意进口设备的配套问题",{"key":34,"text":226,"correct":22},"先确定设备的型号和数量后再确定生产工艺流程",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},899842,"在编制建设投资估算表时，按形成资产法分类，下列费用属于建设投资组成部分的有（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"固定资产费用",{"key":24,"text":234,"correct":26},"无形资产费用",{"key":28,"text":236,"correct":26},"其他资产费用",{"key":31,"text":238,"correct":22},"工程费用",{"key":34,"text":240,"correct":26},"预备费","ABCE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":183,"analysis":37},899843,"在选择建设地点（厂址）时，应尽量满足下列要求（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"节约土地，尽量少占耕地，降低土地补偿费用",{"key":24,"text":249,"correct":22},"建设地点（厂址）的地下水位应与地下建筑物的基准面持平",{"key":28,"text":251,"correct":26},"尽量选择人口相对稀疏的地区，减少拆迁移民数量",{"key":31,"text":253,"correct":26},"尽量选择在工程地质、水文地质较好的地段",{"key":34,"text":255,"correct":22},"厂区地形平坦，避免山地",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":52,"analysis":37},899844,"建设规模是影响工程造价的主要因素之一，项目决策阶段合理确定建设规模的主要方法有（ ）。",[260,262,264,266,268],{"key":20,"text":261,"correct":26},"盈亏平衡产量分析法",{"key":24,"text":263,"correct":26},"平均成本法",{"key":28,"text":265,"correct":26},"生产能力平衡法",{"key":31,"text":267,"correct":22},"单位生产能力估算法",{"key":34,"text":269,"correct":22},"回归分析法",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":282,"analysis":37},899845,"在技术改造项目中，可采用生产能力平衡法来确定合理生产规模。下列属于生产能力平衡法的是（ ）。",[274,275,276,278,280],{"key":20,"text":261,"correct":22},{"key":24,"text":263,"correct":22},{"key":28,"text":277,"correct":26},"最小公倍数法",{"key":31,"text":279,"correct":26},"最大工序生产能力法",{"key":34,"text":281,"correct":22},"设备系数法","CD",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":297,"analysis":37},899846,"采用指标估算法时.影响投资估算精度的因素有（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":26},"价格变化",{"key":24,"text":290,"correct":22},"技术水平的变化",{"key":28,"text":292,"correct":26},"现场施工条件的变化",{"key":31,"text":294,"correct":22},"工艺流程的变化",{"key":34,"text":296,"correct":26},"项目特征的变化","ACE",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":312,"analysis":37},899847,"对于工业建设项目厂址选择时，需要进行技术经济论证，下列内容中属于建设厂址比较的主要内容的有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":26},"建设费用比较",{"key":24,"text":305,"correct":26},"经营费用比较",{"key":28,"text":307,"correct":22},"市场风险比较",{"key":31,"text":309,"correct":22},"技术水平比较",{"key":34,"text":311,"correct":26},"环境影响比较","ABE",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":312,"analysis":37},899848,"估算建设投资后需编制建设投资估算表，为后期的融资决策提供依据。按概算法分类，建设投资可分为（ ）。",[317,318,320,321,322],{"key":20,"text":238,"correct":26},{"key":24,"text":319,"correct":26},"工程建设其他费用",{"key":28,"text":232,"correct":22},{"key":31,"text":234,"correct":22},{"key":34,"text":240,"correct":26},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":110,"analysis":37},899849,"在进行工程方案的选择时，应满足的基本要求包括（ ）。",[327,329,331,333,334],{"key":20,"text":328,"correct":26},"满足生产使用功能要求",{"key":24,"text":330,"correct":26},"适应已选定的场址",{"key":28,"text":332,"correct":26},"符合工程标准规范要求",{"key":31,"text":208,"correct":26},{"key":34,"text":335,"correct":22},"力求环境效益与经济效益相统一",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":67,"analysis":37},899850,"下列形成固定资产，但属于固定资产其他费用的是（ ）。",[340,342,344,346,348],{"key":20,"text":341,"correct":22},"工器具购置费",{"key":24,"text":343,"correct":26},"建设管理费",{"key":28,"text":345,"correct":26},"勘察设计费",{"key":31,"text":347,"correct":26},"引进技术和引进设备其他费用",{"key":34,"text":349,"correct":22},"生产准备及开办费",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":364,"analysis":37},899851,"项目规模确定中需考虑的主要环境因素包括（ ）。",[354,356,358,360,362],{"key":20,"text":355,"correct":26},"产业政策",{"key":24,"text":357,"correct":26},"协作及土地条件",{"key":28,"text":359,"correct":22},"劳动力市场情况",{"key":31,"text":361,"correct":26},"运输通信条件",{"key":34,"text":363,"correct":22},"竞争对手状况","ABD",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":379,"analysis":37},899852,"项目决策阶段进行设备选用时，应处理好的问题包括（ ）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"进口设备与国产设备费用的比例关系问题",{"key":24,"text":372,"correct":26},"进口设备的备件供应与维修能力问题",{"key":28,"text":374,"correct":26},"设备间的衔接配套问题",{"key":31,"text":376,"correct":26},"设备与原有厂房之间的配套问题",{"key":34,"text":378,"correct":26},"进口设备与原材料之间的配套问题","BCDE",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":364,"analysis":37},899853,"选择工艺流程方案，需研究的问题有（ ）。",[384,386,388,390,392],{"key":20,"text":385,"correct":26},"工艺流程方案对产品质量的保证程度",{"key":24,"text":387,"correct":26},"工艺流程各工序间衔接的合理性",{"key":28,"text":389,"correct":22},"拟采用生产方法的技术来源的可得性",{"key":31,"text":391,"correct":26},"工艺流程的主要参数",{"key":34,"text":393,"correct":22},"是否有利于厂区合理布置",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":408,"analysis":37},899854,"下列费用中，项目投产时将直接形成固定资产的费用有（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":26},"建设单位管理费",{"key":24,"text":401,"correct":26},"研究试验费",{"key":28,"text":403,"correct":22},"生产准备费",{"key":31,"text":405,"correct":26},"工程保险费",{"key":34,"text":407,"correct":26},"临时设施费","ABDE",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":408,"analysis":37},899855,"确定项目建设规模需要考虑的政策因素有（ ）。",[413,415,416,418,420],{"key":20,"text":414,"correct":26},"国家经济发展规划",{"key":24,"text":355,"correct":26},{"key":28,"text":417,"correct":22},"生产协作条件",{"key":31,"text":419,"correct":26},"地区经济发展规划",{"key":34,"text":421,"correct":26},"技术经济政策",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":364,"analysis":37},899856,"项目建设地区选择应遵循的基本原则包括（ ）。",[426,428,430,432,434],{"key":20,"text":427,"correct":26},"靠近原料和燃料地原则",{"key":24,"text":429,"correct":26},"靠近产品消费地",{"key":28,"text":431,"correct":22},"节约土地原则",{"key":31,"text":433,"correct":26},"工业项目适当聚集的原则",{"key":34,"text":435,"correct":22},"工业项目集中布局原则",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":312,"analysis":37},899857,"在技术方案选择中，下列（ ）属于生产方法选择的内容。",[440,442,444,446,448],{"key":20,"text":441,"correct":26},"研究分析与项目产品相关的国内外生产方法的优缺点",{"key":24,"text":443,"correct":26},"研究拟采用的生产方法是否与采用的原材料相适应",{"key":28,"text":445,"correct":22},"研究选择先进合理的物料消耗定额，提高收益",{"key":31,"text":447,"correct":22},"研究生产产品在品种、规格上的灵活性",{"key":34,"text":449,"correct":26},"研究拟采用生产方法是否符合节能和清洁的要求",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":464,"analysis":37},899858,"在进行流动资金估算时，流动负债通常包括（ ）。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"应收账款",{"key":24,"text":457,"correct":26},"应付账款",{"key":28,"text":459,"correct":26},"预收账款",{"key":31,"text":461,"correct":22},"预付账款",{"key":34,"text":463,"correct":22},"存货","BC",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":36,"analysis":37},899859,"下列关于民用住宅建筑设计中影响工程造价的主要因素的表述中，正确的是（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"在矩形民用住宅建筑中长宽比以4.3最佳",{"key":24,"text":472,"correct":26},"住宅层高降低，可降低工程造价和提高建筑密度’",{"key":28,"text":474,"correct":26},"在满足住宅功能和质量的前提下，适当加大住宅宽度，有利于降低工程造价",{"key":31,"text":476,"correct":22},"随着住宅层数的增加，单方造价系数逐渐降低，而边际造价系数逐渐增加",{"key":34,"text":478,"correct":26},"衡量单元组合、户型设计的指标是结构面积系数",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":312,"analysis":37},899860,"关于工程设计对造价的影响，下列说法中正确的有（ ）。 A.周长与建筑面积比越大，单位造价越高",[483,485,487,489,491],{"key":20,"text":484,"correct":26},"流通空间的减少，可以经济建筑物的平面布置",{"key":24,"text":486,"correct":26},"层数越多，则单位造价越低",{"key":28,"text":488,"correct":22},"房屋长度越大，则单位造价越低",{"key":31,"text":490,"correct":22},"结构面积系数越小，设计方案越经济",{"key":34,"text":492,"correct":26},"B选项的原文.流通空间的减少，可相应地降低造价。",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":282,"analysis":37},899861,"关于工业建设项目的设备选用，其选用的重点因设计形式的不同而不同，应选择能满足（ ）要求的最适用的设备和机械。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"建设规模",{"key":24,"text":500,"correct":22},"建筑结构",{"key":28,"text":502,"correct":26},"生产工艺",{"key":31,"text":504,"correct":26},"生产能力",{"key":34,"text":506,"correct":22},"环保措施",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":183,"analysis":37},899862,"民用住宅建筑设计中影响工程造价的主要因素包括（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":26},"建筑物平面形状和周长系数",{"key":24,"text":514,"correct":22},"占地面积",{"key":28,"text":516,"correct":26},"住宅的层高和净高",{"key":31,"text":518,"correct":26},"住宅的层数",{"key":34,"text":520,"correct":22},"建筑群体的布置形式",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":82,"analysis":37},899863,"建筑工程概算的编制方法主要有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"设备价值百分比法",{"key":24,"text":528,"correct":26},"概算定额法",{"key":28,"text":530,"correct":22},"综合吨位指标法",{"key":31,"text":532,"correct":26},"概算指标法",{"key":34,"text":534,"correct":26},"类似工程预算法",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":36,"analysis":37},899864,"采用概算指标法编制建筑工程设计概算，直接套用概算指标时，拟建工程符合的条件是（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"拟建工程和概算指标中工程建设地区相同",{"key":24,"text":542,"correct":26},"拟建工程和概算指标中工程建设地点相同",{"key":28,"text":544,"correct":26},"拟建工程和概算指标中工程的工程特征、结构特征基本相同",{"key":31,"text":546,"correct":22},"拟建工程和概算指标中工程的建造工艺相差不大",{"key":34,"text":548,"correct":26},"拟建工程和概算指标中工程的建筑面积相差不大",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":297,"analysis":37},899865,"下列内容中，属于设计概算编制依据的是（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":26},"国家、行业和地方有关规定",{"key":24,"text":556,"correct":22},"工程量清单",{"key":28,"text":558,"correct":26},"工程勘察与设计文件",{"key":31,"text":560,"correct":22},"工程建设其他费用定额",{"key":34,"text":562,"correct":26},"建设项目资金筹措方案",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":364,"analysis":37},899866,"总平面设计中，影响工程造价的主要因素包括（ ）。",[567,569,570,572,574],{"key":20,"text":568,"correct":26},"现场条件",{"key":24,"text":514,"correct":26},{"key":28,"text":571,"correct":22},"工艺设计",{"key":31,"text":573,"correct":26},"功能分区",{"key":34,"text":575,"correct":22},"柱网布置",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":52,"analysis":37},899867,"直接套用概算指标编制单位建筑工程设计概算时，拟建工程应符合的条件包括（ ）。",[580,582,584,586,588],{"key":20,"text":581,"correct":26},"建设地点与概算指标中的工程建设地点相同",{"key":24,"text":583,"correct":26},"工程特征与概算指标中的工程特征基本相同",{"key":28,"text":585,"correct":26},"建筑面积与概算指标中的工程建筑面积相差不大",{"key":31,"text":587,"correct":22},"建造时间与概算指标中工程建造时间相近",{"key":34,"text":589,"correct":22},"物价水平与概算指标中工程的物价水平基本相同",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":241,"analysis":37},899868,"下列关于工业项目建筑设计影响工程造价的阐述，正确的是（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":26},"在满足建筑物一定要求前提下，将流通空间减小到最小",{"key":24,"text":597,"correct":26},"建筑物周长与建筑面积比越低，设计越经济",{"key":28,"text":599,"correct":26},"对于多跨厂房，当跨度不变时，中跨数目越多越经济",{"key":31,"text":601,"correct":22},"建筑物的室内外高差过小，工程造价将有所提高",{"key":34,"text":603,"correct":26},"对于工业建筑，采用大跨度、大柱距的平面设计形式，可提高平面利用系数，从而降低工程造价",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":183,"analysis":37},899869,"关于工业建设项目总平面设计，现场条件是制约设计方案的重要因素之一，下列内容中属于现场条件的有（ ）",[608,610,612,614,616],{"key":20,"text":609,"correct":26},"气象条件",{"key":24,"text":611,"correct":22},"人文条件",{"key":28,"text":613,"correct":26},"地形地貌",{"key":31,"text":615,"correct":26},"场地大小",{"key":34,"text":617,"correct":22},"建设项目所在地区的有关技术经济条件",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":67,"analysis":37},899870,"住宅建筑是民用建筑中最大量、最主要的建筑形式。下列内容中，属于民用住宅建筑设计中影响工程造价的主要因素的有（ ）。",[622,623,625,627,628],{"key":20,"text":514,"correct":22},{"key":24,"text":624,"correct":26},"平面形状",{"key":28,"text":626,"correct":26},"层高",{"key":31,"text":500,"correct":26},{"key":34,"text":520,"correct":22},{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":198,"analysis":37},899871,"下列内容中，属于设计阶段影响工程造价的因素的有（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"建筑面积",{"key":24,"text":636,"correct":22},"建设地点的选择",{"key":28,"text":638,"correct":22},"工程方案",{"key":31,"text":640,"correct":26},"设计人员的知识水平",{"key":34,"text":642,"correct":26},"风险因素",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":364,"analysis":37},899872,"某建设项目由厂房、办公楼、宿舍等单项工程组成，则单项工程综合概算中的内容有（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":26},"机械设备及安装工程概算",{"key":24,"text":650,"correct":26},"电气设备及安装工程概算",{"key":28,"text":652,"correct":22},"工程建设其他费用概算",{"key":31,"text":654,"correct":26},"特殊构筑物工程概算",{"key":34,"text":656,"correct":22},"流动资金概算",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":36,"analysis":37},899873,"在使用概算指标法编制设计概算时，若想直接套用概算指标编制概算，则拟建工程应在（ ）等方面与概算指标相同或相近。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"消耗定额",{"key":24,"text":664,"correct":26},"结构特征",{"key":28,"text":666,"correct":26},"地质及自然条件",{"key":31,"text":668,"correct":22},"投资主体",{"key":34,"text":634,"correct":26},{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":680,"analysis":37},899874,"设计概算编制方法中，设备安装工程概算的编制方法包括（ ）。",[674,675,677,678,679],{"key":20,"text":528,"correct":22},{"key":24,"text":676,"correct":26},"预算单价法",{"key":28,"text":532,"correct":22},{"key":31,"text":530,"correct":26},{"key":34,"text":534,"correct":22},"BD",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":52,"analysis":37},899875,"在建筑设计影响工程造价的因素中，属于空间组合的有（ ）。",[685,686,688,690,692],{"key":20,"text":626,"correct":26},{"key":24,"text":687,"correct":26},"层数",{"key":28,"text":689,"correct":26},"室内外高差",{"key":31,"text":691,"correct":22},"建筑物的体积和面积",{"key":34,"text":575,"correct":22},{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":364,"analysis":37},899876,"某建设项目由教学楼、办公楼、宿舍等单项工程组成，则可包含在各单项工程综合概算中的内容有（ ）。",[697,699,701,702,704],{"key":20,"text":698,"correct":26},"单位设备工程概算",{"key":24,"text":700,"correct":26},"单位安装工程概算",{"key":28,"text":652,"correct":22},{"key":31,"text":703,"correct":26},"单位建筑工程概算",{"key":34,"text":656,"correct":22},{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":297,"analysis":37},899877,"在单位工程概算编制中，设备及安装工程概算的编制方法主要有（ ）。",[709,710,711,712,713],{"key":20,"text":526,"correct":26},{"key":24,"text":528,"correct":22},{"key":28,"text":676,"correct":26},{"key":31,"text":532,"correct":22},{"key":34,"text":714,"correct":26},"扩大单价法",[716,720,723,726,729,732],{"id":717,"name":718,"category":7,"favorite":719},1,"领导干部任职前廉政法规知识测试题",92,{"id":721,"name":722,"category":7,"favorite":717},595,"建筑结构与设备",{"id":724,"name":725,"category":7,"favorite":717},715,"招标采购专业知识与法律法规",{"id":727,"name":728,"category":7,"favorite":717},848,"市政方向-通用基础",{"id":730,"name":731,"category":7,"favorite":8},534,"BIM工程师",{"id":733,"name":731,"category":7,"favorite":8},535]