[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":699},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,38,50,2160,[13,38,53,67,82,96,111,126,141,155,170,184,197,212,225,235,250,265,279,294,308,320,334,346,360,374,386,396,406,420,430,444,458,469,483,497,510,524,539,552,564,578,590,601,615,629,643,657,671,685],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899777,2,"多选题","根据《建设工程工程量清单计价规范》（GB 10500——2013），在其他项目清单中，应由投标人自主确定价格的有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","暂列金额",false,{"key":24,"text":25,"correct":22},"B","专业工程暂估价",{"key":27,"text":28,"correct":22},"C","材料暂估价单价",{"key":30,"text":31,"correct":32},"D","计日工单价",true,{"key":34,"text":35,"correct":32},"E","总承包服务费","DE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899778,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于工程量清单计价的有关要求，下列说法中正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"事业单位自有资金投资的建设工程发承包，可以不采用工程量清单计价",{"key":24,"text":45,"correct":32},"使用国有资金投资的建设工程发承包，必须采用工程量清单计价",{"key":27,"text":47,"correct":32},"招标工程量清单应以单位工程为单位编制",{"key":30,"text":49,"correct":22},"工程量清单计价方式下，必须采用单价合同",{"key":34,"text":51,"correct":22},"招标工程量清单的准确性和完整性由清单编制人负责","BC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},899779,"根据《建设工程工程量清单计价规范》的规定，其他项目清单的暂列金额部分包括（ ）。",[57,59,60,62,64],{"key":20,"text":58,"correct":32},"施工合同签订时不可预见的所需材料采购费用",{"key":24,"text":35,"correct":22},{"key":27,"text":61,"correct":32},"尚未确定的所需服务的采购费用",{"key":30,"text":63,"correct":22},"材料的暂估单价",{"key":34,"text":65,"correct":32},"合同约定的可能发生的工程价款调整费用","ACE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},899780,"分部分项工程项目清单的组成部分是（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"项目编码",{"key":24,"text":74,"correct":32},"项目名称",{"key":27,"text":76,"correct":22},"项目内容",{"key":30,"text":78,"correct":32},"项目特征",{"key":34,"text":80,"correct":32},"工程数量","ABDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":81,"analysis":37},899781,"措施项目清单的编制依据有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"施工现场情况",{"key":24,"text":89,"correct":32},"工程特点",{"key":27,"text":91,"correct":22},"施工承包合同",{"key":30,"text":93,"correct":32},"常规施工方案",{"key":34,"text":95,"correct":32},"建设工程设计文件",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},899782,"下列工程项目中，必须采用工程量清单计价的有（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":32},"使用各级财政预算资金的项目",{"key":24,"text":103,"correct":32},"使用国家发行债券所筹资金的项目",{"key":27,"text":105,"correct":32},"国有资金投资总额占50%以上的项目",{"key":30,"text":107,"correct":32},"使用国家政策性贷款的项目",{"key":34,"text":109,"correct":22},"使用国际金融机构货款的项目","ABCD",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},899783,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于分部分项工程量清单的编制，下列说法正确的有（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":32},"以重量计算的项目，其计量单位应为吨或千克",{"key":24,"text":118,"correct":32},"以吨为计量单位时，其计算结果应保留三位小数",{"key":27,"text":120,"correct":22},"以立方米为计量单位时，其计算结果应保留三位小数",{"key":30,"text":122,"correct":22},"以千克为计量单位时，其计算结果应保留一位小数",{"key":34,"text":124,"correct":32},"以“个”、“项”为单位的，应取整数","ABE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},899784,"关于工程量清单编制中的项目特征描述，下列说法中正确的是（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"措施项目无需描述项目特征",{"key":24,"text":133,"correct":32},"应按计量规范附录中规定的项目特征，结合技术规范、标准图集加以描述",{"key":27,"text":135,"correct":22},"对完成清单项目可能发生的具体工作和操作程序仍需加以描述",{"key":30,"text":137,"correct":22},"图纸中已有的工程规格、型号、材质等可不描述",{"key":34,"text":139,"correct":32},"项目独有的特征，清单编制人视项目具体情况确定","BE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":125,"analysis":37},899785,"根据《房屋建筑与装饰工程工程量计算规范》GB50584的规定，下列属于可以计算工程量的措施项目有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"施工排水、施工降水",{"key":24,"text":148,"correct":32},"垂直运输",{"key":27,"text":150,"correct":22},"冬雨季施工",{"key":30,"text":152,"correct":22},"安全文明施工",{"key":34,"text":154,"correct":32},"大型机械设备进出场及安拆",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},899786,"下列各项关于其他项目清单的编制，说法正确的有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"暂列金额是预见肯定要发生而暂时无法明确数额的费用项目",{"key":24,"text":162,"correct":22},"专业工程暂估价应包括除规费以外的所有综合单价构成内容",{"key":27,"text":164,"correct":32},"需要纳入分部分项工程量清单项目综合单价中的暂估价只是材料费和工程设备费",{"key":30,"text":166,"correct":22},"总承包服务费包括总承包人为分包工程及自行采购材料、设备发生的管理费用",{"key":34,"text":168,"correct":32},"招标人应预计总承包服务费并按投标人的投标报价向投标人支付该项费用","CE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":36,"analysis":37},899787,"对于适用于以“项”计价的措施项目，其计算基础可为( )。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"定额基价",{"key":24,"text":177,"correct":22},"定额人工费+定额材料费",{"key":27,"text":179,"correct":22},"定额机械费",{"key":30,"text":181,"correct":32},"定额人工费",{"key":34,"text":183,"correct":32},"定额人工费+定额机械费",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":196,"analysis":37},899788,"下列措施项目中，适宜于采用综合单价方式计价的是（ ）。",[188,190,191,192,194],{"key":20,"text":189,"correct":22},"已完工程及设备保护",{"key":24,"text":154,"correct":32},{"key":27,"text":152,"correct":22},{"key":30,"text":193,"correct":32},"混凝土、钢筋混凝土模板",{"key":34,"text":195,"correct":32},"施工排水、降水","BDE",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":211,"analysis":37},899789,"分部分项工程量清单的项目特征应按“清单计价规范”附录中规定的项目特征，结合()予以详细而准确的表述和说明。",[201,203,205,207,209],{"key":20,"text":202,"correct":32},"技术规范",{"key":24,"text":204,"correct":22},"工程内容",{"key":27,"text":206,"correct":32},"标准图集",{"key":30,"text":208,"correct":32},"施工图纸",{"key":34,"text":210,"correct":32},"安装位置","ACDE",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":211,"analysis":37},899790,"措施项目清单的编制依据包括（ ）。",[216,217,219,221,223],{"key":20,"text":93,"correct":32},{"key":24,"text":218,"correct":22},"分部分项工程量清单",{"key":27,"text":220,"correct":32},"施工现场情况、地勘水文资料",{"key":30,"text":222,"correct":32},"拟定的招标文件",{"key":34,"text":224,"correct":32},"建设工程设计文件及相关资料",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":36,"analysis":37},899791,"根据《建设工程工程量清单计价规范》GB 50500--2013，在其他项目清单中，应由投标人自主确定价格的有（ ）。",[229,230,231,233,234],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":232,"correct":22},"材料暂估单价",{"key":30,"text":31,"correct":32},{"key":34,"text":35,"correct":32},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":249,"analysis":37},899792,"关于措施项目工程量清单编制与计价，下列说法中正确的是()。",[239,241,243,245,247],{"key":20,"text":240,"correct":22},"不能计算工程量的措施项目也可以采用分部分项工程量清单方式编制",{"key":24,"text":242,"correct":32},"安全文明施工费按总价方式编制，其计算基础可为“定额基价”、“定额人工费”",{"key":27,"text":244,"correct":22},"总价措施项目清单表应列明计量单位、费率、金额等内容",{"key":30,"text":246,"correct":32},"除安全文明施工费外的其他总价措施项目的计算基础可为“定额人工费”",{"key":34,"text":248,"correct":22},"按施工方案计算的总价措施项目可以只填“金额”数值","BD",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":264,"analysis":37},899793,"下列有关暂列金额的表述，正确的是()。",[254,256,258,260,262],{"key":20,"text":255,"correct":32},"用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购",{"key":24,"text":257,"correct":32},"用于施工中可能发生的工程变更、合同约定调整因素出现时的合同价款调整",{"key":27,"text":259,"correct":32},"用于发生的索赔、现场签证确认等的费用",{"key":30,"text":261,"correct":22},"用于支付必然发生但暂时不能确定价格的材料的单价",{"key":34,"text":263,"correct":22},"指招标人在工程量清单中暂定但未包括在合同价款中的一笔款项","ABC",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":66,"analysis":37},899794,"施工中材料的消耗分为必需消耗的材料和损失的材料，在确定材料定额消耗量时，必需消耗的材料包括（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":32},"直接用于建筑和安装工程的材料",{"key":24,"text":272,"correct":22},"不可避免的场外运输损耗材料",{"key":27,"text":274,"correct":32},"不可避免的场内运输损耗材料",{"key":30,"text":276,"correct":22},"不可避免的现场仓储损耗材料",{"key":34,"text":278,"correct":32},"不可避免的施工过程中损耗材料",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":293,"analysis":37},899795,"工人工作时间中的损失时间包括（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"准备与结束工作时间",{"key":24,"text":286,"correct":32},"施工本身造成的停工时间",{"key":27,"text":288,"correct":32},"非施工本身造成的停工时间",{"key":30,"text":290,"correct":22},"休息时间",{"key":34,"text":292,"correct":32},"偶然工作时间","BCE",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":264,"analysis":37},899796,"挂贴墙面花岗岩板材的施工中，所用下列材料属于形成工程实体材料的有（ ）。",[298,300,302,304,306],{"key":20,"text":299,"correct":32},"花岗石板材",{"key":24,"text":301,"correct":32},"砂",{"key":27,"text":303,"correct":32},"钢筋",{"key":30,"text":305,"correct":22},"脚手架",{"key":34,"text":307,"correct":22},"安全网",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":66,"analysis":37},899797,"下列工人工作时间中，属于有效工作时间的有（ ）。",[312,314,316,318,319],{"key":20,"text":313,"correct":32},"基本工作时间",{"key":24,"text":315,"correct":22},"不可避免中断时间",{"key":27,"text":317,"correct":32},"辅助工作时间",{"key":30,"text":292,"correct":22},{"key":34,"text":284,"correct":32},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":333,"analysis":37},899798,"确定施工时间定额时，下列工人工作时间可以计入定额时间的有（ ）。",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"机手并动下的辅助工作时间",{"key":24,"text":327,"correct":32},"准备与结束工作的时间",{"key":27,"text":329,"correct":32},"与施工过程工艺特点有关的工作中断时间",{"key":30,"text":331,"correct":32},"必需的休息时间",{"key":34,"text":286,"correct":22},"BCD",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":345,"analysis":37},899799,"在确定人工定额消耗量时，规范时间包括（ ）。",[338,339,340,342,344],{"key":20,"text":313,"correct":22},{"key":24,"text":317,"correct":22},{"key":27,"text":341,"correct":32},"准备与结束时间",{"key":30,"text":343,"correct":32},"不可避免的中断时间",{"key":34,"text":290,"correct":32},"CDE",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":249,"analysis":37},899800,"当确定测时法的观察次数时，需要重点考虑的因素是（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":22},"同时测定施工过程的类型数",{"key":24,"text":353,"correct":32},"要求的算术平均值精确度",{"key":27,"text":355,"correct":22},"被测定的工人人数",{"key":30,"text":357,"correct":32},"数列的稳定系数",{"key":34,"text":359,"correct":22},"完成产品的可能次数等",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":293,"analysis":37},899801,"关于测定时间消耗的工作日写实法的特点的说法中，正确的有（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"工作日写实法用于检查定额执行情况时，需要测定3～4次",{"key":24,"text":367,"correct":32},"能够获得整个工作班内各种工时的消耗量",{"key":27,"text":369,"correct":32},"工作日写实法用于编制定额时，需要记录产品数量和影响工时消耗的各种因素",{"key":30,"text":371,"correct":22},"记录时间需要将有效工作时间分成不同组成部分",{"key":34,"text":373,"correct":32},"应按工时消耗性质分类记录各类工时消耗量",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":140,"analysis":37},899802,"下列工人工作时间中，虽属于损失时间，但在拟定定额时又要适度考虑它的影响的是（ ）。",[378,380,382,383,385],{"key":20,"text":379,"correct":22},"施工本身导致的停工时间",{"key":24,"text":381,"correct":32},"非施工本身导致的停工时间",{"key":27,"text":343,"correct":22},{"key":30,"text":384,"correct":22},"多余工作时",{"key":34,"text":292,"correct":32},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":395,"analysis":37},899803,"下列施工工作的时间分类选项中，属于工人有效工作时间的有（ ）。",[390,391,392,393,394],{"key":20,"text":313,"correct":32},{"key":24,"text":290,"correct":22},{"key":27,"text":317,"correct":32},{"key":30,"text":284,"correct":32},{"key":34,"text":343,"correct":22},"ACD",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":405,"analysis":37},899804,"在人工定额的编制过程中，通常可以采用工时规范或经验数据来确定的是（ ）。",[400,401,402,403,404],{"key":20,"text":313,"correct":22},{"key":24,"text":317,"correct":32},{"key":27,"text":341,"correct":32},{"key":30,"text":343,"correct":32},{"key":34,"text":290,"correct":32},"BCDE",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":140,"analysis":37},899805,"在定额的测定中，写实记录法是测定时间定额的常用方法，其特点包括()。",[410,412,414,416,418],{"key":20,"text":411,"correct":22},"主要适用于测定定时重复的循环工作",{"key":24,"text":413,"correct":32},"能够获得分析工作时间消耗和制定定额必需的全部资料",{"key":27,"text":415,"correct":22},"能够通过测定检查定额的执行情况",{"key":30,"text":417,"correct":22},"精确度可以达到0．2～15s",{"key":34,"text":419,"correct":32},"数示法写实记录适用于组成部分较少而且比较稳定的施工过程",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":429,"analysis":37},899806,"下列各类时间中属于工序作业时间的有（ ）。",[424,425,426,427,428],{"key":20,"text":313,"correct":32},{"key":24,"text":317,"correct":32},{"key":27,"text":284,"correct":22},{"key":30,"text":343,"correct":22},{"key":34,"text":290,"correct":22},"AB",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":66,"analysis":37},899807,"影响定额动态人工日工资单价的因素包括（ ）。 A.人工日工资单价的组成内容",[434,436,438,440,442],{"key":20,"text":435,"correct":32},"社会工资差额",{"key":24,"text":437,"correct":22},"劳动力市场供需变化",{"key":27,"text":439,"correct":32},"社会最低工资水平",{"key":30,"text":441,"correct":22},"政府推行的社会保障与福利政策",{"key":34,"text":443,"correct":32},"D选项的正确说法是.社会【平均】工资水平不是【最低】",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":293,"analysis":37},899808,"下列费用中属于人工单价组成内容的有（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"职工福利费",{"key":24,"text":451,"correct":32},"计时工资或计件工资",{"key":27,"text":453,"correct":32},"津贴补贴",{"key":30,"text":455,"correct":22},"劳动保护费",{"key":34,"text":457,"correct":32},"奖金",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":249,"analysis":37},899809,"下列费用项目中，应计入建筑安装工程人工单价的有（ ）。",[462,464,465,466,468],{"key":20,"text":463,"correct":22},"养老保险费",{"key":24,"text":457,"correct":32},{"key":27,"text":455,"correct":22},{"key":30,"text":467,"correct":32},"加班加点工资",{"key":34,"text":449,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":405,"analysis":37},899810,"影响建筑材料预算价格变动的因素包括（ ）。 A.定额材料消耗量",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"材料生产成本",{"key":24,"text":476,"correct":32},"运输距离",{"key":27,"text":478,"correct":32},"市场供求",{"key":30,"text":480,"correct":32},"材料供应体制",{"key":34,"text":482,"correct":32},"A不属于影响材料价格变动的因素。",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":293,"analysis":37},899811,"下列材料单价的构成费用，包含在采购及保管费中进行计算的有（ ）。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"运杂费",{"key":24,"text":490,"correct":32},"仓储费",{"key":27,"text":492,"correct":32},"工地保管费",{"key":30,"text":494,"correct":22},"运输损耗",{"key":34,"text":496,"correct":32},"仓储损耗",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":81,"analysis":37},899812,"下列费用包含或可能包含在材料价格中材料运杂费的是（ ）。",[501,503,505,506,508],{"key":20,"text":502,"correct":32},"附加工作费",{"key":24,"text":504,"correct":32},"装卸费",{"key":27,"text":494,"correct":22},{"key":30,"text":507,"correct":32},"调车费",{"key":34,"text":509,"correct":32},"运输费",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":52,"analysis":37},899813,"下列费用项目中，计算施工机械台班单价时应考虑的有（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"购置机械的资金成本",{"key":24,"text":517,"correct":32},"检修费",{"key":27,"text":519,"correct":32},"维护费",{"key":30,"text":521,"correct":22},"机械设备的财产损失保险费",{"key":34,"text":523,"correct":22},"大型机械安拆费",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":538,"analysis":37},899814,"下列各项费用可以计入材料单价的是（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":32},"材料的供应价格",{"key":24,"text":531,"correct":22},"材料的检验试验费",{"key":27,"text":533,"correct":22},"新材料、新结构试验费",{"key":30,"text":535,"correct":32},"材料的工地管理费",{"key":34,"text":537,"correct":32},"材料的仓储损耗","ADE",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":551,"analysis":37},899815,"下列费用项目中，应计入人工日工资单价的有（ ）。",[543,545,547,548,550],{"key":20,"text":544,"correct":32},"计件工资",{"key":24,"text":546,"correct":32},"劳动竞赛奖金",{"key":27,"text":455,"correct":22},{"key":30,"text":549,"correct":32},"流动施工津贴",{"key":34,"text":449,"correct":22},"ABD",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":66,"analysis":37},899816,"下列费用项目中，构成施工仪器仪表台班单价的有（ ）。",[556,558,559,560,562],{"key":20,"text":557,"correct":32},"折旧费",{"key":24,"text":517,"correct":22},{"key":27,"text":519,"correct":32},{"key":30,"text":561,"correct":22},"人工费",{"key":34,"text":563,"correct":32},"校验费",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":36,"analysis":37},899817,"关于材料单价的构成和计算，下列说法中正确的有（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"材料单价指材料由其来源地运达工地仓库的入库价",{"key":24,"text":571,"correct":22},"运输损耗指材料在场外运输装卸及施工现场搬运发生的不可避免损耗",{"key":27,"text":573,"correct":22},"采购及保管费包括组织材料检验、供应过程中发生的费用",{"key":30,"text":575,"correct":32},"材料单价中包括材料仓储费和工地保管费",{"key":34,"text":577,"correct":32},"材料生产成本的变动直接影响材料单价的波动",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":589,"analysis":37},899818,"下列因素中，属于影响人工日工资单价因素的有（ ）。",[582,584,586,587,588],{"key":20,"text":583,"correct":32},"人工日工资单价的组成内容",{"key":24,"text":585,"correct":32},"社会平均工资水平",{"key":27,"text":437,"correct":32},{"key":30,"text":439,"correct":22},{"key":34,"text":441,"correct":32},"ABCE",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":333,"analysis":37},899819,"下列材料单价的构成中，包含在采购及保管费中进行计算的有（ ）。",[594,596,597,598,600],{"key":20,"text":595,"correct":22},"检验费",{"key":24,"text":490,"correct":32},{"key":27,"text":492,"correct":32},{"key":30,"text":599,"correct":32},"采购费",{"key":34,"text":494,"correct":22},{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":110,"analysis":37},899820,"编制预算定额应依据（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":32},"现行施工定额",{"key":24,"text":608,"correct":32},"典型施工图纸",{"key":27,"text":610,"correct":32},"现行施工及验收规范",{"key":30,"text":612,"correct":32},"成熟推广的新结构、新材料和先进施工方法",{"key":34,"text":614,"correct":22},"现行的概算定额",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":249,"analysis":37},899822,"确定预算定额人工工日消耗量过程中，应计入其他用工的有（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"材料二次搬运用工",{"key":24,"text":622,"correct":32},"电焊点火用工",{"key":27,"text":624,"correct":22},"按劳动定额规定应增（减）计算的用工",{"key":30,"text":626,"correct":32},"临时水电线路移动造成的停工",{"key":34,"text":628,"correct":22},"完成某一分项工程所需消耗的技术工种用工",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":264,"analysis":37},899823,"下列施工机械的停歇时间，在预算定额机械幅度差中考虑的是（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":32},"机械维修引起的停歇",{"key":24,"text":636,"correct":32},"工程质量检查引起的停歇",{"key":27,"text":638,"correct":32},"机械转移工作面引起的停歇",{"key":30,"text":640,"correct":22},"进行准备与结束工作时间引起的停歇",{"key":34,"text":642,"correct":22},"施工机械在单位工程之间转移引起的停歇",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":429,"analysis":37},899824,"预算定额中人工、材料、机械台班消耗量的确定方法包括（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":32},"以劳动定额为基础确定",{"key":24,"text":650,"correct":32},"以现场观察测定资料为基础计算",{"key":27,"text":652,"correct":22},"以工程量清单计算规则为依据计算",{"key":30,"text":654,"correct":22},"以各类费用定额为基础确定",{"key":34,"text":656,"correct":22},"以工程结算资料为依据计算",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":333,"analysis":37},899825,"下列用工项目中，构成预算定额人工工日消耗量，但并不包括在施工定额中的有（ ）。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"材料水平搬运用工",{"key":24,"text":664,"correct":32},"材料加工用工和电焊点火用工",{"key":27,"text":666,"correct":32},"工序交接时对前一工序修整用工",{"key":30,"text":668,"correct":32},"在施工定额基础上应增加计算的用工",{"key":34,"text":670,"correct":22},"完成施工任务必需消耗的技术工程用工",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":140,"analysis":37},899826,"单位工程投资估算指标的表示方式中，管道以“元\u002Fm”并区分（ ）表示。",[675,677,679,681,683],{"key":20,"text":676,"correct":22},"结构形式",{"key":24,"text":678,"correct":32},"材质",{"key":27,"text":680,"correct":22},"容积",{"key":30,"text":682,"correct":22},"面层",{"key":34,"text":684,"correct":32},"管径",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":333,"analysis":37},899827,"下列有关定额编制的描述中，符合预算定额简明适用原则的是（ ）。",[689,691,693,695,697],{"key":20,"text":690,"correct":22},"对于主要工种、主要项目、常用项目，定额步距要大些",{"key":24,"text":692,"correct":32},"对于不常用的、价值量小的项目，分项工程划分可以粗些",{"key":27,"text":694,"correct":32},"要注意补充因采用新技术、新材料而出现的新的定额项目",{"key":30,"text":696,"correct":32},"要合理确定预算定额计量单位，避免一量多用",{"key":34,"text":698,"correct":22},"尽可能多留活口，以适应不同条件下，调整使用定额的需要",[700,704,707,710,713,716],{"id":701,"name":702,"category":7,"favorite":703},1,"领导干部任职前廉政法规知识测试题",92,{"id":705,"name":706,"category":7,"favorite":701},595,"建筑结构与设备",{"id":708,"name":709,"category":7,"favorite":701},715,"招标采购专业知识与法律法规",{"id":711,"name":712,"category":7,"favorite":701},848,"市政方向-通用基础",{"id":714,"name":715,"category":7,"favorite":8},534,"BIM工程师",{"id":717,"name":715,"category":7,"favorite":8},535]