[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":729},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,36,50,2160,[13,38,53,68,83,98,112,127,141,155,170,185,199,213,228,242,257,271,286,300,315,329,344,357,371,385,399,414,428,443,457,472,486,500,514,529,540,554,563,577,591,605,619,633,647,661,674,689,703,715],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899674,2,"多选题","下列关于预付款担保的说法中，正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","预付款担保应在施工合同签订后、预付款支付前提供",true,{"key":24,"text":25,"correct":26},"B","预付款担保必须采用银行保函的形式",false,{"key":28,"text":29,"correct":22},"C","承包人中途毁约，中止工程，发包人有权从预付款担保金额中获得预付款补偿",{"key":31,"text":32,"correct":22},"D","发包人应在预付款扣完后将预付款保函退还承包人",{"key":34,"text":35,"correct":26},"E","在预付款全部扣回之前，预付款保函应始终保持有效，且担保金额应与预付款金额一致","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899677,"根据《建设项目工程总承包合同示范文本》（GF-2011-0216），以下情形中属于应对合同价款进行调整的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"合同变更",{"key":24,"text":45,"correct":22},"法律法规变化影响的合同价格增减",{"key":28,"text":47,"correct":22},"工程造价管理部门公布的价格调整造成工程成本增减",{"key":31,"text":49,"correct":26},"一周内停水、停电等造成累计停工超过8 小时",{"key":34,"text":51,"correct":22},"发包人批准的变更估算的增减","BCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},899678,"在国际工程承包中，根据FIDIC《施工合同条件》（1999 年版），因工程量变更可以调整合同规定费率或价格的条件包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"实际工程量比工程量表中规定的工程量的变动大于10%",{"key":24,"text":60,"correct":22},"该工程量的变更与相对应费率的乘积超过了中标金额的0.01%",{"key":28,"text":62,"correct":22},"由于工程量的变动直接造成单位工程费用的变动超过1%",{"key":31,"text":64,"correct":26},"原工程量全剖删减，其替代工程的费用对合司总价无影响",{"key":34,"text":66,"correct":26},"该部分工程量是合同中规定的“固定率项目”","ABC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},899679,"根据《标准施工招标文件》的规定，承包人只能获得“工期+费用”补偿的事件有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"基准日后法律的变化",{"key":24,"text":75,"correct":22},"施工中发现文物、古迹",{"key":28,"text":77,"correct":26},"发包人提供的材料、工程设备造成工程质量不合格",{"key":31,"text":79,"correct":22},"施工中遇到不利的物质条件",{"key":34,"text":81,"correct":26},"发包人更换其提供的不合格材料、工程设备","BD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},899680,"下列索赔事件引起的费用索赔中，承包人可以获得利润补偿的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"施工中发现文物",{"key":24,"text":90,"correct":22},"延迟提供施工场地",{"key":28,"text":92,"correct":22},"监理人检查质量但质量合格",{"key":31,"text":94,"correct":22},"延迟提供图纸",{"key":34,"text":96,"correct":26},"承包人提前竣工","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":111,"analysis":37},899681,"根据《标准施工招标文件》（2007 版）通用合同条款，承包人可能同时获得工期和费用补偿、但不能获得利润补偿的索赔事件有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"迟延提供施工场地",{"key":24,"text":105,"correct":22},"发包人更换其提供的不合格设备",{"key":28,"text":107,"correct":26},"发包人负责的材料推迟提供",{"key":31,"text":109,"correct":26},"监理人指令错误",{"key":34,"text":88,"correct":22},"BE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},899682,"根据《建设工程工程量清单计价规范》（GB50500—2013），关于单价合同措施项目费的调整，下列说法中正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"设计变更引起措施项目发生变化的，可以调整措施项目费",{"key":24,"text":119,"correct":22},"招标工程量清单分部分项工程漏项引起的措施项目发生变化的，可以调整措施项目费",{"key":28,"text":121,"correct":26},"招标工程量清单措施项目缺项的，不应调整措施项目费",{"key":31,"text":123,"correct":22},"承包人提出调整措施项目费的，应事先将实施方案报发包人批准",{"key":34,"text":125,"correct":26},"措施项目费的调整方法与分部分项工程费的调整方法相同","ABD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":82,"analysis":37},899683,"下列各项中，属于工程索赔合同价款调整事项的是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"项目特征不符",{"key":24,"text":134,"correct":22},"提前竣工",{"key":28,"text":136,"correct":26},"工程量清单缺项",{"key":31,"text":138,"correct":22},"误期赔偿",{"key":34,"text":140,"correct":26},"工程量偏差",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":97,"analysis":37},899684,"下列资料中，可以作为施工发承包双方提出和处理索赔直接依据的有（ ）",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"未在会同中约定的工程量所在地地方性法规",{"key":24,"text":148,"correct":22},"工程施工合同文件",{"key":28,"text":150,"correct":22},"合同中约定的非强制性标准",{"key":31,"text":152,"correct":22},"现场签证",{"key":34,"text":154,"correct":26},"合同中未明确规定的地方定额",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},899685,"根据《建设工程工程量清单计价规范》（GB-50500-2013），关于计日工费的确认和支付，下列说法中正确的有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"承包人应按照确认的计日工现场签证报告核实该项目的工程数量和单价",{"key":24,"text":162,"correct":22},"己标价工程量清单中有该类计日工单价的，按该单价计算",{"key":28,"text":164,"correct":26},"已标价工程量清单中没有该类计日工单价的，按承包人报价计算",{"key":31,"text":166,"correct":22},"计日工价款应列入同期进度款支付",{"key":34,"text":168,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人应予执行","ABDE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},899686,"根据《标准施工招标文件》(2007)版，承包人有可能同时获得工期和费用补偿的事件有（ ）",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"发包方延期提供施工图纸",{"key":24,"text":177,"correct":26},"因不可抗力造成的工期延误",{"key":28,"text":179,"correct":22},"甲供设备未按时进场导致停工",{"key":31,"text":181,"correct":22},"监理对覆盖的隐藏工程重新检查且结果合格",{"key":34,"text":183,"correct":22},"施工中发现文物古迹","ACDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":36,"analysis":37},899687,"根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程变更价款的调整方法，下列说法中正确的有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"工程变更导致已标价工程量清单项目的工程量变化小于15%，仍采用原价格",{"key":24,"text":192,"correct":26},"已标价的工程量清单中没有相同或类似的工程变更项目，由发包人提出变更工程项目的总价和单价",{"key":28,"text":194,"correct":22},"安全文明施工费按照实际发生变化的措施项目并依据国家或省级、行业建设主管部门的规定进行调整",{"key":31,"text":196,"correct":22},"采用单价方式计算的措施费，按照分部分项工程费的调整方法确定变更单价",{"key":34,"text":198,"correct":26},"按系数计算的措施项目费均应按照实际发生变化的措施项目调整，系数不得浮动",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":82,"analysis":37},899688,"根据现行规定，合同中没有适用或类似于变更工程的价格，其工程变更价款的处理原则是（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"由工程师提出适当的变更价格，报业主批准执行",{"key":24,"text":206,"correct":22},"由承包方提出适当的变更价格，经工程师确认后执行",{"key":28,"text":208,"correct":26},"当工程师与承包方对变更价格意见不一致时，由工程师确认其认为合适的价格",{"key":31,"text":210,"correct":22},"当工程师与承包方对变更价格意见不一致时，可以由造价管理部门调解",{"key":34,"text":212,"correct":26},"当业主与承包方对变更价格意见不一致时，由造价管理部门裁定",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},899689,"因不可抗力事件导致人员伤亡、财产损失及其费用增加，发承包双方承担工期和价款损失的原则是（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"因发生不可抗力时间工期延误的，工期相应顺延",{"key":24,"text":220,"correct":26},"停工期间，承包人应发包人要求留在施工场地的必要管理人员及保卫人员的费用由承包人承担",{"key":28,"text":222,"correct":26},"发包人、承包人、第三方人员伤亡分别由其所在单位负责，并承担费用",{"key":31,"text":224,"correct":22},"工程所需清理、修复费用，由发包人承担",{"key":34,"text":226,"correct":26},"承包人的施工机械设备损坏及停工损失，可以向发包人要求赔偿","AD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":126,"analysis":37},899691,"工程竣工验收报告的附有文件包括（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"施工许可证",{"key":24,"text":235,"correct":22},"施工单位签署的工程质量保修书",{"key":28,"text":237,"correct":26},"完整的施工管理资料",{"key":31,"text":239,"correct":22},"施工图设计文件审查意见",{"key":34,"text":241,"correct":26},"设备的进场实验报告",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},899692,"关于无形资产的计价方法，下列说法中正确的有（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"自创专利权可作为无形资产核算",{"key":24,"text":249,"correct":26},"自创专有技术可作为无形资产核算",{"key":28,"text":251,"correct":26},"购入商标权不能作为无形资产核算",{"key":31,"text":253,"correct":26},"通过行政划拨取得的土地使用权可作为无形资产核算",{"key":34,"text":255,"correct":22},"无形资产计价入账后，应在其有效使用期内分期摊销","AE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":184,"analysis":37},899693,"土地使用权的取得方式影响竣工结算新增资产的核定，下列土地使用权的作价应作为无形资产核算的有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"通过支付土地出让金取得的土地使用权",{"key":24,"text":264,"correct":26},"通过行政划拨取得的土地使用权",{"key":28,"text":266,"correct":22},"通过有偿转让取得的出让土地使用权",{"key":31,"text":268,"correct":22},"以补交土地出让价款，作价入股的土地使用权",{"key":34,"text":270,"correct":22},"租借房屋的土地使用权",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},899694,"下列属于新增流动资产价值的内容有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"现金及各种存款",{"key":24,"text":278,"correct":26},"应付款项",{"key":28,"text":280,"correct":26},"预收款项",{"key":31,"text":282,"correct":22},"短期投资",{"key":34,"text":284,"correct":22},"其他货币资金","ADE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":184,"analysis":37},899695,"下列各项中属于竣工财务决算说明书内容的是（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"基本建设项目概况",{"key":24,"text":293,"correct":26},"工程竣工造价对比分析",{"key":28,"text":295,"correct":22},"基建结余资金等分配情况",{"key":31,"text":297,"correct":22},"基本建设项目管理及决算中存在的问题、建议",{"key":34,"text":299,"correct":22},"决算与概算的差异和原因分析",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},899696,"关于新增固定资产价值的确定，下列说法中正确的有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":26},"以单位工程为对象计算",{"key":24,"text":307,"correct":22},"以验收合格、正式移交生产或使用为前提",{"key":28,"text":309,"correct":26},"分期分批交付生产的工程，按最后一批交付时间统一计算",{"key":31,"text":311,"correct":22},"包括达到固定资产标准不需要安装的设备和工器具的价值",{"key":34,"text":313,"correct":22},"是建设项目竣工投产后所增加的固定资产价值","BDE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":126,"analysis":37},899697,"下列各项中属于基本建设项目竣工财务决算表中资金来源项目的是（ ）",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"项目资本公积金",{"key":24,"text":322,"correct":22},"企业债券资金",{"key":28,"text":324,"correct":26},"应收票据",{"key":31,"text":326,"correct":22},"待冲基建支出",{"key":34,"text":328,"correct":26},"货币资金",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},899698,"下列关于新增资产价值的说法正确的是（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"新增资产价值分为固定资产价值、无形资产价值和其他资产价值三种",{"key":24,"text":336,"correct":26},"分期分批交付使用的工程，应在最后一次交付使用后计入新增固定资产价值",{"key":28,"text":338,"correct":26},"运输设备及其他不需要安装的设备、工器具、家具等固定资产需要计算采购成本和待摊投资",{"key":31,"text":340,"correct":22},"自创商标权一般不作为无形资产入账，而将商标设计、制作、广告宣传等发生的费用直接作为销售费用计入当期损益",{"key":34,"text":342,"correct":22},"以划拨方式取得的土地使用权不得作为无形资产核算","DE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":111,"analysis":37},899699,"根据财政部、国家发改委、住建部的有关文件，竣工决算的组成文件包括（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"工程竣工验收报告",{"key":24,"text":351,"correct":22},"工程竣工图",{"key":28,"text":353,"correct":26},"设计概算施工图预算",{"key":31,"text":355,"correct":26},"工程竣工决算",{"key":34,"text":293,"correct":22},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":52,"analysis":37},899700,"下列有关缺陷责任期与质量保证金的说法中，正确的是（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"缺陷责任期从提交竣工验收报告30 天后，工程将自动进入缺陷责任期",{"key":24,"text":364,"correct":22},"发包人有权要求承包人相应延长缺陷责任期，但缺陷责任期最长不超过2 年",{"key":28,"text":366,"correct":22},"采用工程质量保证担保、工程质量保险等其他方式的，发包人不得再预留保证金",{"key":31,"text":368,"correct":26},"屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏保修期为2 年",{"key":34,"text":370,"correct":22},"全部或者部分使用政府投资的建设项目，按工程价款结算总额3%左右的比例预留保证金",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":314,"analysis":37},899701,"关于设备购置费的构成和计算，下列说法中正确的有（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"国产标准设备的原价中，一般不包含备件的价格",{"key":24,"text":378,"correct":22},"成本计算估价法适用于非标准设备原价的价格",{"key":28,"text":380,"correct":26},"进口设备原价是指进口设备到岸价",{"key":31,"text":382,"correct":22},"应使非标准设备计价接近实际出厂价格",{"key":34,"text":384,"correct":22},"达到固定资产标准的工器具，其购置费用应计入设备购置费中",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":97,"analysis":37},899702,"某建设项目的进口设备采用装运港船上交货价，则买方的责任有（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"负责租船并将设备装上船只",{"key":24,"text":392,"correct":22},"负责租船或订舱，支付运费",{"key":28,"text":394,"correct":22},"负担货物在装运港越过船舷后的各种费用以及货物灭失或损坏的一切风险",{"key":31,"text":396,"correct":22},"办理在目的港的收货手续",{"key":34,"text":398,"correct":26},"办理出口手续",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":413,"analysis":37},899703,"在CFR交货方式下，卖方的责任是（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"取得出口许可证或其他官方批准的证件",{"key":24,"text":406,"correct":22},"在需要办理海关手续时，办理货物出口所需的一切海关手续",{"key":28,"text":408,"correct":22},"将货物装上船并支付至目的港的运费，装船后及时通知买方",{"key":31,"text":410,"correct":26},"负责货物装船后一切费用和风险",{"key":34,"text":412,"correct":22},"负担货物在装运港在装上船为止的一切费用和风险","ABCE",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":413,"analysis":37},899704,"国产非标准设备原价按成本计算估价法确定时，其包装费的计算基数包括（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"材料费",{"key":24,"text":421,"correct":22},"辅助材料费",{"key":28,"text":423,"correct":22},"加工费",{"key":31,"text":425,"correct":26},"非标准设备设计费",{"key":34,"text":427,"correct":22},"外购配套件费",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":442,"analysis":37},899705,"设备购置费应包括（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"原价",{"key":24,"text":435,"correct":22},"运杂费",{"key":28,"text":437,"correct":26},"采购保管费",{"key":31,"text":439,"correct":26},"单体试车费",{"key":34,"text":441,"correct":26},"办公和生活家具购置费","AB",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":343,"analysis":37},899706,"下列费用项目中，以“关税完税价格+关税+消费税”为基数，乘以各自给定费（税）率进行计算的有（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":26},"外贸手续费",{"key":24,"text":450,"correct":26},"关税",{"key":28,"text":452,"correct":26},"银行财务费",{"key":31,"text":454,"correct":22},"进口环节增值税",{"key":34,"text":456,"correct":22},"车辆购置税",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":471,"analysis":37},899707,"下列费用中，属于设备运杂费的有（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"国际运费",{"key":24,"text":464,"correct":26},"运输损耗费",{"key":28,"text":466,"correct":22},"供销部门手续费",{"key":31,"text":468,"correct":22},"采购费",{"key":34,"text":470,"correct":22},"仓库保管费","CDE",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":52,"analysis":37},899708,"国产非标准设备按其成本估算其原价时，下列计算式中正确的有（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":26},"材料费=材料净重×每吨材料综合价",{"key":24,"text":479,"correct":22},"加工费=设备总重量×设备每单位重量加工费",{"key":28,"text":481,"correct":22},"辅助材料费=设备总重量×辅助材料费指标",{"key":31,"text":483,"correct":26},"利润=（材料费+加工费+辅助材料费+专用工具费+废品损失费+外购配套件费）×利润费率",{"key":34,"text":485,"correct":22},"当期销项税额=销售额×适用增值税税率",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":184,"analysis":37},899709,"计算国产非标准设备原价时，常用的计算方法有（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"成本计算估价法",{"key":24,"text":493,"correct":26},"系数估算法",{"key":28,"text":495,"correct":22},"系列设备插入估价法",{"key":31,"text":497,"correct":22},"分部组合估价法",{"key":34,"text":499,"correct":22},"定额估价法",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":52,"analysis":37},899710,"关于设备运杂费的构成及计算的说法中，正确的有（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":26},"运费和装卸费是由设备制造厂交货地点至施工安装作业面所发生的费用",{"key":24,"text":507,"correct":22},"进口设备运费和装卸费是由我国到岸港口或边境车站至工地仓库所发生的费用",{"key":28,"text":509,"correct":22},"原价中没有包含的、为运输而进行包装所支出的各种费用应计入包装费",{"key":31,"text":511,"correct":26},"采购与仓库保管费不含采购人员和管理人员的工资",{"key":34,"text":513,"correct":22},"设备运杂费为设备原价与设备运杂费率的乘积",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":528,"analysis":37},899711,"根据我国现行工程造价构成，设备购置费包括的费用有（ ）。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"达到固定资产标准的各种设备原价",{"key":24,"text":521,"correct":26},"未达到固定资产标准的设备原价",{"key":28,"text":523,"correct":22},"达到固定资产标准的工具、器具原价",{"key":31,"text":525,"correct":26},"未达到固定资产标准的工具、器具原价",{"key":34,"text":527,"correct":22},"设备运杂费","ACE",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":314,"analysis":37},899712,"计算设备进口环节增值税时，作为计算基数的计税价格包括（ ）。",[533,534,536,537,538],{"key":20,"text":448,"correct":26},{"key":24,"text":535,"correct":22},"到岸价",{"key":28,"text":527,"correct":26},{"key":31,"text":450,"correct":22},{"key":34,"text":539,"correct":22},"消费税",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":553,"analysis":37},899713,"设备运杂费包括下列（ ）。",[544,546,548,550,551],{"key":20,"text":545,"correct":22},"运费和装卸费",{"key":24,"text":547,"correct":22},"包装费",{"key":28,"text":549,"correct":22},"设备供销部门手续费",{"key":31,"text":437,"correct":22},{"key":34,"text":552,"correct":26},"设备增值税","ABCD",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":256,"analysis":37},899714,"下列进口从属费用中，以“到岸价+关税+消费税”为基数，乘以各自给定费(税)率进行计算的有（ ）。",[558,559,560,561,562],{"key":20,"text":454,"correct":22},{"key":24,"text":450,"correct":26},{"key":28,"text":452,"correct":26},{"key":31,"text":448,"correct":26},{"key":34,"text":456,"correct":22},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":184,"analysis":37},899715,"下列费用项目中，属于安装工程费用的有（ ）。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"被安装设备的防腐、保温等工作的材料费",{"key":24,"text":570,"correct":26},"设备基础的工程费用",{"key":28,"text":572,"correct":22},"对单台设备进行单机试运转的调试费",{"key":31,"text":574,"correct":22},"被安装设备的防腐、保温等工作的安装费",{"key":34,"text":576,"correct":22},"与设备相连的工作台、梯子、栏杆的工程费用",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":285,"analysis":37},899716,"按我国现行建筑安装工程费用项目组成的规定，下列属于企业管理费内容的有（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"企业管理人员办公用的文具、纸张等费用",{"key":24,"text":584,"correct":26},"企业施工生产和管理使用的属于固定资产的交通工具的购置、维修费",{"key":28,"text":586,"correct":26},"对建筑以及材料、构件和建筑安装进行特殊鉴定检查所发生的检验试验费",{"key":31,"text":588,"correct":22},"按全部职工工资总额比例计提的工会经费",{"key":34,"text":590,"correct":22},"为施工生产筹集资金、履约担保所发生的财务费用",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":227,"analysis":37},899717,"根据我国现行建筑安装工程费用项目组成的规定，下列费用中属于安全文明施工中临时设施费的有（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":22},"现场采用砖砌围挡的安砌费用",{"key":24,"text":598,"correct":26},"现场围挡的墙面美化费用",{"key":28,"text":600,"correct":26},"施工现场的操作场地的硬化费用",{"key":31,"text":602,"correct":22},"施工现场规定范围内临时简易道路的铺设费用",{"key":34,"text":604,"correct":26},"地下室施工时所采用的照明设备的安拆费用",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":67,"analysis":37},899718,"根据我国现行建筑安装工程费用项目组成的规定，下列人工费中能够计入分部分项工程费的有（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"保管建筑材料人员的工资",{"key":24,"text":612,"correct":22},"绑扎钢筋人员的工资",{"key":28,"text":614,"correct":22},"操作施工机械人员的工资",{"key":31,"text":616,"correct":26},"现场临时设施搭设人员的工资",{"key":34,"text":618,"correct":26},"施工排水、降水作业人员的工资",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":126,"analysis":37},899719,"根据我国现行建筑安装工程费用组成，下列各费用项目中属于措施费的是（ ）。",[623,625,627,629,631],{"key":20,"text":624,"correct":22},"安全施工费",{"key":24,"text":626,"correct":22},"超高施工增加费",{"key":28,"text":628,"correct":26},"建设单位临时设施费",{"key":31,"text":630,"correct":22},"已完工程及设备保护费",{"key":34,"text":632,"correct":26},"工程排污费",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":97,"analysis":37},899720,"固定资产投资中的积极部分包括了（ ）。",[637,639,641,643,645],{"key":20,"text":638,"correct":26},"建安工程费用",{"key":24,"text":640,"correct":22},"工艺设备购置费",{"key":28,"text":642,"correct":22},"工具、器具购置费",{"key":31,"text":644,"correct":22},"生产家具购置费",{"key":34,"text":646,"correct":26},"固定资产折旧费",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":52,"analysis":37},899721,"关于措施费中超高施工增加费，下列说法正确的有（ ）。",[651,653,655,657,659],{"key":20,"text":652,"correct":26},"单层建筑檐口高度超过30m时计费",{"key":24,"text":654,"correct":22},"多层建筑超过6层时计算",{"key":28,"text":656,"correct":22},"包括建筑超高引起的人工工效降低费",{"key":31,"text":658,"correct":26},"不包括通信联络设备的使用费",{"key":34,"text":660,"correct":22},"按建筑物超高部分建筑面积以“㎡”为单位计算",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":673,"analysis":37},899722,"能够用㎡作为计算单位的措施项目包括（ ）。",[665,667,669,670,672],{"key":20,"text":666,"correct":22},"垂直运输费",{"key":24,"text":668,"correct":26},"施工排水、降水费",{"key":28,"text":626,"correct":22},{"key":31,"text":671,"correct":26},"场地平整费",{"key":34,"text":630,"correct":26},"AC",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":688,"analysis":37},899723,"企业管理费中的税金通常包括（ ）。",[678,680,682,684,686],{"key":20,"text":679,"correct":26},"增值税",{"key":24,"text":681,"correct":22},"印花税",{"key":28,"text":683,"correct":22},"非生产性车船使用税",{"key":31,"text":685,"correct":22},"地方教育附加",{"key":34,"text":687,"correct":22},"教育费附加","BCDE",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":314,"analysis":37},899724,"下列费用项目中，属于建筑安装工程企业管理费的有（ ）。",[693,695,697,699,701],{"key":20,"text":694,"correct":26},"养老保险费",{"key":24,"text":696,"correct":22},"管理人员工资",{"key":28,"text":698,"correct":26},"医疗保险费",{"key":31,"text":700,"correct":22},"财产保险费",{"key":34,"text":702,"correct":22},"检验试验费",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":82,"analysis":37},899725,"下列各费用项目中属于措施费的是（ ）。",[707,709,711,712,713],{"key":20,"text":708,"correct":26},"财务费",{"key":24,"text":710,"correct":22},"施工降水费",{"key":28,"text":696,"correct":26},{"key":31,"text":630,"correct":22},{"key":34,"text":714,"correct":26},"广告费",{"id":716,"libraryId":5,"type":15,"typeLabel":16,"stem":717,"options":718,"answer":413,"analysis":37},899726,"下列工程中，其工程费用列入建筑工程费用的是（ ）。",[719,721,723,725,727],{"key":20,"text":720,"correct":22},"设备基础工程",{"key":24,"text":722,"correct":22},"供水、供暖、通风工程",{"key":28,"text":724,"correct":22},"电缆导线敷设工程",{"key":31,"text":726,"correct":26},"附属于被安装设备的管线敷设工程",{"key":34,"text":728,"correct":22},"各种炉窑的砌筑工程",[730,734,737,740,743,746],{"id":731,"name":732,"category":7,"favorite":733},1,"领导干部任职前廉政法规知识测试题",92,{"id":735,"name":736,"category":7,"favorite":731},595,"建筑结构与设备",{"id":738,"name":739,"category":7,"favorite":731},715,"招标采购专业知识与法律法规",{"id":741,"name":742,"category":7,"favorite":731},848,"市政方向-通用基础",{"id":744,"name":745,"category":7,"favorite":8},534,"BIM工程师",{"id":747,"name":745,"category":7,"favorite":8},535]