[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":741},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,35,50,2160,[13,38,53,68,83,98,113,128,143,157,171,185,200,215,229,243,258,272,287,302,316,331,345,359,374,388,403,417,431,445,459,473,487,501,516,530,544,558,572,586,600,615,629,643,657,671,685,699,713,727],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899593,2,"多选题","(2016年)关于新增固定资产价值的确定，下列说法中正确的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","以单位工程为对象计算",false,{"key":24,"text":25,"correct":26},"B","以验收合格、正式移交生产或使用为前提",true,{"key":28,"text":29,"correct":22},"C","分期分批交付生产的工程，按最后一批交付时间统一计算",{"key":31,"text":32,"correct":26},"D","包括达到固定资产标准不需要安装的设备和工器具的价值",{"key":34,"text":35,"correct":26},"E","是建设项目竣工投产后所增加的固定资产价值","BDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899594,"(2014年)土地使用权的取得方式影响竣工结算新增资产的核定，下列土地使用权的作价应作为无形资产核算的有（）",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"通过支付土地出让金取得的土地使用权",{"key":24,"text":45,"correct":22},"通过行政划拨取得的土地使用权",{"key":28,"text":47,"correct":26},"通过有偿转让取得的出让土地使用权",{"key":31,"text":49,"correct":26},"以补交土地出让价款，作价入股的土地使用权",{"key":34,"text":51,"correct":22},"租借房屋的土地使用权","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},899596,"下列费用中应计入到设备运杂费的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"设备保管人员工资",{"key":24,"text":60,"correct":26},"设备采购人员工资",{"key":28,"text":62,"correct":22},"设备自生产厂家运至工地仓库的运费、装卸费",{"key":31,"text":64,"correct":26},"运输中的设备包装支出",{"key":34,"text":66,"correct":26},"设备仓库所占用的固定资产使用费","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},899598,"进口一台正常缴纳关税的机床，其进口从属费的构成为（ ）",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"银行财务费",{"key":24,"text":75,"correct":22},"国际运费",{"key":28,"text":77,"correct":26},"关税",{"key":31,"text":79,"correct":22},"车辆购置税",{"key":34,"text":81,"correct":26},"增值税","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},899599,"国际贸易中，FOB 交货方式下买方的基本义务有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"负责装船前的装货费",{"key":24,"text":90,"correct":26},"承担货物在装运港越过船舷以后的一切风险",{"key":28,"text":92,"correct":26},"承担运输途中因遭遇风险引起的额外费用",{"key":31,"text":94,"correct":26},"在合同约定的装运港领受货物",{"key":34,"text":96,"correct":26},"办理进口清关手续","BCDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},899601,"关于企业管理费，下列说法正确的是（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"交通差旅费不包括职工探亲路费",{"key":24,"text":105,"correct":26},"检验试验费的增值税进项税抵扣按6%计",{"key":28,"text":107,"correct":26},"城市维护建设税属于企业管理费",{"key":31,"text":109,"correct":26},"列入企业管理费中的税金包括地方教育费附加",{"key":34,"text":111,"correct":22},"工程定位复测费属于企业管理费","BCD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},899602,"根据《建筑安装工程费用项目组成》（建标[2013]44 号），关于措施项目的说法中正确的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"垂直运输费可按照施工日历天数以天为单位来计算",{"key":24,"text":120,"correct":26},"超高施工增加费包括高层施工用水加压水泵的安装及拆除费用",{"key":28,"text":122,"correct":22},"脚手架费不包括拆除脚手架后材料的堆放费用",{"key":31,"text":124,"correct":26},"模板及支架（撑）费计算，除考虑租赁价格外，还需考虑支搭、拆卸及运输费",{"key":34,"text":126,"correct":22},"施工排水降水费用通常按照设计图示尺寸以钻孔深度按米计算","ABD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},899604,"在计算夜间施工增加费时，通常包括以下内容（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"临时可移动照明灯具的设置、拆除",{"key":24,"text":135,"correct":26},"施工现场安全标牌的设置费用",{"key":28,"text":137,"correct":26},"施工人员夜班补助",{"key":31,"text":139,"correct":26},"夜间施工劳动效率降低",{"key":34,"text":141,"correct":22},"在地下室等特殊施工部位施工所采用的照明设备的维护费用","ABCD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":36,"analysis":37},899605,"根据现行建筑安装工程费用项目组成规定，下列费用项目中，属于建筑安装工程企业管理的有（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"仪器仪表使用费",{"key":24,"text":150,"correct":26},"工具用具使用费",{"key":28,"text":152,"correct":22},"建筑安装工程一切险",{"key":31,"text":154,"correct":26},"地方教育附加费",{"key":34,"text":156,"correct":26},"劳动保险费",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":127,"analysis":37},899606,"根据我国现行建筑安装工程费用项目组成规定，下列施工企业发生的费用中，计入企业管理费的是（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"建筑材料、构件一般性鉴定检查费",{"key":24,"text":164,"correct":26},"支付给企业离休干部的经费",{"key":28,"text":166,"correct":22},"施工现场工程排污费",{"key":31,"text":168,"correct":26},"履约担保所发生的费用",{"key":34,"text":170,"correct":22},"施工生产用仪器仪表使用费",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":142,"analysis":37},899610,"根据“关于印发《建筑安装工程费用项目组成》的通知”的规定，其他项目费的内容包括（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"暂列金额",{"key":24,"text":178,"correct":26},"计日工",{"key":28,"text":180,"correct":26},"暂估价",{"key":31,"text":182,"correct":26},"总承包服务费",{"key":34,"text":184,"correct":22},"总承包管理费",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},899611,"下列费用中，属于“与项目建设有关的其他建设费用”的有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":26},"建设单位管理费",{"key":24,"text":192,"correct":26},"工程监理费",{"key":28,"text":194,"correct":26},"建设单位临时设施费",{"key":31,"text":196,"correct":22},"施工单位临时设施费",{"key":34,"text":198,"correct":26},"市政公用设施费","ABCE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},899613,"关于生产准备及开办费、下列说法中正确的有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"包括自行组织培训和委托其他单位培训的相关费用",{"key":24,"text":207,"correct":22},"包括正常生产所需的生产办公家具用具的购置费用",{"key":28,"text":209,"correct":22},"包括正常生产所需的生活家具用具的购置费用",{"key":31,"text":211,"correct":22},"包括含备品备件在内的第一套不够固定资产标准的生产工具购置费",{"key":34,"text":213,"correct":26},"可按设计定员乘以人均生产费标准计算","AE",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":82,"analysis":37},899614,"关于建设用地取得及费用，下列说法中正确的有（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"通过出让获得国有土地使用权的方式有招标、拍卖、挂牌和协议",{"key":24,"text":222,"correct":22},"工业、商业、旅游、娱乐用地的土地使用权出让最长年限为40 年",{"key":28,"text":224,"correct":26},"以划拨方式取得的土地使用权，因企业改制不再符合划拨用地目录，应实行有偿使用",{"key":31,"text":226,"correct":22},"通过市场机制获得的土地使用权，不再承担征地补偿费或拆迁补偿费",{"key":34,"text":228,"correct":26},"搬迁补助费的标准，由各省、自治区、直辖市人民政府规定",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":36,"analysis":37},899615,"以下对于征地补偿费用的标准，正确的是（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"征用耕地的补偿费，为该耕地被征前三年产值的4-6 倍",{"key":24,"text":236,"correct":26},"凡在协商征地方案后抢种的农作物、树木等，一律不予补偿",{"key":28,"text":238,"correct":22},"每一个需要安置的农业人口的安置补偿标准，为该征地被征前三年平均年产值的6-10 倍",{"key":31,"text":240,"correct":26},"每公顷被征收耕地的安置补助费，最高不得超过被征收前三年平均年产值的15 倍",{"key":34,"text":242,"correct":26},"土地补偿费和安置补助费的综合不得超过被征收前三年平均年产值的30 倍",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},899618,"根据分部组合计价原理，单位施工可依据（ ）等的不同分解为分部工程。",[247,249,251,253,255],{"key":20,"text":248,"correct":26},"结构部位",{"key":24,"text":250,"correct":26},"路段长度",{"key":28,"text":252,"correct":26},"施工特点",{"key":31,"text":254,"correct":22},"材料",{"key":34,"text":256,"correct":22},"工序","ABC",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":127,"analysis":37},899619,"下列项目中，必须采用工程量清单计价的是（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"使用各级财政预算资金的项目",{"key":24,"text":265,"correct":26},"使用国家政策性贷款的项目",{"key":28,"text":267,"correct":22},"使用国有企业事业单位贷款资金的项目",{"key":31,"text":269,"correct":26},"国有资金不足50%但国有投资者实质上拥有控股权的工程建设项目",{"key":34,"text":271,"correct":22},"非国有资金投资的项目",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},899621,"关于工程量清单计价和定额计价，下列计价公式中正确的有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"单位工程直接费=Σ（假定建筑安装产品工程量*工料单价）+措施费",{"key":24,"text":279,"correct":22},"单位工程概预算费=单位工程直接费+企业管理费+利润+税金",{"key":28,"text":281,"correct":26},"分部分项工程费=Σ（分部分项工程量*分部分项工程综合单价）",{"key":31,"text":283,"correct":26},"措施项目费=Σ按“项”计算的措施项目费+Σ（措施项目工程量*措施项目综合单价）",{"key":34,"text":285,"correct":26},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金","CDE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},899624,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程量清单计价的有关要求，下列说法中正确的有（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"事业单位自有资金投资的建设工程发承包，可以不采用工程量清单计价",{"key":24,"text":294,"correct":26},"使用国有资金投资的建设工程发承包，必须采用工程量清单计价",{"key":28,"text":296,"correct":26},"招标工程量清单应以单位工程为单位编制",{"key":31,"text":298,"correct":22},"工程量清单计价方式下，必须采用单价合同",{"key":34,"text":300,"correct":22},"招标工程量清单的准确性和完整性由清单编制人负责","BC",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":257,"analysis":37},899625,"关于招标分项工程量清单的项目特征描述，应遵循的编制原则有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"按专业工程量计算规范附录的规定，结合拟建工程实际描述",{"key":24,"text":309,"correct":26},"其他独有特征，由清单编制人视项目具体情况而定",{"key":28,"text":311,"correct":26},"要满足确定综合单价的需要",{"key":31,"text":313,"correct":22},"应详细描述分部分项工程的施工工艺和方法",{"key":34,"text":315,"correct":22},"对于采用标准图集的项目，可直接描述为“详见##图集”",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":330,"analysis":37},899626,"关于暂估价的计算和填写，下列说法中正确的有（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":26},"暂估价数量和拟用项目应结合工程量清单中的“暂估价表”予以补充说明",{"key":24,"text":323,"correct":22},"材料暂估价应由招标人填写暂估单价，无须指出拟用于哪些清单项目",{"key":28,"text":325,"correct":22},"工程设备暂估价不应纳入分部分项工程综合单价",{"key":31,"text":327,"correct":26},"专业工程暂估价应分不同专业，列出明细表",{"key":34,"text":329,"correct":26},"专业工程暂估价由招标人填写，并计入投标总价","ADE",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":52,"analysis":37},899627,"关于分部分项工程量清单的编制，下列说法中正确的有（ ）。",[335,337,339,341,343],{"key":20,"text":336,"correct":26},"以清单计算规范附录中的名称为基础，结合具体工作内容补充细化项目名称",{"key":24,"text":338,"correct":22},"清单项目的工作内容在招标工程量清单的项目特征中加以描述",{"key":28,"text":340,"correct":26},"有两个或以上计量单位时，选择最适宜表现项目特征并方便计量的单位",{"key":31,"text":342,"correct":26},"除另有说明外，清单项目的工程量应以实体工程量为准，各种施工中的损耗和需要增加的工程量应在单价中考虑",{"key":34,"text":344,"correct":22},"在工程量清单中应附补充项目名称、项目特征、计量单位和工程量",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":52,"analysis":37},899628,"下列施工工作时间分类选项中，属于工人有效工作时间的有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":26},"基本工作时间",{"key":24,"text":352,"correct":22},"休息时间",{"key":28,"text":354,"correct":26},"辅助工作时间",{"key":31,"text":356,"correct":26},"准备与结束工作时间",{"key":34,"text":358,"correct":22},"不可避免的中断时间",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":373,"analysis":37},899629,"下列对工人工作时间中基本工作时间的理解正确的是（ ）",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"基本工作时间与辅助工作时间之和构成了有效工作时间",{"key":24,"text":366,"correct":26},"基本工作时间的长短与工作量大小成正比",{"key":28,"text":368,"correct":22},"基本工作时间是在正常额定负荷状态下的工作时间",{"key":31,"text":370,"correct":26},"基本工作时间可以改变产品的外形、结构或性质",{"key":34,"text":372,"correct":22},"基本工作时间中包括由施工工艺特点引起的工作时间所必须的时间","BD",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":286,"analysis":37},899631,"关于材料单价的构成和计算，下列说法中正确的有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"材料单价指材料由其来源地运达工地仓库的入库价",{"key":24,"text":381,"correct":22},"运输耗材指材料在场外运输装卸及施工现场内搬运发生的不可避免损耗",{"key":28,"text":383,"correct":26},"采购及保管费包括组织材料检验、供应过程中发生的费用",{"key":31,"text":385,"correct":26},"材料单价中包括材料仓储费和工地管理费",{"key":34,"text":387,"correct":26},"材料生产成本的变动直接影响材料单价的波动",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":402,"analysis":37},899633,"下列各项中属于材料单价中材料运杂费的是（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":26},"调车和驳船费",{"key":24,"text":395,"correct":26},"装卸费",{"key":28,"text":397,"correct":22},"运输损耗",{"key":31,"text":399,"correct":22},"采购费",{"key":34,"text":401,"correct":26},"运输费","ABE",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":112,"analysis":37},899635,"下列用工项目中，构成预算定额人工工日消耗量但不包括在劳动定额中的有（ ）。",[407,409,411,413,415],{"key":20,"text":408,"correct":22},"材料水平搬运用工",{"key":24,"text":410,"correct":26},"材料加工用工和电焊点火用工",{"key":28,"text":412,"correct":26},"工序交接时对前一工序修整用工",{"key":31,"text":414,"correct":26},"工作质量检查和隐蔽工程验收工作的影响",{"key":34,"text":416,"correct":22},"完成施工任务必须消耗的技术工种用工",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":214,"analysis":37},899638,"关于投资估算指标反映的费用内容和计价单位，下列说法中正确的有（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":26},"单位工程指标反映建筑安装工程费，以每m2、m3、m、座等单位投资表示",{"key":24,"text":424,"correct":22},"单项工程指标反映工程费用，以每m2、m3、m、座等单位投资表示",{"key":28,"text":426,"correct":22},"单项工程指标反映建筑安装工程费，以单项工程生产能力投资表示",{"key":31,"text":428,"correct":22},"建设项目综合指标反映项目固定资产投资，以项目综合生产能力单位投资表示",{"key":34,"text":430,"correct":26},"建设项目综合指标反映项目总投资，以项目综合生产能力单位投资表示",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":82,"analysis":37},899639,"建设项目工程造价指数是由（ ）指数综合得到的。",[435,437,439,441,443],{"key":20,"text":436,"correct":26},"设备、工器具价格指数",{"key":24,"text":438,"correct":22},"人工费价格指数",{"key":28,"text":440,"correct":26},"建筑安装工程造价指数",{"key":31,"text":442,"correct":22},"材料价格指数",{"key":34,"text":444,"correct":26},"工程建设其他费用指数",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":402,"analysis":37},899640,"关于工程造价指数，下列说法中正确的有（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":26},"工程造价指数可以反映建筑市场的供求关系",{"key":24,"text":452,"correct":26},"工程造价指数可以反映报告期与基期相比的价格变动趋势",{"key":28,"text":454,"correct":22},"建筑安装工程造价指数是一种单项指数",{"key":31,"text":456,"correct":22},"设备、工器具价格指数是一种数量指标指数",{"key":34,"text":458,"correct":26},"单项工程造价指数一般用平均数指数的形式表示",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":142,"analysis":37},899641,"工程造价指数中的个体指数包括（ ）。",[463,465,467,469,471],{"key":20,"text":464,"correct":26},"材料费指数",{"key":24,"text":466,"correct":26},"机械费指数",{"key":28,"text":468,"correct":26},"间接费指数",{"key":31,"text":470,"correct":26},"工程建设其他费指数",{"key":34,"text":472,"correct":22},"设备工器具价格指数",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":286,"analysis":37},899642,"下列工程造价指数中，用平均数指数形式编制的总指数有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"工程建设其他费费率指数",{"key":24,"text":480,"correct":22},"设备、工器价格指数",{"key":28,"text":482,"correct":26},"建筑安装工程价格指数",{"key":31,"text":484,"correct":26},"单项工程造价指数",{"key":34,"text":486,"correct":26},"建设项目造价指数",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":82,"analysis":37},899643,"下列关于设备和工器具价格指数说法正确的是（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":26},"拉斯贝尔体系以基期指标为同度量因素",{"key":24,"text":494,"correct":22},"拉斯贝尔体系以基期数量为同度量因素",{"key":28,"text":496,"correct":26},"派许体系以报告期指标为同度量因素",{"key":31,"text":498,"correct":22},"设备和工器具价格指数是平均数指数形式",{"key":34,"text":500,"correct":26},"设备和工器具价格指数同度量的方法有拉斯贝尔体系和派许体系两种形式",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":515,"analysis":37},899644,"下列关于工程造价信息的说法中，不正确的有（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"建设项目工程造价指数包括建筑安装工程造价指数",{"key":24,"text":508,"correct":22},"建筑安装工程价格指数和单项工程造价指数都属于平均数指数",{"key":28,"text":510,"correct":26},"机械价格信息包括设备市场价格信息和设备租赁市场价格信息两部分，前者对于工程计价更重要",{"key":31,"text":512,"correct":22},"设备及工器具价格指数属于总指数",{"key":34,"text":514,"correct":26},"按组织方式来分，工程造价信息分为宏观和微观工程造价信息","CE",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":301,"analysis":37},899645,"采用生产能力指数法估算项目的静态投资，主要应用于（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"设计已经达到一定深度",{"key":24,"text":523,"correct":26},"拟建建设项目与类似建设项目的规模不同",{"key":28,"text":525,"correct":26},"设计定型并系列化",{"key":31,"text":527,"correct":22},"行业内相关指数和系数等基础资料不完备",{"key":34,"text":529,"correct":22},"有详细的工程设计资料",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":52,"analysis":37},899647,"在选择建设地点（厂址）时，应尽量满足下列需求（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"节约土地，尽量少占耕地，降低土地补偿费用",{"key":24,"text":537,"correct":22},"建设地点（厂址）的地下水位应与地下建筑物的基准面持平",{"key":28,"text":539,"correct":26},"尽量选择人口相对稀疏的地区，减少拆迁移民数量",{"key":31,"text":541,"correct":26},"尽量选择在工程地质、水文地质较好的地段",{"key":34,"text":543,"correct":22},"厂区地形应平坦，避免山地",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":82,"analysis":37},899650,"下列有关流动资金估算公式正确的是（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":26},"流动资金=流动资产-流动债",{"key":24,"text":551,"correct":22},"流动资产=应收账款-预付账款+存货+库存现金",{"key":28,"text":553,"correct":26},"流动负债=应付账款+预收账款",{"key":31,"text":555,"correct":22},"现金=（年工资及福利费+年其他费用）×现金周转次数",{"key":34,"text":557,"correct":26},"存货=外购原材料、燃料+其他材料+在产品+产成品",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":36,"analysis":37},899651,"建设工程概算的编制方法主要有（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"设备价值百分比法",{"key":24,"text":565,"correct":26},"概算定额法",{"key":28,"text":567,"correct":22},"综合吨位指标法",{"key":31,"text":569,"correct":26},"概算指标法",{"key":34,"text":571,"correct":26},"类似工程预算法",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":142,"analysis":37},899652,"下列文件中，属于建设项目总概算文件中的有（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":26},"总概算表",{"key":24,"text":579,"correct":26},"单项工程综合概算表",{"key":28,"text":581,"correct":26},"工程建设其他费用概算",{"key":31,"text":583,"correct":26},"主要建筑安装材料汇总表",{"key":34,"text":585,"correct":22},"分年投资计划表",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":127,"analysis":37},899653,"总平面设计中，影响工程造价的主要因素是（ ）",[590,592,594,596,598],{"key":20,"text":591,"correct":26},"现场条件",{"key":24,"text":593,"correct":26},"占地面积",{"key":28,"text":595,"correct":22},"工艺设计",{"key":31,"text":597,"correct":26},"功能分区",{"key":34,"text":599,"correct":22},"柱网布置",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":614,"analysis":37},899654,"采用全费用综合单价法编制施工图预算，下列说法正确的是（ ）。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"计算直接费后编制工料分析表",{"key":24,"text":607,"correct":26},"全费用综合单价中应包括规费和税金",{"key":28,"text":609,"correct":26},"综合计取的措施项目费以分部分项工程费和可计量的措施项目费之和为基数计算",{"key":31,"text":611,"correct":22},"编制综合单价分析表时，工料机消耗量与单价均应来自预算定额",{"key":34,"text":613,"correct":26},"分部分项工程费与措施项目费之和即为建筑安装工程施工图预算费用","BCE",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":257,"analysis":37},899656,"下列有关暂列金额的表述，正确的有（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":26},"用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购",{"key":24,"text":622,"correct":26},"用于施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整",{"key":28,"text":624,"correct":26},"用于发生的索赔、现场签证确认等的费用",{"key":31,"text":626,"correct":22},"用于支付必然发生但暂时不能确定价格的材料的单价",{"key":34,"text":628,"correct":22},"用于因为标准不明确或者需要有专业承包人完成，暂时无法确定价格的费用",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":402,"analysis":37},899659,"《招标施工招标文件》（2007 版），下列有关施工招标的说法中正确的有（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"当进行资格预审时，招标文件中应包括投标邀请书",{"key":24,"text":636,"correct":26},"投标准备时间最短不得少于20 天",{"key":28,"text":638,"correct":22},"投标人对招标文件有疑问时，应在规定时间内以电话、电报等方式要求招标人澄清",{"key":31,"text":640,"correct":22},"按照规定应编制招标控制价的项目，其控制价应在开标时一并公布",{"key":34,"text":642,"correct":26},"详细评审可选择经评审的最低投标价法和综合评估法",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":52,"analysis":37},899660,"在建设项目施工招标过程中，以下内容中属于招标文件中投标人须知的是（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":26},"重新招标和不再招标",{"key":24,"text":650,"correct":22},"技术标准和要求",{"key":28,"text":652,"correct":26},"招标文件的澄清和修改的规定",{"key":31,"text":654,"correct":26},"投标报价编制的要求",{"key":34,"text":656,"correct":22},"本工程拟采用的专用合同条款",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":127,"analysis":37},899661,"根据《建设工程工程量清单计价规范》(GB50500-2013)，招标控制价中综合单价中应考虑的风险因素包括（ ）。",[661,663,665,667,669],{"key":20,"text":662,"correct":26},"项目管理的复杂性",{"key":24,"text":664,"correct":26},"项目的技术难度",{"key":28,"text":666,"correct":22},"人工单价的市场变化",{"key":31,"text":668,"correct":26},"材料价格的市场风险",{"key":34,"text":670,"correct":22},"税金、规费的政策变化",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":286,"analysis":37},899664,"关于施工投标报价中对工程量的复核，下列说法中正确的有（ ）。",[675,677,679,681,683],{"key":20,"text":676,"correct":22},"投标人应逐项计算工程量，复核工程量清单",{"key":24,"text":678,"correct":22},"投标人应修改错误的工程量，并通知招标人",{"key":28,"text":680,"correct":26},"投标人可以不向招标人提出复核工程量中发现的遗漏",{"key":31,"text":682,"correct":26},"投标人可以通过复核防止由于订货超量带来的浪费",{"key":34,"text":684,"correct":26},"投标人应根据复核工程量的结果选择适用的施工设备",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":82,"analysis":37},899668,"关于合同价款的约定，下列说法正确的是（ ）。",[689,691,693,695,697],{"key":20,"text":690,"correct":26},"签约合同价就是中标价",{"key":24,"text":692,"correct":22},"中标人无正当理由拒签合同的，招标人取消其中标资格，但投标保证金要退还",{"key":28,"text":694,"correct":26},"发出中标通知书后，招标人无正当理由拒签合同的，招标人向中标人退还投标保证金",{"key":31,"text":696,"correct":22},"招标人最迟应当与中标人签订合同后3 天内，向中标人和未中标的投标人退还投标保证金及银行同期存款利息",{"key":34,"text":698,"correct":26},"招标与投标文件不一致，以投标文件为准",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":127,"analysis":37},899671,"依法必须招标的工程，对投标保证金的退还，下列处置方式正确的有（ ）。",[703,705,707,709,711],{"key":20,"text":704,"correct":26},"中标人无正当理由拒签合同的，投标保证金不予退还",{"key":24,"text":706,"correct":26},"招标人无正当理由拒签合同的，应向中标人退还投标保证金",{"key":28,"text":708,"correct":22},"招标人与中标人签订合同的，应在合同签订后向中标人退还投标保证金",{"key":31,"text":710,"correct":26},"招标人与中标人签订合同的，应向未中标人退还投标保证金及利息",{"key":34,"text":712,"correct":22},"未中标人的投标保证金，应在中标通知书发书同时退还",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":614,"analysis":37},899672,"下列关于国际性招标的说法正确的是（ ）。",[717,719,721,723,725],{"key":20,"text":718,"correct":22},"如果投标人未经资格预审，则评标的过程中应对所有的投标人进行资格定审",{"key":24,"text":720,"correct":26},"采用“两个信封制度”的，技术上不符合要求的标书则第二个信封不再开启",{"key":28,"text":722,"correct":26},"在谈判过程中，发包人不得要求投标人承担额外的工作",{"key":31,"text":724,"correct":22},"标价由直接费用、间接费用以及利润组成",{"key":34,"text":726,"correct":26},"凡采购大而复杂的工程宜采用资格预审",{"id":728,"libraryId":5,"type":15,"typeLabel":16,"stem":729,"options":730,"answer":373,"analysis":37},899673,"关于工程计量，下列说法错误的有（ ）。",[731,733,735,737,739],{"key":20,"text":732,"correct":22},"工程计量可选择按月或按工程形象进度分段计量",{"key":24,"text":734,"correct":26},"承包人原因造成的返工工程量应予计量",{"key":28,"text":736,"correct":22},"单价合同工程量必须以承包人完成合同工程应予计量的工程量确定",{"key":31,"text":738,"correct":26},"总价合同约定的项目计量应以实际完成的工程量为依据",{"key":34,"text":740,"correct":22},"工程计量可以依据工程量清单及说明",[742,746,749,752,755,758],{"id":743,"name":744,"category":7,"favorite":745},1,"领导干部任职前廉政法规知识测试题",92,{"id":747,"name":748,"category":7,"favorite":743},595,"建筑结构与设备",{"id":750,"name":751,"category":7,"favorite":743},715,"招标采购专业知识与法律法规",{"id":753,"name":754,"category":7,"favorite":743},848,"市政方向-通用基础",{"id":756,"name":757,"category":7,"favorite":8},534,"BIM工程师",{"id":759,"name":757,"category":7,"favorite":8},535]