[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,34,50,2160,[13,38,53,68,83,98,113,128,143,158,172,187,201,215,230,244,258,272,287,301,315,330,345,359,370,384,398,412,426,441,455,469,484,498,512,526,540,554,568,583,597,611,625,639,654,668,682,697,711,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899533,2,"多选题","(2018年)关于工程施工项目最高投标限价编制的注意事项,下列说法正确的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","未釆用工程造价管理机关发布的工程造价信息时,应予以说明",true,{"key":24,"text":25,"correct":26},"B","施工机械设备的选型应本着经济实用、平均有效的原则确定",false,{"key":28,"text":29,"correct":26},"C","暂估价中的材料单价应通过市场调查确定",{"key":31,"text":32,"correct":22},"D","不可竞争措施项目费应按国家有关规定计算",{"key":34,"text":35,"correct":22},"E","竞争性措施项目费应依据经专家论证确认的施工组织设计或施工方案","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},899534,"(2016年)关于招标分部分项工程量清单的项目特征描述，应遵循的编制原则有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"按专业工程量计算规范附录的规定，结合拟建工程实际描述",{"key":24,"text":45,"correct":22},"其他独有特征，由清单编制人视项目具体情况确定",{"key":28,"text":47,"correct":22},"要满足确定综合单价的需要",{"key":31,"text":49,"correct":26},"应详细描述分部分项工程的施工工艺和方法",{"key":34,"text":51,"correct":22},"对于采用标准图集的项目，可直接描述为“详见##图集”","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},899535,"（2019年真题）满足施工招标工程量清单编制的需要，招标人需拟定施工总方案，其主要内容包括（ ）",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工方法",{"key":24,"text":60,"correct":26},"施工步骤",{"key":28,"text":62,"correct":22},"施工机械设备的选择",{"key":31,"text":64,"correct":26},"施工顺序",{"key":34,"text":66,"correct":22},"现场平面布置","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},899537,"(2015年)复核工程量是投标人编制投标报价前的一项重要工作。通过复核工程量，便于投标人( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"决定报价尺度",{"key":24,"text":75,"correct":22},"采取合适的施工方法",{"key":28,"text":77,"correct":22},"选用合适的施工机具",{"key":31,"text":79,"correct":22},"决定投入劳动力数量",{"key":34,"text":81,"correct":26},"选用合适的承包方式","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},899538,"(2013年)关于投标文件的编制与递交，下列说法中正确的有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"投标函附录中不可以提出比招标文件要求更能吸引招标人的承诺",{"key":24,"text":90,"correct":22},"当投标文件的正本与副本不一致时以正本为准",{"key":28,"text":92,"correct":26},"允许递交备选投标方案时，所有投标人的备选方案应同等对待",{"key":31,"text":94,"correct":22},"在要求提交投标文件的截止时间后送达的投标文件为无效的投标文件",{"key":34,"text":96,"correct":22},"境内投标人以现金形式提交的投标保证金应当出自投标人的基本账户","BDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},899539,"(2015年)根据《建设工程工程量清单计价规范》( GB 50500-2013)，在其他项目清单中，应由投标人自主确定价格的有()。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"暂列金额",{"key":24,"text":105,"correct":26},"专业工程暂估价",{"key":28,"text":107,"correct":26},"材料暂估单价",{"key":31,"text":109,"correct":22},"计日工单价",{"key":34,"text":111,"correct":22},"总承包服务费","DE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},899540,"(2015年)投标报价的调查询价阶段，总承包商对分包人询价时应注意的事项包括（）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"分包标函的完整性",{"key":24,"text":120,"correct":22},"分包人的质量保证措施",{"key":28,"text":122,"correct":26},"分包人的成本和利润",{"key":31,"text":124,"correct":22},"分包工程单价所含内容",{"key":34,"text":126,"correct":26},"分包工程施工进度计划","ABD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},899541,"(2016年)投标文件应当对招标文件作出实质性响应的内容有()。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"报价",{"key":24,"text":135,"correct":22},"工期",{"key":28,"text":137,"correct":22},"投标有效期",{"key":31,"text":139,"correct":22},"质量要求",{"key":34,"text":141,"correct":22},"招标范围","BCDE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},899542,"（2017 年考题）根据我国现行施工招标投标管理规定，投标有效期的确定一般应考虑的因素有（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":26},"投标报价需要的时间",{"key":24,"text":150,"correct":22},"组织评标需要的时间",{"key":28,"text":152,"correct":22},"确定中标人需要的时间",{"key":31,"text":154,"correct":22},"签订合同需要的时间",{"key":34,"text":156,"correct":26},"提交履约保证金需要的时间","BCD",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":36,"analysis":37},899543,"(2018年)投标人在递交投标交件后，其投标保证金按规定不予退还的情形有（ ）。",[162,164,166,168,170],{"key":20,"text":163,"correct":22},"投标人在投标有效期内撤销投标文件的",{"key":24,"text":165,"correct":26},"投标人拒绝延长投标有效期的",{"key":28,"text":167,"correct":26},"投标人在投标截止日前修改投标文件的",{"key":31,"text":169,"correct":22},"中标后无故拒签合同协议书的",{"key":34,"text":171,"correct":22},"中标后未按招标文件规定提交履约担保的",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},899544,"(2018年)根据《建设工程工程量清单计价规范》(GB50500-2013)，关于投标文件措施项目计价表的编制，下列说法正确的有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"单价措施项目计价表应采用综合单价方式计价",{"key":24,"text":179,"correct":26},"总价措施项目计价表应包含规费和建筑业增值税",{"key":28,"text":181,"correct":22},"不能精确计量的措施项目应编制总价措施项目计价表",{"key":31,"text":183,"correct":26},"总价措施项目的内容确定与招标人拟定的措施清单无关",{"key":34,"text":185,"correct":26},"总价措施项目的内容确定与投标人投标时拟定的施工组织设计无关","AC",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":200,"analysis":37},899545,"（2019年真题）投标报价的分包询价，投标人应注意的问题有( )。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"分包标函是否完整",{"key":24,"text":194,"correct":22},"分包单价所包含的内容",{"key":28,"text":196,"correct":26},"分包人是否自有专用施工机具",{"key":31,"text":198,"correct":22},"分包人可信赖程度",{"key":34,"text":120,"correct":22},"ABDE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":52,"analysis":37},899547,"(2016年)根据《招投标法实施条例》，关于依法必须招标项目中标候选人的公示，下列说法中正确的有()。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"应公示中标候选人",{"key":24,"text":208,"correct":22},"公示对象是全部中标候选人",{"key":28,"text":210,"correct":22},"公示期不得少于3日",{"key":31,"text":212,"correct":26},"公示在开标后的第二天发布",{"key":34,"text":214,"correct":22},"对有业绩信誉条件的项目，其业绩信誉情况应一并进行公示",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},899548,"(2013年)为维护公开、公平、公正的市场环境，对中标候选人的公示，下列做法中正确的有()。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"依法必须进行招标的项目，是否公示中标候选人由招标人自定",{"key":24,"text":222,"correct":22},"公示期不得少于3日，从公示的第二天开始算起",{"key":28,"text":224,"correct":26},"一般只公示排名第一的中标候选人而不必公示中标候选人全部名单",{"key":31,"text":226,"correct":22},"对有业绩信誉条件的项目，在开标时提供的资格或业绩信誉证明资料一并予以公示",{"key":34,"text":228,"correct":26},"中标候选人的各评分要素的得分情况需一并公示","BD",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":97,"analysis":37},899549,"(2014年)关于履约担保，下列说法中正确的有（）",[234,236,238,240,242],{"key":20,"text":235,"correct":26},"履约担保可以用现金、支票、汇票、银行保函形式但不能单独用履约担保书",{"key":24,"text":237,"correct":22},"履约保证金不得超过中标合同金额的10%",{"key":28,"text":239,"correct":26},"中标人不按期提交履约担保的视为废标",{"key":31,"text":241,"correct":22},"招标人要求中标人提供履约担保的，招标人应同时向中标人提供工程款支付担保",{"key":34,"text":243,"correct":22},"履约保证金的有效期需保持至工程接收证书颁发之时",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":157,"analysis":37},899550,"(2015年)在评标过程中，评标委员会可以要求投标人对投标文件有关文件作出必要澄清、说明和补充的情形包括()。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"投标文件未经单位负责人签字",{"key":24,"text":251,"correct":22},"对同类问题表述不一致",{"key":28,"text":253,"correct":22},"投标文件中有含义不明确的内容",{"key":31,"text":255,"correct":22},"有明显的计算错误",{"key":34,"text":257,"correct":26},"投标人主动提出的澄清说明",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":229,"analysis":37},899551,"（2019年真题）下列条件下的建设工程，其施工承包合同适合采用成本加酬金方式确定合同价的有（ ）",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"工程建设规模小",{"key":24,"text":265,"correct":22},"施工技术特别复杂",{"key":28,"text":267,"correct":26},"工期较短",{"key":31,"text":269,"correct":22},"紧急抢险项目",{"key":34,"text":271,"correct":26},"施工图设计还有待进一步深化",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},899553,"(2018年)与其他工程总承包方式相比较，交钥匙总承包的优越性有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"有利于满足业主的特殊要求",{"key":24,"text":279,"correct":26},"有利于降低总包商承担的风险",{"key":28,"text":281,"correct":22},"有利于调动总包商的积极性",{"key":31,"text":283,"correct":22},"有利于简化业主与承包商之间的关系",{"key":34,"text":285,"correct":26},"有利于加大业主的介入程度","ACD",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":229,"analysis":37},899554,"(2014年)根据《标准施工招标文件》的规定，承包人只能获得“工期+费用”补偿的事件有（）",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"基准日后法律的变化",{"key":24,"text":294,"correct":22},"施工中发现文物、古迹",{"key":28,"text":296,"correct":26},"发包人提供的材料、工程设备造成工程质量不合格",{"key":31,"text":298,"correct":22},"施工中遇到不利的物质条件",{"key":34,"text":300,"correct":26},"发包人提供不合格材料、工程设备",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":186,"analysis":37},899555,"(2015年)根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程变更价款的调整方法，下列说法中正确的有()。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"工程变更导致已标价工程量清单项目的工程量变化小于15%，仍采用原价格",{"key":24,"text":308,"correct":26},"已标价的工程量清单中没有相同或类似的工程变更项目，由发包人提出变更工程项目的总价和单价",{"key":28,"text":310,"correct":22},"安全文明施工费按照实际发生变化的措施项目并依据国家或省级、行业建设主管部门的规定进行调整",{"key":31,"text":312,"correct":26},"采用单价方式计算的措施费，按照分部分项工程费的调整方法确定变更单价",{"key":34,"text":314,"correct":26},"按系数计算的措施项目费均应按照实际发生变化的措施项目调整，系数不得浮动",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},899556,"(2015年)根据《标准施工招标文件》(2007)版，承包人有可能同时获得工期和费用补偿的事件有( )。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"发包方延期提供施工图纸",{"key":24,"text":322,"correct":26},"因不可抗力造成的工期延误",{"key":28,"text":324,"correct":22},"甲供设备未按时进场导致停工",{"key":31,"text":326,"correct":22},"监理对覆盖的隐藏工程重新检查且结果合格",{"key":34,"text":328,"correct":22},"施工中发现文物古迹","ACDE",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},899557,"(2016年)根据《标准施工招标文件》（2007年版）通用合同条款，承包人可能同时获得工期和费用补偿，但不能获得利润补偿的索赔事件有()。",[334,336,338,340,342],{"key":20,"text":335,"correct":26},"延迟提供施工场地",{"key":24,"text":337,"correct":22},"施工遇到不利物资条件",{"key":28,"text":339,"correct":26},"发包人负责的材料延迟提供",{"key":31,"text":341,"correct":26},"监理人指令错误",{"key":34,"text":343,"correct":22},"施工中发现文物","BE",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":127,"analysis":37},899558,"(2016年)根据《建设工程工程量清单计价规范》（GB50500--2013），关于单价合同措施项目费的调整，下列说法中正确的有()。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"设计变更引起措施项目发生变化的，可以调整措施项目费",{"key":24,"text":352,"correct":22},"招标工程量清单分部分项工程漏项引起措施项目发生变化的，可以调整措施项目费",{"key":28,"text":354,"correct":26},"招标工程量清单措施项目缺项的，不应调整措施项目费",{"key":31,"text":356,"correct":22},"承包人提出调整措施项目费的，应事先将实施方案报发包人批准",{"key":34,"text":358,"correct":26},"措施项目费的调整方法与分部分项工程费的调整方法相同",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":229,"analysis":37},899559,"(2013年)下列索赔事件引起的费用索赔中，可以获得利润补偿的有()。",[363,364,365,367,369],{"key":20,"text":343,"correct":26},{"key":24,"text":335,"correct":22},{"key":28,"text":366,"correct":26},"承包人提前竣工",{"key":31,"text":368,"correct":22},"延迟提供图纸",{"key":34,"text":292,"correct":26},{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":36,"analysis":37},899560,"(2013年)下列事件的发生，已经或将造成工期延误，则按照《标准施工招标文件》中相关合同条件，可以获得工期补偿的有()。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"监理人发出错误指令",{"key":24,"text":377,"correct":26},"监理人对已覆盖的隐蔽工程要求重新检查且检查结果不合格",{"key":28,"text":379,"correct":26},"承包人的设备故障",{"key":31,"text":381,"correct":22},"发包人提供工程设备不合格",{"key":34,"text":383,"correct":22},"异常恶劣的气候条件",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":97,"analysis":37},899561,"(2014年)关于施工期间合同暂估价的调整，下列做法中正确的有（）",[388,390,392,394,396],{"key":20,"text":389,"correct":26},"不属于依法必须招标的材料，应直接按承包人自主采购的价格调整暂估价",{"key":24,"text":391,"correct":22},"属于依法必须招标的工程设备，以中标价取代暂估价",{"key":28,"text":393,"correct":26},"属于依法必须招标的专业工程，承包人不参加投标的，应由承包人作为招标人，组织招标的费用一般由发包人另行支付",{"key":31,"text":395,"correct":22},"属于依法必须招标的专业工程，承包人参加投标的，应由发包人作为招标人同等条件下优先选择承包人中标",{"key":34,"text":397,"correct":22},"不属于依法必须招标的专业工程，应按工程变更事件的合同价款调整方法确定专业工程价款",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":157,"analysis":37},899562,"(2016年)支持承包人工程索赔成立的基本条件有()。",[402,404,406,408,410],{"key":20,"text":403,"correct":26},"合同履行过程中承包人没有违约行为",{"key":24,"text":405,"correct":22},"索赔事件已造成承包人直接经济损失或工期延误",{"key":28,"text":407,"correct":22},"索赔事件是因非承包人的原因引起的",{"key":31,"text":409,"correct":22},"承包人已按合同规定提交了索赔意向通知.索赔报告及相关证明材料",{"key":34,"text":411,"correct":26},"发包人已按合同规定给予了承包人答复",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":329,"analysis":37},899563,"(2018年)因发包人原因导致工程延期时，下列索赔事件能够成立的有（ ）",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"材料超期储存费用索赔",{"key":24,"text":419,"correct":26},"材料保管不善造成的损坏费用索赔",{"key":28,"text":421,"correct":22},"现场管理费索赔",{"key":31,"text":423,"correct":22},"保险费索赔",{"key":34,"text":425,"correct":22},"保函手续费索赔",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":440,"analysis":37},899564,"(2018年)根据《建设工程施工合同(示范文本)》(GF-2013-0201)，下列事项应纳入工程变更范围的有（ ）。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"改变工程的标高",{"key":24,"text":433,"correct":22},"改变工程的实施顺序",{"key":28,"text":435,"correct":22},"提高合同中的工作质量标准",{"key":31,"text":437,"correct":26},"将合同中的某项工作转由他人实施",{"key":34,"text":439,"correct":26},"工程设备价格的变化","ABC",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":67,"analysis":37},899565,"（2019年真题）关于依法必须招标的给定暂估价的专业工程招标，下列说法正确的有（）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"承包人不参加投标的，应由承包人作为招标人",{"key":24,"text":448,"correct":26},"承包人组织招标工作的有关费用应另行计算",{"key":28,"text":450,"correct":22},"承包人参加投标的，应由发包人负责招标",{"key":31,"text":452,"correct":26},"发包人组织招标工作的有关费用应从签约合同价中扣回",{"key":34,"text":454,"correct":22},"承包人参加投标的，同等条件下应优先中标",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":329,"analysis":37},899568,"(2013年)关于合同价款纠纷的处理，下列说法中正确的有()。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"借用有资质的建筑施工企业名义与他人签订建设工程施工合同的行为无效",{"key":24,"text":462,"correct":26},"当事人对垫资利息有约定且约定的利息高于同期同类贷款利率的应予支持",{"key":28,"text":464,"correct":22},"当事人对建筑工程的计价标准或计价方法有约定的按约定结算工程价款",{"key":31,"text":466,"correct":22},"对于阴阳合同，其价款结算应以备案的中标合同作为依据",{"key":34,"text":468,"correct":22},"建设工程未交付，工程价款也未结算的，则工程欠款的计息日为当事人的起诉之日",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":483,"analysis":37},899569,"(2015年)工程造价咨询人在进行工程造价鉴定时，应自行收集而非由委托人提供的鉴定资料有( )。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"适用于鉴定项目的规章、规范性文件和定额",{"key":24,"text":476,"correct":22},"鉴定项目同期同类型工程的技术经济指标",{"key":28,"text":478,"correct":26},"鉴定项目施工过程中的施工组织、质量、工期等工程资料",{"key":31,"text":480,"correct":26},"鉴定项目的施工合同及补充协议",{"key":34,"text":482,"correct":26},"鉴定项目所涉及实物标的的现场勘验资料","AB",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":440,"analysis":37},899570,"(2016年)承包人应在每个计量周期到期后，向发包人提交已完工程进度款支付申请，支付申请包括的内容有()。",[488,490,492,494,496],{"key":20,"text":489,"correct":22},"累计已完成的合同价款",{"key":24,"text":491,"correct":22},"本期合计完成的合同价款",{"key":28,"text":493,"correct":22},"本期合计应扣减的金额",{"key":31,"text":495,"correct":26},"累计已调整的合同金额",{"key":34,"text":497,"correct":26},"预计下期将完成的合同价款",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":52,"analysis":37},899571,"(2016年)工程造价咨询人开展工程造价司法鉴定工作时，正确的做法有()。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"应按仲裁.诉讼程序和要求进行鉴定",{"key":24,"text":505,"correct":22},"应依法出庭接受鉴定项目方当事人对鉴定意向书的质询",{"key":28,"text":507,"correct":22},"应自行收集适用于鉴定项目的工程造价信息",{"key":31,"text":509,"correct":26},"应自行对现场进行勘验",{"key":34,"text":511,"correct":22},"是鉴定项目一方当事人、代理人的，应自行回避",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":286,"analysis":37},899572,"(2014年)下列关于预付款担保的说法中，正确的是（）",[516,518,520,522,524],{"key":20,"text":517,"correct":22},"预付款担保应在施工合同签订后预付款支付前提供",{"key":24,"text":519,"correct":26},"预付款担保必须采用银行保函的形式",{"key":28,"text":521,"correct":22},"承包人中途毁约，中止工程，发包人有权从预付款担保金额中获得预付款补偿",{"key":31,"text":523,"correct":22},"发包人应在预付款扣完后将预付款保函退还承包人",{"key":34,"text":525,"correct":26},"在预付款全部扣回之前，预付款保函应始终保持有效，且担保金额应保持不变",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":36,"analysis":37},899573,"(2014年)关于建设工程竣工结算的办理，下列说法中正确的有（）",[530,532,534,536,538],{"key":20,"text":531,"correct":22},"竣工结算文件经发承包人双方签字确认的，应当作为工程结算的依据",{"key":24,"text":533,"correct":26},"竣工结算文件由发包人组织编制，承包人组织核对",{"key":28,"text":535,"correct":26},"工程造价咨询机构审核结论与承包人竣工结算文件不一致时，以造价咨询机构审核意见为准",{"key":31,"text":537,"correct":22},"合同双方对复核后的竣工结算有异议时，可以就无异议部分的工程办理不完全竣工结算",{"key":34,"text":539,"correct":22},"承包人对工程造价咨询企业的审核意见有异议的，可以向工程造价管理机构申请调解",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":200,"analysis":37},899574,"(2015年)采用工程量清单计价的工程，在办理建设工程结算时，工程量计算的原则和方法有( )。",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"不符合质量要求的工程不予计量",{"key":24,"text":547,"correct":22},"应按工程量清单计算规范的要求进行计量",{"key":28,"text":549,"correct":26},"无论何种原因，超出合同工程范围的工程均不予计量",{"key":31,"text":551,"correct":22},"因承包人原因造成的返工工程不予计量",{"key":34,"text":553,"correct":22},"应按合同的约定对承包人完成合同工程的数量进行计算和确认",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":200,"analysis":37},899575,"(2018年)承包人提交的已完工程进度款支付申请中，应计入本周期完成合同价款中的有（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"本周期已完成单价项目的金额",{"key":24,"text":561,"correct":22},"本周期应支付的总价项目的金额",{"key":28,"text":563,"correct":26},"本周期应扣回的预付款",{"key":31,"text":565,"correct":22},"本周期应支付的安全文明施工费",{"key":34,"text":567,"correct":22},"本周期完成的计日工价款",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":37},899577,"（2019年真题）工程施工中的下列情形，发包人不予计量的有（）。",[572,574,576,578,580],{"key":20,"text":573,"correct":22},"监理人抽检不合格返工增加的工程日",{"key":24,"text":575,"correct":22},"承包人自检不合格返工增加的工程日",{"key":28,"text":577,"correct":26},"承包人修复因不可抗力损坏工程增加的工程量",{"key":31,"text":579,"correct":26},"承包人在合同范围之外按发包人要求增建的临时工程工程量",{"key":34,"text":581,"correct":22},"工程质量验收资料缺项的工程量","ABE",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":286,"analysis":37},899578,"（2019年真题）关于工程签证争议的鉴定，下列做法正确的有（）。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"签证明确了人工、材料、机具台班数量及价格的，按签证的数量和价格计算",{"key":24,"text":590,"correct":26},"签证只有用工数量没有单价的，其人工单价比照鉴定项目人工单价下浮计算",{"key":28,"text":592,"correct":22},"签证只有材料用量没有价格的，其材料价格按照鉴定项目相应材料价格计算",{"key":31,"text":594,"correct":22},"签证只有总价款而无明细表述的，按总价款计算",{"key":34,"text":596,"correct":26},"签证中零星工程数量与实际完成数量不一致时，按签证的数量计算",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":142,"analysis":37},899581,"(2014年)根据《建设项目工程总承包合同示范文本》（GF-2011-0216），以下情形中，属于应对合同价款进行调整的有（）",[601,603,605,607,609],{"key":20,"text":602,"correct":26},"合同变更",{"key":24,"text":604,"correct":22},"法律法规变化影响的合同价格增减",{"key":28,"text":606,"correct":22},"工程造价管理部门公布的价格调整造成工程成本增减",{"key":31,"text":608,"correct":22},"一周内非承包人原因的停水、停电等造成累计停工超过8小时",{"key":34,"text":610,"correct":22},"发包人批准的变更估算的增减",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":97,"analysis":37},899582,"(2013年)国际工程合同价款结算中，关于预付款下列说法中正确的有()。",[615,617,619,621,623],{"key":20,"text":616,"correct":26},"首次预付款的支付时间以收到预付款保函和颁发中标函之日两者中较早者为准",{"key":24,"text":618,"correct":22},"预付款应在支付证书中按百分比扣减的方式偿还",{"key":28,"text":620,"correct":26},"当期中支付证书中累计总额超过中标合同价（含暂定金额）的10%开始扣减",{"key":31,"text":622,"correct":22},"在预付款完全偿还之前承包商应保证预付款保函一直有效",{"key":34,"text":624,"correct":22},"如在预付款保函截止日期前28天预付款还未完全偿还，则承包商应相应延长保函期限",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":440,"analysis":37},899583,"（2017年考题）在国际工程承包中，根据 FIDIC《施工合同条件》(1999年版)，因工程量变更可以调整合同规定费率或价格的条件包括（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"实际工程量比工程量表中规定的工程量的变动大于10%",{"key":24,"text":632,"correct":22},"该工程量的变更与相对应费率的乘积超过了中标金额的0.01%",{"key":28,"text":634,"correct":22},"由于工程量的变动直接造成单位工程费用的变动超过1%",{"key":31,"text":636,"correct":26},"原工程量全剖删减，其替代工程的费用对合司总价无影响",{"key":34,"text":638,"correct":26},"该部分工程量是合同中规定的“固定率项目”",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":653,"analysis":37},899584,"(2018年)根据《建设项目工程总承包合同示范文本(试行》(GF 2011-0216) 下列关于预付款的说法正确的有（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":26},"合同约定预付款保函的，发包人在收到预付款保通后7 天内向承包人支付预付款金额",{"key":24,"text":646,"correct":22},"预付款的抵扣方式，比例等，由合同双方在专用条款中约定",{"key":28,"text":648,"correct":22},"预付款抵扣完后，发包人应及时向承包人退还预付款保函",{"key":31,"text":650,"correct":26},"合同解除时预付款尚未扣完的，发包人应直接从预付款保函中扣除尚未扣完的款项",{"key":34,"text":652,"correct":26},"合同未约定承包人提交保函的，尚未扣回的预付款应直接从履约保函中扣回","BC",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":127,"analysis":37},899585,"（2019年真题）根据2017版FIDIC《施工合同条件》，关于工程变更的说法，正确的有（）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"不论何种变更，均需工程师发出变更指令",{"key":24,"text":661,"correct":22},"在明确构成工程变更的情况下，承包商享有工期顺延和调价权利，无需再发出索赔通知",{"key":28,"text":663,"correct":26},"承包商建议的变更是指承包商基于价值工程主动提出建议而形成的变更",{"key":31,"text":665,"correct":22},"对于变更工程重新确定费率或价格，在没有可供参考依据且缺乏合同约定的条件下，利润率按5%计取",{"key":34,"text":667,"correct":26},"承包商基于价值工程主动提出建议引起的变更批准后，变更永久工程的设计增加的设计费由发包人承担",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":200,"analysis":37},899587,"(2018年)编制建设项目竣工决算必须满足的条件包括（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"经批准的初步设计所确定的工程内容已完成",{"key":24,"text":675,"correct":22},"单项工程或建设项目竣工结算已完成",{"key":28,"text":677,"correct":26},"收尾工程竣工结算已完成",{"key":31,"text":679,"correct":22},"预留费用不超过规定比例",{"key":34,"text":681,"correct":22},"涉及工程质量纠纷事项已处理完毕",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":696,"analysis":37},899588,"（2019年真题）一般不作为无形资产入账，但当涉及转让时，应作为无形资产核算的有（ ）",[686,688,690,692,694],{"key":20,"text":687,"correct":26},"自创专利权",{"key":24,"text":689,"correct":22},"自创专有技术",{"key":28,"text":691,"correct":22},"自创商标权",{"key":31,"text":693,"correct":26},"出让方式取得土地使用权",{"key":34,"text":695,"correct":22},"划拨方式取得土地使用权","BCE",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":127,"analysis":37},899590,"（2015 年考题）工程竣工验收报告的附有文件包括( )。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"施工许可证",{"key":24,"text":704,"correct":22},"施工单位签署的工程质量保修书",{"key":28,"text":706,"correct":26},"完整的施工管理资料",{"key":31,"text":708,"correct":22},"施工图设计文件审查意见",{"key":34,"text":710,"correct":26},"设备的进场实验报告",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":186,"analysis":37},899591,"(2011年)关于无形资产价值确定的说法中，正确的有()。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"无形资产计价入账后，应在其有效使用期内分期摊销",{"key":24,"text":718,"correct":26},"专利权转让价格必须按成本估价",{"key":28,"text":720,"correct":22},"自创专利权的价值为开发过程中的实际支出",{"key":31,"text":722,"correct":26},"自创的非专利技术一般作为无形资产入账",{"key":34,"text":724,"correct":26},"通过行政划拨的土地，其土地使用权作为无形资产核算",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":36,"analysis":37},899592,"(2013年)关于新增固定资产价值的确定，下列说法中正确的有()。",[729,731,733,735,737],{"key":20,"text":730,"correct":22},"新增固定资产价值是以独立发挥生产能力的单项工程为对象计算的",{"key":24,"text":732,"correct":26},"分期分批交付的工程，应在最后一期（批）交付时一次性计算新增固定资产价值",{"key":28,"text":734,"correct":26},"凡购置的达到固定资产标准不需安装的设备，应计入新增固定资产价值",{"key":31,"text":736,"correct":22},"运输设备等固定资产，仅计算采购成本，不计分摊的“待摊投资”",{"key":34,"text":738,"correct":22},"建设单位管理费按建筑工程、安装工程以及需安装设备价值总额按比例分摊",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]