[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,33,50,2160,[13,38,52,67,82,97,112,127,142,157,172,187,201,216,230,245,259,272,287,301,315,329,344,358,372,386,401,415,429,441,454,467,481,495,509,523,537,551,565,579,593,607,619,633,647,660,675,689,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},899475,2,"多选题","（2019年真题）在工程量清单编制中，施工组织设计、施工范围和验收规范可以用于确定（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","项目名称",true,{"key":24,"text":25,"correct":26},"B","项目编码",false,{"key":28,"text":29,"correct":22},"C","项目特征",{"key":31,"text":32,"correct":26},"D","计量单位",{"key":34,"text":35,"correct":22},"E","工程数量","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},899476,"(2014年)下列措施项目中，应按分部分项工程量清单编制方式编制的有（）",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"超高施工增加",{"key":24,"text":45,"correct":26},"建筑物的临时保护设施",{"key":28,"text":47,"correct":22},"大型机械设备进出场及安拆",{"key":31,"text":49,"correct":26},"已完工程及设备保护",{"key":34,"text":51,"correct":22},"施工排水.降水",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},899477,"(2013年)下列工程项目中，必须采用工程量清单计价的有()。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"使用各级财政预算资金的项目",{"key":24,"text":59,"correct":22},"使用国家发行债券所筹资金的项目",{"key":28,"text":61,"correct":22},"国有资金投资总额占50%以上的项目",{"key":31,"text":63,"correct":22},"使用国家政策性货款的项目",{"key":34,"text":65,"correct":26},"使用国际金融机构货款的项目","ABCD",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},899478,"(2014年)关于措施项目工程量清单编制与计价，下列说法中正确的是（）",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"不能计算工程量的措施项目也可以采用分部分项工程量清单方式编制",{"key":24,"text":74,"correct":22},"安全文明施工费按总价方式编制，其计算基础可为“定额基价”、“定额人工费”",{"key":28,"text":76,"correct":26},"总价措施项目清单表应列明计量单位、费率、金额等内容",{"key":31,"text":78,"correct":22},"除安全文明施工费外的其他总价措施项目的计算基础可为“定额人工费”",{"key":34,"text":80,"correct":26},"按施工方案计算的总价措施项目可以只需填“金额”数值","BD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},899479,"(2016年)关于暂估价的计算和填写，下列说法中正确的有()。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"暂估价数量和拟用项目应结合工程量清单中“暂估价表”予以补充说明",{"key":24,"text":89,"correct":26},"材料暂估价应由招标人填写暂估单价，无须指出拟用于哪些清单项目",{"key":28,"text":91,"correct":26},"工程设备暂估价不应纳入分部分项工程综合单价",{"key":31,"text":93,"correct":22},"专业工程暂估价应分不同专业，列出明细表",{"key":34,"text":95,"correct":22},"专业工程暂估价由招标人填写，并计入投标总价","ADE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},899480,"（2017年考题）根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程量清清单计价的有关要求，下列说法中正确的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"事业单位自有资金投资的建设工程发承包，可以不采用工程量清单计价",{"key":24,"text":104,"correct":22},"使用国有资金投资的建设工程发承包，必须采用工程量清单计价",{"key":28,"text":106,"correct":22},"招标工程量清单应以单位工程为单位编制",{"key":31,"text":108,"correct":26},"工程量清单计价方式下，必须采用单价合同",{"key":34,"text":110,"correct":26},"招标工程量清单的准确性和完整性由编制人负责","BC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},899481,"(2016年)关于分部分项工程量清单的编制，下列说法中正确的有()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"以清单计算规范附录中的名称为基础，结合具体工作内容补充细化项目名称",{"key":24,"text":119,"correct":26},"清单项目的工作内容在招标工程量清单的项目特征中加以描述",{"key":28,"text":121,"correct":22},"有两个或以上计量单位时，选择最适宜表现项目特征并方便计算的单位",{"key":31,"text":123,"correct":22},"除另有说明外，清单项目的工程量应以实体工程量为准，各种施工中的损耗和需要增加的工程量应在单价中考虑",{"key":34,"text":125,"correct":26},"在工程量清单中应附补充项目的项目名称、项目特征、计量单位和工程量","ACD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},899482,"(2018年)下列费用中,由招标人填写金额,投标人直接计入投标总价的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"材料设备暂估价",{"key":24,"text":134,"correct":22},"专业工程暂估价",{"key":28,"text":136,"correct":22},"暂列金额",{"key":31,"text":138,"correct":26},"计日工单价",{"key":34,"text":140,"correct":26},"总承包服务费","ABC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},899483,"(2018年)为有利于措施费的确定和调整,根据现行工程量计算规范。适宜釆用单价措施项目计价的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"夜间施工增加费",{"key":24,"text":149,"correct":26},"二次搬运费",{"key":28,"text":151,"correct":22},"施工排水、降水费",{"key":31,"text":153,"correct":22},"超高施工增加费",{"key":34,"text":155,"correct":22},"垂直运输费","CDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},899484,"（2019年真题）关于分部分项工程项目清单的编制，下列说法正确的有（）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"项目编码第7-9位为分项工程项目名称顺序码",{"key":24,"text":164,"correct":26},"项目名称应按工程量计算规范附录中给定的名称确定",{"key":28,"text":166,"correct":26},"项目特征应按工程量计算规范附录中规定的项目特征予以描述",{"key":31,"text":168,"correct":22},"计量单位应按工程量计算规范附录中给定的，选用最适宜表现该项目特征并方便计量的单位",{"key":34,"text":170,"correct":26},"工程量应按实际完成的工程量计算","AD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},899487,"(2013年)为保证写实记录法数据的可靠性，写实记录延续时间的确定，应满足的要求有()。",[176,178,180,182,184],{"key":20,"text":177,"correct":26},"算术平均值精确度",{"key":24,"text":179,"correct":22},"被测定个人或小组的最低数量",{"key":28,"text":181,"correct":26},"测定的数列的稳定系数",{"key":31,"text":183,"correct":22},"测定总延续时间的最小值",{"key":34,"text":185,"correct":22},"测定完成产品的最低次数","BDE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":126,"analysis":37},899488,"(2014年)下列施工工作时间分类选项中，属于工人有效工作时间的有（）",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"基本工作时间",{"key":24,"text":194,"correct":26},"休息时间",{"key":28,"text":196,"correct":22},"辅助工作时间",{"key":31,"text":198,"correct":22},"准备与结束工作时间",{"key":34,"text":200,"correct":26},"不可避免的中断时间",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},899489,"(2013年)下列材料单价的构成费用，包含在采购及保管费中进行计算的有()。",[205,207,209,211,213],{"key":20,"text":206,"correct":26},"运杂费",{"key":24,"text":208,"correct":22},"仓储费",{"key":28,"text":210,"correct":22},"工地管理费",{"key":31,"text":212,"correct":26},"运输损耗",{"key":34,"text":214,"correct":22},"仓储损耗","BCE",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":36,"analysis":37},899490,"(2014年)影响定额动态人工日工资单价的因素包括（）",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"人工日工资单价的组成内容",{"key":24,"text":223,"correct":26},"社会工资差额",{"key":28,"text":225,"correct":22},"劳动力市场供需变化",{"key":31,"text":227,"correct":26},"社会最低工资水平",{"key":34,"text":229,"correct":22},"政府推行的社会保障与福利政策",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},899491,"(2015年)下列费用项目中，应计入人工日工资单价的有( )。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"计件工资",{"key":24,"text":237,"correct":22},"劳动竞赛奖金",{"key":28,"text":239,"correct":26},"劳动保护费",{"key":31,"text":241,"correct":22},"流动施工津贴",{"key":34,"text":243,"correct":26},"职工福利费","ABD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":81,"analysis":37},899492,"(2016年)下列定额测定方法中，主要用于测定材料净用量的有()。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"现场技术测定法",{"key":24,"text":252,"correct":22},"实验室试验法",{"key":28,"text":254,"correct":26},"现场统计法",{"key":31,"text":256,"correct":22},"理论计算法",{"key":34,"text":258,"correct":26},"写实记录法",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":126,"analysis":37},899494,"（2019年真题）下列人工、材料、机械台班的消耗，应计入定额消耗量的有（）。",[263,264,266,268,270],{"key":20,"text":198,"correct":22},{"key":24,"text":265,"correct":26},"施工本身原因造成的工人停工时间",{"key":28,"text":267,"correct":22},"措施性材料的合理消耗量",{"key":31,"text":269,"correct":22},"不可避免的施工废料",{"key":34,"text":271,"correct":26},"低负荷下的机械工作时间",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},899496,"(2013年)预算定额中人工、材料、机械台班消耗量的确定方法包括()。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"以施工定额为基础确定",{"key":24,"text":279,"correct":22},"以现场观察测定资料为基础计算",{"key":28,"text":281,"correct":26},"以工程量计算规则为依据计算",{"key":31,"text":283,"correct":26},"以各类费用定额为基础确定",{"key":34,"text":285,"correct":26},"以工程结算资料为依据计算","AB",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":186,"analysis":37},899497,"(2015年)下列有关概算定额与概算指标关系的表述中，正确有（）。",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"概算定额以单位工程为对象，概算指标以单项工程为对象",{"key":24,"text":294,"correct":22},"概算定额以预算定额为基础，概算指标主要来自各种预算和结算资料",{"key":28,"text":296,"correct":26},"概算定额适用于初步设计阶段，概算指标不适用于初步设计阶段",{"key":31,"text":298,"correct":22},"概算指标比概算定额更加综合与扩大",{"key":34,"text":300,"correct":22},"概算定额是编制概算指标的依据",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":215,"analysis":37},899498,"(2015年)关于投资估算指标，下列说法中正确的有( )。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"应以单项工程为编制对象",{"key":24,"text":308,"correct":22},"是反映建设总投资的经济指标",{"key":28,"text":310,"correct":22},"概略程度与可行性研究工作深度相适应",{"key":31,"text":312,"correct":26},"编制基础包括概算定额，不包括预算定额",{"key":34,"text":314,"correct":22},"可根据历史预算资料和价格变动资料等编制",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":328,"analysis":37},899499,"(2015年)下列与施工机械工作相关的时间中，应包括在预算定额机械台班消耗量中，但不包括在施工定额中的有()。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"低负荷下工作时间",{"key":24,"text":322,"correct":22},"机械施工不可避免的工序间歇",{"key":28,"text":324,"correct":22},"机械维修引起的停歇时间",{"key":31,"text":326,"correct":22},"开工时工作量不饱满所损失的时间",{"key":34,"text":200,"correct":26},"BCD",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},899500,"(2018年)关于概算定额与预算定额，下列说法正确的有（ ）",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"概算定额的主要内容、主要方式及基本使用方法与预算定额相同",{"key":24,"text":336,"correct":22},"概算定额与预算定额的不同之处，在于项目划分和综合扩大程度上的差异",{"key":28,"text":338,"correct":26},"概算定额是确定概算指标中各种消耗量的依据",{"key":31,"text":340,"correct":26},"概算定额与预算定额之间的水平差一般在10%左右",{"key":34,"text":342,"correct":22},"概算定额项目可以按工程结构划分，也可以按工程部位划分","ABE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":343,"analysis":37},899501,"（2019年真题）关于各类工程计价定额的说法，正确的有（）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"概算定额基价可以是工料单价、综合单价或全费用综合单价",{"key":24,"text":351,"correct":22},"概算指标分为建筑工程概算指标和设备及安装工程概算指标",{"key":28,"text":353,"correct":26},"综合概算指标的准确性高于单项概算指标",{"key":31,"text":355,"correct":26},"概算指标是在概算定额的基础上进行编制的",{"key":34,"text":357,"correct":22},"投资估算指标必须反映项目建设前期和交付使用期内发生的动态投资",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":156,"analysis":37},899502,"(2016年)关于工程量清单计价和定额计价，下列计价公式中正确的有（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":26},"单位工程直接费=∑(假定建筑安装产品工程量×工料单价)+措施费",{"key":24,"text":365,"correct":26},"单位工程概预算费=单位工程直接费+企业管理费+利润+税金",{"key":28,"text":367,"correct":22},"分部分项工程费=∑(分部分项工程量×分部分项工程综合单价)",{"key":31,"text":369,"correct":22},"措施项目费=∑按“项”计算的措施项目费+∑(措施项目工程量×措施项目综合单价)",{"key":34,"text":371,"correct":22},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":141,"analysis":37},899503,"(2014年)下列关于各类工程计价定额的说法中，正确的有（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"预算定额以现行劳动定额和施工定额为编制基础",{"key":24,"text":379,"correct":22},"概、预算定额的基价一般由人工、材料和机械台班费用组成",{"key":28,"text":381,"correct":22},"概算指标可分为建筑工程概算指标、设备及安装工程概算指标",{"key":31,"text":383,"correct":26},"投资估算指标主要以概算定额和概算指标为编制基础",{"key":34,"text":385,"correct":26},"单位工程投资估算指标中仅包括建筑安装工程费",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},899505,"(2013年)把各种不能直接相加的现象还原为价值形态，先相加再相除，用以反映观测对象变化趋势的指数属于()。",[390,392,394,396,398],{"key":20,"text":391,"correct":26},"个体指数",{"key":24,"text":393,"correct":26},"环比指数",{"key":28,"text":395,"correct":26},"平均指数",{"key":31,"text":397,"correct":22},"综合指数",{"key":34,"text":399,"correct":22},"总指数","DE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":36,"analysis":37},899506,"(2014年)建设项目工程造价指数是由（）指数综合得到的",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"设备、工器具价格指数",{"key":24,"text":408,"correct":26},"人工费价格指数",{"key":28,"text":410,"correct":22},"建筑安装工程造价指数",{"key":31,"text":412,"correct":26},"材料价格指数",{"key":34,"text":414,"correct":22},"工程建设其它费用指数",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":343,"analysis":37},899507,"(2016年)关于工程造价指数，下列说法中正确的有()。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"平均指数是综合指数的变形",{"key":24,"text":422,"correct":22},"设备、工器具价格指数属于总指数",{"key":28,"text":424,"correct":26},"建筑安装工程造价指数用拉氏指数变性后的加权平均指数表示",{"key":31,"text":426,"correct":26},"单项工程造价指数用派氏公式计算的综合指数表示",{"key":34,"text":428,"correct":22},"建设项目造价指数是质量指标指数",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":156,"analysis":37},899508,"(2018年)建设项目造价指数属于总指数,是由（ ）综合编制而成。",[433,435,437,438,439],{"key":20,"text":434,"correct":26},"人、材、机价格指数",{"key":24,"text":436,"correct":26},"企业管理费价格指数",{"key":28,"text":406,"correct":22},{"key":31,"text":410,"correct":22},{"key":34,"text":440,"correct":22},"工程建设其他费用指数",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":36,"analysis":37},899509,"（2019年真题）建设工程造价指标测算常用的方法包括( )。",[445,447,449,451,452],{"key":20,"text":446,"correct":22},"数据统计法",{"key":24,"text":448,"correct":26},"现场测算法",{"key":28,"text":450,"correct":22},"典型工程法",{"key":31,"text":258,"correct":26},{"key":34,"text":453,"correct":22},"汇总计算法",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":466,"analysis":37},899511,"(2018年)根据现行建筑安装工程费用项目组成规定,下列费用项目中已包括在人工日工资单价内的有（ ）。",[458,460,461,463,464],{"key":20,"text":459,"correct":22},"节约奖",{"key":24,"text":241,"correct":22},{"key":28,"text":462,"correct":22},"高温作业临时津贴",{"key":31,"text":239,"correct":26},{"key":34,"text":465,"correct":22},"探亲假期间工资","ABCE",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":111,"analysis":37},899512,"（2019年真题）下列费用中，不计入机械台班单价而单独列项计算的有（）。",[471,473,475,477,479],{"key":20,"text":472,"correct":26},"安拆简单、移动需要起重及运输机械的轻型施工机械的安拆费及场外运费",{"key":24,"text":474,"correct":22},"安拆复杂、移动需要起重及运输机械的重型施工机械的安拆费及场外运费",{"key":28,"text":476,"correct":22},"利用辅助设施移动的施工机械的辅助设施相关费用",{"key":31,"text":478,"correct":26},"不需相关机械辅助运输的自行移动机械的场外运费",{"key":34,"text":480,"correct":26},"固定在车间的施工机械的安拆费及场外运费",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":126,"analysis":37},899513,"(2014年)在选择建设地点（厂址）时，应尽量满足下列需求（）",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"节约土地，尽量少占耕地，降低土地补偿费用",{"key":24,"text":488,"correct":26},"建设地点（厂址）的地下水位应与地下建筑物的基准面持平",{"key":28,"text":490,"correct":22},"尽量选择人口相对稀疏的地区，减少拆迁移民数量",{"key":31,"text":492,"correct":22},"尽量选择在工程地质、水文地质较好的地段",{"key":34,"text":494,"correct":26},"厂区地形求平坦，避免山地",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":286,"analysis":37},899514,"(2016年)关于投资决策阶段流动资金的估算，下列说法中正确的有()。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"流动资金周转额的大小与生产规模及周转速度直接相关",{"key":24,"text":502,"correct":22},"分项详细估算时，需要计算各类流动资产和流动负债的年周转次数",{"key":28,"text":504,"correct":26},"当年发生的流动资金借款应按半年计息",{"key":31,"text":506,"correct":26},"流动资金借贷利息应计入建设期贷款利息",{"key":34,"text":508,"correct":26},"不同生产负荷下的流动资金按100%生产负荷下的流动资金乘以生产负荷百分比计算",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":141,"analysis":37},899515,"(2015年)建设规模是影响工程造价的主要固素之一，项目决策阶段合理确定建设规模的主要方法有( )。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"盈亏平衡产量分析法",{"key":24,"text":516,"correct":22},"平均成本法",{"key":28,"text":518,"correct":22},"生产能力平衡法",{"key":31,"text":520,"correct":26},"单位生产能力估算法",{"key":34,"text":522,"correct":26},"回归分析法",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":466,"analysis":37},899516,"(2018年)下列估算方法中,不适用于可行性研究阶段投资估算的有（)",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"生产能力指数",{"key":24,"text":530,"correct":22},"比例估算法",{"key":28,"text":532,"correct":22},"系数估算法",{"key":31,"text":534,"correct":26},"指标估算法",{"key":34,"text":536,"correct":22},"混合法",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":466,"analysis":37},899517,"（2019年真题）以下属于流动资产的是（ ）",[541,543,545,547,549],{"key":20,"text":542,"correct":22},"存货",{"key":24,"text":544,"correct":22},"库存现金",{"key":28,"text":546,"correct":22},"应收账款",{"key":31,"text":548,"correct":26},"应付账款",{"key":34,"text":550,"correct":22},"预付账款",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":141,"analysis":37},899518,"(2015年)直接套用概算指标编制单位建筑工程设计概算时，拟建工程应符合的条件包括( )。",[555,557,559,561,563],{"key":20,"text":556,"correct":22},"建设地点与概算指标中的工程建设地点相同",{"key":24,"text":558,"correct":22},"工程特征与概算指标中的工程特征基本相同",{"key":28,"text":560,"correct":22},"建筑面积与概算指标中的工程建筑面积相差不大",{"key":31,"text":562,"correct":26},"建造时间与概算指标中工程建造时间相近",{"key":34,"text":564,"correct":26},"物价水平与概算指标中工程的物价水平基本",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":244,"analysis":37},899519,"(2013年)某建设项目由厂房、办公楼、宿舍等单项工程组成，则可包含在各单项工程综合概算中的内容有()。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"机械设备及安装工程概算",{"key":24,"text":572,"correct":22},"电气设备及安装工程概算",{"key":28,"text":574,"correct":26},"工程建设其他费用概算",{"key":31,"text":576,"correct":22},"特殊构筑物工程概算",{"key":34,"text":578,"correct":26},"流动资金概算",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":186,"analysis":37},899520,"(2014年)建筑工程概算的编制方法主要有（）",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"设备价值百分比法",{"key":24,"text":586,"correct":22},"概算定额法",{"key":28,"text":588,"correct":26},"综合吨位指标法",{"key":31,"text":590,"correct":22},"概算指标法",{"key":34,"text":592,"correct":22},"类似工程预算法",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":81,"analysis":37},899521,"(2018年)关于建筑设计对工业项目造价的影响,下列说法正确的有（ ）",[597,599,601,603,605],{"key":20,"text":598,"correct":26},"建筑周长系数越高,单位面积造价越低",{"key":24,"text":600,"correct":22},"单跨厂房柱间距不变,跨度越大,单位面积造价越低",{"key":28,"text":602,"correct":26},"多跨厂房跨度不变,中跨数目越多,单位面积造价越高",{"key":31,"text":604,"correct":22},"超高层建筑采用框架结构和剪力墙结构比较经济",{"key":34,"text":606,"correct":26},"大中型工业厂房一般选用砌体结构来降低工程造价",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":618,"analysis":37},899522,"（2019年真题）某单位建筑工程的初步设计采用的技术比较成熟，但由于设计深度不够，不能准确计算出工程量，若急需该单位建筑工程概算时，可采用的概算编制方法有（）。",[611,613,614,615,616],{"key":20,"text":612,"correct":26},"预算单价法",{"key":24,"text":586,"correct":26},{"key":28,"text":590,"correct":22},{"key":31,"text":592,"correct":22},{"key":34,"text":617,"correct":26},"扩大单价法","CD",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":286,"analysis":37},899524,"(2015年)关于施工图预算对投资方的作用，下列说法中正确的有( )。",[623,625,627,629,631],{"key":20,"text":624,"correct":22},"是控制施工图设计不突破设计概算的重要措施",{"key":24,"text":626,"correct":22},"是控制造价及资金合理使用的依据",{"key":28,"text":628,"correct":26},"是投标报价的基础",{"key":31,"text":630,"correct":26},"是与施工预算进行“两算”对比的依据",{"key":34,"text":632,"correct":26},"是调配施工力量、组织材料供应的依据",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":618,"analysis":37},899525,"(2016年)施工图预算对投资方、施工企业都具有十分重要的作用。下列选项中仅属于对施工企业作用的有()。",[637,639,641,643,645],{"key":20,"text":638,"correct":26},"确定合同价款的依据",{"key":24,"text":640,"correct":26},"控制资金合理使用的依据",{"key":28,"text":642,"correct":22},"控制工程施工成本的依据",{"key":31,"text":644,"correct":22},"调配施工力量的依据",{"key":34,"text":646,"correct":26},"办理工程结算的依据",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":111,"analysis":37},899526,"(2018年)在编制单位建筑工程施工图预算时,一般应计入综合取定的措施项目费的有（ ）。",[651,653,655,656,658],{"key":20,"text":652,"correct":26},"施工降水费用",{"key":24,"text":654,"correct":22},"冬雨季施工增加费",{"key":28,"text":147,"correct":22},{"key":31,"text":657,"correct":26},"模板费用",{"key":34,"text":659,"correct":26},"脚手架费用",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":674,"analysis":37},899528,"(2015年)关于招标工程量清单的编制，下列说法正确的是( )。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"若采用标准图集能够全部满足项目特征描进的要求，项目特征描进可直接采用“详见xx图”的格式",{"key":24,"text":667,"correct":22},"措施项目清单的编制需考虑工程本身、水文、气象、环境、安全等多种因素",{"key":28,"text":669,"correct":26},"以“项”为计量单位的专业工程暂估价一般应包括管理费、规费、利润、税金等",{"key":31,"text":671,"correct":22},"工程量清单总说明应对工程概况、工程招标及分包范围、工程质量要求等进行描进",{"key":34,"text":673,"correct":22},"工程量清单编制依据包括设计文件、招标文件、施工现场情况、常规施工方案等","ABDE",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":343,"analysis":37},899529,"(2013年)关于施工招标文件，下列说法中正确的有()。",[679,681,683,685,687],{"key":20,"text":680,"correct":22},"招标文件应包括拟签合同的主要条款",{"key":24,"text":682,"correct":22},"当进行资格预审时，招标文件中应包括投标邀请书",{"key":28,"text":684,"correct":26},"自招标文件开始发出之日起至投标截止之日最短不得少于5天",{"key":31,"text":686,"correct":26},"招标文件不得说明评标委员会的组建方法",{"key":34,"text":688,"correct":22},"招标文件应明确评标方法",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":244,"analysis":37},899530,"(2015年)根据《建设工程工程量清单计价规》(GE50500-2010)，招标控制价中综合单价中应考虑的风险因素包括()。",[693,695,697,699,701],{"key":20,"text":694,"correct":22},"项目管理的复杂性",{"key":24,"text":696,"correct":22},"项目的技术难度",{"key":28,"text":698,"correct":26},"人工单价的市场变化",{"key":31,"text":700,"correct":22},"材料价格的市场风险",{"key":34,"text":702,"correct":26},"税金、规费的政策变化",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":674,"analysis":37},899531,"(2014年)关于工程量清单中的项目特征描述，下列表述正确的是（）",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"应符合工程量计算规范附录的规定",{"key":24,"text":710,"correct":22},"应能满足确定综合单价的需要",{"key":28,"text":712,"correct":26},"不能直接采用详见××图集的方式",{"key":31,"text":714,"correct":22},"可以采用文字描述和详见××图号的方式",{"key":34,"text":716,"correct":22},"应结合拟建工程的实际",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":126,"analysis":37},899532,"(2013年)关于招标工程量清单与招标控制价，下列说法中正确的有()。",[721,723,725,727,729],{"key":20,"text":722,"correct":22},"专业工程暂估价应包括除规费、税金以外的管理费和利润等",{"key":24,"text":724,"correct":26},"招标控制价必须公布其总价而不得公布各组成部分的详细内容",{"key":28,"text":726,"correct":22},"投标报价若超过公布的招标控制价则按废标处理",{"key":31,"text":728,"correct":22},"招标控制价原则上不得超过批准的设计概算",{"key":34,"text":730,"correct":26},"招标人仅要求对分包的专业工程进行总承包管理和协调时，总承包服务费按专业工程估算的3%～5%计算",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]