[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,31,50,2160,[13,34,46,58,70,82,94,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,549,560,572,584,596,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},899371,1,"单选题","（2020年真题）根据《招标施工招标文件》通用合同条款，下列引起承包人索赔的事件中，可以同时获得工期和费用补偿的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","发包人原因造成承包人人员工伤事故",false,{"key":24,"text":25,"correct":26},"B","施工中遇到不利物质条件",true,{"key":28,"text":29,"correct":22},"C","承包人提前竣工",{"key":31,"text":32,"correct":22},"D","基准日后法律的变化","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},899372,"（2020年真题）某市政工程施工合同中约定:（1）基准日为2020年2月20日;（2）竣工日期为2020年7月30日;（3）工程价款结算时人工单价、钢材、商品混凝土及施工机具使用费采用价格指数法调差，各项权重系数及价格指数见下表，工程开工后，由于发包人原因导致原计划7月施工的工程延误至8月实施，2020年8月承包人当月完成清单子目价款3000万元，当月按已标价工程量清单价格确认的变更金额为100万元，则本工程2020年8月的价格调整金额为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"60.18",{"key":24,"text":41,"correct":22},"62.24",{"key":28,"text":43,"correct":22},"67.46",{"key":31,"text":45,"correct":26},"88.94",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},899373,"（2020年真题）某项目施工合同约定，由承包人承担±10%范围内的碎石价格风险，超出部分采用造价信息法调差。已知承包人投标价格、基准期的价格分别为100\u002Fm3、96元\u002Fm3，2020年7月的造价信息发布价为130元\u002Fm3，则该月碎石的实结算价格为（ ）元\u002Fm3。",[50,52,54,56],{"key":20,"text":51,"correct":22},"117.0",{"key":24,"text":53,"correct":26},"120.0",{"key":28,"text":55,"correct":22},"124.4",{"key":31,"text":57,"correct":22},"130.0",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},899374,"（2020年真题）因工程变更引起措施项目发生变化时，关于合同价款的调整，下列说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"安全文明施工费不予调整",{"key":24,"text":65,"correct":22},"按总价计算的措施项目费的调整，不考虑承包人报价浮动因素",{"key":28,"text":67,"correct":26},"按单价计算的措施项目费的调整，以实际发生变化的措施项目数量为准",{"key":31,"text":69,"correct":22},"招标清单中漏项的措施项目费的调整，以承包人自行拟定的实施方案为准",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},899375,"（2018年考题）因不可抗力造成的下列损失，应由承包人承担的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程所需清理、修复费用",{"key":24,"text":77,"correct":22},"运至施工场地待安装设备的损失",{"key":28,"text":79,"correct":26},"承包人的施工机械设备损坏及停工损失",{"key":31,"text":81,"correct":22},"停工期间，发包人要求承包人留在工地的保卫人员费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},899376,"（2019年考题）某施工现场主导施工机械一台，由承包人租得，施工合同约定，当发生索赔事件时，遂机械台班单价、租赁费分别按900元\u002F台班、400元\u002F台班计，人工工资、窝工补贴分别按100元工日、50元\u002F工日计；以人工费与机械费之和为基数的综合费率为30%，在施工过程中，发生如下事件:①出现异赏恶劣天气导致工程停工2天,人员窝工20个工日；②因恶劣天气导致工程修复用工10个工日。机械1个台班，为此承包人可向发包人索赔的费用为（ ）元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1820",{"key":24,"text":89,"correct":26},"2470",{"key":28,"text":91,"correct":22},"2820",{"key":31,"text":93,"correct":22},"3470",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},899377,"（2019年考题）根据《标准施工招标文件》（2007年版）通用合同条款，下列引起承包人索赔的事件中，可以同时获得工期、费用和利润补偿的是（ ）。",[98,100,102,103],{"key":20,"text":99,"correct":22},"施工中发现文物、古迹",{"key":24,"text":101,"correct":26},"发包人延迟提供建筑材料",{"key":28,"text":29,"correct":22},{"key":31,"text":104,"correct":22},"因不可抗力造成工期延误",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},899378,"（2019年考题）关于工程索赔的相关论述，下列说法正确的是（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"工程索赔是指承包人向发包人提出工期和（或）费用补偿要求的行为",{"key":24,"text":112,"correct":22},"由于发包人原因导致分包人承受经济损失，分包人可直接向发包人提出索赔",{"key":28,"text":114,"correct":26},"承包人提出的工期补偿索赔经发包人批准后，可免除承包人非自身原因拖期违约责任",{"key":31,"text":116,"correct":22},"由于不可抗力事件造成合同非正常终止，承包人不能向发包人提出索赔",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},899379,"（2019年考题）某招标工程项目执行《建设工程工程量清单计价规范》（GB50500-2013）,招标工程量清单中某分项工程的工程量为1500m3，施工中由于设计变更调增1900m3,该分项工程最高投标限价综合单价为40元\u002Fm3,投标报价为47元\u002Fm3,则该分项工程的结算价为（ ）元。",[121,123,125,127],{"key":20,"text":122,"correct":22},"87400",{"key":24,"text":124,"correct":22},"88900",{"key":28,"text":126,"correct":26},"89125",{"key":31,"text":128,"correct":22},"89300",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},899380,"（2019年考题）.下列发承包双方在约定调整合同价款的事项中属于工程变更的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":26},"工程量清单缺项",{"key":24,"text":136,"correct":22},"不可抗力",{"key":28,"text":138,"correct":22},"物价波动",{"key":31,"text":140,"correct":22},"提前竣工",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},899381,"（2018年考题）关于计日工费用的确认和支付，下列说法正确的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":26},"承包人应按照确认的计日工现场签证报告提出计日工项目的数量",{"key":24,"text":148,"correct":22},"发包人应根据已标价工程量清单中的工程数量和计日工单价确定",{"key":28,"text":150,"correct":22},"已标价工程量清单中没有计日工单价的，由发包人确定价格",{"key":31,"text":152,"correct":22},"已标价工程量清单中没有计日工单价的，由承包人确定价格",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},899382,"（2018年考题）某工程进度计划网络图上的工作X（在关键线路上）与工作Y（在非关键线路上）同时受到异常恶劣气候条件的彩响，导致X工作延误10天，Y工作延误15天，该气候条件未对其他工作造成影晌，若Y工作的自由时差为20天，则承包人可以向发包人索赔的工期是（ ）天。",[157,159,161,163],{"key":20,"text":158,"correct":26},"10",{"key":24,"text":160,"correct":22},"15",{"key":28,"text":162,"correct":22},"25",{"key":31,"text":164,"correct":22},"35",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},899383,"（2018年考题）发包人在招标工程量清单中给定某工程设备暂估价，下列关于该工程设备价款调整的说法正确的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"依法可不招标的项目，应由发包人组织采购，以采购价格取代暂估价",{"key":24,"text":172,"correct":26},"依法可不招标的项目，应由承包人按合同约定采购，以发包人确认后的价格取代暂估价",{"key":28,"text":174,"correct":22},"依法必须招标的项目，应由发包人招标选择供应商，以中标价格取代暂估价",{"key":31,"text":176,"correct":22},"依法必须招标的项目，应由承包人招标选择供应商，以中标价格取代暂估价",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},899384,"（2018年考题）根据《标准施工招标文件》（2007年版）通用合同条款，下列引起承包人索赔的事件中，只能获得费用补偿的是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"发包人提前向承包人提供材料、工程设备",{"key":24,"text":184,"correct":22},"因发包人提供的材料、工程设备造成工程不合格",{"key":28,"text":186,"correct":22},"发包人在工程竣工前提前占用工程",{"key":31,"text":188,"correct":22},"异常恶劣的气候条件，导致工期延误",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},899385,"（2018年考题）关于法规变化类合同价款的调整，下列说法正确的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"不实行招标的工程，一般以施工合同签订前的第42天为基准日",{"key":24,"text":196,"correct":22},"基准日之前国家颁布的法规对合同价款有影晌的，应予调整",{"key":28,"text":198,"correct":26},"基准日之后国家政策对材料价格的影响，如已包含在物价波动调价公式中，不再予以考虑",{"key":31,"text":200,"correct":22},"承包人原因导致的工期延误期间，国家政策变化引起工程造价变化的．合同价款不予调",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},899386,"（2018年考题）某施工合同中的工程内容由主体工程与附属工程两部分组成，两部分工程的合同额分别为800万元知200万元。合同中对误期赔偿费的约定是：每延误一个日历天应赔偿2万元，且总赔费不超过合同总价款的5%，该工程主体工程按期通过竣工验收，附属工程延误30日历天后通过竣工验收，则该工程的误期赔偿费为（ ）万元。",[205,207,209,211],{"key":20,"text":206,"correct":26},"1O",{"key":24,"text":208,"correct":22},"12",{"key":28,"text":210,"correct":22},"50",{"key":31,"text":212,"correct":22},"6",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},899387,"（2018年考题）某项目施工合同约定，承包人承租的水泥价格风险幅度为±5%，超出部分采用造价信息法调差，已知投标人投标价格、基准期发布价格为440元\u002Ft、450元\u002Ft,2018年3月的造价信息发布价为430元\u002Ft，则该月水泥的实际结算价格为（ ）元\u002Ft。",[217,219,221,223],{"key":20,"text":218,"correct":22},"418",{"key":24,"text":220,"correct":22},"427.5",{"key":28,"text":222,"correct":22},"430",{"key":31,"text":224,"correct":26},"440",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},899388,"（2015年考题）下列文件和资料中，可作为建设工程工程量计量依据的是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"造价管理机构发布的调价文件",{"key":24,"text":232,"correct":22},"造价管理机构发布的价格信息",{"key":28,"text":234,"correct":26},"质量合格证书",{"key":31,"text":236,"correct":22},"各种预付款支付凭证",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},899389,"（2017年考题）关于施工合同工程预付款，下列说法中正确的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"承包人预付款的担保金额通常高于发包人的预付款",{"key":24,"text":244,"correct":22},"采用起扣点计算法抵扣预付款对承包人比较不利",{"key":28,"text":246,"correct":22},"预付款的担保金额不会随着预付款的扣回而减少",{"key":31,"text":248,"correct":26},"预付款的额度通常与主要材料和构件费用占建安费的比例相关",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},899390,"（2017年考题）关于施工合同价款的期中支付，下列说法中正确的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":26},"期中进度款的支付比例，一般不低于期中价款总额的60%",{"key":24,"text":256,"correct":22},"期中进度款的支付比例，一般不高于期中价款总额的80%",{"key":28,"text":258,"correct":22},"综合单价发生调整的项目，其增减费在竣工结算时一并结算",{"key":31,"text":260,"correct":22},"发承包双方如对部分计算量结果存在争议，等待争议解决后在支付全部进度款",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},899391,"（2016年考题）关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":268,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":28,"text":270,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":31,"text":272,"correct":26},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},899392,"（2015年考题）关于建筑安装工程结算的编制，下列说法中正确的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"采用固定总价合同的，暂列金额不得调整",{"key":24,"text":280,"correct":22},"采用固定总价合同的，税率可不按政府部门新公布的税率调整",{"key":28,"text":282,"correct":22},"规费应按县级建设主管部门规定的费率计算",{"key":31,"text":284,"correct":26},"现场签证费用应依据发承包双方签证资料确认的金额计算",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},899393,"（2017年考题）发包人未按照规定的程序支付竣工结算款的，承包人正确的做法是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"将该工程自主拍卖",{"key":24,"text":292,"correct":22},"将该工程折价出售",{"key":28,"text":294,"correct":22},"将该工程抵押贷款",{"key":31,"text":296,"correct":26},"催告发包人支付，并索要延迟付款利息",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},899394,"（2016年考题）建设工程最终结清的工作事项和时间节点包括：①提交最终结清申请单；②签发最终结清支付证书；?签发缺陷责任期终止证书；④最终结清付款；⑤缺陷责任期终止。按时间先后顺序排列正确的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"⑤?①②④",{"key":24,"text":304,"correct":22},"①②④⑤?",{"key":28,"text":306,"correct":22},"?①②④⑤",{"key":31,"text":308,"correct":22},"①?②⑤④",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},899395,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程计量，下列说法中正确的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":26},"合同文件中规定的各种费用支付项目应予计量",{"key":24,"text":316,"correct":22},"因异常恶劣天气造成的返工工程量不予计量",{"key":28,"text":318,"correct":22},"成本加酬金合同应按照总价合同的计量规定进行计量",{"key":31,"text":320,"correct":22},"总价合同应按实际完成的工程量计算",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},899396,"（2016年考题）施工合同价款纠纷处理中，一方当事人拒不履行，另一方当事人可以请求人民法院执行的文书是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"和解协议书",{"key":24,"text":328,"correct":22},"造价认定书",{"key":28,"text":330,"correct":22},"行政调解书",{"key":31,"text":332,"correct":26},"仲裁调解书",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},899397,"（2015年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"30%",{"key":24,"text":340,"correct":22},"40%",{"key":28,"text":342,"correct":22},"50%",{"key":31,"text":344,"correct":26},"60%",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},899398,"（2015年考题）关于工程造价咨询人从事工程造价鉴定工作，下列做法中正确的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"不需收集施工过程中的施工组织、质量、工期等资料",{"key":24,"text":352,"correct":22},"可以安排经验丰富的造价员独立承担鉴定工作",{"key":28,"text":354,"correct":26},"应收集鉴定项目同时期、同类型工程的技术经济指标",{"key":31,"text":356,"correct":22},"工程造价鉴定书中可不对鉴定过程中使用的技术手段进行描述",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},899399,"（2015年考题）关于建设工程竣工结算审核，下列说法中正确的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"非国有企业投资的建设工程，不应委托工程造价咨询机构审核",{"key":24,"text":364,"correct":26},"国有资金投资的建设工程，应当委托工程造价咨询机构审核",{"key":28,"text":366,"correct":22},"承包人不同意造价咨询机构的结算审核结论时，造价咨询机构不得出具审核报告",{"key":31,"text":368,"correct":22},"工程造价咨询机构的核对结论与承包人竣工结算文件不一致的，以造价机构核对结论为准",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},899400,"（2015年考题）关于建设工程施工合同价款纠纷的处理，下列说法中正确的是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"竣工验收不合格，经承包人修复后合格的，承包人支付修复费用的要求应予支持",{"key":24,"text":376,"correct":26},"竣工验收不合格，经承包人修复后合格的，修复费用应由承包人承担",{"key":28,"text":378,"correct":22},"竣工验收不合格，多次修复后仍不合格的，发包人应酌情给予承包人部分人修复费用",{"key":31,"text":380,"correct":22},"安装后发现加工设备存在质量问题，但承包人参与进场验收的，发包人不应支付承包人设备拆除、重新安装的费用",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},899401,"（2016年考题）建设工程已实际交付，但施工合同没有约定付款时间，则拖欠工程款利息的起算日期为（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"提交竣工结算文件之日",{"key":24,"text":388,"correct":22},"确认竣工结算文件之日",{"key":28,"text":390,"correct":22},"竣工验收合格之日",{"key":31,"text":392,"correct":26},"工程实际交付之日",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},899402,"（2016年考题）已知某建筑工程施工合同总额为8000万元，工程预付款按合同金额的20%计取，主要材料及构件造价占合同额的50%。预付款起扣点为（ ）万元。",[397,399,401,403],{"key":20,"text":398,"correct":22},"1600",{"key":24,"text":400,"correct":22},"4000",{"key":28,"text":402,"correct":26},"4800",{"key":31,"text":404,"correct":22},"6400",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},899403,"（2016年考题）由发包人提供的工程材料、工程设备的金额，应在合同价款的期中支付和结算中予以扣除，具体的扣除标准是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":26},"按签约单价和签约数量",{"key":24,"text":412,"correct":22},"按实际采购单价和实际数量",{"key":28,"text":414,"correct":22},"按签约单价和实际数量",{"key":31,"text":416,"correct":22},"D按实际采购单价和签约数量",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},899404,"（2017年考题）调解是解决工程合同价款纠纷的一种途径，下列关于调解的说法中正确的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"承包人对调解书有异议的，可以停止施工",{"key":24,"text":424,"correct":22},"发承包双方签字认可的调解书不能作为合同的补充文件",{"key":28,"text":426,"correct":26},"发承包双方可在合同履行期间协议调换或终止合同约定的调解人",{"key":31,"text":428,"correct":22},"调解人的任期在竣工结算经发承包双方确认时终止",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},899405,"（2017年考题）关于建设项目竣工结清阶段承包人索赔的权力和期限，下列说法中正确的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"承包人接收竣工结算支付证书后再无权提出任何索赔",{"key":24,"text":436,"correct":22},"承包人只能提出工程接收证书颁发前的索赔",{"key":28,"text":438,"correct":22},"承包人提出索赔的期限自缺陷责任期满时终止",{"key":31,"text":440,"correct":26},"承包人提出索赔的期限自接收最终支付证书时终止",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},899406,"（2017年考题）下列建设工程施工合同无效情况下产生的价款纠纷，法院不予支持的是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"工程竣工验收合格，承包人请求按合同支付工程价款",{"key":24,"text":448,"correct":22},"工程竣工验收不合格，但修复后合格，发包人要求承包人承担修复费用",{"key":28,"text":450,"correct":26},"工程竣工验收不合格、修复后仍不合格，承包人请求支付工程价款",{"key":31,"text":452,"correct":22},"承包人超越资质等级签订施工合同，但竣工前取得相应资质等级，请求按照有效合同处理",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},899407,"（2018年考题）采用起扣点计算法扣回预付款的正确做法是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"从已完工程的累计合同额相当于工程预付款数额时起扣",{"key":24,"text":460,"correct":22},"从已完工成所用的主要材料及构件的价值相当于工程预付款数额时起扣",{"key":28,"text":462,"correct":26},"从未完工程所需的主要材料及构件的价值相当于工程预付款数额时起扣",{"key":31,"text":464,"correct":22},"从未完工程的剩余合同额相当于工程预付款数额时起扣",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},899408,"（2018年考题）关于发全文明施工费的支付，下列说法正确的是（ ）",[469,471,473,475],{"key":20,"text":470,"correct":22},"按工期平均分摊安全文明施工费，与进度款同期支付；",{"key":24,"text":472,"correct":22},"按合同建筑安装工程费分摊安全文施工费，与进度款同期支付；",{"key":28,"text":474,"correct":26},"在开工后28天内预付不低于当年施工进度计划的安全文明施工费总额的60%，其余部分与进度款同期支付；",{"key":31,"text":476,"correct":22},"在正式开工前预付不低于当年施工进度计划的安全文明施工费总额的60%；",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":20,"analysis":33},899409,"（2020年真题）对于国有资金投资的建设工程，受发包人委托对竣工结算文件进行审核的单位是（）",[481,483,485,487],{"key":20,"text":482,"correct":26},"工程造价咨询机构",{"key":24,"text":484,"correct":22},"工程设计单位",{"key":28,"text":486,"correct":22},"工程造价管理机构",{"key":31,"text":488,"correct":22},"工程监理单位",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},899410,"（2020年真题）某工程合同总额为20000万元，其中主要材料占比40%，合同中约定的工程预付款项总额为2400万元，则按起扣点计算法计算的预付款起扣点为（）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"6000",{"key":24,"text":496,"correct":22},"8000",{"key":28,"text":498,"correct":22},"12000",{"key":31,"text":500,"correct":26},"14000",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},899411,"（2020年真题）发生下列工程事项时，发包人应予计量的是（）",[505,507,509,511],{"key":20,"text":506,"correct":22},"承包人自行增建的临时工程工程量",{"key":24,"text":508,"correct":22},"因监理人抽查不合格返工增加的工程量",{"key":28,"text":510,"correct":26},"承包人修复因不可抗力损坏工程增加的工程量",{"key":31,"text":512,"correct":22},"承包人自检不合格返工增加的工程量",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},899412,"（2020年真题）根据《建设工程造价鉴定规范》（GB\u002FT51262-2017）,关于鉴定期限的起算，下列说法正确的是（）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"从鉴定机构函回复委托人接手委托之日起算",{"key":24,"text":520,"correct":22},"从鉴定机构函回复委托人接手委托之日的次日计算",{"key":28,"text":522,"correct":22},"从鉴定人接收委托人移交证据材料之日起算",{"key":31,"text":524,"correct":26},"从鉴定人接收委托人移交证据材料之日的次日起算",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},899413,"（2020年真题）因承包人原因解除合同的，承包人有权要求发包人支付（）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"承包人员遣送费",{"key":24,"text":532,"correct":22},"临时工程拆除费",{"key":28,"text":534,"correct":22},"施工设备运离现场费",{"key":31,"text":536,"correct":26},"已完措施项目费",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},899414,"（2020年真题）承包人按合同接受竣工结算支付证书的，可以认为承包人已无权要求（ ）颁发前发生的工程变更。",[541,543,545,547],{"key":20,"text":542,"correct":26},"合同工程接纳证书",{"key":24,"text":544,"correct":22},"质量保证金返还证书",{"key":28,"text":546,"correct":22},"缺陷责任期终止证书",{"key":31,"text":548,"correct":22},"最终支付证书",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},899415,"（2018年考题）因不可抗力解除合同的，发包人不应向承包人支付的费用是（ ）。",[553,554,556,558],{"key":20,"text":532,"correct":22},{"key":24,"text":555,"correct":26},"承包人未交付材料的货款",{"key":28,"text":557,"correct":22},"已实施的措施项目应付价款",{"key":31,"text":559,"correct":22},"承包人施工设备运离现场的费用",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":28,"analysis":33},899416,"（2018年考题）工程量清单计价项采用单价合同的，工程竣工结算编中一般不允许调整的是（ ）",[564,566,568,570],{"key":20,"text":565,"correct":22},"分部分项工程的清单数量",{"key":24,"text":567,"correct":22},"安全文明施工费的清单总额",{"key":28,"text":569,"correct":26},"已标价工程量清单综合单价",{"key":31,"text":571,"correct":22},"总承包服务费清单总额",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},899417,"（2018年考题）关于政府投资项目竣工结算的审核，下列说法正确的是（ ）",[576,578,580,582],{"key":20,"text":577,"correct":22},"单位工程竣工结算由承包人审核；",{"key":24,"text":579,"correct":22},"单项工程竣工结算承包人审核；",{"key":28,"text":581,"correct":22},"建设项目竣工结算由发包人委托造价工程师审核；",{"key":31,"text":583,"correct":26},"竣工结算文件由发包人委托具有相应资质的工程造价咨询机构审核；",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},899418,"（2018年考题）某国内工程合同对欠付价款利息计付标准和付款时间没有约定，当发生欠款事件时，下列利息支付的说法中错误的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"按照中国人民银行发布的同期各类贷款放利率中的高值计息",{"key":24,"text":591,"correct":22},"建设工程已实际交付的，计息日为交付之日",{"key":28,"text":593,"correct":22},"建设工程没有交付的，计息日为提交竣工结算文件之日",{"key":31,"text":595,"correct":22},"建设工程未交付的，工程价款也未结算的，计息日为当事人起诉之日",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},899419,"（2019年考题）编制竣工结算文件时，应按国家、省级或行业建设主管部门门的规定计价的是（ ）。 A.劳动保险费 B.总承包服务费 C.安全文明施工费D现场签证费。",[600,601,602,603],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":31,"analysis":33},899420,"（2019年考题）发包人收到承包人提交的最终结清申请单,并在规定时间内予以核实后，向承包人签发（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":22},"工程接收证书",{"key":24,"text":611,"correct":22},"竣工结算支付书",{"key":28,"text":613,"correct":22},"缺陷责任期終止证书",{"key":31,"text":548,"correct":26},[616,619,622,625,628,631],{"id":15,"name":617,"category":7,"favorite":618},"领导干部任职前廉政法规知识测试题",92,{"id":620,"name":621,"category":7,"favorite":15},595,"建筑结构与设备",{"id":623,"name":624,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":626,"name":627,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":629,"name":630,"category":7,"favorite":8},534,"BIM工程师",{"id":632,"name":630,"category":7,"favorite":8},535]