[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,30,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,258,270,282,294,306,318,329,341,353,365,377,389,401,413,425,437,449,461,473,485,495,507,519,531,543,555,567,579,591,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},899321,1,"单选题","（2017年考题）我国某世界银行货款项目采用经评审的最低投标价法评标，招标文件规定借款国內投标人有7.5%的评标优惠，若投标工期提前，则按每月25万美元进行报价修正，现国內甲投标人报价5000万美元，承诺较投标要求工期提前2个月，则甲投标人评价标为（ ）万美元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","5000",false,{"key":24,"text":25,"correct":22},"B","4625",{"key":27,"text":28,"correct":22},"C","4600",{"key":30,"text":31,"correct":32},"D","4575",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},899322,"（2016年考题）某招标项目采用经评审的最低投标价法评标，招标文件规定对同时投多个标段的评标修正率为5%，投标人甲同时投标1#、2#标段，报价分别为5000万元、4000万元。若甲在1#标段中标，则其在2#标段的评标为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"3750",{"key":24,"text":41,"correct":32},"3800",{"key":27,"text":43,"correct":22},"4200",{"key":30,"text":45,"correct":22},"4250",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},899323,"（2015年考题）关于依法必须招标工程中标候选人的公示，下列说法中正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"评标结果只能在交易场所公示",{"key":24,"text":53,"correct":32},"公示对象是全部中标候选人",{"key":27,"text":55,"correct":22},"公示对象是所有投标人",{"key":30,"text":57,"correct":22},"公示的内容包括各评分要素的得分",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},899324,"（2015年考题）关于依法必须招标工程合同签订和合同价款的约定，下列说法中正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"招标人和中标人应在投标有效期内并在中标通知发出28天内订立书面合同",{"key":24,"text":65,"correct":32},"发承包双方应根据中标通知书确定的价格签订合同",{"key":27,"text":67,"correct":22},"签约合同价为工程量清单中各种价格的总和扣减暂列金额",{"key":30,"text":69,"correct":22},"招标人应当在中标通知书发出后，合同签订前向未中标人退还投标保证金",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},899325,"（2018年考题）根据《评标委员会和评标方法暂行规定》等，评标委员会发现的投标报价算数错误，应由（ ）进行修正。",[74,76,78,80],{"key":20,"text":75,"correct":32},"评标委员会",{"key":24,"text":77,"correct":22},"招标监督机构",{"key":27,"text":79,"correct":22},"招标人",{"key":30,"text":81,"correct":22},"投标人",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},899326,"（2019年考题）某高速公路项目招标采用经评的最低投标价法评标，招标文件规定对同时投多个标最的评标修正率为4%。现有投标人甲同时投标1#、2#标段，其报价依次为7000万元、6000万元，若甲在1#标段已被确定为中标，则其在2#标段的评标价是（ ）万元",[86,88,90,92],{"key":20,"text":87,"correct":22},"5720",{"key":24,"text":89,"correct":22},"6240",{"key":27,"text":91,"correct":32},"5760",{"key":30,"text":93,"correct":22},"6280",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},899327,"（2015年考题）关于施工招标工程的履约担保，下列说法中正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"中标人应在签订合同后向招标人提交履约担保",{"key":24,"text":101,"correct":22},"履约保证金不得超过中标合同金额的5%",{"key":27,"text":103,"correct":22},"招标人仅对现金形式的履约担保，向中标人提供工程款支付担保",{"key":30,"text":105,"correct":32},"发包人应在工程接收证书颁发后28天内将履约保证金退还给承包人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},899328,"（2016年考题）下列评标时所遇情形中，评标委员会应当否决其投标的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"投标文件中大写金额与小写金额不一致",{"key":24,"text":113,"correct":22},"投标文件总价金额与依据单价计算出的结果不一致",{"key":27,"text":115,"correct":32},"投标文件未经投标单位盖章和单位负责人签字",{"key":30,"text":117,"correct":22},"对不同文字文本投标文件的解释有异议的",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},899329,"（2017年考题）关于评标过程中，对投标报价算术错误的修正，下列做法中正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"评标委员会应对报价中的算术性错误进行修正",{"key":24,"text":125,"correct":22},"修正的价格，经评标委员会书面确认后具有约束力",{"key":27,"text":127,"correct":22},"投标入应接受修正价格，否则将没收其投标保证金",{"key":30,"text":129,"correct":22},"投标文件中的大写与小写金额不一致的，以小写金额为准",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},899330,"（2020年真题）对于综合评估法中的评标基准价的确定，下列说法正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"按所有有效投标人中的最低投标价确定",{"key":24,"text":137,"correct":22},"按所有有效投标人的平均投标价确定",{"key":27,"text":139,"correct":22},"按所有有效投标人的平均投标价乘以事先约定的浮动系数确定",{"key":30,"text":141,"correct":32},"按项目特点、行业管理规定自行确定",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},899331,"（2020年真题）建设工程评标过程中遇下列情形，评标委员会可直接否决投标文件的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"投标文件中的大、小写金额不一致",{"key":24,"text":149,"correct":22},"未按施工组织设计方案进行报价",{"key":27,"text":151,"correct":32},"投标联合体没有提交共同投标协议",{"key":30,"text":153,"correct":22},"投标报价中采用了不平衡报价",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},899332,"（2017年考题）工程总承包企业承担工程项目的设计、采购、施工、试运行服务等工作，对承包工程的质量、安全、工期、造价全面负责的工程总承包类型是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"交钥匙总承包",{"key":24,"text":161,"correct":32},"EPC总承包",{"key":27,"text":163,"correct":22},"设计—施工总承包",{"key":30,"text":165,"correct":22},"工程项目管理总承包",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},899333,"（2017年考题）工程总承包企业投标报价决策时应准确估计成本：其成本费用应由（ ）等组成。",[170,172,174,176],{"key":20,"text":171,"correct":22},"勘察设计费用、采购费用、施工费用、总部管理费",{"key":24,"text":173,"correct":22},"勘察设计费用、分包合同费用、施工费用、利润",{"key":27,"text":175,"correct":32},"公司本部费用、施工费用、直接设备材料费用、分包合同费用",{"key":30,"text":177,"correct":22},"公司本部费用、施工费用、直接设备材料费用、风险费用",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},899334,"（2019年考题）国际工程投标报价时，对于当地采购的材料，其单价应为（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"市场价格+运杂费",{"key":24,"text":185,"correct":22},"市场价格+运杂费+运输保管耗损费",{"key":27,"text":187,"correct":22},"市场价格+运余费+采购保管费",{"key":30,"text":189,"correct":32},"市场价格+运杂费+采购保管费+运输保管损耗费",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},899335,"（2019年考题）下列工程总承包类型中，总承包商需要履行试运行工作职责的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":32},"设计采购施工总承包",{"key":24,"text":197,"correct":22},"设计-施工总承包",{"key":27,"text":199,"correct":22},"采购-施工总承包",{"key":30,"text":201,"correct":22},"设计-采购总承包",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},899336,"（2015年考题）按照世界银行有关规定进行的国际竞争性招标，在中标人确定后还应进行合同谈判。下列主题中属合同谈判内容的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"合同价格的优惠",{"key":24,"text":209,"correct":22},"合同双方的权利和义务",{"key":27,"text":211,"correct":32},"合同标的物数量增减引起的价格变化",{"key":30,"text":213,"correct":22},"投标人承担技术规格书中没有规定的额外任务",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},899337,"（2015年考题）根据《标准设计施工总承包招标文件》，除投标人须知前附表另有规定外，工程总承包招标的投标有效期为（ ）天。",[218,220,222,224],{"key":20,"text":219,"correct":22},"60",{"key":24,"text":221,"correct":22},"90",{"key":27,"text":223,"correct":32},"120",{"key":30,"text":225,"correct":22},"180",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},899338,"（2015年考题）工程总承包投标报价成本分析过程中，被归为公司本部费用的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":32},"勘察设计费",{"key":24,"text":233,"correct":22},"施工费用",{"key":27,"text":235,"correct":22},"分包合同费用",{"key":30,"text":237,"correct":22},"调试、开车服务费",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},899339,"（2015年考题）关于世界银行贷款项目采用国际竞争性招标，下列说法中正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"借款人向世界银行送交总采购通告的时间，最晚不应迟于公开发售招标文件前90天",{"key":24,"text":245,"correct":22},"一个项目的具体采购合同是否需要资格预审，由借款人自主决定",{"key":27,"text":247,"correct":32},"未进行资格预审的，评标后应对标价最低并拟授予合同的投标人进行资格定审",{"key":30,"text":249,"correct":22},"招标文件公开发售前，无需得到世界银行的意见",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},899340,"（2015年考题）总承包企业不仅承包工程项目的建设实施任务，而且提供建设项目的前期工作和运营准备工作的综合任务，该类总承包合同的类型是（ ）。",[254,255,256,257],{"key":20,"text":195,"correct":22},{"key":24,"text":159,"correct":32},{"key":27,"text":163,"correct":22},{"key":30,"text":165,"correct":22},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},899341,"（2016年考题）关于工程总承包投标报价中的标高金，下列说法中正确的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"标高金分析首先应对风险进行评估",{"key":24,"text":265,"correct":32},"标高金分析应进行价值增值分析",{"key":27,"text":267,"correct":22},"标高金中不包括利润和风险费",{"key":30,"text":269,"correct":22},"标高金中的管理费主要指公司本部费用",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},899342,"（2016年考题）国际工程投标报价中，若将分包费列入直接费，则对分包商的管理费通常应列入（ ）中。",[274,276,278,280],{"key":20,"text":275,"correct":22},"直接费",{"key":24,"text":277,"correct":22},"分包费",{"key":27,"text":279,"correct":32},"间接费",{"key":30,"text":281,"correct":22},"暂定金额",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},899343,"（2017年考题）国际竞争性招标投标过程中，只对标书的报价和其他因素进行评比，不对投标人资格进行评审的工作是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"清标",{"key":24,"text":289,"correct":22},"审标",{"key":27,"text":291,"correct":32},"评标",{"key":30,"text":293,"correct":22},"定标",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},899344,"（2018年考题）工程总承包的签约合同价中不包括暂估价，且发包人在价格清单中给定暂估价的专业工程依法必须招标的，该专业工程应由（ ）招标确定分包人。",[298,300,302,304],{"key":20,"text":299,"correct":22},"项目主管部门",{"key":24,"text":301,"correct":22},"发包人",{"key":27,"text":303,"correct":22},"承包人",{"key":30,"text":305,"correct":32},"发包人和承包人",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},899345,"（2020年真题）根据现行《标准设计施工总承包招标文件》，关于\"合同价格\"和\"签约合同价\"下列说法正确的是（）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"合同价格是指签约合同价",{"key":24,"text":313,"correct":32},"签约合同价中包括了专业工程暂估价",{"key":27,"text":315,"correct":22},"合同价格不包括按合同约定进行的变更价款",{"key":30,"text":317,"correct":22},"签约合同价一般高于中标价",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":30,"analysis":33},899346,"（2020年真题）下列费用中包含在国际工程投标报价其他费用中的是（）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"保函手续费",{"key":24,"text":325,"correct":22},"保险费",{"key":27,"text":327,"correct":22},"代理人佣金",{"key":30,"text":281,"correct":32},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},899347,"（2020年真题）EPC总承包模式中承包人应承担的工作（）",[333,335,337,339],{"key":20,"text":334,"correct":32},"设计、采购、施工、试运行",{"key":24,"text":336,"correct":22},"项目决策、设计、施工",{"key":27,"text":338,"correct":22},"项目决策、采购、施工",{"key":30,"text":340,"correct":22},"可行性研究、采购、施工",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},899348,"（2015年考题）对某招标工程进行报价分析，在不考虑安全文明施工费的前提下，承包人中标价为1500万元，招标控制价为1600万元，设计院编制的施工图预算为1550万元，承包人认为的合理报价值为1540万元，则承包人的报价浮动率是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"0.65%",{"key":24,"text":348,"correct":32},"6.25%",{"key":27,"text":350,"correct":22},"93.75%",{"key":30,"text":352,"correct":22},"96.25%",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},899349,"（2017年考题）某分项工程招标工程量清单数量为4000㎡，施工中由于设计变更调减为3000㎡，该项目招标控制价综合单价为600元\u002F㎡，投标报价为450元\u002F㎡。合同约定实际工程量与招标工程量偏差超过±15%时，综合单价以招标控制价为基础调整。若承包人报价浮动率为10%，该分项工程费结算价为（ ）万元。",[357,359,361,363],{"key":20,"text":358,"correct":32},"137.70",{"key":24,"text":360,"correct":22},"155.25",{"key":27,"text":362,"correct":22},"186.30",{"key":30,"text":364,"correct":22},"207.00",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},899350,"（2016年考题）根据《建设工程工程量清单计价规范》（GB50500--2013），当实际增加的工程量超过清单工程量15%以上，且造成按总价方式计价的措施项目发生变化的，应将（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"综合单价调高，措施项目调增",{"key":24,"text":372,"correct":22},"综合单价调高，措施项目调减",{"key":27,"text":374,"correct":32},"综合单价调低，措施项目调增",{"key":30,"text":376,"correct":22},"综合单价调低，措施项目调减",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},899351,"（2016年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），下列关于计日工的说法中正确的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"招标工程量清单计日工数量为暂定，计日工费不计入投标总价",{"key":24,"text":384,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人可以视情况决定是否执行",{"key":27,"text":386,"correct":32},"计日工表的费用项目包括人工费、材料费、施工机械使用费、企业管理费和利润",{"key":30,"text":388,"correct":22},"计日工金额不列入期中支付，在竣工结算时一并支付",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":27,"analysis":33},899352,"（2016年考题）施工合同中约定，承包人承担的钢筋价格风险幅度为±5%，超出部分依据《建设工程工程量清单计价规范》（GB50500--2013）造价信息法调差。已知承包人投标价格、基准期发布价格分别为2400元\u002Ft、2200元\u002Ft，2015年12月、2016年7月的造价信息发布价为2000元\u002Ft，2600元\u002Ft。则该两月钢筋的实际结算价格应分别为（ ）元\u002Ft。",[393,395,397,399],{"key":20,"text":394,"correct":22},"2280，2520",{"key":24,"text":396,"correct":22},"2310，2690",{"key":27,"text":398,"correct":32},"2310，2480",{"key":30,"text":400,"correct":22},"2280，2480",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},899353,"（2017年考题）根据《标准施工招标文件》（2007年版）通用合同条款，下列引起承包人索赔的事件中，只能获得工期补偿的是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"发包人提前向承包人提供材料和工程设备",{"key":24,"text":408,"correct":22},"工程暂停后因发包人原因导致无法按时复工",{"key":27,"text":410,"correct":22},"因发包人原因导致工程试运行失败",{"key":30,"text":412,"correct":32},"异常恶劣的气候条件导致工期延误",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},899354,"（2016年考题）根据《标准施工招标文件》（2007年版）通用合同条款，承包人最有可能同时获得工期、费用和利润补偿的索赔事件是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"基准日后法律的变化",{"key":24,"text":420,"correct":22},"发包人更换其提供的不合格材料",{"key":27,"text":422,"correct":22},"发包人提前向承包人提供工程设备",{"key":30,"text":424,"correct":32},"发包人在工程竣工前占用工程",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":30,"analysis":33},899355,"（2017年考题）关于施工过程中的现场签证，下列说法中正确的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"发包人应按照现场签证内容计算价款，在竣工结算时一并支付",{"key":24,"text":432,"correct":22},"没有计日工单价的现场签证，按承包商提出的价格计算并支付",{"key":27,"text":434,"correct":22},"因发包人口头指令实施的现场签证事项，其发生的费用应由发包人承担",{"key":30,"text":436,"correct":32},"经发包人授权的工程咨询人，可与承包人做现场签证",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},899356,"（2017年考题）某施工合同约定人工工资为200元\u002F工日，窝工补贴按人工工资的25%计算，在施工过程中发生了如下事件：①出现异常恶劣天气导致工程停工2天，人员窝工20个工日；②因恶劣天气导致场外道路中断，抢修道路用工20个工日；③几天后，场外停电，停工1天，人员窝工10个工日。承包人可向发包人索赔的人工费为（ ）元。",[441,443,445,447],{"key":20,"text":442,"correct":22},"1500",{"key":24,"text":444,"correct":22},"2500",{"key":27,"text":446,"correct":32},"4500",{"key":30,"text":448,"correct":22},"5500",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},899357,"（2017年考题）关于施工合同履行过程中共同延误的处理原则，下列说法中正确的是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"在初始延误发生作用期间，其他并发延误者按比例承担责任",{"key":24,"text":456,"correct":32},"若初始延误者是发包人，则在其延误期内，承包人可得到经济补偿",{"key":27,"text":458,"correct":22},"若初始延误者是客观原因，则在其延误期内，承包人不能得到经济补偿",{"key":30,"text":460,"correct":22},"若初始延误者是承包人，则在其延误期内，承包人只能得到工期补偿",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":33},899358,"（2016年考题）采用网络图分析法处理可原谅延期，下列说法中正确的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"只有在关键线路上的工作延误，才能索赔工期",{"key":24,"text":468,"correct":22},"非关键线路上的工作延误，不应索赔工期",{"key":27,"text":470,"correct":32},"如延误的工作为关键工作，则延误的时间为工期索赔值",{"key":30,"text":472,"correct":22},"该方法不适用于多种干扰事件共同作用所引起的工期索赔",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},899359,"（2017年考题）某施工合同约定采用价格指数及价格调整公式调整价格差额，调价因素及有关数据见下表。某月完成进度款为1500万元，则该月应当支付给承包人的价格调整金额为（ ）万元。",[477,479,481,483],{"key":20,"text":478,"correct":22},"-30.3",{"key":24,"text":480,"correct":32},"36.45",{"key":27,"text":482,"correct":22},"112.5",{"key":30,"text":484,"correct":22},"130.5",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":30,"analysis":33},899360,"（2015年考题）根据《标准施工招标文件》（2007版）的合同通用条件，承包人通常只能获得费用补偿，但不能得到利润补偿和工期顺延的事件是（ ）。",[489,491,493,494],{"key":20,"text":490,"correct":22},"施工中遇到不利物质条件",{"key":24,"text":492,"correct":22},"因发包人的原因导致工程试运行失败",{"key":27,"text":420,"correct":22},{"key":30,"text":418,"correct":32},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},899361,"（2015年考题）关于施工合同履行过程中暂估价的确定，下列说法中正确的是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"不属于依法必须招标的材料，以承包人自行采购的价格取代暂估价",{"key":24,"text":502,"correct":32},"属于依法必须招标的暂估价设备，由发承包双方以招标方式选择供应商，以中标价取代暂估价",{"key":27,"text":504,"correct":22},"不属于依法必须招标的暂估价专业工程，不应按工程变更确定价款而应另行签订补充协议确定工程价款",{"key":30,"text":506,"correct":22},"属于依法必须招标的暂估价专业工程，承包人不得参加投标",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},899362,"（2015年考题）某房屋基坑开挖后，发现局部有软弱下卧层。甲方代表指示乙方配合进行地质复查，共用工10个工日。地质复查和处理费用为4万元，同时工期延长3天，人员窝工15工日。若用工按100元\u002F工日、窝工按50元\u002F工日计算，则乙方可就该事件索赔的费用是（ ）元。",[511,513,515,517],{"key":20,"text":512,"correct":22},"41250",{"key":24,"text":514,"correct":32},"41750",{"key":27,"text":516,"correct":22},"42500",{"key":30,"text":518,"correct":22},"45250",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},899363,"（2015年考题）某建筑工程钢筋综合用量1000t。施工合同中约定，结算时对钢筋综合价格涨幅±5%以上部分依据造价处发布的基准价调整价格差额。承包人投标报价2400元\u002Ft，投标期、施工期间造价管理机构发布的钢筋综合基准价格为2500元\u002Ft、2800元\u002Ft，则需调增钢筋材料费用为（ ）万元。",[523,525,527,529],{"key":20,"text":524,"correct":32},"17.5",{"key":24,"text":526,"correct":22},"28.0",{"key":27,"text":528,"correct":22},"30.0",{"key":30,"text":530,"correct":22},"40.0",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":27,"analysis":33},899364,"（2016年考题）当施工机械停工导致费用索赔成立时，台班停滞费用正确的计算方法是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"按照机械设备台班费计算",{"key":24,"text":538,"correct":22},"按照台班费中的设备使用费计算",{"key":27,"text":540,"correct":32},"自有设备按照台班折旧费计算",{"key":30,"text":542,"correct":22},"租赁设备按照台班租金计算",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":27,"analysis":33},899365,"（2016年考题）工程延误期间，因国家法律、行政法规发生变化引起工程造价变化的，则（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"承包人导致的工程延误，合同价款均应予调整",{"key":24,"text":550,"correct":22},"发包人导致的工程延误，合同价款均应予调整",{"key":27,"text":552,"correct":32},"不可抗力导致的工程延误，合同价款均应予调整",{"key":30,"text":554,"correct":22},"无论何种情况，合同价款均应予调整",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":27,"analysis":33},899366,"（2016年考题）某工程施工过程中发生如下事件：①因异常恶劣气候条件导致工程停工2天，人员窝工20个工日；②遇到不利地质条件导致工程停工1天，人员窝工10个工日，处理不利地质条件用工15个工日。若人工工资为200元\u002F工日，窝工补贴为100元\u002F工日，不考虑其他因素。根据《标准施工招标文件》（2007年版）通用合同条款，施工企业可向业主索赔的工期和费用分别是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"3天，6000元",{"key":24,"text":562,"correct":22},"1天，3000元",{"key":27,"text":564,"correct":32},"3天，4000元",{"key":30,"text":566,"correct":22},"1天，4000元",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":27,"analysis":33},899367,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），中标人报价浮动率的计算公式是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"（1-中标价\u002F招标控制价）×100%",{"key":24,"text":574,"correct":22},"（1-中标价\u002F施工图预算）×100%",{"key":27,"text":576,"correct":32},"（1-不含安全文明施工费的中标价\u002F不含安全文明施工费的招标控制价）×100%",{"key":30,"text":578,"correct":22},"（1-不含安全文明施工费的中标价\u002F不含安全文明施工费的施工图预算）×100%",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},899368,"（2017年考题）为合理划分发承包双方的合同风险，对于招标工程，在施工合同中约定的基准日期一般为（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":32},"招标文件中规定的提交投标文件截止时间前的第28天",{"key":24,"text":586,"correct":22},"招标文件中规定的提交投标文件截止时同前的第42天",{"key":27,"text":588,"correct":22},"施工合同签订前的第28天",{"key":30,"text":590,"correct":22},"施工合同签订前的第42天",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":30,"analysis":33},899369,"（2020年真题）施工合同履行期间出现现场签证事件时，现场签证应由（）提出。",[595,596,598,600],{"key":20,"text":301,"correct":22},{"key":24,"text":597,"correct":22},"监理人",{"key":27,"text":599,"correct":22},"设计人",{"key":30,"text":303,"correct":32},{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":20,"analysis":33},899370,"（2020年真题）根据现行《建设工程工程量清单计价规范》，对于不实行招标的建设工程，建设工程施工合同签订前的第（）天作为基准日。",[605,607,609,611],{"key":20,"text":606,"correct":32},"28",{"key":24,"text":608,"correct":22},"30",{"key":27,"text":610,"correct":22},"35",{"key":30,"text":612,"correct":22},"42",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]