[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,3,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,428,440,452,460,472,484,496,504,516,528,540,552,564,576,588,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},897883,1,"单选题","(2014年)在对材料消耗过程测定与观察的基础上，通过完成产品数量和材料消耗量的计算而确定各种材料消耗定额的方法是（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","实验室试验法",false,{"key":24,"text":25,"correct":26},"B","现场技术测定法",true,{"key":28,"text":29,"correct":22},"C","现场统计法",{"key":31,"text":32,"correct":22},"D","理论计算法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},897884,"(2014年)根据国家相关法律、法规和政策规定，因停工学习、执行国家或社会义务等原因，按计时工资标准支付的工资属于人工日工资单价中的（）",[38,40,42,44],{"key":20,"text":39,"correct":22},"基本工资",{"key":24,"text":41,"correct":22},"奖金",{"key":28,"text":43,"correct":22},"津贴补贴",{"key":31,"text":45,"correct":26},"特殊情况下支付的工资",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},897885,"(2015年)某出料容量750L的混凝土搅拌机，每循环一次的正常延续时间为9分钟，机械正常利用系数为0.9。按8小时工作制考虑，该机械的台班产量定额为( )。",[50,52,54,56],{"key":20,"text":51,"correct":26},"36m3\u002F台班",{"key":24,"text":53,"correct":22},"40m3\u002F台班",{"key":28,"text":55,"correct":22},"0.28台班\u002Fm3",{"key":31,"text":57,"correct":22},"0.25台班\u002Fm3",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},897886,"(2016年)下列机械工作时间中，属于有效工作时间的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"筑路机在工作区末端的掉头时间",{"key":24,"text":65,"correct":26},"体积达标而未达到载重吨位的货物汽车运输时间",{"key":28,"text":67,"correct":22},"机械在工作地点之间的转移时间",{"key":31,"text":69,"correct":22},"装车数量不足而在低负荷下工作的时间",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},897887,"(2016年)某出料容量750L的砂浆搅拌机，每一次循环工作中，运料、装料、搅拌、卸料、终端需要的时间分别为150s、40s、250s、50s、40s，运料和其他时间的交叠时间为50s，机械利用系数为0.8。该机械的台班产量定额为()m3\u002F台班。",[74,76,78,80],{"key":20,"text":75,"correct":22},"29.79",{"key":24,"text":77,"correct":22},"32.60",{"key":28,"text":79,"correct":26},"36.00",{"key":31,"text":81,"correct":22},"39.27",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},897888,"(2015年)某工地商品混凝土从甲、乙两地采购，甲地采购量及材料单价分别为400m3、350元／m3，乙地采购量及有关费用如下表所示，则该工地商品混凝土的材料单价应为( )元／m3。",[86,88,90,92],{"key":20,"text":87,"correct":22},"341.00",{"key":24,"text":89,"correct":26},"341.68",{"key":28,"text":91,"correct":22},"342.50",{"key":31,"text":93,"correct":22},"343.06",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},897889,"(2012年)关于施工机械安拆费和场外运费的说法，正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"安拆费指安拆一次所需的人工，材料和机械使用费之和",{"key":24,"text":101,"correct":26},"安拆费中包括机械辅助设施的折旧费",{"key":28,"text":103,"correct":22},"能自行开动机械的安拆费不予计算",{"key":31,"text":105,"correct":22},"塔式起重机安拆费的超高增加费应计入机械台班单价",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},897890,"(2013年)下列工人工作时间消耗中，属于有效工作时间的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"因混凝土养护引起的停工时间",{"key":24,"text":113,"correct":22},"偶然停工（停水、停电）增加的时间",{"key":28,"text":115,"correct":22},"产品质量不合格返工的工作时间",{"key":31,"text":117,"correct":26},"准备施工工具花费的时间",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},897891,"(2013年)某材料自甲、乙两地采购，相关信息如下表所示，则其材料单价为()元／t。",[122,124,126,128],{"key":20,"text":123,"correct":22},"63.80",{"key":24,"text":125,"correct":22},"63.83",{"key":28,"text":127,"correct":22},"64.26",{"key":31,"text":129,"correct":26},"64.30",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},897892,"(2014年)正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为0.90kg，已知该材料的损耗率为7.20%，则其总消耗量为（）kg。",[134,136,138,140],{"key":20,"text":135,"correct":22},"13.50",{"key":24,"text":137,"correct":26},"13.40",{"key":28,"text":139,"correct":22},"12.50",{"key":31,"text":141,"correct":22},"11.60",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},897893,"(2015年)根据施工过程工时研究结果，与工人所担负的工作量大小无关的必须消耗时间是( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"基本工作时间",{"key":24,"text":149,"correct":22},"辅助工作时间",{"key":28,"text":151,"correct":26},"准备与结束工作时间",{"key":31,"text":153,"correct":22},"多余工作时间",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},897894,"(2015年)用水泥砂浆砌筑2m3砖墙，标准砖(240mmx115mmx53mm)的总耗用量为1113块。已知砖的损耗率为5%，则标准砖、砂浆的净用量分别为( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"1057块、0.372m3",{"key":24,"text":161,"correct":22},"1057块、0.454m3",{"key":28,"text":163,"correct":22},"1060块、0.372m3",{"key":31,"text":165,"correct":26},"1060块、0.449m3",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},897895,"(2015年)某大型施工机械需配机上司机、机上操作人员各1名，若年制度工作日为250天，年工作台班为200台班，人工日工资单价均为100元\u002F工日，则该施工机械的台班人工费为( )元。",[170,172,174,176],{"key":20,"text":171,"correct":22},"100",{"key":24,"text":173,"correct":22},"125",{"key":28,"text":175,"correct":22},"200",{"key":31,"text":177,"correct":26},"250",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},897896,"(2016年)若完成1m3墙体砌筑工作的基本工时为0.5工日，辅助工作时间占工序时间的4%，准备与结束工作时间、不可避免的中断时间、休息时间分别占工作时间的6%、3%和12%，该工程时间定额为()工日\u002Fm3。",[182,184,186,188],{"key":20,"text":183,"correct":22},"0.581",{"key":24,"text":185,"correct":22},"0.608",{"key":28,"text":187,"correct":22},"0.629",{"key":31,"text":189,"correct":26},"0.659",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},897897,"(2017年)已知人工挖某土方1m3的基本工作时间为1个工作日，辅助工作时间占工序作业时间的5%，准备与结束工作时间、不可避免的中断时间、休息时间分别占工作日的3%、2%、15%，该人工挖土的时间定额为（）工日\u002F10m3。",[194,196,198,200],{"key":20,"text":195,"correct":22},"13.33",{"key":24,"text":197,"correct":26},"13.16",{"key":28,"text":199,"correct":22},"13.13",{"key":31,"text":139,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},897898,"(2016年)某大型施工机械预算价格为5万元，机械耐用总台班为1250台班，大修理周期数为4，一次大修理费用为2000元，经常修理费系数为60%，机上人工费和燃料动力费为60元\u002F台班。不考虑残值和其他有关费用，则该机械台班单价为()。",[205,207,209,211],{"key":20,"text":206,"correct":26},"107.68",{"key":24,"text":208,"correct":22},"110.24",{"key":28,"text":210,"correct":22},"112.80",{"key":31,"text":212,"correct":22},"52.80",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},897899,"(2013年)下列费用项目中，应计入进口材料运杂费中的是( )。",[217,219,221,223],{"key":20,"text":218,"correct":22},"国际运费",{"key":24,"text":220,"correct":22},"国际运输保险费",{"key":28,"text":222,"correct":26},"到岸后外埠中转运输费",{"key":31,"text":224,"correct":22},"进口环节税费",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},897900,"(2018年)某砼输送泵每小时纯工作状态可输送砼25 m3,泵的时间利用系数为0.75 则该砼输送泵的产量定额为（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":26},"150m3\u002F台班",{"key":24,"text":232,"correct":22},"0.67 台班\u002F100m3",{"key":28,"text":234,"correct":22},"200m3\u002F台班",{"key":31,"text":236,"correct":22},"0.50 台班\u002F100m3",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},897901,"(2018年)关于材料消耗的性质及确定材料消耗量的基本方法,下列说法正的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"理论计算法适用于确定材料净用量",{"key":24,"text":244,"correct":22},"必须消耗的材料量指材料的净用量",{"key":28,"text":246,"correct":22},"土石方爆破工程所需的炸药、雷管、引信属于非实体材料",{"key":31,"text":248,"correct":22},"现场统计法主要适用于确定材料损耗量",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},897902,"(2018年)已知某人工抹灰10m2 的基本工作时间为4 小时,辅助工作时间占工序作业时间的5%,准备与结束工作时间、不可避免的中断时间、休息时间分别占工作日的6%、11%、3%。则该人工抹灰的时间定额为（ ）工日\u002F100m2",[253,255,257,259],{"key":20,"text":254,"correct":22},"6.30",{"key":24,"text":256,"correct":22},"6.56",{"key":28,"text":258,"correct":26},"6.58",{"key":31,"text":260,"correct":22},"6.67",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},897903,"(2016年)从甲、乙两地采购某工程材料，采购量及有关费用如下表所示，该工程材料的材料单价为()元\u002Ft。注：下表中的数据为不含税价格：",[265,267,269,271],{"key":20,"text":266,"correct":22},"262.08",{"key":24,"text":268,"correct":26},"258.29",{"key":28,"text":270,"correct":22},"262.42",{"key":31,"text":272,"correct":22},"262.50",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},897904,"（2019年真题）工作日写实法测定的数据显示，完成10m3某现浇混凝土工程需基本工作时间8小时，辅助工作时间占工序作业时间的8%，准备与结束工作时间、不可避免的中断时间、休息时间、损失时间分别占工作日的5%、2%、18%、 6%。则该混凝土工程的时间定额是( ) 工日\u002F10m3。",[277,279,281,283],{"key":20,"text":278,"correct":22},"1.44",{"key":24,"text":280,"correct":26},"1.45",{"key":28,"text":282,"correct":22},"1.56",{"key":31,"text":284,"correct":22},"1.64",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},897905,"（2019年真题）用于混凝土抹灰砂浆贴200*300瓷砖墙面，灰缝宽5mm ，假设瓷砖损耗率为8%， 则100m2瓷砖墙面的瓷砖损耗是( )m2。",[289,291,293,295],{"key":20,"text":290,"correct":26},"103.6",{"key":24,"text":292,"correct":22},"104.3",{"key":28,"text":294,"correct":22},"108",{"key":31,"text":296,"correct":22},"108.7",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},897906,"（2019年真题）在测定时所采用的方法中,测时法用于测定（）",[301,303,305,307],{"key":20,"text":302,"correct":26},"循环组成部分的工作时间",{"key":24,"text":304,"correct":22},"准备与结束时间",{"key":28,"text":306,"correct":22},"工人休息时间",{"key":31,"text":308,"correct":22},"非循环工作时间",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},897910,"(2012年)下列用时中，同时包含在劳动定额和预算定额人工消耗量中的是( )。",[313,315,317,319],{"key":20,"text":314,"correct":22},"隐蔽工程验收的影响时间",{"key":24,"text":316,"correct":22},"工序搭接发生的停歇时间",{"key":28,"text":318,"correct":26},"不可避免的中断时间",{"key":31,"text":320,"correct":22},"加工材料所需的时间",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},897911,"(2013年)关于预算定额人工、材料、机械台班消耗量的计算和确认，下列说法中正确的是()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"人工消耗中包含超出预算定额取定运距后的超运距工",{"key":24,"text":328,"correct":22},"材料损耗量按照材料消耗量的一定比例计算",{"key":28,"text":330,"correct":26},"各种胶结、涂料等材料的配合比用料，按换算法计算",{"key":31,"text":332,"correct":22},"按小组产量计算机械台班产量时，机械幅度差系数取10%",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},897912,"(2014年)某挖土机挖土一次正常循环工作时间为50s，每次循环平均挖土量为0.5m3，机械正常利用系数为0.8，机械幅度差系数为25%，按8小时工作制考虑，挖土方预算定额的机械台班消耗量为（）台班\u002F1000m3。",[337,339,341,343],{"key":20,"text":338,"correct":26},"5.43",{"key":24,"text":340,"correct":22},"7.2",{"key":28,"text":342,"correct":22},"8",{"key":31,"text":344,"correct":22},"8.68",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},897913,"(2016年)完成某分部分项工程1m3需基本用工0.5工日，超运距用工0.05工日，辅助用工0.1工日。如人工幅度差系数为10%，则该工程预算定额人工工日消耗量为()供给\u002F10m3。",[349,351,353,355],{"key":20,"text":350,"correct":22},"6.05",{"key":24,"text":352,"correct":22},"5.85",{"key":28,"text":354,"correct":22},"7.00",{"key":31,"text":356,"correct":26},"7.15",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},897914,"(2015年)在正常施工条件下，完成10m3混凝土梁浇捣需4个基本用工，0.5个辅助用工，0.3个超运距用工，若人工幅度差系数为10%，则该梁混凝土浇捣预算定额人工消耗量为( )工日\u002F10m3。",[361,363,365,367],{"key":20,"text":362,"correct":22},"5.20",{"key":24,"text":364,"correct":22},"5.23",{"key":28,"text":366,"correct":22},"5.25",{"key":31,"text":368,"correct":26},"5.28",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},897915,"(2010年)根据单项工程的一般划分原则，下列单项工程中属于辅助生产设施的是()。",[373,375,377,379],{"key":20,"text":374,"correct":22},"废水处理站",{"key":24,"text":376,"correct":22},"水塔",{"key":28,"text":378,"correct":26},"机修车间",{"key":31,"text":380,"correct":22},"职工医院",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},897916,"(2010年)下列人工费用中，不属于预算定额基价构成内容的是()。",[385,387,389,391],{"key":20,"text":386,"correct":22},"施工作业的生产工人工资",{"key":24,"text":388,"correct":22},"施工机械操作人员工资",{"key":28,"text":390,"correct":22},"工人夜间施工的夜班补助",{"key":31,"text":392,"correct":26},"大型施工机械安装与拆卸所发生的人工费",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},897917,"(2013年)关于概算指标的编制，下列说法中正确的是()。",[397,399,401,403],{"key":20,"text":398,"correct":22},"概算指标分为建筑安装工程概算指标和设备工器具概算指标",{"key":24,"text":400,"correct":22},"综合概算指标的准确性高于单项概算指标",{"key":28,"text":402,"correct":22},"单项形式的概算指标对工程结构形式可不作说明",{"key":31,"text":404,"correct":26},"构筑物的概算指标以预算书确定的价值为准，不必进行建筑面积换算",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},897918,"(2013年)下列工程项目总投资构成项中，应计入单项工程投资估算指标中的是()。",[409,411,413,415],{"key":20,"text":410,"correct":26},"生产家具购置费",{"key":24,"text":412,"correct":22},"基本预备费",{"key":28,"text":414,"correct":22},"涨价预备费",{"key":31,"text":416,"correct":22},"铺底流动资金",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},897919,"(2014年)完成某单位分部分项工程需要基本用工4.2工日，超运距用工0.3工日，辅助用工1工日，人工幅度系数为10%，则该单位分部分项工作预算定额人工消耗量为（）工日。",[421,423,425,427],{"key":20,"text":422,"correct":22},"5.92",{"key":24,"text":424,"correct":22},"5.95",{"key":28,"text":426,"correct":22},"6.02",{"key":31,"text":350,"correct":26},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},897920,"(2016年)下列材料损耗，应计入预算定额材料损耗量的是()。",[432,434,436,438],{"key":20,"text":433,"correct":22},"场外运输损耗",{"key":24,"text":435,"correct":22},"工地仓储损耗",{"key":28,"text":437,"correct":22},"一般性检验鉴定损耗",{"key":31,"text":439,"correct":26},"施工加工损耗",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},897921,"(2018年)关于工程计价定额中的概算指标,下列说法正确的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"概算指标通常以分部工程为对象",{"key":24,"text":447,"correct":26},"概算指标中各种消耗量指标的确定,主要来自预算或结算资料",{"key":28,"text":449,"correct":22},"概算指标的组成内容一般分为列表形式和必要的附录两部分",{"key":31,"text":451,"correct":22},"概算指标的使用及调整方法,一般在附录中说明",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},897922,"(2018年)关于预算定额消耗量的确定方法,下列表述正确的是（ ）。",[456,457,458,459],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},897923,"(2018年)编制某分项工程预算定额人工工日消耗量时,已知基本用工,辅助用工、超运距用工分别为20工日、2 工日、3 工日,人工幅度差系数为10%,则该分项工程单位人工工日消耗量为（ ）工日。",[464,466,468,470],{"key":20,"text":465,"correct":22},"27.0",{"key":24,"text":467,"correct":22},"27.2",{"key":28,"text":469,"correct":22},"27.3",{"key":31,"text":471,"correct":26},"27.5",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},897924,"（2019年真题）编制预算定额人工日消耗量时，实际工程现场运距超过预算定额取定运距时的用工应计入（ ）",[476,478,480,482],{"key":20,"text":477,"correct":22},"超运距用工",{"key":24,"text":479,"correct":22},"辅助用工",{"key":28,"text":481,"correct":26},"二次搬运费",{"key":31,"text":483,"correct":22},"人工幅度差",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},897926,"(2010年)下列工程造价指数中，适合采用综合指数形式表示的是()。",[488,490,492,494],{"key":20,"text":489,"correct":26},"设备、工器具价格指数",{"key":24,"text":491,"correct":22},"建筑安装工程造价指数",{"key":28,"text":493,"correct":22},"单项工程造价指数",{"key":31,"text":495,"correct":22},"建设项目造价指数",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},897927,"(2010年)假设q1、P1分别表示报告期的采购数量与价格，qo、Po分别表示基期的采购数量与价格，则派氏综合指数为()。",[500,501,502,503],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},897928,"(2014年)最能体现信动态性变化特征，并且在工程价格的市场机制中起重要作用的工程造价信息主要包括（）",[508,510,512,514],{"key":20,"text":509,"correct":22},"工程造价指数在建工程信息和已完工程信息",{"key":24,"text":511,"correct":26},"价格信息、工程造价指数和已完工程信息",{"key":28,"text":513,"correct":22},"人工价格信息、材料价格信息及在建工程信息",{"key":31,"text":515,"correct":22},"价格信息、工程造价指数及刚开工的工程信息",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},897929,"(2009年)某工程在建设期初预计和建设期第一年末实际发生的设备、工器具购置情况如下表所示。与建设期初相比，第一年末的设备、工器具价格指数为()。",[520,522,524,526],{"key":20,"text":521,"correct":22},"0.9802",{"key":24,"text":523,"correct":26},"1.0811",{"key":28,"text":525,"correct":22},"1.1072",{"key":31,"text":527,"correct":22},"1.197",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},897930,"(2010年)从信息管理组织角度，可以将工程造价信息分为()。",[532,534,536,538],{"key":20,"text":533,"correct":22},"文件式信息和非文件式信息",{"key":24,"text":535,"correct":26},"系统化信息和非系统化信息",{"key":28,"text":537,"correct":22},"宏观信息和微观信息",{"key":31,"text":539,"correct":22},"固定信息和流动信息",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},897931,"(2013年)表明某经济现象某一期对其上一期或前一期的综合变动程度的指数属于()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"综合指数",{"key":24,"text":547,"correct":26},"环比指数",{"key":28,"text":549,"correct":22},"定基指数",{"key":31,"text":551,"correct":22},"平均数指数",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},897932,"(2013年)若以∑q1p0／∑q0p0为造价指数，则该指标属于()。",[556,558,560,562],{"key":20,"text":557,"correct":22},"质量指标指数",{"key":24,"text":559,"correct":22},"派氏价格指数",{"key":28,"text":561,"correct":26},"以基期的质量指标作为同度量因素的指数",{"key":31,"text":563,"correct":22},"以报告期的质量指标作为同度量因素的指数",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},897933,"(2014年)工程造价信息分类应从系统工程的角度出发，放在具体的应用环境中考虑，综合项目的实施环境和信息技术工具，这体现了工程造价信息分类的（）原则。",[568,570,572,574],{"key":20,"text":569,"correct":26},"综合实用性",{"key":24,"text":571,"correct":22},"稳定性",{"key":28,"text":573,"correct":22},"兼容性",{"key":31,"text":575,"correct":22},"可扩展性",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},897934,"(2015年)某类建筑材料本身的价格不高，但所需的运输费用却很高，该类建筑材料的价格信息一般具有较明显的()。",[580,582,584,586],{"key":20,"text":581,"correct":22},"专业性",{"key":24,"text":583,"correct":22},"季节性",{"key":28,"text":585,"correct":26},"区域性",{"key":31,"text":587,"correct":22},"动态性",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},897935,"(2016年)下列工程造价指数，既属于总指数又可用综合指数形式表示的是()。",[592,593,594,595],{"key":20,"text":489,"correct":26},{"key":24,"text":491,"correct":22},{"key":28,"text":493,"correct":22},{"key":31,"text":495,"correct":22},{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},897936,"(2016年)某建筑工程报告期各项费用构成和各单项价格指数如下表所示，则该工程的建筑安装工程造价指数为()。",[600,602,604,606],{"key":20,"text":601,"correct":26},"0.995",{"key":24,"text":603,"correct":22},"0.996",{"key":28,"text":605,"correct":22},"0.997",{"key":31,"text":607,"correct":22},"0.998",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]