[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,29,50,2160,[13,34,46,57,69,81,93,105,117,129,141,153,165,177,189,197,209,221,233,245,256,268,280,292,304,316,328,340,352,364,376,388,397,409,419,431,443,455,465,477,489,501,513,525,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},899270,1,"单选题","（2016年考题）某单项工程的单位建筑工程预算为1000万元，单位安装工程预算为500万元，设备购置预算为600万元，未达到固定资产标准的工器具购置预算为60万元，若预备费率费5%，则该单项工程施工图预算为（ ）万元。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1500",false,{"key":24,"text":25,"correct":22},"B","2100",{"key":27,"text":28,"correct":29},"C","2160",true,{"key":31,"text":32,"correct":22},"D","2268","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},899271,"（2020年真题）施工图预算的三级预算编制形式由（）组成。",[38,40,42,44],{"key":20,"text":39,"correct":29},"单位工程预算、单项工程综合预算、建设项目总预算",{"key":24,"text":41,"correct":22},"静态投资、动态投资、流动资金",{"key":27,"text":43,"correct":22},"建筑安装工程费、设备购置费、工程建设其他费",{"key":31,"text":45,"correct":22},"单项工程综合预算、建设期利息、建设项目总预算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},899272,"（2020年真题）关于施工图预算编制时工程建设其他费的计费原则，下列说法正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"若工程建设其他费已发生，则发生部分按合理发生金额计列",{"key":24,"text":53,"correct":22},"若工程建设其他费已发生，则发生部分按本阶段的计费标准计列",{"key":27,"text":55,"correct":22},"无论工程建设其他费是否发生，均按原批复概算的计费标准计列",{"key":31,"text":55,"correct":22},{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":27,"analysis":33},899273,"（2017年考题）根据《标准施工招标文件》（2007年版），进行了资格预审的施工招标文件应包括（ ）。",[61,63,65,67],{"key":20,"text":62,"correct":22},"招标公告",{"key":24,"text":64,"correct":22},"投标资格条件",{"key":27,"text":66,"correct":29},"投标邀请书",{"key":31,"text":68,"correct":22},"评标委员会名单",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":20,"analysis":33},899274,"（2017年考题）为编制招标工程量清单，在拟定常规的施工组织设计时，正确的做法是（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":29},"根据概算指标和类似工程估算整体工程量时，仅对主要项目加以估算",{"key":24,"text":76,"correct":22},"拟定施工总方案时需要考虑施工步骤",{"key":27,"text":78,"correct":22},"在满足工期要求的前提下，施工进度计划应尽量推后以降低风险",{"key":31,"text":80,"correct":22},"在计算工、料、机资源需要量时，不必考虑节假日、气候的影响",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},899275,"（2016年考题）关于工程量清单编制总说明的内容，下列说法中正确的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"建设规模是指工程投资总额",{"key":24,"text":88,"correct":22},"工程特征是指结构类型及主要施工方案",{"key":27,"text":90,"correct":29},"环境保护要求包括避免材料运输影响周边环境的防护要求",{"key":31,"text":92,"correct":22},"施工现场实际情况是指自然地理条件",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":31,"analysis":33},899276,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），关于招标控制价的编制要求，下列说法中正确的是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"应依据投标人拟定的施工方案进行编制",{"key":24,"text":100,"correct":22},"应包括招标文件中要求招标人承担风险的费用",{"key":27,"text":102,"correct":22},"应由招标工程量清单编制单位负责编制",{"key":31,"text":104,"correct":29},"应使用行业和地方的计价定额与相关文件计价",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},899277,"（2015年考题）关于依法必须招标的工程，下列说法中正确的是（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"国有资金投资的建筑工程招标可不设招标控制价",{"key":24,"text":112,"correct":29},"招标人可以自行决定是否编制标底，标底必须保密",{"key":27,"text":114,"correct":22},"招标人设有最高投标限价的，应当在开标时公布",{"key":31,"text":116,"correct":22},"招标人也可以根据需要，规定最低投标限价",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":31,"analysis":33},899278,"（2016年考题）关于依法必须招标工程的标底和招标控制价，下列说法中正确的是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"招标人有权自行决定是否采用设标底招标、无标底招标以及招标控制价招标",{"key":24,"text":124,"correct":22},"采用设标底招标的，招标人有权决定标底是否在招标文件中公开",{"key":27,"text":126,"correct":22},"采用招标控制价招标的，招标人应在招标文件中明确最高招标限价，也可以规定最低投标限价",{"key":31,"text":128,"correct":29},"公布招标控制价时，还应公布各单位工程的分部分项工程费、措施项目费、其他项目费、规费和税金",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},899279,"（2018年考题）直接发承包项目如按初步设计总概算投资包干，其签约合同费应以（ ）为准。",[133,135,137,139],{"key":20,"text":134,"correct":22},"经审批的概算投资总额",{"key":24,"text":136,"correct":22},"经审批的概算投资中与承包内容相对应的建筑安装费用",{"key":27,"text":138,"correct":29},"经审批的概算投资中与承包内容相对应部分的投资",{"key":31,"text":140,"correct":22},"经审批的概算投资汇总相对应的工程费",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},899280,"（2018年考题）关于施工招标文件的疑问和澄清，下列说法正确的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"投标人可以口头方式提出疑问",{"key":24,"text":148,"correct":22},"投标人不得在投标截止前的15天内提出疑问",{"key":27,"text":150,"correct":22},"投标人收到澄清后的确认时间应按绝对时间设置",{"key":31,"text":152,"correct":29},"招标文件的书面澄清应发给所有投标人",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},899281,"（2018年考题）根据《建设工程工程量清单计价规范》（GB 50500-2013）关于招标工程量清单中暂列金额的编制，下列说法正确的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"应详列其项目名称、计量单位，不列明金额",{"key":24,"text":160,"correct":22},"应列明暂定金额总额，不详列项目名称",{"key":27,"text":162,"correct":29},"不同专业预留的暂列金额应分别列项",{"key":31,"text":164,"correct":22},"没有特殊要求一般不列暂列金额",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},899282,"（2018年考题）根据《建设工程工程量清单计价规范》（GB 50500-2013）中对招标控制价的相关规定，下列说法正确的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"招标控制价公布后根据需要可以上浮或下调",{"key":24,"text":172,"correct":22},"招标人可以只公布招标控制价总价，也可以只公布单价",{"key":27,"text":174,"correct":22},"招标控制价可以在招标文件中公布，也可以在开标时公布",{"key":31,"text":176,"correct":29},"高于招标控制价的投标报价应被拒绝",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},899283,"（2019年考题）编制招标工程量清单时，应根据施工图纸的深度、暂估价设定的水平、合同价款约定调整因素以及工程实际情况合理确定的清单项目是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"措施项目清单",{"key":24,"text":184,"correct":29},"暂列金额",{"key":27,"text":186,"correct":22},"专业工程暂估价",{"key":31,"text":188,"correct":22},"计日工",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},899284,"（2019年考题）关于招标工程量清单中分部分项工程量清单的编制，下列说法正确的是（ ）。 A.所列项目应该是施工过程中以其本身构成工程实体的分项工程或可以精确计量的措施分项项目 B.拟建施工图纸有体现，但专业工程量计算规范附录中没有相对应项目的，则必须编制这些分项工程的补充项目 C.补充项目的工程量计算规则，应符合“计算规则要具有可计算性”且“计算结果要具有唯一性”的原则D采用标准图集的分项工程，其特征描述应直接采用“详见×图集”方式",[193,194,195,196],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":29},{"key":31,"text":31,"correct":22},{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},899285,"（2015年考题）关于招标工程量清单中分部分项工程量清单的编制，下列说法中错误的是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":29},"招标人只负责项目编码、项目名称、计量单位和工程量四项内容的填写",{"key":24,"text":204,"correct":22},"同一招标工程的项目编码不得有重码",{"key":27,"text":206,"correct":22},"清单所列项目应是在单位工程施工过程中以其本身构成该工程实体的分项工程",{"key":31,"text":208,"correct":22},"当清单计价规范附录中有两个计量单位时，应结合实际情况选择其中一个",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":20,"analysis":33},899286,"（2015年考题）拟定施工总方案是编制招标工程量清单的一项准备工作，下列选项中属于拟定施工总方案范畴的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":29},"对关键工艺的原则性规定",{"key":24,"text":216,"correct":22},"拟定施工步骤和施工顺序",{"key":27,"text":218,"correct":22},"估算整体工程量",{"key":31,"text":220,"correct":22},"编制施工进度计划",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":27,"analysis":33},899287,"（2015年考题）招标控制价中暂列金额一般按分部分项工程费的一定比率参考计算，这一比率的范围是（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"3%~5%",{"key":24,"text":228,"correct":22},"5%~10%",{"key":27,"text":230,"correct":29},"10%~15%",{"key":31,"text":232,"correct":22},"15%~20%",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},899288,"（2015年考题）招标人对已发出的招标文件进行的必要修改，应当在投标截止时间（ ）天内发出。",[237,239,241,243],{"key":20,"text":238,"correct":22},"7",{"key":24,"text":240,"correct":22},"10",{"key":27,"text":242,"correct":22},"14",{"key":31,"text":244,"correct":29},"15",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},899289,"（2016年考题）关于暂列金额，下列说法中正确的是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"用于必须要发生但暂时不能确定价格的项目",{"key":24,"text":252,"correct":22},"由承包人支配，按签证价格结算",{"key":27,"text":254,"correct":22},"不能用于因工程变更而发生的索赔支付",{"key":31,"text":162,"correct":29},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},899290,"（2016年考题）关于招标控制价的相关规定，下列说法中正确的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":29},"国有资金投资的工程建设项目，应编制招标控制价",{"key":24,"text":263,"correct":22},"招标控制价应在招标文件中公布，仅需公布总价",{"key":27,"text":265,"correct":22},"招标控制价超过批准概算3%以内时，招标人不必将其报原概算审核部门审核",{"key":31,"text":267,"correct":22},"当招标控制价复查结论超高原公布的招标控制价3%以内时，应责成招标人改正",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},899291,"（2016年考题）招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":29},"专业工程估算造价",{"key":24,"text":275,"correct":22},"投标报价总额",{"key":27,"text":277,"correct":22},"分部分项工程费用",{"key":31,"text":279,"correct":22},"分部分项工程费与措施费之和",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},899292,"（2017年考题）关于招标工程量清单中其他项目清单的编制，下列说法中正确的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"投标人情况、发包人对工程管理要求对其內容会有直接影响",{"key":24,"text":287,"correct":29},"暂列金额可以只列总额，但不同专业预留的暂列金额应分别列项",{"key":27,"text":289,"correct":22},"专业工程暂估价应包括利润、规费和税金",{"key":31,"text":291,"correct":22},"计日工的暂定数量可以由投标人填写",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},899293,"（2018年考题）关于工程量清单“量价分离”和“风险分担”的编制原则，下列说法正确的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":29},"招标人对已标价工程量清单中各分部分项工程量的准确性和完整性负责",{"key":24,"text":299,"correct":22},"招标人对已标价工程量清单中措施项目工程量的准确性和完整性负责",{"key":27,"text":301,"correct":22},"投标人对已标价工程量清单中各分部分项工程量的准确性和完整性负责",{"key":31,"text":303,"correct":22},"投标人对已标价工程量清单中措施项目工程量的准确性和完整性负责",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":27,"analysis":33},899294,"（2020年真题）关于建设工程工程量清单的编制，下列说法正确的是（）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"招标文件必须由专业咨询机构编制，由招标人发布",{"key":24,"text":311,"correct":22},"材料的品牌档次应在设计文件中体现，在工程量清单编制说明中不再说明",{"key":27,"text":313,"correct":29},"专业工程暂估价中包括企业管理费和利润",{"key":31,"text":315,"correct":22},"税金、规费是政府规定的，在清单编制中可不列项",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},899295,"（2020年真题）关于建设工程招标工程量清单的编制，下列说法正确的是（）",[320,322,324,326],{"key":20,"text":321,"correct":22},"总承包服务费应计列在暂列金额项下",{"key":24,"text":323,"correct":29},"分部分项工程项目清单中所列工程量应按专业工程量计算规范规定的工程计算规则计算",{"key":27,"text":325,"correct":22},"措施项目清单的编制不用考虑施工技术方案",{"key":31,"text":327,"correct":22},"在专业工程量计算规范中没有列项的分部分项工程，不得编制补充项目",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},899296,"（2020年真题）关于最高投标限价的编制，下列说法正确的是（）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"国有企业的建设工程招标可以不编制最高投标限价",{"key":24,"text":335,"correct":22},"招标文件中可以不公开最高投标限价",{"key":27,"text":337,"correct":22},"最高投标限价与标底的本质是相同的",{"key":31,"text":339,"correct":29},"政府投资的建设工程招标时，应设最高投标限价",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},899297,"（2020年真题）关于建设工程施工招标文件，下列说法正确的是（）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"工程量清单不是招标文件的组成部分",{"key":24,"text":347,"correct":22},"由招标人编制的招标文件只对投标人具有约束力",{"key":27,"text":349,"correct":22},"招标项目的技术要求可以不在招标文件中描述",{"key":31,"text":351,"correct":29},"招标人可以对已发出的招标文件进行必要的修改",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},899298,"（2019年考题）关于编制最高投标限价总承包服务费的可参考标准，下列说法正确的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"招标人仅要求对分包专业工程进行总承包管理和协调时，按分包专业工程估算造价的0.5%计算",{"key":24,"text":359,"correct":22},"招标人仅要求对分包专业工程进行总承包管理和协调时，按分包专业工程估算造价的1%计算",{"key":27,"text":361,"correct":22},"招标人要求对分包专业I程进行总承包管理和协调，且要求提供配合服务时，按分包专业工程估算造价的1%~3%计算",{"key":31,"text":363,"correct":29},"招标人要求对分包专业工程进行总承包管理和协调，且要求提供配合服务时，按分包专业工程估算造价的3%~5%计算",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},899299,"（2019年考题）依据工程所在地区颁发的计价定额等编制最高投标限价、进行分部分项工程综合单价组价时，首先应确定的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"风险范围与幅度",{"key":24,"text":371,"correct":22},"工程造价信息确定的人工单价等",{"key":27,"text":373,"correct":29},"定额项目名称及工程量",{"key":31,"text":375,"correct":22},"管理费率和利润率",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},899300,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），在招标文件未另有要求的情况下，投标报价的综合单价一般要考虑的风险因素是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"政策法规的变化",{"key":24,"text":383,"correct":22},"人工单价的市场变化",{"key":27,"text":385,"correct":22},"政府定价材料的价格变化",{"key":31,"text":387,"correct":29},"管理费、利润的风险",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},899301,"（2016年考题）根据《建设工程工程量清单计价规范》（GB50500--2013），允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是（ ）。",[392,394,395,396],{"key":20,"text":393,"correct":22},"分部分项工程量清单",{"key":24,"text":182,"correct":29},{"key":27,"text":184,"correct":22},{"key":31,"text":188,"correct":22},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},899302,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），关于施工发承包投标报价的编制，下列做法正确的是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"设计图纸与招标工程量清单项目特征描述不同的，以设计图纸特征为准",{"key":24,"text":404,"correct":29},"暂列金额应按照招标工程量清单中列出的金额填写，不得变动",{"key":27,"text":406,"correct":22},"材料、工程设备暂估价应按暂估单价，乘以所需数量后计入其他项目费",{"key":31,"text":408,"correct":22},"总承包服务费应按照投标人提出的协调、配合和服务项目自主报价",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},899303,"（2017年考题）施工招标工程量清单中，应由投标人自主报价的其他项目是（ ）。",[413,414,415,417],{"key":20,"text":186,"correct":22},{"key":24,"text":184,"correct":22},{"key":27,"text":416,"correct":22},"工程设备暂估价",{"key":31,"text":418,"correct":29},"计日工单价",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},899304,"（2017年考题）关于联合体投标需遵循的规定，下列说法中正确的是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"联合体各方签订共同投标协议后，可再以自己的名义单独投标",{"key":24,"text":426,"correct":22},"资格预审后联合体增减、更换成员的，其投标有效性待定",{"key":27,"text":428,"correct":22},"由同一专业的单位组成的联合体，按其中较高资质确定联合体资质等级",{"key":31,"text":430,"correct":29},"联合体投标的，可以联合体牵头人的名义提交投标保证金",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},899305,"（2018年考题）关于工程施工投标报价过程中的工程量复核，下列说法正确的是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"复核的准确程度不会影响施工方法的选用",{"key":24,"text":438,"correct":22},"复核的目的在于修改工程量清单中的工程量",{"key":27,"text":440,"correct":29},"复核有助于防止由于物资少***的停工待料",{"key":31,"text":442,"correct":22},"复核中发现的遗漏和错误应向招标人提出",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":31,"analysis":33},899306,"（2018年考题）招标工程量清单中某分部分项清单项目与某一计价定额子目的工作内容与计量规则一致，则确定该清单项目综合单价不可或缺的工作是（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"计算工程内容的工程数量",{"key":24,"text":450,"correct":22},"计算工程内容的清单单位含量",{"key":27,"text":452,"correct":22},"计算措施项目的费用",{"key":31,"text":454,"correct":29},"计算管理费、利润和风险费用",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},899307,"（2019年考题）投标报价时，投标人需严格按照招标人所列项目明细进行自主报价的是（ ）",[459,461,462,463],{"key":20,"text":460,"correct":22},"总价措施项目",{"key":24,"text":186,"correct":22},{"key":27,"text":188,"correct":29},{"key":31,"text":464,"correct":22},"规费",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},899308,"（2019年考题）在投标报价确定分部分项工程综合单价时，应根据所选的计算基础计算工程内容的工程量，该数量应为（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"实物工程量",{"key":24,"text":472,"correct":22},"施工工程量",{"key":27,"text":474,"correct":29},"定额工程量",{"key":31,"text":476,"correct":22},"复核的清单工程量",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},899309,"（2015年考题）关于投标报价，下列说法中正确的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"总价措施项目由投标人自主报价",{"key":24,"text":484,"correct":22},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":27,"text":486,"correct":22},"暂估价依据询价情况填报",{"key":31,"text":488,"correct":29},"投标人对投标报价的任何优惠均应反映在相应的清单项目的综合单价中",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},899310,"（2015年考题）关于投标报价时综合单价的确定，下列做法中正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":29},"以项目特征描述为依据确定综合单价",{"key":24,"text":496,"correct":22},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":27,"text":498,"correct":22},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":31,"text":500,"correct":22},"消耗量指标的计算应以地区或行业定额为依据",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},899311,"（2016年考题）施工项目投标报价的工作包括：①收集投标信息；②选择报价策略；③组建投标班子；④确定基础标价；⑤确定投标报价；⑥研究招标文件，以上工作正确的先后顺序是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"⑥①③②④⑤",{"key":24,"text":508,"correct":29},"③⑥①④②⑤",{"key":27,"text":510,"correct":22},"③①⑥②④⑤",{"key":31,"text":512,"correct":22},"⑥③①④②⑤",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},899312,"（2016年考题）投标人在投标报价时，应优先被采用为综合单价编制依据的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":29},"企业定额",{"key":24,"text":520,"correct":22},"地区定额",{"key":27,"text":522,"correct":22},"行业定额",{"key":31,"text":524,"correct":22},"国家定额",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},899313,"（2016年考题）投标人在投标前期研究招标文件时，对合同形式进行分析的主要内容为（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"承包商任务",{"key":24,"text":532,"correct":29},"计价方式",{"key":27,"text":534,"correct":22},"付款办法",{"key":31,"text":536,"correct":22},"合同价款调整",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},899314,"（2018年考题）施工投标报价工作包括：①工程现场调查；②组建投标报价班子；③确定基础报价；④制定项目管理规划；⑤复核清单工程量，下列工作排序正确的是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"①④②③⑤",{"key":24,"text":544,"correct":22},"②③④①⑤",{"key":27,"text":546,"correct":22},"①②③④⑤",{"key":31,"text":548,"correct":29},"②①⑤④③",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},899315,"（2018年考题）相较于在劳务市场招募零散的劳动力，承包人选择成建制劳务公司法人劳务分包具有（ ）的特点。",[553,555,557,559],{"key":20,"text":554,"correct":22},"价格低，管理强度低",{"key":24,"text":556,"correct":29},"价格高，管理强度低",{"key":27,"text":558,"correct":22},"价格低，管理强度高",{"key":31,"text":560,"correct":22},"价格高，管理强度高",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},899316,"（2020年真题）关于施工总承包建设工程投标文件的内容，下列说法正确的是（）",[565,567,569,571],{"key":20,"text":566,"correct":22},"不包括施工组织设计",{"key":24,"text":568,"correct":29},"应提供投标人的法定代表人身份证明或附有法定代表人身份证明的授权委托书",{"key":27,"text":570,"correct":22},"应包括深化设计图纸",{"key":31,"text":572,"correct":22},"不包括拟分包项目情况表",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},899317,"（2020年真题）关于建设工程投标报价的编制，下列说法正确的是（）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"可不考虑拟订合同中的工程变更条款",{"key":24,"text":580,"correct":29},"应仔细研究招标文件中给定的工程技术标准",{"key":27,"text":582,"correct":22},"可不考虑施工现场用地情况",{"key":31,"text":584,"correct":22},"不必关注工程所在地气象资料",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},899319,"（2017年考题）下列施工评标及相关工作事宜中，属于清标工作内容的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"投标文件的澄清",{"key":24,"text":592,"correct":22},"施工组织设计的评审",{"key":27,"text":594,"correct":22},"形式评审",{"key":31,"text":596,"correct":29},"不平衡报价分析",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":27,"analysis":33},899320,"（2016年考题）关于建设工程施工评标，下列说法中正确的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"评标委员会按照公平、公正、公开的原则评标",{"key":24,"text":604,"correct":22},"评标委员会可以接受投标人主动提出的澄清",{"key":27,"text":606,"correct":29},"评标委员会可以要求投标人澄清投标文件疑问直至满足评标委员会的要求",{"key":31,"text":608,"correct":22},"评标委员会有权直接确定中标人",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]