[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,28,50,2160,[13,34,46,58,70,82,94,102,114,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,316,328,340,348,360,372,384,396,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},899220,1,"单选题","（2018年考题）关于项目建设规模，下列说法正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建设规模越大，产生的效益越高",false,{"key":24,"text":25,"correct":22},"B","国家不对行业的建设规模设定规模界限",{"key":27,"text":28,"correct":29},"C","资金市场条件对建设规模的选择起着制约作用",true,{"key":31,"text":32,"correct":22},"D","技术因素是确定建设规模需考虑的首要因素","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},899221,"（2018年考题）关于工业项目建设地点的选择，下列说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"应远离其他工业项目，减少环境保护费用",{"key":24,"text":41,"correct":22},"应远离铁路、公路、水路，减少运营干扰",{"key":27,"text":43,"correct":22},"选靠近城镇和居民密集区，减少生活设施费",{"key":31,"text":45,"correct":29},"应少占耕地，降低土地补偿费用",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},899222,"（2018年考题）关于建设项目投资估算的编制，下列说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"应直接委托造价工程师编制",{"key":24,"text":53,"correct":22},"应做到费用构成齐全，并适当降低估算标准，节省投资",{"key":27,"text":55,"correct":22},"项目建设书阶段的投资估算精度误差应控制在±20%以内",{"key":31,"text":57,"correct":29},"应对影响造价变动的因素进行敏感性分析",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},899223,"（2018年考题）某地2017年拟建一座年产20万吨的化工厂，该地区2015年建成的年产15万吨相同产品的类似项目实际建设投资为6000万元。2015年和2017年该地区的工程造价指数（定基指数）分别为1.12和1.15，生产能力指数为0.7，预计该项目建设期的两年内工程造价仍将年均上涨5%。则该项目的静态投资为（ ）万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"7147.08",{"key":24,"text":65,"correct":29},"7535.09",{"key":27,"text":67,"correct":22},"7911.84",{"key":31,"text":69,"correct":22},"8307.43",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},899224,"（2018年考题）采用分项详细估算法进行流动资金估算时，应计入流动负债的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"预收账款",{"key":24,"text":77,"correct":22},"存货",{"key":27,"text":79,"correct":22},"库存资金",{"key":31,"text":81,"correct":22},"应收账款",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},899225,"（2017年考题）在国外其地建设一座化工厂，已知设备到达工地的用 （E）为3000万美元，该项目的朗格系数（K）及包含的內容如下表所示。则该工厂的同接费用为（ ）万美元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"9009",{"key":24,"text":89,"correct":22},"6930",{"key":27,"text":91,"correct":29},"2079",{"key":31,"text":93,"correct":22},"1350",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},899226,"（2019年考题）若外币对人民币贬值,则关于该汇率变化对涉外项目投资额产生的影响，下列说法正确的是（ ）。 A.从国外市场购买材料，所支付的外币金额减少 B.从国处市场购买村料，换算成人民币所支付的金额减少 C.从国外借款，本息所支付的外币金额增加D从国外借款，换算成人民币所支付的本息金额增加",[98,99,100,101],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},899227,"（2019年考题）在进行建设厂址多方案全寿命周期技术经济分析时，应计入项目投产后生产经营费用的是（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"拆迁补偿费",{"key":24,"text":109,"correct":22},"生活设施费",{"key":27,"text":111,"correct":29},"动力设施费",{"key":31,"text":113,"correct":22},"原材料运输费",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},899228,"（2015年考题）按照形成资产法编制建设投资估算表，下列费用中应列入无形资产费用的是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"建设单位管理费",{"key":24,"text":121,"correct":29},"土地使用权",{"key":27,"text":123,"correct":22},"生产设备及开办费",{"key":31,"text":125,"correct":22},"引进技术费",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},899229,"（2015年考题）建设地点选择时需要进行费用分析，下列费用应列入项目投资费用比较的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"动力供应费",{"key":24,"text":133,"correct":22},"燃料运入费",{"key":27,"text":135,"correct":22},"产品运出费",{"key":31,"text":137,"correct":29},"建材运输费",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},899230,"（2015年考题）世界银行贷款项目的投资估算常采用朗格系数法推算建设项目的静态投资，该方法的计算基数是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"主体工程费",{"key":24,"text":145,"correct":29},"设备购置费",{"key":27,"text":147,"correct":22},"其他工程费",{"key":31,"text":149,"correct":22},"安装工程费",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},899231,"（2016年考题）某地2016年拟建一年产50万吨产品的工业项目，预计建设期为3年，该地区2013年已建年产40万吨的类似项目投资为2亿元。已知生产能力指数为0.9，该地区2013、2016年同类工程造价指数分别为108、112，预计拟建项目建设期内工程造价年上涨率为5%。用生产能力指数法估算的拟建项目静态投资为（ ）亿元。",[154,156,158,160],{"key":20,"text":155,"correct":29},"2.54",{"key":24,"text":157,"correct":22},"2.74",{"key":27,"text":159,"correct":22},"2.75",{"key":31,"text":161,"correct":22},"2.94",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},899232,"（2017年考题）按照形成资产法编制建设投资估算表：下列费用中可计入无形资产费用的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"研究试验费",{"key":24,"text":169,"correct":29},"非专利技术使用费",{"key":27,"text":171,"correct":22},"引进技术和引进设备其他费",{"key":31,"text":173,"correct":22},"生产准备及开办费",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},899233,"（2020年真题）关于投资估算中建设投资估算的构成，下列说法正确的是（）",[178,180,182,184],{"key":20,"text":179,"correct":22},"由工程费用和建设期利息估算构成",{"key":24,"text":181,"correct":22},"由工程费用、预备费和建设期利息估算构成",{"key":27,"text":183,"correct":22},"由建筑安装工程费用、工程建设其他费用和预备费估算构成",{"key":31,"text":185,"correct":29},"由工程费用、工程建设其他费用和预备费估算构成",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},899234,"（2020年真题）关于项目决策与工程造价的关系，下列说法正确的是（）",[190,192,194,196],{"key":20,"text":191,"correct":22},"项目不同决策阶段的投资估算精度要求是一致的",{"key":24,"text":193,"correct":22},"项目决策的内容与工程造价无关",{"key":27,"text":195,"correct":22},"项目决策的正确性不影响设备选型",{"key":31,"text":197,"correct":29},"工程造价的金额影响项目决策的结果",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},899235,"（2020年真题）确定建设项目建设规模需考虑的首要因素是（）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"建设地点",{"key":24,"text":205,"correct":29},"产品需求市场",{"key":27,"text":207,"correct":22},"生产成本",{"key":31,"text":209,"correct":22},"建造方案",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},899236,"（2015年考题）关于建筑设计对民用住宅项目工程造价的影响，下列说法中正确的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"加大住宅宽度，不利于降低单方造价",{"key":24,"text":217,"correct":29},"降低住宅层高，有利于降低单方造价",{"key":27,"text":219,"correct":22},"结构面积系数越大，越有利于降低单方造价",{"key":31,"text":221,"correct":22},"住宅层数越多，越有利于降低单方造价",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},899237,"（2015年考题）当建设项目为一个单项工程时，其设计概算应采用的编制形式是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"单位工程概算、单项工程综合概算和建设项目总概算二级",{"key":24,"text":229,"correct":22},"单位工程概算和单项工程综合概算二级",{"key":27,"text":231,"correct":22},"单项工程综合概算和建设项目总概算二级",{"key":31,"text":233,"correct":29},"单位工程概算和建设项目总概算二级",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},899238,"（2015年考题）在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"概算定额法",{"key":24,"text":241,"correct":29},"概算指标法",{"key":27,"text":243,"correct":22},"预算单价法",{"key":31,"text":245,"correct":22},"综合吨位指标法",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},899239,"（2018年考题）关于设计概算的作用，下列说法正确的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"设计概算是确定建设规模的依据",{"key":24,"text":253,"correct":29},"设计概算是编制固定资产投资计划的依据",{"key":27,"text":255,"correct":22},"政府投资项目设计概算经批准后，不得进行调整",{"key":31,"text":257,"correct":22},"设计概算不应作为签订贷款合同的依据",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},899240,"（2018年考题）采用概算定额法编制设计概算的主要工作有：①列出分部分项工程项目名称并计算工程量；②搜集基础资料；③编制概算和编制说明；④计算措施项目费；⑤确定各分部分项工程费；⑥汇总单位工程概算造价。下列工作排序正确的是（ ）",[262,264,266,268],{"key":20,"text":263,"correct":29},"②①⑤④⑥③",{"key":24,"text":265,"correct":22},"②③①⑤④⑥",{"key":27,"text":267,"correct":22},"③②①④⑤⑥",{"key":31,"text":269,"correct":22},"②①③⑤④⑥",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},899241,"（2018年考题）关于设计概算的编制，下列计算式正确的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"单位工程概算=人工费+材料费+施工机具使用费+企业管理费+利润",{"key":24,"text":277,"correct":29},"单项工程综合概算=建筑工程费+安装工程费+设备及工器具购置费",{"key":27,"text":279,"correct":22},"单项工程综合概算=建筑工程费+安装工程费+设备及工器具购置费+工程建设其他费用",{"key":31,"text":281,"correct":22},"建设项目总概算=各单项工程综合概算+建设期利息+预备费",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},899242,"（2016年考题）某地拟建一工程，与其类似的已完工程单方工程造价为4500元\u002Fm3，其中人、材料、施工机具使用费分别占工程造价的15%、55%和10%，拟建工程地区与类似工程地区人工、材料、施工机具使用费差异系数分别为1.05、1.03和0.98。假定以人、材、机费用之和为基数取费，综合费率为25%。用类似工程预算法计算的拟建工程造价指标为（ ）元\u002Fm2。",[286,288,290,292],{"key":20,"text":287,"correct":22},"3699.00",{"key":24,"text":289,"correct":22},"4590.75",{"key":27,"text":291,"correct":22},"4599.00",{"key":31,"text":293,"correct":29},"4623.75",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},899243,"（2019年考题）.关于设计概算的说法，正确的是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"设计概算是工程造价在设计阶段的表现形式，具备价格属性",{"key":24,"text":301,"correct":22},"三级概算编制形式适用于单一的单项工程建设项目",{"key":27,"text":303,"correct":22},"概算中工程费用应按预测的建设期价格水平编制",{"key":31,"text":305,"correct":29},"概算应考虑货款的时间价值对投资的影响",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},899244,"（2019年考题）编制工程建设其他表用概算表时，下列其他用中，一般按“工程费用×费率”计算的是（ ）。",[310,312,313,314],{"key":20,"text":311,"correct":22},"征地补偿费",{"key":24,"text":107,"correct":22},{"key":27,"text":167,"correct":22},{"key":31,"text":315,"correct":29},"工程监理费",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":27,"analysis":33},899245,"（2019年考题）某地市政道路工程，已知与其关似已完工程造价指标为600元\u002Fm2，人、材、机占工程造价10%，50%，20%，拟建工程与类似工程人、材、机差异系数为1.1，1.05，1.05，假定以人、材、机为基数取，综合率为25%，则该工程综合单价为（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"507",{"key":24,"text":323,"correct":22},"608.4",{"key":27,"text":325,"correct":29},"633.75",{"key":31,"text":327,"correct":22},"657",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},899246,"（2019年考题）某项目根据《建设项目投资估算编审规程>（CECA\u002FGCI-2015）,采用概算法编制的估算中，工程费用为8000万元，基本预备费用为880万元，价差预备费为120万元，工程建设其他费800万，建设期利息为200万元，流动资金为100万元，则该项目为（ ）万元。",[332,334,336,338],{"key":20,"text":333,"correct":22},"9680",{"key":24,"text":335,"correct":29},"9800",{"key":27,"text":337,"correct":22},"10000",{"key":31,"text":339,"correct":22},"10100",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},899247,"（2019年考题）在满足住宅功能和质量的前提下，下列设计方法中，可降低单位建筑面积造价的是（ ）。 A.增加住宅层高 B.分散布置公共设施C增大墙体面积系数 D.减少结构面积系数",[344,345,346,347],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":27,"analysis":33},899248,"（2015年考题）设计概算一经批准一般不得进行调整，其总投资应反映（ ）时的价格水平。",[352,354,356,358],{"key":20,"text":353,"correct":22},"项目立项",{"key":24,"text":355,"correct":22},"可行性研究",{"key":27,"text":357,"correct":29},"概算编制",{"key":31,"text":359,"correct":22},"项目施工",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},899249,"（2016年考题）关于住宅建筑设计中的结构面积系数，下列说法中正确的是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"结构面积系数越大，设计方案越经济",{"key":24,"text":367,"correct":29},"房间平均面积越大，结构面积系数越小",{"key":27,"text":369,"correct":22},"结构面积系数与房间户型组成有关，与房屋长度、宽度无关",{"key":31,"text":371,"correct":22},"结构面积系数与房屋结构有关，与房屋外形无关",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},899250,"（2016年考题）某地拟建一办公楼，当地类似工程的单位工程概算指标为3600元\u002Fm3。概算指标为瓷砖地面，拟建工程为复合木地板，每100m2该类建筑中铺贴地面面积为50m2，当地预算定额中瓷砖地面和复合木地板的预算单价分别为128元\u002Fm2、190元\u002Fm2。假定以人、材、机费用之和为基数取费，综合费率为25%。则用概算指标法计算的拟建工程造价指标为（ ）元\u002Fm3。",[376,378,380,382],{"key":20,"text":377,"correct":22},"2918.75",{"key":24,"text":379,"correct":22},"3413.75",{"key":27,"text":381,"correct":22},"3631.00",{"key":31,"text":383,"correct":29},"3638.75",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},899251,"（2016年考题）下列原因中，不能据以调整设计概算的是（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":22},"超出原设计范围的重大变更",{"key":24,"text":391,"correct":29},"超出承包人预期的货币贬值和汇率变化",{"key":27,"text":393,"correct":22},"超出基本预备费规定范围的不可抗拒重大自然灾害引起的工程变动和费用增加",{"key":31,"text":395,"correct":22},"超出价差预备费的国家重大政策性调整",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},899252,"（2017年考题）当初步设计深度不够，只有设备出厂价而无详细规格、重量时，编制设备安装工程费概算可选用的方法是（ ）。",[400,402,404,405],{"key":20,"text":401,"correct":29},"设备价值百分比法",{"key":24,"text":403,"correct":22},"设备系数法",{"key":27,"text":245,"correct":22},{"key":31,"text":243,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},899253,"（2017年考题）关于建筑设计因素对工业项目工程造价的影响，下列说法中正确的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"建筑周长系数越高，建筑工程造价越低",{"key":24,"text":413,"correct":29},"多跨厂房跨度不变，中跨数目越多越经济",{"key":27,"text":415,"correct":22},"大中型工业厂房一般选用砌体结构，以降低造价",{"key":31,"text":417,"correct":22},"建筑物面积或体积的增加，一股会因其单位面积造价的增加",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},899254,"（2018年考题）采用全费用综合单价建筑施工图预算，下列说法正确的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"综合单价应由人材机费、管理费、综合计取的措施项目费、规费和税金构成",{"key":24,"text":425,"correct":29},"可以计量的措施项目费与分部分项工程费的计算方法相同",{"key":27,"text":427,"correct":22},"人工费、材料费、施工机具使用费应按预算定额编制时期的价格确定",{"key":31,"text":429,"correct":22},"综合计取的措施项目费应以分部分项工程费为基数乘以相应费率计算",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},899255,"（2018年考题）用工料单价法计算建筑安装工程费时需套用定额预算单价，下列做法正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":29},"分项工程名称与定额名称完全一致时，直接套用定额预算单价",{"key":24,"text":437,"correct":22},"分项工程计量单位与定额计量单位完全一致时，直接套用定额预算单价",{"key":27,"text":439,"correct":22},"分项工程主要材料品种与预算定额不一致时，直接套用定额预算单价",{"key":31,"text":441,"correct":22},"分项工程施工工艺条件与预算定额不一致时，调整定额预算单价后套用",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},899256,"（2020年真题）采用概算定额法编制设计概算的主要工作步骤有:①套用各子目的综合单价;②搜集基础资料;③计算措施项目费:④编写概算编制说明;⑤汇总单位工程造价;⑥计算工程量。上述工作步骤正确的排序是（）。",[446,448,450,452],{"key":20,"text":447,"correct":29},"②⑥①③⑤④",{"key":24,"text":449,"correct":22},"④②⑥①⑤③",{"key":27,"text":451,"correct":22},"②⑥④①③⑤",{"key":31,"text":453,"correct":22},"④⑥②①⑤③",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},899257,"（2020年真题）某地新建单身宿舍一座，当地同期类似工程概算指标为900元\u002Fm3，该工程基础为混凝土结构，而概算指标对应的基础为毛石混凝土结构，已知该工程与概算指标每100m3建面中分摊的基础工程量均为15m3，同期毛石混凝土基础综合单价为580元\u002Fm3，混凝土基础综合单价为640元\u002Fm3，则经结构差异修正后的概算指标为（）元\u002Fm。",[458,460,462,464],{"key":20,"text":459,"correct":22},"891",{"key":24,"text":461,"correct":29},"909",{"key":27,"text":463,"correct":22},"906",{"key":31,"text":465,"correct":22},"993",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},899258,"（2020年真题）对于单层大跨度工业厂房设计，较经济合理的结构类型是（）",[470,472,474,476],{"key":20,"text":471,"correct":22},"木结构",{"key":24,"text":473,"correct":22},"砌体结构",{"key":27,"text":475,"correct":29},"钢结构",{"key":31,"text":477,"correct":22},"钢筋混凝土结构",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},899259,"（2020年真题）关于单位工程概算的费用组成，下列表述中正确的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"由直接费、企业管理费、利润、规费组成",{"key":24,"text":485,"correct":22},"由直接费、企业管理费、利润、规费、税金组成",{"key":27,"text":487,"correct":29},"由直接费、企业管理费、利润、规费、税金、设备及工器具购置费组成",{"key":31,"text":489,"correct":22},"由直接费、企业管理费、利润、规费、税金、设备及工器具购置费、工程建设其地费组成",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},899260,"（2016年考题）关于施工图预算的含义，下列说法中正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"是设计阶段对工程建设所需资金的粗略计算",{"key":24,"text":497,"correct":22},"其成果文件一般不属于设计文件的组成部分",{"key":27,"text":499,"correct":29},"可以由施工企业根据企业定额考虑自身实力计算",{"key":31,"text":501,"correct":22},"其价格性质为预期，不具有市场性质",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},899261,"（2017年考题）施工图预算的二级预算编制形式是指（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"编制人编制、审核人审核",{"key":24,"text":509,"correct":22},"建筑安装工程预算，设备工器购置费预算",{"key":27,"text":511,"correct":29},"单位工程预算、建设项目总预算",{"key":31,"text":513,"correct":22},"单项工程综合预算、建设项目总预算",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},899262,"（2015年考题）单位建筑工程预算的费用包括（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"建筑安装工程费用、设备及工器具购置费、建设单位管理费",{"key":24,"text":521,"correct":29},"人、材、机费用及企业管理费、利润、规费和税金",{"key":27,"text":523,"correct":22},"人、材、机费用及企业管理费、工程建设其他费用",{"key":31,"text":525,"correct":22},"分部分项工程费、措施费、规费、税金、工程建设其他费用",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},899263,"（2017年考题）工料单价法编制施工图预算的工作有：①计算主材料；②套用工料单价；③计算措施项目人材机费用；④划分工程项目和计算工程量；⑤进行工料分析，下列工作排序正确的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"④②⑤①③",{"key":24,"text":533,"correct":22},"④⑤①②③",{"key":27,"text":535,"correct":22},"②④⑤①③",{"key":31,"text":537,"correct":29},"④②③⑤①",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},899264,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），招标控制价的综合单价组价工作包括：①确定工、料、机单价；②确定所组价定额项目名称；③计算组价定额项目的合价；④除以工程量清单项目工程量；⑤计算组价定额项目工程量，下列工作排序正确的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":29},"②⑤①③④",{"key":24,"text":545,"correct":22},"①②⑤④③",{"key":27,"text":547,"correct":22},"②③①⑤④",{"key":31,"text":549,"correct":22},"①②③④⑤",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},899265,"（2016年考题）根据《标准施工招标文件》（2007年版），关于“分包和偏差问题处理”的内容应包括于（ ）之中。",[554,556,558,560],{"key":20,"text":555,"correct":22},"招标公告",{"key":24,"text":557,"correct":29},"投标人须知",{"key":27,"text":559,"correct":22},"评标办法",{"key":31,"text":561,"correct":22},"合同条款与格式",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},899266,"（2019年考题）采用实物量法与工料单价法编制施工图预算，其工作步骤的差异体现在（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"工程量的计算",{"key":24,"text":569,"correct":29},"直接费的计算",{"key":27,"text":571,"correct":22},"税金的计算",{"key":31,"text":573,"correct":22},"企业管理费的计算",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},899267,"（2019年考题）施工图预算以二级预算编制形成（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":29},"总预算和单位工程预算",{"key":24,"text":581,"correct":22},"单位工程综合预算和单位工程预算",{"key":27,"text":583,"correct":22},"总预算和单位工程综合预算",{"key":31,"text":585,"correct":22},"建筑工程预算和设备安装工程预算",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},899268,"（2015年考题）关于各级施工图预算的构成内容，下列说法中正确的是（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":29},"建设项目总预算反映施工图设计阶段建设项目的预算总投资",{"key":24,"text":593,"correct":22},"建设项目总预算由组成该项目的各个单项工程综合预算费用相加而成",{"key":27,"text":595,"correct":22},"单项工程综合预算由单项工程的建筑工程费和设备及工器具购置费组成",{"key":31,"text":597,"correct":22},"单位工程预算由单位建筑工程预算和单位安装工程预算费用组成",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":27,"analysis":33},899269,"（2017年考题）用全费用综合单价法编制施工图预算，下列建筑安装工程施工图预算费计算式正确的是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"Σ（子目工程量×子目工料单价）+企业管理费+利润+规费+税金",{"key":24,"text":605,"correct":22},"Σ（分部分项工程量×分部分项工程全费用综合单价）",{"key":27,"text":607,"correct":29},"分部分项工程费+措施项目费",{"key":31,"text":609,"correct":22},"分部分项工程费+措施项目费+其他项目+规费+税金",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]