[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,26,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,297,309,321,333,344,356,368,380,392,404,416,428,440,450,462,474,482,494,506,518,530,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},899118,1,"单选题","（2020年真题）某拟建项目，建筑安装工程费为11.2亿元，设备及工器具购置费为33.6亿元，工程建设其他费为8.4亿元，建设单位管理费为3亿元，基本预备费费率为5%，则拟建项目基本预备费为（）亿元。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","0.56",false,{"key":24,"text":25,"correct":22},"B","2.24",{"key":27,"text":28,"correct":29},"C","2.66",true,{"key":31,"text":32,"correct":22},"D","2.81","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},899119,"（2020年真题）某工程建设期2年，第一年投入2000万元，第二年投入3000万元，建设期利息只计息不付息，利率10%。建设期利息是（）",[38,40,42,44],{"key":20,"text":39,"correct":22},"455",{"key":24,"text":41,"correct":29},"460",{"key":27,"text":43,"correct":22},"720",{"key":31,"text":45,"correct":22},"830",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},899120,"（2017年考题）根据现行建筑安装工程费用项目组成的规定，下列费用项目中，属于施工用具折旧费的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"仪器仪表使用费",{"key":24,"text":53,"correct":22},"施工机械财产保险费",{"key":27,"text":55,"correct":22},"大型机械进出费",{"key":31,"text":57,"correct":22},"大型机械安拆费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},899121,"（2016年考题）根据我国现行建筑安装工程费用项目构成的规定，下列费用中属于安全文明费的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"夜间施工时，临时可移动照明灯具的设置、拆除费用",{"key":24,"text":65,"correct":29},"工人的安全防护用品的购置费用",{"key":27,"text":67,"correct":22},"地下室施工时所采用的照明设施拆除费",{"key":31,"text":69,"correct":22},"建筑物的临时保护设施费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},899122,"（2017年考题）下列费用项目中，包含在国外建筑安装工程材料费中的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"单独列项的增值税",{"key":24,"text":77,"correct":29},"材料价格预涨费",{"key":27,"text":79,"correct":22},"周转材料摊销费",{"key":31,"text":81,"correct":22},"各种现场用水、用电费",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},899123,"（2016年考题）关于国外建筑安装工程费用的计算，下列说法中正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"分包工程费不包括分包工程的管理费和利润",{"key":24,"text":89,"correct":22},"材料的预涨费计入管理费",{"key":27,"text":91,"correct":29},"开办费一般包括了工地清理费及完工后清理费",{"key":31,"text":93,"correct":22},"现场管理费属于开办费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},899124,"（2018年考题）按照国外建筑安装工程费用构成惯例，关于其直接工程费中的人工费，下列说法正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工人按技术等级划分为技工、普工和壮工",{"key":24,"text":101,"correct":22},"平均工资应按各类工人工资的算术平均值计算",{"key":27,"text":103,"correct":29},"包括工资、加班费、津贴、招雇解雇费",{"key":31,"text":105,"correct":22},"包括工资、加班费和代理人费用",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},899125,"（2016年考题）某县城建筑工程承建市区某建筑工程，2015年8月编制结算的税前造价为6000万元。已知营业税税率为3%，市、县城市维护建设税税率分别为7%、5%，教育费附加率、地方教育附加率分别为3%、2%。该工程的结算造价应为（ ）万元。",[110,112,114,116],{"key":20,"text":111,"correct":22},"6198.0",{"key":24,"text":113,"correct":22},"6201.6",{"key":27,"text":115,"correct":22},"6204.8",{"key":31,"text":117,"correct":29},"6208.6",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},899126,"（2017年考题）其建筑工程的造价组成见下表，该工程的含税造价为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"6826.5",{"key":24,"text":125,"correct":22},"6876.0",{"key":27,"text":127,"correct":22},"7276.5",{"key":31,"text":129,"correct":22},"7326.0",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},899127,"（2019年考题）根据国外建筑安装工程费用的构成，施工工人的招雇解雇用一般计入（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":29},"直接工程费",{"key":24,"text":137,"correct":22},"现场管理费",{"key":27,"text":139,"correct":22},"公司办理费",{"key":31,"text":141,"correct":22},"开办费",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},899128,"（2019年考题）根据我国现行建筑安装工程费用构成，下列费用中属于安全文明施工费的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"脚手架费",{"key":24,"text":149,"correct":29},"临时设施费",{"key":27,"text":151,"correct":22},"二次搬运费",{"key":31,"text":153,"correct":22},"非夜间施工照明",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},899129,"（2015年考题）根据我国现行建筑安装工程费项目组成的规定，下列费用应列入暂列金额的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":29},"施工过程中可能发生的工程变更及索赔、现场签证等费用",{"key":24,"text":161,"correct":22},"应建设单位要求，完成建设项目之外的零星项目费用",{"key":27,"text":163,"correct":22},"对建设单位自行采购的材料进行保管所发生的费用",{"key":31,"text":165,"correct":22},"施工用电、用水的开办费",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},899130,"（2015年考题）根据我国现行建筑安装工程费用项目组成的规定，下列关于措施项目费用的说法中正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"冬雨季施工费是冬、雨季施工增加的临时设施，防滑处理，雨雪排除等费用",{"key":24,"text":173,"correct":22},"施工排水、降水费由排水和降水两个独立的费用项目组成",{"key":27,"text":175,"correct":22},"当单层建筑物檐口高度超过15m时，可计算超高施工增加费",{"key":31,"text":177,"correct":22},"已完工程及设备保护费是指分部工程或结构部位验收前，对已完工程及设备采取必要保护措施所发生的费用",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},899131,"（2017年考题）关于建筑安装工程费用中建筑业增值税的计算，下列说法中正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"当事人可以自主选择一般计税法或简易计税法计税",{"key":24,"text":185,"correct":22},"一般计税法，简易计税法中的建筑业增值税税率均为11%",{"key":27,"text":187,"correct":22},"采用简易计税法时，税前造价不包含增值税的进项税额",{"key":31,"text":189,"correct":29},"采用一般计税法时，税前造价不包含增值税的进项税额",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},899132,"（2018年考题）根据现行的建筑安装工程费用项目组成规定，下列关于施工企业管理费中工具用具使用费的说法正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"指企业管理使用，而非施工生产使用的工具用具使用费",{"key":24,"text":197,"correct":22},"指企业施工生产使用，而非企业管理使用的工具用具使用费",{"key":27,"text":199,"correct":29},"采用一般计税方法时，工具用具使用费中的增值税进项税额可以抵扣",{"key":31,"text":201,"correct":22},"包括各类资产标准的工具用具的购置、维修和摊销费用",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},899133,"（2018年考题）根据现行建筑安装工程费用项目组成规定，下列费用项目属于按造价形成划分的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"人工费",{"key":24,"text":209,"correct":22},"企业管理费",{"key":27,"text":211,"correct":22},"利润",{"key":31,"text":213,"correct":29},"税金",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},899134,"（2020年真题）编制工程量清单时，下列费用属于总承包服务费考虑范围的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"总包人对专业工程的投标费",{"key":24,"text":221,"correct":22},"承包人自行采购工程设备的保护费",{"key":27,"text":223,"correct":29},"总包人施工现场的管理费",{"key":31,"text":225,"correct":22},"竣工决算文件的编制费",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},899135,"（2020年真题）下列计入总价措施项目表的是（）",[230,232,234,236],{"key":20,"text":231,"correct":22},"垂直运输费",{"key":24,"text":233,"correct":22},"施工降排水",{"key":27,"text":235,"correct":29},"地上地下成品保护",{"key":31,"text":237,"correct":22},"大型机械进出场",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},899136,"（2020年真题）根据国外建筑安装工程费的构成规定，工程施工中的周转材料费应包含在（）中。",[242,244,246,247],{"key":20,"text":243,"correct":22},"材料费",{"key":24,"text":245,"correct":22},"暂定金额",{"key":27,"text":141,"correct":29},{"key":31,"text":248,"correct":22},"其他摊销费",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":27,"analysis":33},899137,"（2020年真题）下列费用中，属于安全文明施工费中临时设施费的是（）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"现场配备的医疗保健器材费",{"key":24,"text":256,"correct":22},"塔吊及外用电梯安全防护措施费",{"key":27,"text":258,"correct":29},"临时文化福利用房费",{"key":31,"text":260,"correct":22},"新建项目的场地准备费",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},899138,"（2015年考题）依法必须采用工程量清单招标的建设项目，投标人需要采用而招标人不需采用的计价依据是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"国家、地区或行业定额资料",{"key":24,"text":268,"correct":22},"工程造价信息、资料和指数",{"key":27,"text":270,"correct":22},"计价活动相关规章规程",{"key":31,"text":272,"correct":29},"企业定额",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},899139,"（2017年考题）下列计价性定额中，项目划分最细的计价定额是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"材料消耗定额",{"key":24,"text":280,"correct":22},"劳动定额",{"key":27,"text":282,"correct":29},"预算定额",{"key":31,"text":284,"correct":22},"概算定额",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},899140,"（2016年考题）关于工程定额，下列说法正确的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"劳动定额主要表现形式为时间定额，机械消耗定额主要表现形式为产量定额",{"key":24,"text":292,"correct":22},"企业定额是企业内部使用的预算定额",{"key":27,"text":294,"correct":29},"补充定额只能在指定范围内使用",{"key":31,"text":296,"correct":22},"地区统一定额应根据地区工程技术特点、施工生产和管理水平独立编制",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},899141,"（2018年考题）关于工程造价的分部组合计价原理，下列说法正确的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"分部分项工程费=基本构造单元工程量×工料单价",{"key":24,"text":304,"correct":22},"工料单价指人工、材料和施工机械台班单价",{"key":27,"text":306,"correct":22},"基本构造单元是由分部工程适当组合形成",{"key":31,"text":308,"correct":29},"工程总价是按规定程序和方法逐级汇总形成的工程造价",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},899142,"（2018年考题）关于工程量清单计价适用范围，下列说法正确的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"达到或超过规定建设规模的工程，必须采用工程量清单计价",{"key":24,"text":316,"correct":22},"达到或超过规定投资数额的工程，必须采用工程量清单计价",{"key":27,"text":318,"correct":22},"国有资金占投资总额不足50%的建设工程发承包，不必采用工程量清单计价",{"key":31,"text":320,"correct":29},"不采用工程量清单计价的建设工程，应执行计价规范中除工程量清单等专门性规定以外的规定",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},899143,"（2018年考题）招标工程量清单的项目特征中通常不需描述的内容是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"材料材质",{"key":24,"text":328,"correct":22},"结构部位",{"key":27,"text":330,"correct":29},"工程内容",{"key":31,"text":332,"correct":22},"规格尺寸",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},899144,"（2019年考题）根据现行工程量计算规范，适宜采用分部分项工程项目清单计价方式计价的措施项目费是（ ）。",[337,338,340,342],{"key":20,"text":151,"correct":22},{"key":24,"text":339,"correct":29},"超高施工增加费",{"key":27,"text":341,"correct":22},"已完工程及设备保护费",{"key":31,"text":343,"correct":22},"地上、地下设施临时保护费",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},899145,"（2019年考题）关于工程量清单计价，下列表达式正确的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"分部分项工程费=Σ（分部分项工程量×相应分部分项的工料单价）",{"key":24,"text":351,"correct":22},"措施项目费=Σ（措施项目工程量×相应的工料单价）",{"key":27,"text":353,"correct":22},"其他项目费=暂列金额+材料设备暂估价+计日工+总承包服务费",{"key":31,"text":355,"correct":29},"单位工程造价=分部分项工程费+措施项目费+其他项目费+规费+税金",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},899146,"（2019年考题）关于施工定额的应用，下列说法正确的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"施工定额是编制施工图预算的依据",{"key":24,"text":363,"correct":22},"行业统一定额只能在本行业范围内使用",{"key":27,"text":365,"correct":22},"企业定额反映了施工企业的生产消耗标准，宜用于工程计价",{"key":31,"text":367,"correct":29},"工期定额是工程定额的一种类型，但不属于工程计价定额",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},899147,"（2019年考题）在工程量清单计价中，下列费用项目应计入总承包服务费的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"总承包人的工程分包费",{"key":24,"text":375,"correct":22},"总承包人的管理费",{"key":27,"text":377,"correct":29},"总承包人对发包人自行采购材料的保管费",{"key":31,"text":379,"correct":22},"总承包工程的竣工验收费",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},899148,"（2019年考题）在工程量清单计价中下列关于暂估价的说法正确的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"材料设备暂估价是指用于尚未确定或不可预见的材料、设备采购的费用",{"key":24,"text":387,"correct":22},"纳入分部分项工程项目清单综合单价中的材料暂估价包括暂估单价及数量",{"key":27,"text":389,"correct":29},"专业工程暂估价与分部分项工程综合单价在费用构成方面应保持一致",{"key":31,"text":391,"correct":22},"专业工程暂估价由投标人自主报价",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},899149,"（2015年考题）根据我国建设市场发展现状，工程量清单计价和计量规范主要适用于（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"项目建设前期各阶段工程造价的估量",{"key":24,"text":399,"correct":22},"项目初步设计阶段概算的预测",{"key":27,"text":401,"correct":22},"项目施工图设计阶段预算的预测",{"key":31,"text":403,"correct":29},"项目合同价格的形成和后续合同价格的管理",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},899150,"（2015年考题）工程计量工作包括工程项目的划分和工程量的计算，下列关于工程计量工作的说法中正确的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"项目划分须按预算定额规定的定额子项进行",{"key":24,"text":411,"correct":29},"通过项目划分确定单位工程基本构造单元",{"key":27,"text":413,"correct":22},"工程量的计算须按工程量清单计算规范的规则进行计算",{"key":31,"text":415,"correct":22},"工程量的计算应依据施工图设计文件，不应依据施工组织设计文件",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":27,"analysis":33},899151,"（2016年考题）下列说法中，符合工程计价基本原理的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"工程计价的基本原理在于项目划分与工程量计算",{"key":24,"text":423,"correct":22},"工程计价分为项目的分解与组合两个阶段",{"key":27,"text":425,"correct":29},"工程计价包括工程单价的确定和总价的计算",{"key":31,"text":427,"correct":22},"工程单价包括生产要素单价、工料单价和综合单价",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},899152,"（2017年考题）关于建设工程的分部组合计价，下列说法中正确的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"适用于没有具体图样和工程量清单的建设项目计价",{"key":24,"text":435,"correct":29},"要求将建设项目细分到最基本的构造单元",{"key":27,"text":437,"correct":22},"是利用产出函数进行计价",{"key":31,"text":439,"correct":22},"具有自上而下、由粗到细的计价组合特点",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},899153,"（2018年考题）反应完成一定计量单位合格扩大结构构件需要消耗的人工、材料和施工机具台班的数量的定额是（ ）。",[444,446,447,448],{"key":20,"text":445,"correct":22},"概算指标",{"key":24,"text":284,"correct":29},{"key":27,"text":282,"correct":22},{"key":31,"text":449,"correct":22},"施工定额",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},899154,"（2018年考题）根据《建设工程工程量计价规范》（GB 50500-2013，关于工程量清单编制和计价，下列说法正确的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":29},"暂列金额由招标人在工程量清单中暂定",{"key":24,"text":457,"correct":22},"暂列金额包括暂不能确定价格的材料暂定价",{"key":27,"text":459,"correct":22},"专业工程量暂估价中包括规费和税金",{"key":31,"text":461,"correct":22},"计日工单价中不包括企业管理费和利润",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},899155,"（2020年真题）下列工程量清单计价的基本原理描述正确的是（）",[466,468,470,472],{"key":20,"text":467,"correct":22},"∑分部分项工程量×工料单价",{"key":24,"text":469,"correct":22},"∑措施项目工程量×措施项目工料单价）",{"key":27,"text":471,"correct":29},"其他项目=暂列金额+暂估价+计日工+总承包服务费",{"key":31,"text":473,"correct":22},"单项工程费=分部分项项目费+措施项目费+其他项目+税金",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},899156,"（2020年真题）下列定额反应平均先进水平的是（）",[478,479,480,481],{"key":20,"text":449,"correct":29},{"key":24,"text":282,"correct":22},{"key":27,"text":284,"correct":22},{"key":31,"text":445,"correct":22},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},899157,"（2015年考题）招标工程量清单是招标文件的组成部分，其准确性由（ ）负责。",[486,488,490,492],{"key":20,"text":487,"correct":22},"招标代理机构",{"key":24,"text":489,"correct":29},"招标人",{"key":27,"text":491,"correct":22},"编制工程量清单的造价咨询机构",{"key":31,"text":493,"correct":22},"招标工程量清单的编制人",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},899158,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），下列费用项目中需纳入分部分项工程项目综合单价中的是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":29},"工程设备暂估价",{"key":24,"text":501,"correct":22},"专业工程暂估价",{"key":27,"text":503,"correct":22},"暂列金额",{"key":31,"text":505,"correct":22},"计日工费",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},899159,"（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），一般不作为安全文明施工费计算基础的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"定额人工费",{"key":24,"text":513,"correct":29},"定额人工费+定额材料费",{"key":27,"text":515,"correct":22},"定额人工费+定额施工机具使用费",{"key":31,"text":517,"correct":22},"定额人工费+定额施工机具使用费+定额材料费",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":27,"analysis":33},899160,"（2016年考题）对于不能计量工程量的措施项目，当按施工方案计算措施费时，若无“计算基础”和“费率”数值，则（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"以定额基价为计算基础，以国家、行业、地区定额中相应的费率计算金额",{"key":24,"text":525,"correct":22},"以“定额人工费+定额机械费”为计算基础，以国家、行业、地区定额中相应费率计算金额",{"key":27,"text":527,"correct":29},"只填写“金额”数值，在备注中说明施工方案出处或计算方法",{"key":31,"text":529,"correct":22},"以备注中说明的计算方法，补充填写“计算基础”和“费率”",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},899161,"（2016年考题）采用工程量清单计价的总承包服务费计价表中，应由投标人填写的内容是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"项目价值",{"key":24,"text":537,"correct":22},"服务内容",{"key":27,"text":539,"correct":22},"计算基础",{"key":31,"text":541,"correct":29},"费率和金额",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":27,"analysis":33},899163,"（2015年考题）关于工程量清单的编制，下列说法中正确的是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"项目编码以五级全国统一编码设置，用十二位阿拉伯数字表示",{"key":24,"text":549,"correct":22},"编制分部分项工程量清单时，必须对工作内容进行描述",{"key":27,"text":551,"correct":29},"补充项目的编码由计量规范的代码与B和三位阿拉伯数字组成",{"key":31,"text":553,"correct":22},"按施工方案计算的措施费，必须写明“计算基础”、“费率”的数值",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},899164,"（2015年考题）关于工程量清单中的计日工，下列说法中正确的是（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"即指零星工作所消耗的人工工时",{"key":24,"text":561,"correct":22},"在投标时计入总价，其数量和单价由投标人填报",{"key":27,"text":563,"correct":22},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":565,"correct":29},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},899165,"（2015年考题）关于总承包服务费的支付，下列说法中正确的是（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":29},"建设单位向总承包单位支付",{"key":24,"text":573,"correct":22},"分包单位向总承包单位支付",{"key":27,"text":575,"correct":22},"专业承包单位向总承包单位支付",{"key":31,"text":577,"correct":22},"专业承包单位向建设单位支付",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},899166,"（2016年考题）根据《建设工程工程量清单计价规范》（GB50500—2013），下列关于工程量清单项目编码的说法中，正确的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":585,"correct":29},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":27,"text":587,"correct":22},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":589,"correct":22},"补充项目编码以“B”加上计量规范代码后跟三位数字表示",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},899167,"（2020年真题）关于分部分项工程项目清单中项目编码的编制，下列说法正确的是（）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"第二级编码为分部工程顺序码",{"key":24,"text":597,"correct":22},"第五级编码为分项工程项目名称顺序码",{"key":27,"text":599,"correct":22},"同一标段内多个单位工程中项目特征完全相同的分项工程，可采用相同编码",{"key":31,"text":601,"correct":29},"补充项目应采用6位编码工程",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":27,"analysis":33},899168,"（2015年考题）根据施工过程工时研究结果，与工人所担负的工作量大小无关的必须消耗时间是（ ）。",[606,608,610,612],{"key":20,"text":607,"correct":22},"基本工作时间",{"key":24,"text":609,"correct":22},"辅助工作时间",{"key":27,"text":611,"correct":29},"准备与结束工作时间",{"key":31,"text":613,"correct":22},"多余工作时间",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]