[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,25,50,2160,[13,34,46,58,68,80,92,104,116,128,140,152,164,176,188,200,212,224,236,248,256,268,280,288,300,312,324,335,347,359,371,383,395,407,419,431,442,454,466,478,490,502,514,526,536,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},899068,1,"单选题","某工业项目及其总装车间的各项费用如下表所示（单位：万元），则总装车间分摊的建设单位管理费为（ ）万元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","18.67",false,{"key":24,"text":25,"correct":22},"B","18.29",{"key":27,"text":28,"correct":22},"C","17.14",{"key":30,"text":31,"correct":32},"D","17.21",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},899069,"对共同费用进行分摊时，土地征用费按照（ ）比例分摊。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程费用",{"key":24,"text":41,"correct":32},"建筑工程造价",{"key":27,"text":43,"correct":22},"建筑安装工程费用",{"key":30,"text":45,"correct":22},"工程费用+基本预备费",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},899070,"本身具有使用价值，且其价值在于它的使用能产生超额获利能力，一般不作为无形资产入账，自创过程中发生的费用按当期费用处理，按此确定价值的资产是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"专利权",{"key":24,"text":53,"correct":32},"专有技术",{"key":27,"text":55,"correct":22},"商标权",{"key":30,"text":57,"correct":22},"存货",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},899071,"在各类无形资产中，自创或者外购方式取得均应计入无形资产价值的是（ ）。",[62,64,65,67],{"key":20,"text":63,"correct":22},"土地使用权",{"key":24,"text":55,"correct":22},{"key":27,"text":66,"correct":22},"非专利技术",{"key":30,"text":51,"correct":32},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},899072,"已知某建设项目设备、工器具购置费为5000万元，建筑安装工程费为3000万元，土地使用权出让金8000万元，征地补偿费2500万元，建设单位管理费为3%，则该建设项目建设单位管理费为（ ）万元。",[72,74,76,78],{"key":20,"text":73,"correct":32},"240",{"key":24,"text":75,"correct":22},"150",{"key":27,"text":77,"correct":22},"480",{"key":30,"text":79,"correct":22},"555",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":27,"analysis":33},899073,"下列有关新增固定资产价值的确定，描述错误的是（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"医务所、托儿所等单项工程建成并交付使用后，也要计算新增固定资产价值",{"key":24,"text":87,"correct":22},"凡购置达到固定资产标准不需要安装的设备、工器具，应在交付使用后计人新增固定资产价值",{"key":27,"text":89,"correct":32},"-次交付生产或使用、分期分批交付生产或使用的单项工程，均应最终一次性计算新增固定资产价值",{"key":30,"text":91,"correct":22},"一般情况下，建设单位管理费按建安工程、需安装设备价值总额等按比例分摊",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},899074,"下列不属于新增固定资产价值的内容的是（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":32},"工程中的标准的设备",{"key":24,"text":99,"correct":22},"已投入生产或交付使用的安装工程造价",{"key":27,"text":101,"correct":22},"已投入生产或交付使用的建筑工程造价",{"key":30,"text":103,"correct":22},"增加固定资产价值的其他费用",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},899075,"关于专有技术的计价，以下说法中错误的是()。",[108,110,112,114],{"key":20,"text":109,"correct":32},"如果专有技术是自创的，一般应作为无形资产入账",{"key":24,"text":111,"correct":22},"专有技术的价值在于其使用所能产生的超额获利能力",{"key":27,"text":113,"correct":22},"外购专有技术应由法定评估机构确认后再进行估价",{"key":30,"text":115,"correct":22},"专有技术的估价方法往往通过能产生的收益采用收益法进行估价",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},899076,"某工业建设项目及其总装车间的建筑工程费、安装工程费、需安装设备费以及应摊入费用如下表所示，则总装车间新增固定资产价值为（ ）万元。",[120,122,124,126],{"key":20,"text":121,"correct":22},"62.85",{"key":24,"text":123,"correct":22},"1900",{"key":27,"text":125,"correct":32},"1962.85",{"key":30,"text":127,"correct":22},"2150",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":30,"analysis":33},899077,"（2017年考题）根据现行建设项目工程造价构成的相关规定，工程造价是指（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"为完成工程项目建造，生产性设备及配合工程安装设备的费用",{"key":24,"text":135,"correct":22},"建设期内直接用于工程建造、设备购置及其安装的建设投资",{"key":27,"text":137,"correct":22},"为完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":30,"text":139,"correct":32},"在建设期内预计或实际支出的建设费用",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":27,"analysis":33},899078,"（2016年考题）关于我国建设项目投资，以下说法正确的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"非生产性建设项目总投资由固定资产投资和铺底流动资金组成",{"key":24,"text":147,"correct":22},"生产性建设项目总投资由工程费用、工程建设其他费用和预备费三部分组成",{"key":27,"text":149,"correct":32},"建设投资是为了完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":30,"text":151,"correct":22},"建设投资由固定资产投资和建设期利息组成",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},899079,"（2019年考题）根据我国现行建设工程总投资及工程造价的构成，下列资金在数额上和工程造价相等的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"固定资产投资+流动资金",{"key":24,"text":159,"correct":22},"固定资产投资+铺底流动资金",{"key":27,"text":161,"correct":32},"固定资产投资",{"key":30,"text":163,"correct":22},"建设投资",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},899080,"（2015年考题）根据世界银行对建设工程造价构成的规定，只能作为一种储备可能不动用的费用是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"未明确项目准备金",{"key":24,"text":171,"correct":22},"基本预备费",{"key":27,"text":173,"correct":32},"不可预见准备金",{"key":30,"text":175,"correct":22},"建设成本上升费用",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},899081,"（2018年考题）根据现行建设项目投资相关规定，固定资产投资应与（ ）相对应。",[180,182,184,186],{"key":20,"text":181,"correct":22},"工程费用+工程建设其他费用",{"key":24,"text":183,"correct":32},"建设投资+建设期利息",{"key":27,"text":185,"correct":22},"建设安装工程费+设备及工器具购置费",{"key":30,"text":187,"correct":22},"建设项目总投资",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":30,"analysis":33},899082,"（2020年真题）固定资产投资包括（）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"建筑费+安装费+预备费",{"key":24,"text":195,"correct":22},"建筑费+安装费+建设其他费",{"key":27,"text":197,"correct":22},"建安费+建设其他费+预备费",{"key":30,"text":199,"correct":32},"工程费用+建设其他费+预备费+建设期利息",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},899083,"（2018年考题）国际贸易双方约定费用划分与风险转移均以货物在装运港被装上指定船只时为分界点，该种交易价格被称为（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":32},"离岸价",{"key":24,"text":207,"correct":22},"运费在内价",{"key":27,"text":209,"correct":22},"到岸价",{"key":30,"text":211,"correct":22},"抵岸价",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":30,"analysis":33},899084,"（2018年考题）国内生产某台非标准设备需材料费18万元，加工费2万元，专用工具费率5%，设备损失费率10%，包装费0.4万元，利润率为10%，用成本计算估价法计得该设备的利润是（ ）万元。",[216,218,220,222],{"key":20,"text":217,"correct":22},"2.00",{"key":24,"text":219,"correct":22},"2.10",{"key":27,"text":221,"correct":22},"2.31",{"key":30,"text":223,"correct":32},"2.35",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},899085,"（2015年考题）采用成本计算估价法计算非标准设备原价时，下列表述中正确的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"专用工具费=（材料费+加工费）×专用工具费率",{"key":24,"text":231,"correct":22},"加工费=设备总重量×（1+加工耗损系数）×设备每吨加工费",{"key":27,"text":233,"correct":22},"包装费的计算基数中不应包含废品损失费",{"key":30,"text":235,"correct":32},"利润的计算基数中不应包含外购配套件费",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":27,"analysis":33},899086,"（2016年考题）已知生产某非标准设备所需材料费、加工费、辅助材料费、专用工器具费合计为30万元，废品损失率为10%，外购配套件费为5万元，包装费率为2%，利润率为10%。用成本估算发计算该设备的利润值为（ ）万元。",[240,242,244,246],{"key":20,"text":241,"correct":22},"3.366",{"key":24,"text":243,"correct":22},"3.370",{"key":27,"text":245,"correct":32},"3.376",{"key":30,"text":247,"correct":22},"3.876",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},899087,"（2016年考题）进口设备的原价是指进口设备的（ ）。",[252,253,254,255],{"key":20,"text":209,"correct":22},{"key":24,"text":211,"correct":32},{"key":27,"text":205,"correct":22},{"key":30,"text":207,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},899088,"（2017年考题）关于进口设备到岸价的构成及计算，下列公式中正确的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"到岸价=离岸价+运输保险费",{"key":24,"text":263,"correct":22},"到岸价=离岸价+进口从属费",{"key":27,"text":265,"correct":32},"到岸价=运费在内价+运输保险费",{"key":30,"text":267,"correct":22},"到岸价=运输在内费+进口从属费",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},899089,"（2017年考题）某进口设备到岸价为1500万元，银行财务费，外贸手续费合计36万元。关税300万元，消费税和增值税税率分别为10%、17%，则该进口设备原价为（ ）万元。",[272,274,276,278],{"key":20,"text":273,"correct":22},"2386.8",{"key":24,"text":275,"correct":32},"2376.0",{"key":27,"text":277,"correct":22},"2362.0",{"key":30,"text":279,"correct":22},"2352.6",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},899090,"（2015年考题）关于进口设备外贸手续费的计算，下列公式中正确的是（ ）。 A.外贸手续费=FOB×人民币外汇汇率×外贸手续费率 B.外贸手续费=CIF×人民币外汇汇率×外贸手续费率",[284,285,286,287],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":27,"analysis":33},899091,"（2019年考题）关于设备原价的说法，正确的是（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"进口设备的原价是指其到岸价",{"key":24,"text":295,"correct":22},"国产设备原价应通过查询相关交易价格或向生产厂家询价获得",{"key":27,"text":297,"correct":32},"设备原价通常包含备品备件费在内",{"key":30,"text":299,"correct":22},"设备原价占设备购置费比重增大，意味资本有机构成的提高",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":30,"analysis":33},899092,"（2015年考题）某批进口设备离岸价格为1000万元人民币，国际运费为100万元人民币，运输保险费费率为1%。则该批设备关税完税价格应为（ ）万元人民币。",[304,306,308,310],{"key":20,"text":305,"correct":22},"1100.00",{"key":24,"text":307,"correct":22},"1110.00",{"key":27,"text":309,"correct":22},"1111.00",{"key":30,"text":311,"correct":32},"1111.11",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":30,"analysis":33},899093,"（2020年真题）某应纳消费税的进口设备到岸价为1800万元，关税税率为20%，消费税税率为10%。增值税税率为16%，则该台设备进口环节增值税额为（）万元。",[316,318,320,322],{"key":20,"text":317,"correct":22},"316.80",{"key":24,"text":319,"correct":22},"345.60",{"key":27,"text":321,"correct":22},"380.16",{"key":30,"text":323,"correct":32},"384.00",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},899094,"（2020年真题）某国内设备制造厂生产某台非标准设备的生产制造成本及包装费用20万元，外购配套件费为3万元，利润率为10%，增值税率为13%，则生产该台设备的利润为（）万元。",[328,329,331,333],{"key":20,"text":217,"correct":32},{"key":24,"text":330,"correct":22},"2.26",{"key":27,"text":332,"correct":22},"2.30",{"key":30,"text":334,"correct":22},"2.60",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},899095,"（2015年考题）下列费用项目中，应在研究试验费中列支的是（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":32},"为验证设计数据而进行必要的研究试验所需的费用",{"key":24,"text":342,"correct":22},"新产品试验费",{"key":27,"text":344,"correct":22},"施工企业技术革新的研究试验费",{"key":30,"text":346,"correct":22},"设计模型制作费",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},899096,"（2016年考题）关于工程建设其他费用，下列说法中正确的是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"建设单位管理费一般按建筑安装工程费乘以相应费率计算",{"key":24,"text":354,"correct":22},"研究试验费包括新产品试制费",{"key":27,"text":356,"correct":32},"改扩建项目的场地准备及临时设施费一般只计拆除清理费",{"key":30,"text":358,"correct":22},"不拥有产权的专用通信设施投资，列入市政公用设施费",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},899097,"（2017年考题）下列费用项目中，属于联合试运转费中试运转支出的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":32},"施工单位参加试运转人员的工资",{"key":24,"text":366,"correct":22},"单台设备的单机试运转费",{"key":27,"text":368,"correct":22},"试运转中暴露出来的施工缺陷处理费用",{"key":30,"text":370,"correct":22},"试运转中暴露出来的设备缺陷处理费用",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},899098,"（2015年考题）关于联合试运转费，下列说法中正确的是（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":22},"包括对整个生产线或装置运行无负荷和有负荷试运转所发生的费用",{"key":24,"text":378,"correct":32},"包括施工单位参加试运转人员的工资及专家指导费",{"key":27,"text":380,"correct":22},"包括试运转中暴露的因设备缺陷发生的处理费用",{"key":30,"text":382,"correct":22},"包括对单台设备进行单机试运转工作的调试费",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},899099,"（2018年考题）建设单位通过市场机制取得建设用地，不仅应承担征地补偿费用、拆迁补偿费用，还须向土地所有者支付（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"安置补助费",{"key":24,"text":390,"correct":32},"土地出让金",{"key":27,"text":392,"correct":22},"青苗补偿费",{"key":30,"text":394,"correct":22},"土地管理费",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},899100,"（2018年考题）关于建设项目场地准备和建设单位临时设施费的计算，下列说法正确的是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"改扩建项目一般应计工程费用和拆除清理费",{"key":24,"text":402,"correct":32},"凡可回收材料的拆除工程应采用以料抵工方式冲抵拆除清理费",{"key":27,"text":404,"correct":22},"新建项目应根据实际工程量计算，不按工程费用的比例计算",{"key":30,"text":406,"correct":22},"新建项目应按工程费用比例计算，不根据实际工程量计算",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},899101,"（2019年考题）根据我国现行建设项目总投资及工程造价的构成，联合试运转费应包括（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":32},"施工单位参加联合试运转人员的工资",{"key":24,"text":414,"correct":22},"设备安装中的试车费用",{"key":27,"text":416,"correct":22},"试运转中暴露的设备缺陷的处理费",{"key":30,"text":418,"correct":22},"生产人员的提前进场费",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},899102,"（2019年考题）根据我国现行建设项目总投资及工程造价的构成，下列有关建设项目费用开支，应列入建设单位管理费的是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"监理费",{"key":24,"text":426,"correct":32},"竣工验收费",{"key":27,"text":428,"correct":22},"可行性研究费",{"key":30,"text":430,"correct":22},"节能评估费",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},899103,"（2016年考题）下列与建设用地有关的费用中，归农村集体经济组织所有的是（ ）。",[435,437,438,440],{"key":20,"text":436,"correct":32},"土地补偿费",{"key":24,"text":392,"correct":22},{"key":27,"text":439,"correct":22},"拆迁补偿费",{"key":30,"text":441,"correct":22},"新菜地开发建设基金",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},899104,"（2017年考题）采用工程总承包方式发包的工程，其工程总承包管理费应从（ ）中支出。",[446,448,450,452],{"key":20,"text":447,"correct":32},"建设管理费",{"key":24,"text":449,"correct":22},"建设单位管理费",{"key":27,"text":451,"correct":22},"建筑安装工程费",{"key":30,"text":453,"correct":22},"基本预备费（）",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},899105,"（2020年真题）下列费用中，计入技术服务费中勘察设计费的是（）,",[458,460,462,464],{"key":20,"text":459,"correct":22},"设计评审费",{"key":24,"text":461,"correct":22},"技术经济标准使用费",{"key":27,"text":463,"correct":22},"技术革新研究试验费",{"key":30,"text":465,"correct":32},"非标准设备设计文件编制费",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},899106,"（2020年真题）关于工程建设其他费中的市政公用配套设施费及其构成，下列说法正确的是（）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"包含在用地与工程准备费中",{"key":24,"text":473,"correct":22},"包括界区内水、电、路、电信等设施建设费",{"key":27,"text":475,"correct":32},"包括界区外绿化、人防等配套设施建设费",{"key":30,"text":477,"correct":22},"包括项目配套建设的产权不归本单位的专用铁路、公路建设费",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},899107,"（2017年考题）某建设项目静态投资20000万元，项目建设前期年限为1年，建设期为2年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期价差预备费为（ ）万元。",[482,484,486,488],{"key":20,"text":483,"correct":22},"1006.25",{"key":24,"text":485,"correct":22},"1525.00",{"key":27,"text":487,"correct":32},"2056.56",{"key":30,"text":489,"correct":22},"2601.25",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},899108,"（2017年考题）某项目建设期为2年，第一年贷款4000万元，第二年贷款2000万元，贷款年利率10%，贷款在年内均衡发放，建设期内只计息不付息。该项目第二年的建设期利息为（ ）万元。",[494,496,498,500],{"key":20,"text":495,"correct":22},"200",{"key":24,"text":497,"correct":22},"500",{"key":27,"text":499,"correct":32},"520",{"key":30,"text":501,"correct":22},"600",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},899109,"（2016年考题）某项目建设期为2年，第一年贷款3000万元，第二年贷款2000万元，贷款年内均衡发放，年利率为8%，建设期内只计息不付息。该项目建设期利息为（ ）万元。",[506,508,510,512],{"key":20,"text":507,"correct":22},"366.4",{"key":24,"text":509,"correct":32},"449.6",{"key":27,"text":511,"correct":22},"572.8",{"key":30,"text":513,"correct":22},"659.2",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},899110,"（2018年考题）关于建设期利息计算公式qj=（Pj-1+1\u002F2Aj）×i的应用，下列说法正确的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":32},"按总贷款在建设期内均衡发放考虑",{"key":24,"text":521,"correct":22},"Pj-1为第（j-1）年年初累计贷款本金和利息之和",{"key":27,"text":523,"correct":22},"按贷款在年中发放和支用考虑",{"key":30,"text":525,"correct":22},"按建设期内支付贷款利息考虑",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},899111,"（2019年考题）根据我国现行建设项目总投资及工程造价构成，在工程概算阶段考虑的对一般自然灾害处理的费用应包含在（ ）内。",[530,531,533,535],{"key":20,"text":169,"correct":22},{"key":24,"text":532,"correct":32},"工程建设不可预见费",{"key":27,"text":534,"correct":22},"暂列金额",{"key":30,"text":173,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},899112,"（2019年考题）某新建项目建设期为两年，分年均衡进行贷款，第一年贷款200万元，第二年贷款300万元，在建设期内贷款利息只计息不支付，年利率为10%的情况下，该项目应计建设期贷款利息为（ ）万元？",[540,542,544,546],{"key":20,"text":541,"correct":22},"36.00",{"key":24,"text":543,"correct":32},"46.00",{"key":27,"text":545,"correct":22},"52.00",{"key":30,"text":547,"correct":22},"70.00",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":33},899113,"（2015年考题）某建设项目建设期为二年，建设期内第一年贷款400万元，第二年贷款500万元，贷款在年内均衡发放，年利率为10%。建设期内只计息不支付，则该项目建设期贷款利息为（ ）万元。",[552,554,556,558],{"key":20,"text":553,"correct":22},"85.0",{"key":24,"text":555,"correct":22},"85.9",{"key":27,"text":557,"correct":32},"87.0",{"key":30,"text":559,"correct":22},"109.0",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},899114,"（2015年考题）某建设项目建筑安装工程费为6000 万元，设备购置费为1000 万元，工程建设其他费用为2000 万元，建设期利息为500 万元。若基本预备费费率为5%，则该建设项目的基本预备费为( )万元。",[564,566,568,570],{"key":20,"text":565,"correct":22},"350",{"key":24,"text":567,"correct":22},"400",{"key":27,"text":569,"correct":32},"450",{"key":30,"text":571,"correct":22},"475",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":27,"analysis":33},899115,"（2016年考题）某建设项目静态投资为10000万元，项目建设前期年限为1年，建设期为2年，第一年完成投资40%，第二年完成投资60%。在年平均价格上涨率为6%的情况下，该项目价差预备费应为（ ）万元。",[576,578,580,582],{"key":20,"text":577,"correct":22},"666.3",{"key":24,"text":579,"correct":22},"981.6",{"key":27,"text":581,"correct":32},"1306.2",{"key":30,"text":583,"correct":22},"1640.5",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":27,"analysis":33},899116,"（2018年考题）某建设项目工程费用5000万元，工程建设其他费用1000万元。基本预备费率为8%，年均投资价格上涨率5%，建设期两年，计划每年完成投资50%，则该项目建设期第二年价差预备费应为（ ）万元。",[588,590,592,594],{"key":20,"text":589,"correct":22},"160.02",{"key":24,"text":591,"correct":22},"227.79",{"key":27,"text":593,"correct":32},"246.01",{"key":30,"text":595,"correct":22},"326.02",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},899117,"（2020年真题）下列费用中，属于基本预备费支出范围的是（）。",[600,602,604,606],{"key":20,"text":601,"correct":32},"超规超限设备运输增加费",{"key":24,"text":603,"correct":22},"人工、材料、施工机具的价差费",{"key":27,"text":605,"correct":22},"建设期内利率调整增加费",{"key":30,"text":607,"correct":22},"未明确项目的准备金",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]