[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,24,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,499,511,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},899017,1,"单选题","由于发包人原因导致工程无法按规定期限进行竣（交）工验收的，关于其缺陷责任期的起点，说法正确的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","自工程实际竣（交）工之日算起",false,{"key":24,"text":25,"correct":22},"B","自承包人提交竣（交）工验收报告之日算起",{"key":27,"text":28,"correct":22},"C","自承包人提交竣（交）工验收申请之日算起",{"key":30,"text":31,"correct":32},"D","自承包人提交竣（交）工验收报告90天后，自动进入缺陷责任期",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},899018,"调解是解决工程合同价款纠纷的一种途径，下列关于调解的说法中正确是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"承包人对调解书有异议时，可以停止施工",{"key":24,"text":41,"correct":22},"发承包双方签字认可的调解书不能作为合同的补充文件",{"key":27,"text":43,"correct":32},"发承包双方可在合同履行期间协议调换或终止合同约定的调解人",{"key":30,"text":45,"correct":22},"调解人的任期在竣工结算经发承包双方确认时终止",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},899019,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于工程计量，下列说法中正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"合同文件中规定的各种费用支付项目应予计量",{"key":24,"text":53,"correct":22},"因异常恶劣天气造成的返工工程量不予计量",{"key":27,"text":55,"correct":22},"成本加酬金合同应按照总价合同的计量规定进行计量",{"key":30,"text":57,"correct":22},"总价合同应按实际完成的工程量计算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},899020,"按照规定，发包人委托工程造价咨询机构核对竣工结算的，工程造价咨询机构应核对完毕后，结论与承包人不一致时，下列说法中正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"以工程造价咨询机构的结论为准",{"key":24,"text":65,"correct":22},"以承包人竣工结算文件为准",{"key":27,"text":67,"correct":32},"提交承包人复核",{"key":30,"text":69,"correct":22},"按照合同约定的争议解决方式处理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},899021,"工程竣工后，由于洪水等不可抗力造成的损坏，承担保修费用的单位是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工单位",{"key":24,"text":77,"correct":32},"建设单位",{"key":27,"text":79,"correct":22},"设计单位",{"key":30,"text":81,"correct":22},"监理单位",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},899022,"工程竣工结算的计价原则中，下列有关其他项目计价规定描述错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"计日工应按发包人合同确认的事项计算",{"key":24,"text":89,"correct":22},"暂估价应按发承包双方按照《建设工程工程量清单计价规范》的相关规定计算",{"key":27,"text":91,"correct":22},"施工索赔费用应依据发承包双方确认的索赔事项和金额计算",{"key":30,"text":93,"correct":22},"现场签证费用应依据发承包双方签证资料确认的金额计算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},899023,"关于保修义务的责任落实与损失赔偿责任的承担的叙述中，错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工单位未按照国家有关标准规范和设计要求施工所造成的质量缺陷，由施工单位负责返修并承担经济责任",{"key":24,"text":101,"correct":32},"因地震、台风、洪水等自然灾害或其他不可抗力原因造成的损坏问题，由施工单位负责维修及承担经济责任",{"key":27,"text":103,"correct":22},"因建设单位（含监理单位）错误管理而造成的质量缺陷，先由施工单位负责维修，其经济责任由建设单位承担",{"key":30,"text":105,"correct":22},"由于设计问题造成的质量缺陷，先由施工单位负责维修，其经济责任按有关规定通过建设单位向设计单位索赔",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},899024,"关于工程质量保证金，下列说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"质量保证金总预留比例不得高于签约合同价的5%",{"key":24,"text":113,"correct":32},"已经缴纳履约保证金的，不得同时预留质量保证金",{"key":27,"text":115,"correct":22},"采用工程质量保证担保的，预留质保金不得高于合同价的2%",{"key":30,"text":117,"correct":22},"质量保证金的返还期限一般为2年",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},899025,"关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":125,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":27,"text":127,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":30,"text":129,"correct":32},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},899026,"关于垫资施工合同价款纠纷处理，下列说法正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"合同约定垫资利率高于中国人民银行发布的同期同类贷款利率的，按合同约定返还垫资利息",{"key":24,"text":137,"correct":32},"当事人对垫资没有约定的，按照工程欠款处理",{"key":27,"text":139,"correct":22},"当事人对垫资利息没有约定的，按中国人民银行发布的同期同类贷款利率计算利息",{"key":30,"text":141,"correct":22},"垫资达到合同总和一定比例以上时为无效合同",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},899027,"关于施工合同工程价款的期中支付，下列说法中正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"期中进度款的支付比例，一般不低于期中价款总额的60%",{"key":24,"text":149,"correct":22},"期中进度款的支付比例，一般不高于期中价款总额的80%",{"key":27,"text":151,"correct":22},"综合单价发生调整的项目，其增减费在竣工结算时一并结算",{"key":30,"text":153,"correct":22},"发承包双方如对部分计量结果存在争议，等待争议解决后再支付全部进度款",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},899028,"关于施工合同工程预付款，下列说法中正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"承包人预付款的担保金额通常高于发包人的预付款",{"key":24,"text":161,"correct":22},"采用起扣点计算法抵扣预付款对承包人比较不利",{"key":27,"text":163,"correct":22},"预付款的担保金额不会随着预付款的扣回而减少",{"key":30,"text":165,"correct":32},"预付款的额度通常与主要材料和构件费用占建安费的比例相关",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},899029,"关于建设工程竣工结算审核，下列说法中正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"非国有企业投资的建设工程，不应委托工程造价咨询机构审核",{"key":24,"text":173,"correct":32},"国有资金投资的建设工程，应当委托工程造价咨询机构审核",{"key":27,"text":175,"correct":22},"承包人不同意造价咨询机构的结算审核结论时，造价咨询机构不得出具审核报告",{"key":30,"text":177,"correct":22},"工程造价咨询机构的核对结论与承包人竣工结算文件不一致的，以造价机构核对结论为准",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},899030,"建设工程最终结清的工作事项和时间节点包括：①提交最终结清申请单；②签发最终结清支付证书；③签发缺陷责任期终止证书；④最终结清付款；⑤缺陷责任期终止。按时间先后顺序排列正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":32},"⑤③①②④",{"key":24,"text":185,"correct":22},"①②④⑤③",{"key":27,"text":187,"correct":22},"③①②④⑤",{"key":30,"text":189,"correct":22},"①③②⑤④",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},899031,"关于最终结清，下列说法中正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"最终结清是在工程保修期满后对剩余质量保证金的最终结清",{"key":24,"text":197,"correct":22},"最终结清支付证书一经签发，承包人对合同内享有的索赔权利即自行终止",{"key":27,"text":199,"correct":22},"质量保证金不足以抵减发包人工程缺陷修复费用的，应按合同约定的争议解决方法处理",{"key":30,"text":201,"correct":32},"最终结清付款涉及政府投资的，应按国库集中支付等国家相关规定和专用条款约定办理",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},899033,"关于工程造价鉴定的规定中，若委托鉴定的项目工程造价金额为4000万元，通常鉴定期限应不超过()天。",[206,208,210,212],{"key":20,"text":207,"correct":22},"60",{"key":24,"text":209,"correct":22},"90",{"key":27,"text":211,"correct":32},"80",{"key":30,"text":213,"correct":22},"150",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},899034,"关于施工合同履行期间的期中支付，下列说法中正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"双方对工程计量结果的争议，不影响发包人对已完工程的期中支付",{"key":24,"text":221,"correct":22},"对已签发支付证书中的计算错误，发包人不得再予修正",{"key":27,"text":223,"correct":32},"进度款支付申请中应包括累计已完成的合同价款",{"key":30,"text":225,"correct":22},"本周期实际支付的合同额为本期完成的合同价款合计",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},899035,"已知某工程各月完成的合同价款如下表所示，若工程预付款限额为100万元，主要材料在合同价款中所占比重为40％，承包工程价款总额为800万元，则工程预付款应在（ ）月份开始扣回。",[230,232,234,236],{"key":20,"text":231,"correct":32},"4",{"key":24,"text":233,"correct":22},"5",{"key":27,"text":235,"correct":22},"6",{"key":30,"text":237,"correct":22},"7",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},899036,"缺陷责任期的起算日期必须以（ ）为准。",[242,244,246,248],{"key":20,"text":243,"correct":22},"《建设工程质量管理条例》规定的保修日期",{"key":24,"text":245,"correct":32},"通过竣(交)工验收之日起",{"key":27,"text":247,"correct":22},"工程的实际竣工日期",{"key":30,"text":249,"correct":22},"承发包双方在工程质量保修书中约定的日期",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},899037,"下列关于竣工结算的说法，正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"发承包双方在合同工程实施过程中已经确认的工程计量结果和合同价款，在竣工结算办理中应再次审核后，进入结算",{"key":24,"text":257,"correct":22},"采用单价合同的，在合同约定风险范围内的综合单价应固定不变，并应按合同约定进行计量，且应按合同约定的工程量进行计量",{"key":27,"text":259,"correct":22},"在竣工结算的审核中，接受委托的工程造价咨询机构应做好准备阶段、审核阶段、审定阶段、验收阶段的工作",{"key":30,"text":261,"correct":32},"竣工阶段审核的成果文件应包括竣工结算审定签署表、竣工结算审核汇总对比表、竣工结算审核报告等",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},899038,"某工程合同总价为5000万元，合同工期180天，材料费占合同总价的60％，材料储备定额天数为25天，材料供应在途天数为5天。用公式计算法求得该工程的预付款应为（ ）万元。",[266,268,270,272],{"key":20,"text":267,"correct":32},"417",{"key":24,"text":269,"correct":22},"500",{"key":27,"text":271,"correct":22},"694",{"key":30,"text":273,"correct":22},"833",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},899039,"关于质量保证金的使用及返还，下列说法正确的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":32},"不实行国库集中支付的政府投资项目，保证金可以预留在财政部门",{"key":24,"text":281,"correct":22},"采用工程质量保险担保的，发包人仍可预留5％的保证金",{"key":27,"text":283,"correct":22},"非承包人责任的缺陷，承包人仍有缺陷修复的义务",{"key":30,"text":285,"correct":22},"缺陷责任期终止后的28天内，发包人应将剩余的质量保证金连同利息返还给承包人",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":30,"analysis":33},899040,"FIDIC施工合同条件规定，如果承包商不能按时收到业主的付款，承包商有权就未付款额收取延误支付期间的融资费。融资费计息方式是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"按星期计算单利",{"key":24,"text":293,"correct":22},"按星期计算复利",{"key":27,"text":295,"correct":22},"按月计算单利",{"key":30,"text":297,"correct":32},"按月计算复利",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},899041,"根据FIDIC施工合同条件，如果没有可供参考的相关费率或价格，则新的费率或价格应根据实施该项工作的合理费用，以及合同专用条款中规定的利润率计取，如果没有规定的利润率，则按（ ）计取",[302,304,306,308],{"key":20,"text":303,"correct":32},"5%",{"key":24,"text":305,"correct":22},"3%",{"key":27,"text":307,"correct":22},"10%",{"key":30,"text":309,"correct":22},"1%",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":30,"analysis":33},899042,"在FIDIC合同条件中，工程师确认用于永久工程的材料和设备符合预支条件，在确定其实际费用后，期中支付证书中应增加该费用的（ ）作为工程材料和设备预支款。",[314,316,318,320],{"key":20,"text":315,"correct":22},"50%",{"key":24,"text":317,"correct":22},"60%",{"key":27,"text":319,"correct":22},"70%",{"key":30,"text":321,"correct":32},"80%",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},899043,"根据《建标准设计施工总承包招标文件》2012年规定，变更程序不包括（ ）",[326,328,330,332],{"key":20,"text":327,"correct":22},"变更的提出",{"key":24,"text":329,"correct":22},"变更估价",{"key":27,"text":331,"correct":32},"反索赔",{"key":30,"text":333,"correct":22},"变更指示",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},899044,"根据FIDIC《施工合同条件》（1999版），关于合同价款调整的规定，下列说法正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"工程量的变更与对应费率的乘积超过了中标总金额的1%时才予调整",{"key":24,"text":341,"correct":32},"实际测量工程量比工程量表中工程量变动大于10%时，可调整相应单价",{"key":27,"text":343,"correct":22},"工程师要求改变施工顺序的，不应调整合同价款",{"key":30,"text":345,"correct":22},"承包人配合工程检验所发生的剥露和覆盖，不应调整合同价款",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},899045,"在FIDIC合同条件下，当变更的工程量与对该项工作规定的具体费率的乘积超过了接受合同额的一定比例时，其费率或单价可以调整，该比例为（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"10％",{"key":24,"text":353,"correct":22},"1％",{"key":27,"text":355,"correct":22},"0.1％",{"key":30,"text":357,"correct":32},"0.01％",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},899046,"根据FIDIC合同条件的规定，下列有关工程量变更引起的价格调整的情形，错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"该部分工程不是合同中规定的“固定费率项目”",{"key":24,"text":365,"correct":22},"该部分工程实际测量的工程量比工程量表规定的工程量的变动大于10%",{"key":27,"text":367,"correct":22},"该部分工程工程量的变更与相对应费率的乘积超过了中标金额的0.01%",{"key":30,"text":369,"correct":32},"由于工程量的变更直接造成该部分工程每单位工程量费用的变动超过0.1%",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},899047,"《标准设计施工总承包招标文件》中提供的 (A) (B)条款较多，其中暂估价的 (B)条款适用于（ ）的约定。",[374,376,378,380],{"key":20,"text":375,"correct":22},"合同价格中不包括暂估价",{"key":24,"text":377,"correct":32},"签约合同价中包括暂估价",{"key":27,"text":379,"correct":22},"签约合同价中不包括暂估价",{"key":30,"text":381,"correct":22},"合同价格中包括暂估价",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},899048,"根据《标准设计施工总承包招标文件》中的规定，当签约合同价中不包括暂估价时，发包人在价格清单中给定暂估价的材料、工程设备和专业工程属于依法必须招标的范围并达到规定的规模标准的，由发包人和承包人以招标的方式选择供应商或分包人，列入合同价格的应是()。",[386,388,390,392],{"key":20,"text":387,"correct":22},"经监理人确认的材料、工程设备的价格与工程量清单中所列的暂估价的金额差以及相应的税金等其他费用",{"key":24,"text":389,"correct":22},"经估价的专业工程与工程量清单中所列的暂估价的金额差以及相应的税金等其他费用",{"key":27,"text":391,"correct":32},"中标金额与工程量清单中所列的暂估价的金额差以及相应的税金等其他费用",{"key":30,"text":393,"correct":22},"中标金额",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},899049,"下列不属于建设项目竣工财务决算说明书内容的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"基本建设项目概况",{"key":24,"text":401,"correct":22},"基建结余资金等分配情况",{"key":27,"text":403,"correct":22},"主要技术经济指标的分析、计算情况",{"key":30,"text":405,"correct":32},"主要实物工程量分析",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},899050,"建设项目竣工财务决算应编制基本建设项目概况表，下列选项中不应计入基本建设项目概况表“非经营项目输出投资”的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":32},"水土保持、城市绿化费用",{"key":24,"text":413,"correct":22},"产权不归属本单位的专用道路建设费",{"key":27,"text":415,"correct":22},"产权不归属本单位的送变电站建设费",{"key":30,"text":417,"correct":22},"产权不归属本单位的地下管道建设费",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},899051,"（ ）是以实物数量和货币标准为计量单位，综合反映竣工项目从筹建开始到项目竣工交付使用为止的全部建设费用、建设成果和财务情况的总结性文件，是正确核定新增固定资产价值的依据。",[422,424,426,428],{"key":20,"text":423,"correct":22},"竣工图",{"key":24,"text":425,"correct":22},"竣工结算",{"key":27,"text":427,"correct":32},"竣工决算",{"key":30,"text":429,"correct":22},"竣工验收签证书",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},899052,"（ ）用来反映建设项目的全部资金来源和资金占用情况，是考核和分析投资效果的依据。",[434,436,438,440],{"key":20,"text":435,"correct":32},"基本建设项目竣工财务决算表",{"key":24,"text":437,"correct":22},"基本建设项目概况表",{"key":27,"text":439,"correct":22},"基本建设项目交付使用资产明细表",{"key":30,"text":441,"correct":22},"基本建设项目交付使用资产总表",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},899053,"建设项目竣工决算包括的范围是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":32},"从筹集到竣工投产全过程的全部实际支出费用",{"key":24,"text":449,"correct":22},"从施工到竣工投产全过程的全部实际支出费用",{"key":27,"text":451,"correct":22},"建安工程费用和设备工器具购置费用",{"key":30,"text":453,"correct":22},"建安工程费用和其他费用",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},899054,"竣工财务决算的基本建设项目概况表中，应列入非经营性项目转出投资支出的项目是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"产权属于本单位的城市绿化",{"key":24,"text":461,"correct":22},"不能形成资产的城市绿化",{"key":27,"text":463,"correct":22},"产权属于本单位的专用道路",{"key":30,"text":465,"correct":32},"产权不属于本单位的专用道路",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},899055,"编制建设项目竣工财务决算报表时，下列属于资金占用的项目是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"待冲基建支出",{"key":24,"text":473,"correct":22},"应付款",{"key":27,"text":475,"correct":32},"预付及应收款",{"key":30,"text":477,"correct":22},"未交款",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},899056,"完整的竣工决算所包含的内容是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":32},"竣工财务决算说明书、竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"key":24,"text":485,"correct":22},"竣工财务决算报表、竣工决算、工程竣工图、工程竣工造价对比分析",{"key":27,"text":487,"correct":22},"竣工财务决算说明书、竣工决算、竣工验收报告、工程竣工造价对比分析",{"key":30,"text":489,"correct":22},"竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},899057,"（ ）反映建设项目建成后新增固定资产、流动资产、无形资产和其他资产价值的情况和价值，作为财产交接、检查投资计划完成情况和分析投资效果的依据。",[494,495,496,497],{"key":20,"text":437,"correct":22},{"key":24,"text":435,"correct":22},{"key":27,"text":441,"correct":32},{"key":30,"text":498,"correct":22},"建设项目交付使用资产明细表",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},899058,"建设周期长、建设内容多的项目，单项工程竣工，具备交付使用条件的，可编制（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":32},"单项工程竣工财务决算",{"key":24,"text":506,"correct":22},"单项工程竣工财务决算书",{"key":27,"text":508,"correct":22},"单项工程竣工财务决算报表",{"key":30,"text":510,"correct":22},"单项工程竣工图",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},899059,"竣工决算文件中，真实记录各种地上、地下建筑物、构筑物、特别是基础、地下管线以及设备安装等隐蔽部分的技术文件是（ ）。",[515,517,518,520],{"key":20,"text":516,"correct":22},"总平面图",{"key":24,"text":423,"correct":32},{"key":27,"text":519,"correct":22},"施工图",{"key":30,"text":521,"correct":22},"交付使用资产明细表",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":30,"analysis":33},899060,"关于建设工程竣工图的绘制和形成，下列说法中正确的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"凡按图竣工没有变动的，由发包人在原施工图上加盖“竣工图”标志",{"key":24,"text":529,"correct":22},"凡在施工过程中发生设计变更的，一律重新绘制竣工图",{"key":27,"text":531,"correct":22},"平面布置发生重大改变的，一律南设计单位负责重新绘制竣工图",{"key":30,"text":533,"correct":32},"重新绘制的新图，应加盖“竣工图”标志",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},899061,"编制竣工图的形式和深度，应根据不同情况区别对待，其具体要求包括()。",[538,540,542,544],{"key":20,"text":539,"correct":32},"凡按图竣工没有变动的，由承包人(包括总包和分包承包人，下同)在原施工图上加盖“竣工图”标志后，即作为竣工图",{"key":24,"text":541,"correct":22},"凡在施工过程中，有一般性设计变更，能将原施工图加以修改补充作为竣工图的，也需重新绘制，加盖“竣工图”标志后，作为竣工图",{"key":27,"text":543,"correct":22},"凡结构形式改变、施工工艺改变、平面布置改变、项目改变以及有其他重大改变，宜在原施工图上修改、补充作为竣工图",{"key":30,"text":545,"correct":22},"为了满足竣工验收和竣工决算需要，还应绘制反映竣工工程全部内容的工程设计平面示意图和工艺流程图",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},899062,"根据《基本建设项目竣工财务决算管理暂行办法》(财建[2016]503)的规定，基本建设项目完工可投入使用或者试运行合格后，建设单位应在()内完成竣工财务决算编制工作。",[550,552,554,556],{"key":20,"text":551,"correct":22},"2个月",{"key":24,"text":553,"correct":32},"3个月",{"key":27,"text":555,"correct":22},"75天",{"key":30,"text":557,"correct":22},"100天",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},899063,"关于计算新增固定资产的表述，正确的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"为了保护环境而正在建设的附属工程随主体工程计入新增固定资产价值",{"key":24,"text":565,"correct":32},"不构成生产系统但能独立发挥效益的非生产性项目，在交付使用后计入新增固定资产价值",{"key":27,"text":567,"correct":22},"达到固定资产标准不需安装的设备，购买后计入新增固定资产价值",{"key":30,"text":569,"correct":22},"分批交付生产的工程，应待全部交付完毕后一次性计入新增固定资产价值",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},899064,"关于新增无形资产价值的确定与计价，下列说法中正确的是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"企业接受捐赠的无形资产，按开发中的实际支出计价",{"key":24,"text":577,"correct":22},"专利权转让价格按成本估计进行",{"key":27,"text":579,"correct":32},"自创专有技术在自创中发生的费用按当期费用处理",{"key":30,"text":581,"correct":22},"行政划拨的土地使用权作为无形资产核算",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},899065,"新增固定资产价值的计算是以独立发挥生产能力的（ ）为对象的。",[586,588,590,592],{"key":20,"text":587,"correct":22},"分部工程",{"key":24,"text":589,"correct":22},"单位工程",{"key":27,"text":591,"correct":32},"单项工程",{"key":30,"text":593,"correct":22},"建设项目",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":30,"analysis":33},899066,"下列关于无形资产的计价原则，描述错误的是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"投资者按无形资产作为资本金或者合作条件投入时，按评估确认或合同协议约定的金额计价",{"key":24,"text":601,"correct":22},"购入的无形资产，按照实际支付的价款计价",{"key":27,"text":603,"correct":22},"企业自创并依法申请取得的无形资产，按开发过程中实际支出计价",{"key":30,"text":605,"correct":32},"无形资产计价入账后，应在其有效使用期期末核算",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":27,"analysis":33},899067,"关于建设项目竣工运营后的新增资产，下列说法正确的是（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":22},"新增资产按资产性质分为固定资产、流动资产和无形资产三大类",{"key":24,"text":613,"correct":22},"分期分批交付生产或使用的工程，待工程全部交付使用后，一次性计算新增固定资产增值",{"key":27,"text":615,"correct":32},"凡购置的达到固定资产标准不需安装的工器具，应在交付使用后计入新增固定资产",{"key":30,"text":617,"correct":22},"企业库存现金、存货及建设单位管理费中未计入固定资产的各项费用等，应在交付使用后计入新增流动资产价值",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]