[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,22,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},898917,1,"单选题","工程总承包企业投标报价决策时应准确估计成本，其成本费用应由（ ）等组成。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","勘察设计费用、采购费用、施工费用、总部管理费",false,{"key":24,"text":25,"correct":22},"B","勘测设计费用、分包合同费用、施工费用、利润",{"key":27,"text":28,"correct":29},"C","公司本部费用、施工费用、直接设备材料费用、分包合同费用",true,{"key":31,"text":32,"correct":22},"D","公司本部费用、施工费用、直接设备材料费用、风险费用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},898918,"关于工程总承包投标报价中的标高金，下列说法中正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"标高金分析首先应对风险进行评估",{"key":24,"text":41,"correct":29},"标高金分析应进行价值增值分析",{"key":27,"text":43,"correct":22},"标高金中不包括利润和风险费",{"key":31,"text":45,"correct":22},"标高金中的管理费主要指公司本部费用",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},898919,"关于国际工程招标，下列说法中正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投交标书的方式须加以限制，如规定必须寄交某邮政信箱以免延误",{"key":24,"text":53,"correct":22},"开标时若标书未附投标保证金则拒绝开启",{"key":27,"text":55,"correct":22},"开标时允许投标人提问但不允许录音",{"key":31,"text":57,"correct":29},"采用“两个信封制度”的，技术上不符合要求的标书则第二个信封不再开启",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},898920,"国际工程投标报价时，人工工日单价通常以工程用工量和国内（当地）工人完成工日所占比例进而加权得到的平均工资单价计算，通常权重可表示为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"不同工人工日占总工日数百分比",{"key":24,"text":65,"correct":22},"不同工人工效占总工效百分比",{"key":27,"text":67,"correct":29},"不同工人工日占总工日数百分比／工效比",{"key":31,"text":69,"correct":22},"不同工人工效比／工日占总工日数百分比",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},898921,"国际竞争性投标过程中只对标书的报价和其他因素进行评比不对投标人资格进行评审的工作是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"清标",{"key":24,"text":77,"correct":22},"审标",{"key":27,"text":79,"correct":29},"评标",{"key":31,"text":81,"correct":22},"定标",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},898922,"在承揽国际工程投标报价时，施工机械台班单价的计算与国内工程投标报价相比主要区别是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"不计算折旧费用",{"key":24,"text":89,"correct":29},"不计算大修理费用",{"key":27,"text":91,"correct":22},"不计算经常修理费用",{"key":31,"text":93,"correct":22},"不计算人工费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},898923,"关于招标工程量清单缺项、漏项的处理，下列说法中正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程量清单缺项、漏项及计算错误带来的风险由发承包双方共同承担",{"key":24,"text":101,"correct":29},"分部分项工程量清单漏项造成新增工程量的，应按变更事件的有关方法调整合同价款",{"key":27,"text":103,"correct":22},"分部分项工程量清单缺项引起措施项目发生变化的，应按与分部分项工程相同的方法进行调整",{"key":31,"text":105,"correct":22},"招标工程量清单中措施项目缺项，投标人在投标时未予以填报的，合同实施期间不予增加",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},898924,"关于施工合同履行过程中共同延误的处理原则，下列说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"在初始延误发生作用期间，其他并发延误者按比例承担责任",{"key":24,"text":113,"correct":29},"若初始延误者是发包人，则在其延误期内，承包人可得到经济补偿",{"key":27,"text":115,"correct":22},"若初始延误者是客观原因，则在其延误期内，承包人不能得到经济补偿",{"key":31,"text":117,"correct":22},"若初始延误者是承包人，则在其延误期内，承包人只能得到工期补偿",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},898925,"关于工程变更的说法，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"发包人要求承包人改变已批准的施工工艺或顺序不属于变更",{"key":24,"text":125,"correct":22},"发包人通过变更取消某项工作从而转由他人实施",{"key":27,"text":127,"correct":22},"发包人要求承包人为完成工程需要追加的额外工作不属于变更",{"key":31,"text":129,"correct":29},"承包人不能全面落实变更指令而扩大的损失由承包人承担",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},898926,"关于共同延误的处理原则，下列说法中正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"初始延误者负主要责任，并发延误者负次要责任",{"key":24,"text":137,"correct":22},"初始延误者属发包人原因的，承包人可得工期补偿，但无经济补偿",{"key":27,"text":139,"correct":22},"初始延误者属客观原因的，承包人可得工期补偿，也可得到费用补偿",{"key":31,"text":141,"correct":29},"初始延误者属发包人原因的，承包人可获得工期、费用补偿和利润补偿",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},898927,"根据我国现行合同条件，关于工程索赔的说法中，正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"发包人未能及时发出指令不能视为发包人违约",{"key":24,"text":149,"correct":22},"因政策法令的变化不能提出索赔",{"key":27,"text":151,"correct":22},"机械停工按照机械台班单价计算索赔",{"key":31,"text":153,"correct":29},"发包人指令承包商加速施工有时也会产生索赔",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},898928,"根据规定，因工程量偏差引起的可以调整总价措施项目费的前提是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"合同工程量偏差超过15％",{"key":24,"text":161,"correct":29},"合同工程量偏差超过15％，且引起措施项目相应变化",{"key":27,"text":163,"correct":22},"措施项目工程量超过10％",{"key":31,"text":165,"correct":22},"措施项目工程量超过10％，且引起施工方案发生变化",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},898929,"根据《建设工程工程量清单计价规范》GB50500-2013，当实际增加的工程量超过清单工程量15%以上，且造成按总价方式计价的措施项目发生变化的，应将（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"综合单价调高，措施项目费调增",{"key":24,"text":173,"correct":22},"综合单价调高，措施项目费调减",{"key":27,"text":175,"correct":29},"综合单价调低，措施项目费调增",{"key":31,"text":177,"correct":22},"综合单价调低，措施项目费调减",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},898930,"采用网络图分析法处理可原谅延期，下列说法中正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"只有在关键线路上的工作延误，才能索赔工期",{"key":24,"text":185,"correct":22},"非关键线路上的工作延误，不应索赔工期",{"key":27,"text":187,"correct":29},"如延误的工作为关键工作，则延误的时间为工期索赔值",{"key":31,"text":189,"correct":22},"该方法不适用于多种干扰事件共同作用所引起的工期索赔",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},898931,"对某招标工程进行报价分析，在不考虑安全文明施工费的前提下，承包人中标价为1500万元，招标控制价为1600万元，设计院编制的施工图预算为1550万元，承包人认为的合理报价值为1540万元，则承包人的报价浮动率是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"0.65%",{"key":24,"text":197,"correct":29},"6.25%",{"key":27,"text":199,"correct":22},"93.75%",{"key":31,"text":201,"correct":22},"96.25%",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},898932,"发承包双方可以在合同中约定误期赔偿费，明确每日历天应赔偿额度，以下有关说法正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"承包人未按照合同约定施工，导致实际进度迟于计划进度的，承包人没有义务快进度，实现合同工期",{"key":24,"text":209,"correct":22},"承包人支付误期赔偿费可免除承包人按照合同约定应承担的任何责任和应履行的任何义务",{"key":27,"text":211,"correct":22},"如果承包人的实际进度迟于计划进度，发包人无权向承包人索取并得到实际延误天数和合同约定的每日历天应赔偿额度的乘积计算的误期赔偿费",{"key":31,"text":213,"correct":29},"如果在工程竣工之前，合同工程内的某单项（或单位）工程已通过了竣工验收，且该单项（或单位）工程接收证书中表明的竣工日期并未延误，而是合同工程的其他部分产生了工期延误，则误期赔偿费应按照已颁发工程接收证书的单项（或单位）工程造价占合同价款的比例幅度予以扣减",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},898933,"下列在施工合同履行期间由不可抗力造成的损失中，应由承包人承担的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"因工程损害导致的第三方人员伤亡",{"key":24,"text":221,"correct":29},"因工程损害导致的承包人人员伤亡",{"key":27,"text":223,"correct":22},"工程设备的损害",{"key":31,"text":225,"correct":22},"应监理人要求承包人照管工程的费用",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},898934,"为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日。对于实行招标的建设工程，一般以（ ）前的第28天作为基准日。",[230,232,234,236],{"key":20,"text":231,"correct":29},"投标截止时间",{"key":24,"text":233,"correct":22},"招标截止日",{"key":27,"text":235,"correct":22},"中标通知书发出",{"key":31,"text":237,"correct":22},"合同签订",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},898935,"某房屋基坑开挖后，发现局部有软弱下卧层。甲方代表指示乙方配合进行地质复查，共用工10个工日。地质复查和处理费用为4万元，同时工期延长3天，人员窝工15工日。若用工按100元／工日、窝工按50元／工日计算，则乙方可就该事件索赔的费用是（ ）元。",[242,244,246,248],{"key":20,"text":243,"correct":22},"41250",{"key":24,"text":245,"correct":29},"41750",{"key":27,"text":247,"correct":22},"42500",{"key":31,"text":249,"correct":22},"45250",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},898936,"某工程项目总价值1000万元，合同工期12个月，现承包人因建设条件发生变化需增加额外工程费用100万元，则承包方可提出工期索赔为（ ）个月。",[254,256,258,260],{"key":20,"text":255,"correct":22},"1.5",{"key":24,"text":257,"correct":22},"0.9",{"key":27,"text":259,"correct":29},"1.2",{"key":31,"text":261,"correct":22},"3.6",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},898937,"某建设项目施工合同约定采用价格指数法调整合同价款，各项费用权重及价格如下表所示。已知该工程5月份完成的合同价款为5000万元，则5月份合同价款调整金额为（ ）万元。",[266,268,270,272],{"key":20,"text":267,"correct":22},"258",{"key":24,"text":269,"correct":29},"475",{"key":27,"text":271,"correct":22},"167.5",{"key":31,"text":273,"correct":22},"97.5",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},898938,"某施工合同在履行过程中，先后在不同时间发生了如下事件：因业主对隐蔽工程复检而导致某关键工作停工2天，隐蔽工程复检合格；因异常恶劣天气导致工程全面停工3天；因季节大雨导致工程全面停工4天。则承包人可索赔的工期为（ ）天。",[278,280,282,284],{"key":20,"text":279,"correct":22},"2",{"key":24,"text":281,"correct":22},"3",{"key":27,"text":283,"correct":29},"5",{"key":31,"text":285,"correct":22},"9",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},898939,"某项目合同约定采用调值公式法进行结算，合同价为500万元，并约定合同价的60%为可调部分。可调部分中，人工占40%，材料占40%，其余占20%。结算时，人丁费价格指数增长了10%，材料费增长了15%，其他未发生变化。则该项工程项目应结算的工程价款为（ ）万元。",[290,292,294,296],{"key":20,"text":291,"correct":22},"520",{"key":24,"text":293,"correct":29},"530",{"key":27,"text":295,"correct":22},"540",{"key":31,"text":297,"correct":22},"550",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},898940,"由于发包人原因导致工期延误的，对于计划进度日期后续施工的工程，在使用价格调整公式时，现行价格指数应采用（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"计划进度日期的价格指数",{"key":24,"text":305,"correct":22},"实际进度日期的价格指数",{"key":27,"text":307,"correct":22},"A和B中较低者",{"key":31,"text":309,"correct":29},"A和B中较高者",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},898941,"招标工程量清单是招标文件的组成部分，其准确性由（ ）负责。",[314,316,318,320],{"key":20,"text":315,"correct":22},"招标代理机构",{"key":24,"text":317,"correct":29},"招标人",{"key":27,"text":319,"correct":22},"编制工程量清单的造价咨询机构",{"key":31,"text":321,"correct":22},"招标工程量清单的编制人",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},898942,"如果由于承包人原因导致的工期延误，在工程延误期间国家的法律、行政法规和相关政策发生变化引起工程造价变化的，下列有关价款调整的说法正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":29},"造成合同价款增加的，合同价款不予调整；造成合同价款减少的，合同价款予以调整",{"key":24,"text":329,"correct":22},"造成合同价款增加的，合同价款予以调整；造成合同价款减少的，合同价款不予调整",{"key":27,"text":331,"correct":22},"造成合同价款增加或减少的，合同价款均不予调整",{"key":31,"text":333,"correct":22},"造成合同价款增加或减少的，合同价款均予以调整",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},898943,"某项目施工过程中发生工程变更，引起分部分项工程项目发生变化，已标价工程量清单中没有适用也没有类似于变更工程项目，调整该变更项目的单价应考虑报价浮动率。已知该工程的中标价为5030万元，招标控制价为5100万元，则承包人报价浮动率L为（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":29},"1.37％",{"key":24,"text":341,"correct":22},"1.39％",{"key":27,"text":343,"correct":22},"1.37",{"key":31,"text":345,"correct":22},"1.39",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},898944,"任一计日工项目实施结束后，下列费用计算说法正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"工程数量以承包人提交的现场签证报告为准，无须发包人确认",{"key":24,"text":353,"correct":29},"根据核实的工程数量和承包人已标价工程量清单中的计日工单价计算",{"key":27,"text":355,"correct":22},"已标价工程量清单中没有该类计日工单价的，由发包人确定该类计日工单价",{"key":31,"text":357,"correct":22},"已标价工程量清单中没有该类计日工单价的，由承包人确定该类计日工单价",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},898945,"发包人在招标工程量清单中给定暂估价的专业工程，依法必须招标的，应由发承包双方依法组织招标选择专业分包人，并接受有建设工程招标投标管理机构的监督，下列说法错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"承包人不参加投标的专业工程，应由承包人作为招标人，当拟定的招标文件、评标方法、评标结果应报送发包人批准",{"key":24,"text":365,"correct":22},"承包人参加投标的专业工程，应由发包人作为招标人，同等条件下，应优先选择承包人中标",{"key":27,"text":367,"correct":22},"专业工程依法进行招标后，以中标价为依据取代专业工程暂估价，调整合同价款",{"key":31,"text":369,"correct":29},"与组织招标工作有关的费用由发包人承担",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},898946,"按照索赔事件的性质分类，在施工中发现地下流砂引起的索赔属于（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"工程变更索赔",{"key":24,"text":377,"correct":22},"工程延误索赔",{"key":27,"text":379,"correct":29},"不可预见的不利条件索赔",{"key":31,"text":381,"correct":22},"合同终止的索赔",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},898947,"某公司承包一合同价格为600万元的工程，计划工期为200天，延期20天，同时期承包的所有工程合同总价为1800万元，公司计划总部管理费为60万元，在获得工程延期索赔批准后，可进一步获得的总部管理费为（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":29},"2万元",{"key":24,"text":389,"correct":22},"20万元",{"key":27,"text":391,"correct":22},"6万元",{"key":31,"text":393,"correct":22},"3万元",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},898948,"某工程项目合同价为2000万元，施工过程中收到外界的干扰使得工期拖延了20个月，该部分工程的合同价格为160万元，则承包商可提出的工期索赔为（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"0.8个月",{"key":24,"text":401,"correct":29},"1.6个月",{"key":27,"text":403,"correct":22},"1.8个月",{"key":31,"text":405,"correct":22},"1.2个月",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},898949,"工程在施工合同履行期间发生共同延误事件，正确的处理方式是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"按照延误时间的长短，由责任方共同分担延误带来的损失",{"key":24,"text":413,"correct":22},"发包人是初始延误者，承包人可得到工期和费用补偿，但得不到利润补偿",{"key":27,"text":415,"correct":22},"承包人是初始延误者，承包人只能得到工期补偿，但得不到费用补偿",{"key":31,"text":417,"correct":29},"客观原因造成的初始延误，承包人可得到工期补偿，但很难得到费用补偿",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},898950,"关于施工合同履行过程中暂估价的确定，下列说法中正确的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"不属于依法必须招标的材料，以承包人自行采购的价格取代暂估价",{"key":24,"text":425,"correct":29},"属于依法必须招标的暂估价设备，由发承包双方以招标方式选择供应商，以中标价取代暂估价",{"key":27,"text":427,"correct":22},"不属于依法必须招标的暂估价专业工程，不应按工程变更确定价款而应另行签订补充协议确定工程价款",{"key":31,"text":429,"correct":22},"属于依法必须招标的暂估价专业工程，承包人不得参加投标",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},898951,"某建筑工程钢筋综合用量1000t。施工合同中约定，结算时对钢筋综合价格涨幅±5%以上部分依据造价处发布的基准价调整价格差额。承包人投标报价2400元／t，投标期、施工期间造价管理机构发布的钢筋综合基准价格为2500元／t、2800元／t，则需调增钢筋材料费用为（ ）万元。",[434,436,438,440],{"key":20,"text":435,"correct":29},"17.5",{"key":24,"text":437,"correct":22},"28.0",{"key":27,"text":439,"correct":22},"30.0",{"key":31,"text":441,"correct":22},"40.0",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},898952,"工程延误期间，因国家法律、行政法发生变化引起工程造价变化的，则（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"承包人导致的工程延误，合同价款均应予调整",{"key":24,"text":449,"correct":22},"发包人导致的工程延误，合同价款均应予调整",{"key":27,"text":451,"correct":29},"承包人导致的工程延误，造成合同价款增加的，合同价款不予调整",{"key":31,"text":453,"correct":22},"无论何种情况，合同价款均应予调整",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},898953,"当施工机械停工导致费用索赔成立时，台班停滞费用正确的计算方法是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"按照机械设备台班费计算",{"key":24,"text":461,"correct":22},"按照台班费中的设备使用费计算",{"key":27,"text":463,"correct":29},"自有设备按台班折旧费、人工费与其他费之和计算",{"key":31,"text":465,"correct":22},"租赁设备按照台班租金计算",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},898954,"有关法律法规政策变化引起的价款调整，下列表述中正确的是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"发包人应当承担基准日之前发生的、作为一个有经验的承包人在招标投标阶段不可能合理预见的风险",{"key":24,"text":473,"correct":29},"如果有关价格（如人工、材料和工程设备等价格）的变化已经包含在物价波动事件的调价公式中，则不再考虑法律法规政策变化引起的价款调整",{"key":27,"text":475,"correct":22},"对于不实行招标的建设工程，一般以建设工程开工前的第28天作为基准日",{"key":31,"text":477,"correct":22},"承包人的原因导致的工期延误，在工程延误期间国家的法律、行政法规和相关政策发生变化引起工程造价变化的，造成合同价款增加的，合同价款可以调整",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},898955,"依据规定，因工程量偏差引起的可以调整措施项目费的前提是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"分部分项工程工程量偏差超过20%",{"key":24,"text":485,"correct":22},"分部分项工程工程量偏差超过20%，且引起措施项目相应变化",{"key":27,"text":487,"correct":29},"合同工程量偏差超过15%，且引起措施项目相应变化",{"key":31,"text":489,"correct":22},"合同工程量偏差超过15%",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},898956,"某工程施工过程中发生如下事件：①因异常恶劣气候条件导致工程停工2天，人员窝工20个工作日；②遇到不利地质条件导致工程停工1天，人员窝工10个工日，处理不利地质条件用工15个工日。若人工工资为200元／工日，窝工补贴为100元／工日，不考虑其他因素，根据《标准施工招标文件》（2007年版）通用合同条款，施工企业可向业主索赔的工期和费用分别是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"3天，6000元",{"key":24,"text":497,"correct":22},"1天，3000元",{"key":27,"text":499,"correct":29},"3天，4000元",{"key":31,"text":501,"correct":22},"1天，4000元",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},898957,"因不可抗力原因造成的损失，应由承包人承担的情形是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"因工程损害导致第三方人员伤亡",{"key":24,"text":509,"correct":22},"运至施工场地用于施工的工程设备的损害",{"key":27,"text":511,"correct":22},"工程所需修复费用",{"key":31,"text":513,"correct":29},"承包人的施工机械设备损坏",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},898958,"工程变更引起措施项目发生变化的，承包人提出调整措施项目费的，下列调整措施项目费的方法正确的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"安全文明施工费，按照实际发生变化的措施项目调整，但应考虑承包人报价浮动因素",{"key":24,"text":521,"correct":29},"采用单价计算的措施项目费，按照实际发生的措施项目按分部分项工程费的调整方法确定单价",{"key":27,"text":523,"correct":22},"按总价（或系数）计算的措施项目费，除安全文明施工费外，按照实际发生变化的措施项目调整",{"key":31,"text":525,"correct":22},"措施项目费应按照实际发生变化的措施项目调整，但应考虑承包人报价浮动因素",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},898959,"某建设项目业主与丙施工单位签订了施工合同，合同总价5000万元，合同工期为200天，其应分摊的总部管理费100万元。丙在施工过程中，因遇到不利物质条件造成停工5天，因发包人更换其提供的不合格材料造成工程停工3天，因承包人施工机械损坏停工3天，因异常恶劣气候造成工程停工2天，上述事件均未发生在同一时间，且都在关键路线上，则丙施工单位可索赔的总部管理费为（）万元。",[530,532,534,536],{"key":20,"text":531,"correct":22},"2.5",{"key":24,"text":533,"correct":22},"4.0",{"key":27,"text":535,"correct":29},"5.0",{"key":31,"text":537,"correct":22},"6.5",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},898960,"某施工现场有装载机2台，由施工企业租得，台班单价5000元／台班，租赁费为2000元／台班，人工工资为80元／工日，窝工补贴25元／工日，以人工费和机械费合计为计算基础的综合费率为30%。在施工过程中发生了如下事件：监理人对已经覆盖的隐蔽工程要求重新检查且检查结果合格，配合用工20工日，装载机4台班。为此，施工企业可向业主索赔的费用为（ ）元。",[542,544,546,548],{"key":20,"text":543,"correct":22},"8080",{"key":24,"text":545,"correct":22},"9080",{"key":27,"text":547,"correct":22},"18080",{"key":31,"text":549,"correct":29},"28080",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},898961,"为合理划分发承包双方的合同风险，对于招标工程。在施工合同中约定的基准日期一般为（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":29},"招标文件中规定的提交投标文件截止时间前的第28天",{"key":24,"text":557,"correct":22},"招标文件中规定的提交投标文件截止时间前的第42天",{"key":27,"text":559,"correct":22},"施工合同签订前的第28天",{"key":31,"text":561,"correct":22},"施工合同签订前的第42天",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},898962,"某公路工程的1#标段实行招标确定承包人，中标价为5000万元，招标控制价为5500万元，其中安全文明施工费为500万元，规费为300万元，税金的综合税率为3.48%，则承包人报价浮动率为（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":29},"9.O9%",{"key":24,"text":569,"correct":22},"9.62%",{"key":27,"text":571,"correct":22},"10.00%",{"key":31,"text":573,"correct":22},"10.64%",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},898963,"因物价波动引起的价格调整，可采用价格指数法，在确定可调因子的现行价格指数时，所选择的日期是指（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":29},"付款证书相关周期最后一天的前42天",{"key":24,"text":581,"correct":22},"竣工结算前42天",{"key":27,"text":583,"correct":22},"竣工验收前42天",{"key":31,"text":585,"correct":22},"竣工决算前42天",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},898964,"根据《标准施工招标文件》（2007年版）通用合同条款，下列引起承包人索赔的事件中，只能获得工期补偿的是（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"发包人提前向承包人提供材料和工程设备",{"key":24,"text":593,"correct":22},"工程暂停后因发包人原因导致无法按时复工",{"key":27,"text":595,"correct":22},"因发包人原因导致工程试运行失败",{"key":31,"text":597,"correct":29},"异常恶劣的气候条件导致工程延误",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":31,"analysis":33},898965,"关于施工过程中的现场签证，下列说法中正确的是（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"发包人应按照现场签证内容计算价款，在竣工结算时一并支付",{"key":24,"text":605,"correct":22},"没有计日工单价的现场签证，按承包商提出的价格计算并支付",{"key":27,"text":607,"correct":22},"因发包人口头指令实施的现场签证事项，其发生的费用应由发包人承担",{"key":31,"text":609,"correct":29},"经发包人授权的工程造价咨询人，可与承包人做现场签证",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":20,"analysis":33},898966,"根据《建设工程工程量清单计价规范》GB 50500-2013，中标人投标报价浮动率的计算公式是（ ）。",[614,616,618,620],{"key":20,"text":615,"correct":29},"（1-中标价\u002F招标控制价）×100%",{"key":24,"text":617,"correct":22},"（1-中标价\u002F施工图预算）×100%",{"key":27,"text":619,"correct":22},"（1-不含安全文明施工费的中标价\u002F不含安全施工费的招标控制价）×100%",{"key":31,"text":621,"correct":22},"（1-不含安全文明施工费的中标价\u002F不含安全施工费的施工图预算）×100%",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]