[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,20,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,273,285,297,309,321,333,345,357,369,381,393,404,416,428,438,447,459,471,483,494,506,518,530,542,554,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},898817,1,"单选题","采用工料单价法编制施工图预算，在套用定额预算单价时，若分项工程施工工艺条件与预算单价或单位估价表不一致而造成人工、机械的数量增减时，一般（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","调量不调价",true,{"key":24,"text":25,"correct":26},"B","调价不调量",false,{"key":28,"text":29,"correct":26},"C","既不调价也不调量",{"key":31,"text":32,"correct":26},"D","既调价也调量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},898818,"采用工料单价法编制施工图预算时，在计算直接费之后，下一个步骤是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"套用定额预算单价",{"key":24,"text":41,"correct":22},"编制工料分析表",{"key":28,"text":43,"correct":26},"计算主材费并调整直接费",{"key":31,"text":45,"correct":26},"按计价程序计取其他费用",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},898819,"单位工程施工图预算中的建筑工程预算的费用，采用工料单价法计算直接费后，再根据规定需要计算的费用项目包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"建筑安装工程费用、设备及工器具购置费、建设单位管理费",{"key":24,"text":53,"correct":22},"企业管理费、利润、规费、税金",{"key":28,"text":55,"correct":26},"企业管理费、工程建设其他费用",{"key":31,"text":57,"correct":26},"分部分项工程费、措施费、规费、税金、工程建设其他费用",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},898820,"在采用工料单价法施工图预算编制过程中，工料分析的结果是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"得出单位工程人工、材料的消耗数量",{"key":24,"text":65,"correct":26},"将单价乘以工程量得出合价",{"key":28,"text":67,"correct":26},"明确详图、说明、尺寸和其他符号是否正确",{"key":31,"text":69,"correct":26},"为计算工程量、套用定额、计算直接费打下基础",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},898821,"下列内容中，属于三级预算的工程预算文件，但不属于二级预算的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"单位工程预算表",{"key":24,"text":77,"correct":22},"单项工程综合预算表",{"key":28,"text":79,"correct":26},"总预算表",{"key":31,"text":81,"correct":26},"附件",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},898822,"关于工料单价法编制施工图预算，下列表述中正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"当调整直接费时，主材费的计算依据是材料预算价格",{"key":24,"text":89,"correct":26},"直接费为分部分项工程费与措施项目费之和",{"key":28,"text":91,"correct":22},"在准备工作阶段中需要收集市场材料价格等编制资料",{"key":31,"text":93,"correct":26},"分项工程施工工艺条件与预算单价或单位估价表不一致而造成人工、机具的数量增减时，一般量、价均可调整",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},898823,"关于招标工程量清单中其他项目清单的编制，下列说法中正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"暂列金额是必然会发生的一笔金额",{"key":24,"text":101,"correct":22},"暂列金额由招标人填写其项目名称、计量单位、暂定金额等，若不能详列，也可只列暂定金额总额",{"key":28,"text":103,"correct":26},"专业工程暂估价应包括利润、规费和税金",{"key":31,"text":105,"correct":26},"计日工的暂定数量可以由投标人填写",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},898824,"关于招标控制价的相关规定，下列说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"国有资金投资的工程建设项目，应编制招标控制价",{"key":24,"text":113,"correct":26},"招标控制价应在招标文件中公布，仅需公布总价",{"key":28,"text":115,"correct":26},"招标控制价超过批准概算3%以内时，招标人不必将其报原概算审批部门审核",{"key":31,"text":117,"correct":26},"当招标控制价复查结论超过原公布的招标控制价3%以内时，应责成招标人改正",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},898825,"关于招标控制价及其编制，下列说法中正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"招标人不得拒绝高于招标控制价的投标报价",{"key":24,"text":125,"correct":26},"当重新公布招标控制价时，原投标截止期不变",{"key":28,"text":127,"correct":26},"经复核认为招标控制价误差大于±3%时，投标人应责成招标人改正",{"key":31,"text":129,"correct":22},"投标人经复核认为招标控制价未按规定编制的，应在招标控制价公布后5日内提出投诉",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},898826,"关于标底与招标控制价的编制，下列说法中正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"招标人不得自行决定是否编制标底",{"key":24,"text":137,"correct":22},"招标人不得规定最低投标限价",{"key":28,"text":139,"correct":26},"编制标底时必须同时设有最高投标限价",{"key":31,"text":141,"correct":26},"招标人不编制标底时应规定最低投标限价",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},898827,"编制钢筋工程量清单时，适宜采用暂估量加签证处理的钢筋是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"支撑双层钢筋用的“铁马”",{"key":24,"text":149,"correct":26},"伸出构件的锚固钢筋",{"key":28,"text":151,"correct":26},"设计注明的搭接钢筋",{"key":31,"text":153,"correct":26},"规范规定的搭接钢筋",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},898828,"下列关于招标控制价的说法中，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"招标控制价必须由招标人编制",{"key":24,"text":161,"correct":26},"招标控制价只需公布总价",{"key":28,"text":163,"correct":26},"招标人不得对招标控制价提出异议",{"key":31,"text":165,"correct":22},"招标控制价不应上调或下浮",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},898829,"其他项目清单中，无须由招标人根据拟建工程实际情况提出估算额度的费用项目是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"暂列金额",{"key":24,"text":173,"correct":26},"材料暂估价",{"key":28,"text":175,"correct":26},"专业工程暂估价",{"key":31,"text":177,"correct":22},"计日工费用",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},898830,"为编制招标工程量清单，在拟定常规的施工组织设计时，正确的做法是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"根据概算指标和类似工程估算整体工程量时，仅对主要项目加以估算",{"key":24,"text":185,"correct":26},"拟定施工总方案时需要考虑施工步骤",{"key":28,"text":187,"correct":26},"在满足工期要求的前提下，施工进度计划应尽量推后以降低风险",{"key":31,"text":189,"correct":26},"在计算工、料、机资源需要量时，不必考虑节假日、气候的影响",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},898831,"下列关于发承包阶段合同价款约定的说法，正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"对于直接发包的项目，如按初步设计总概算投资包干时，应以中标时确定的金额为签约合同价",{"key":24,"text":197,"correct":22},"对于直接发包的项目，如按施工图预算包干，则应以审查后的施工图总预算或综合预算为准",{"key":28,"text":199,"correct":26},"招标人发布的招标文件提出了各项要求，主要对承包方有约束力",{"key":31,"text":201,"correct":26},"招标文件包括招标文件的构成以及澄清，但并不含对其修改的内容",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},898832,"关于招标文件的澄清，下列说法中错误的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"投标人应以信函、电报等可以有形地表现所载内容的形式向招标人提出疑问",{"key":24,"text":209,"correct":22},"招标文件的澄清应发给所有投标人并指明澄清问题的来源",{"key":28,"text":211,"correct":26},"澄清发出的时间距投标截止日不足15天的应推迟投标截止时间",{"key":31,"text":213,"correct":26},"投标人收到澄清的确认时间可以是相对时间，也可以是绝对时间",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},898833,"在招标投标过程中，载明招标文件获取方式的应是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"招标公告",{"key":24,"text":221,"correct":26},"资格预审公告",{"key":28,"text":223,"correct":26},"招标文件",{"key":31,"text":225,"correct":26},"投标文件",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},898834,"招标工程量清单应根据常规施工方案编制，拟定常规施工方案时（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"应对主要项目进行估算，如土石方、混凝土",{"key":24,"text":233,"correct":26},"需对施工总方案中的重大问题及关键工艺作明确具体的规定",{"key":28,"text":235,"correct":26},"不需计算人、材、机资源消耗量",{"key":31,"text":237,"correct":26},"不需考虑节假日与气候对工期的影响",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},898835,"招标控制价综合单价的组价包括如下工作：①根据政策规定或造价信息确定工料机单价；②根据工程所在地的定额规定计算工程量；③将定额项目的合价除以清单项目的工程量；④根据费率和利率计算出组价定额项目的合价。则正确的工作顺序是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"①④②③",{"key":24,"text":245,"correct":26},"①③②④",{"key":28,"text":247,"correct":26},"②①③④",{"key":31,"text":249,"correct":22},"②①④③",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},898836,"关于招标工程量清单编制的说法，正确的有（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"暂估价用于支付可能发生也可能不发生的材料及专业工程",{"key":24,"text":257,"correct":22},"暂列金额是招标人考虑工程建设工程中不可预见、不能确定的因素而暂定的一笔费用",{"key":28,"text":259,"correct":26},"计日工清单中由招标人列项，招标人填写数量与单价",{"key":31,"text":261,"correct":26},"脚手架工程应列入以综合单价形式计价的分部分项工程清单",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},898837,"招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备的单价及专业工程的金额是（ ）。",[266,267,269,271],{"key":20,"text":171,"correct":26},{"key":24,"text":268,"correct":22},"暂估价",{"key":28,"text":270,"correct":26},"总承包服务费",{"key":31,"text":272,"correct":26},"价差预备费",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},898838,"下列内容中，属于招标工程量清单编制依据的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":26},"分部分项工程清单",{"key":24,"text":280,"correct":22},"拟定的招标文件",{"key":28,"text":282,"correct":26},"招标控制价",{"key":31,"text":284,"correct":26},"潜在投标人的潜质及能力",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},898839,"招标人对已发出的招标文件进行的必要修改，应当在投标截止时间（ ）天前发出。",[289,291,293,295],{"key":20,"text":290,"correct":26},"7",{"key":24,"text":292,"correct":26},"10",{"key":28,"text":294,"correct":26},"14",{"key":31,"text":296,"correct":22},"15",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},898840,"关于招标工程量清单中分部分项工程量清单的编制，下列说法中错误的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"招标人只负责项目编码、项目名称、计量单位和工程量四项内容的填写",{"key":24,"text":304,"correct":26},"同一招标工程的项目编码不得有重码",{"key":28,"text":306,"correct":26},"清单所列项目应是在单位工程施工过程中以其本身构成该工程实体的分项工程",{"key":31,"text":308,"correct":26},"当清单计价规范附录中有两个计量单位时，应结合实际情况选择其中一个",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},898841,"关于工程量清单编制总说明的内容，下列说法中正确的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":26},"建设规模是指工程投资总额",{"key":24,"text":316,"correct":26},"工程特征是指结构类型及主要施工方案",{"key":28,"text":318,"correct":22},"环境保护要求包括避免材料运输影响周边环境的防护要求",{"key":31,"text":320,"correct":26},"施工现场实际情况是指自然地理条件",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},898842,"关于依法必须招标工程的标底和招标控制价，下列说法中正确的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"招标人有权自行决定是否采用设标底招标、无标底招标以及招标控制价招标",{"key":24,"text":328,"correct":26},"采用设标底招标的，招标人有权决定标底是否在招标文件中公开",{"key":28,"text":330,"correct":26},"采用招标控制价招标的，招标人应在招标文件中明确最高投标限价，也可以规定最低投标限价",{"key":31,"text":332,"correct":22},"公布招标控制价时，还应公布各单位工程的分部分项工程费、措施项目费、其他项目费、规费和税金",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},898843,"招标控制价中暂列金额一般按分部分项工程费的一定比率参考计算，这一比率的范围是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":26},"3%~5%",{"key":24,"text":340,"correct":26},"5%~10%",{"key":28,"text":342,"correct":22},"10%~15%",{"key":31,"text":344,"correct":26},"15%~20%",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},898844,"关于依法必须招标的工程，下列说法中正确的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"国有资金投资的建筑工程招标可不设招标控制价",{"key":24,"text":352,"correct":22},"招标人可以自行决定是否编制标底，标底必须保密",{"key":28,"text":354,"correct":26},"招标人设有最高投标限价的，应当在开标时公布",{"key":31,"text":356,"correct":26},"招标人也可以根据需要，规定最低投标限价",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":28,"analysis":33},898845,"下列关于投标人须知描述错误的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":26},"在正文中的未尽事宜可以通过“投标人须知前附表”进行进一步明确",{"key":24,"text":364,"correct":26},"“投标人须知前附表”由招标人根据招标项目具体特点和实际需要编制和填写",{"key":28,"text":366,"correct":22},"“投标人须知前附表”无须与招标文件的其他章节相衔接",{"key":31,"text":368,"correct":26},"“投标人须知前附表”不得与投标人须知正文内容相抵触",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},898846,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于招标控制价的编制要求，下列说法中正确的是（ ）。 A.应依据投标人拟定的施工方案进行编制",[373,375,377,379],{"key":20,"text":374,"correct":26},"应包括招标文件中要求招标人承担风险的费用",{"key":24,"text":376,"correct":26},"应由招标工程量清单编制单位编制",{"key":28,"text":378,"correct":26},"应使用国家或省级、行业建设主管部门颁发的计价定额和计价办法",{"key":31,"text":380,"correct":22},"C应该是招标人编制",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},898847,"根据《建设工程工程量清单计价规范》GB 50500-2013，招标控制价的综合单价组价工作包括：①确定工、料、机单价；②确定所组价定额项目名称；③计算组价定额项目的合价；④除以工程量清单项目工程量；⑤计算组价定额项目工程量，下列工作排序正确的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"②⑤①③④",{"key":24,"text":388,"correct":26},"①②⑤④③",{"key":28,"text":390,"correct":26},"②③①⑤④",{"key":31,"text":392,"correct":26},"①②③④⑤",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},898848,"根据《标准施工招标文件》（2007年版），进行了资格预审的施工招标文件应包括（ ）。",[397,398,400,402],{"key":20,"text":219,"correct":26},{"key":24,"text":399,"correct":26},"投标资格条件",{"key":28,"text":401,"correct":22},"投标邀请书",{"key":31,"text":403,"correct":26},"评标委员会名单",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},898849,"在编制脚手架工程量清单时，其工作内容不包括（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"场内、场外材料搬运",{"key":24,"text":411,"correct":26},"安全网的铺设",{"key":28,"text":413,"correct":26},"选择附墙点与主体连接",{"key":31,"text":415,"correct":22},"测试手动装置、安全锁等",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},898850,"拟定施工总方案是编制招标工程量清单的一项准备工作，下列选项中属于拟定施工总方案范畴的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"对关键工艺的原则性规定",{"key":24,"text":423,"correct":26},"拟定施工步骤和施工顺序",{"key":28,"text":425,"correct":26},"估算整体工程量",{"key":31,"text":427,"correct":26},"编制施工进度计划",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},898851,"施工招标工程量清单中，应由投标人自主报价的其他项目是（ ）。",[432,433,434,436],{"key":20,"text":175,"correct":26},{"key":24,"text":171,"correct":26},{"key":28,"text":435,"correct":26},"工程设备暂估价",{"key":31,"text":437,"correct":22},"计日工单价",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},898852,"如果修改招标文件的时间距投标截止时间不足（ ）天，相应推后投标截止时间。",[442,443,444,445],{"key":20,"text":290,"correct":26},{"key":24,"text":294,"correct":26},{"key":28,"text":296,"correct":22},{"key":31,"text":446,"correct":26},"20",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":31,"analysis":33},898853,"根据《建设工程工程量清单计价规范》GB 50500 —2013，关于招标控制价的表述符合规定的是()。",[451,453,455,457],{"key":20,"text":452,"correct":26},"招标控制价不能超过批准的概算",{"key":24,"text":454,"correct":26},"投标报价与招标控制价的误差超过±3％时，应予拒绝",{"key":28,"text":456,"correct":26},"招标控制价不应在招标文件中公布，应予保密",{"key":31,"text":458,"correct":22},"工程造价咨询人不得同时编制同一工程的招标控制价和投标报价",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":28,"analysis":33},898854,"在编制招标工程量清单过程中，拟定常规施工组织设计时，通常需要估算整体工程量的项目是()。",[463,465,467,469],{"key":20,"text":464,"correct":26},"抹灰",{"key":24,"text":466,"correct":26},"门窗",{"key":28,"text":468,"correct":22},"混凝土",{"key":31,"text":470,"correct":26},"梁板",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":28,"analysis":33},898855,"关于招标控制价及其编制的说法，正确的是()。",[475,477,479,481],{"key":20,"text":476,"correct":26},"综合单价中包括应由招标人承担的风险费用",{"key":24,"text":478,"correct":26},"招标人供应的材料，总承包服务费应按材料价值的1．5％计算",{"key":28,"text":480,"correct":22},"措施项目费按招标文件中提供的措施项目清单确定",{"key":31,"text":482,"correct":26},"招标文件提供暂估价的主要材料，其主材费用应计入其他项目清单费用",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},898856,"根据《建设工程工程量清单计价规范》GB50500-2013，允许投标人根据具体情况对招标工程量清单进行补充或增加的内容是（ ）。",[487,489,491,492],{"key":20,"text":488,"correct":26},"分部分项工程量清单",{"key":24,"text":490,"correct":22},"措施项目清单",{"key":28,"text":171,"correct":26},{"key":31,"text":493,"correct":26},"计日工",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},898857,"某施工企业投标一城市基础设施项目，投标总价为5000万元，则投标保证金最高数额为（ ）万元。",[498,500,502,504],{"key":20,"text":499,"correct":26},"50",{"key":24,"text":501,"correct":26},"80",{"key":28,"text":503,"correct":26},"76",{"key":31,"text":505,"correct":22},"100",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},898858,"工程量清单计价模式下，确定分部分项工程单价的工作包括：①分析各清单项目的工程内容，②确定计算基础，③计算人工、材料、机械费用，④计算工程内容的工程量与清单单位含量，⑤计算综合单价。对上述工作先后顺序的排列，正确的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":26},"①②④⑤③",{"key":24,"text":513,"correct":22},"②①④③⑤",{"key":28,"text":515,"correct":26},"①②④③⑤",{"key":31,"text":517,"correct":26},"②①④⑤③",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},898859,"关于联合体投标需要遵循的规定，下列说法中正确的是（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":26},"联合体各方签订共同投标协议后，可再以自己名义单独投标",{"key":24,"text":525,"correct":26},"资格预审后联合体增减、更换成员的，其投标有效性待定",{"key":28,"text":527,"correct":26},"由同一专业的单位组成的联合体，按其中较高资质确定联合体资质等级",{"key":31,"text":529,"correct":22},"联合体投标的，可以联合体牵头人的名义提交投标保证金",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},898860,"投标人为使报价具有竞争力，下列有关生产要素询价的做法中，正确的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":26},"在通过资格预审前进行询价",{"key":24,"text":537,"correct":22},"尽量向咨询公司进行询价",{"key":28,"text":539,"correct":26},"不论何时何地尽量使用自有机械",{"key":31,"text":541,"correct":26},"劳务市场招募零散工有利于管理",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},898861,"关于投标报价时综合单价的确定，下列做法中正确的是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"以项目特征描述为依据确定综合单价",{"key":24,"text":549,"correct":26},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":28,"text":551,"correct":26},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":31,"text":553,"correct":26},"消耗量指标的计算应以地区或行业定额为依据",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},898862,"根据《建设工程工程量清单计价规范》GB 50500-2013，下列费用项目中需纳入分部分项工程项目综合单价的是（ ）。",[558,560,561,562],{"key":20,"text":559,"correct":22},"工程设备估价",{"key":24,"text":175,"correct":26},{"key":28,"text":171,"correct":26},{"key":31,"text":563,"correct":26},"计日工费",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},898863,"投标人在投标前期研究招标文件时，对合同形式进行分析的主要内容为（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":26},"承包商任务",{"key":24,"text":571,"correct":22},"计价方式",{"key":28,"text":573,"correct":26},"付款办法",{"key":31,"text":575,"correct":26},"合同价款调整",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},898864,"施工项目投标报价的工作包括：①收集投标信息；②选择报价策略；③组建投标班子；④确定基础标价；⑤确定投标报价；⑥研究招标文件。以下工作正确的先后顺序是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":26},"⑥①③②④⑤",{"key":24,"text":583,"correct":22},"③⑥①④②⑤",{"key":28,"text":585,"correct":26},"③①⑥②④⑤",{"key":31,"text":587,"correct":26},"⑥③①④②⑤",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},898865,"关于投标报价，下列说法中正确的是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":26},"总价措施项目由投标人自主报价",{"key":24,"text":595,"correct":26},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":28,"text":597,"correct":26},"暂估价依据询价情况填报",{"key":31,"text":599,"correct":22},"投标人对投标报价的任何优惠均应反映在相应的清单项目的综合单价中",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},898866,"关于工程量清单方式招标工程合同价格风险及风险分担，下列说法中正确的是（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":22},"当出现的风险内容及幅度在招标文件规定的范围内时，综合单价不变",{"key":24,"text":607,"correct":26},"市场价格波动导致施工机具使用费发生变化时，承包人只承担5%以内的价格风险",{"key":28,"text":609,"correct":26},"人工费变化发生的风险全部由发包人承担",{"key":31,"text":611,"correct":26},"承包人管理费的风险一般由发承包双方共同承担",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]