[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,2,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,297,309,321,332,344,354,366,378,390,402,414,425,437,449,461,473,485,495,507,519,531,543,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},897825,1,"单选题","(2018年)建设单位过市场机制取得建设用地，不仅应承担征地补偿费用、拆迁补偿费用，还须向土地所有者支付（ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","安置补助费",false,{"key":24,"text":25,"correct":26},"B","土地出让金",true,{"key":28,"text":29,"correct":22},"C","青苗补偿费",{"key":31,"text":32,"correct":22},"D","土地管理费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},897826,"（2019年真题）根据我国现行建设项目总投资及工程造价的构成，下列有关建设项目费用开支，应列入建设单位管理费的是（）",[38,40,42,44],{"key":20,"text":39,"correct":22},"监理费",{"key":24,"text":41,"correct":26},"竣工验收费",{"key":28,"text":43,"correct":22},"可行性研究费",{"key":31,"text":45,"correct":22},"节能评估费",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},897827,"（2019年真题）根据我国现行建设项目总投资及工程造价的构成，联合试运转费应包括（）",[50,52,54,56],{"key":20,"text":51,"correct":26},"施工单位参加联合试运转人员的工资",{"key":24,"text":53,"correct":22},"设备安装中的试车费用",{"key":28,"text":55,"correct":22},"试运转中暴露的设备缺陷的处理费",{"key":31,"text":57,"correct":22},"生产人员的提前进厂费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},897830,"(2013年)在我国建设项目投资构成中，超规超限设备运输增加的费用属于()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"设备及工器具购置费",{"key":24,"text":65,"correct":26},"基本预备费",{"key":28,"text":67,"correct":22},"工程建设其他费",{"key":31,"text":69,"correct":22},"建筑安装工程费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},897831,"(2013年)根据我国现行建设项目投资构成，下列费用项目中属于建设期利息包含内容的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"建设单位建设期后发生的利息",{"key":24,"text":77,"correct":22},"施工单位建设期长期贷款利息",{"key":28,"text":79,"correct":26},"国内代理机构收取的贷款管理费",{"key":31,"text":81,"correct":22},"国外贷款机构收取的转贷费",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},897832,"(2014年)某项目共需要贷款资金900万元，建设期为3年，按年度均衡筹资，第1年贷款为300万元，第二年贷款为400万元，建设期内只计利息但不支付，年利率为10%，则第2年的建设期利息应为（）万元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"50.0",{"key":24,"text":89,"correct":26},"51.5",{"key":28,"text":91,"correct":22},"71.5",{"key":31,"text":93,"correct":22},"86.65",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},897833,"(2015年)某建设项目建设期为二年，建设期内第一年货款400万元，第二年货款500万元，贷款在年内均衡发放，年利率为10%。建设期内只计息不支付，则该项目建设期贷款利息为( )万元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"85.0",{"key":24,"text":101,"correct":22},"85.9",{"key":28,"text":103,"correct":26},"87.0",{"key":31,"text":105,"correct":22},"109.0",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},897834,"(2014年)预备费包括基本预备费和价差预备费，其中价差预备费的计算应是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"以编制年费的静态投资额为基数，采用单利方法",{"key":24,"text":113,"correct":22},"以编制年费的静态投资额为基数，采用复利方法",{"key":28,"text":115,"correct":22},"以估算年份价格水平的投资额为基数，采用单利方法",{"key":31,"text":117,"correct":26},"以估算年份价格水平的投资额为基数，采用复利方法",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},897835,"(2015年)某建设项目建筑安装工程费为6000万元，设备购置费为1000万元，工程建设其他费用为2000万元，建设期利息为500万元。若基本预备费费率为5%，则该建设项目的基本预备费为( )万元。",[122,124,126,128],{"key":20,"text":123,"correct":22},"350",{"key":24,"text":125,"correct":22},"400",{"key":28,"text":127,"correct":26},"450",{"key":31,"text":129,"correct":22},"475",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},897836,"(2016年)某建设项目静态投资为10000万元，项目建设前期年限为1年，建设期为2年，第一年完成投资40%，第二年完成投资60%。在年平均价格上涨率为6%的情况下，该项目价差预备费应为()万元。",[134,136,138,140],{"key":20,"text":135,"correct":22},"666.3",{"key":24,"text":137,"correct":22},"981.6",{"key":28,"text":139,"correct":26},"1306.2",{"key":31,"text":141,"correct":22},"1640.5",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},897837,"(2016年)某项目建设期为2年，第一年贷款3000万元，第二年贷款2000万元，贷款年**均衡发放，年利率为8%，建设期内只计息不付息。该项目建设期利息为()万元。",[146,148,150,152],{"key":20,"text":147,"correct":22},"366.4",{"key":24,"text":149,"correct":26},"449.6",{"key":28,"text":151,"correct":22},"572.8",{"key":31,"text":153,"correct":22},"659.2",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},897838,"（2017 年考题）某建设项目静态投资20000 万元，项目建设前期年限为1 年，建设期为2 年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期价差预备费为（ ）万元。",[158,160,162,164],{"key":20,"text":159,"correct":22},"1006.25",{"key":24,"text":161,"correct":22},"1525.00",{"key":28,"text":163,"correct":26},"2056.56",{"key":31,"text":165,"correct":22},"2601.25",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},897839,"(2018年)",[170,172,174,176],{"key":20,"text":171,"correct":22},"按总贷款在建设期内均衡发放考虑",{"key":24,"text":173,"correct":22},"pj-1 为第（j-1）年年初累计贷款本金和利息之和",{"key":28,"text":175,"correct":26},"按贷款在年中发放和支用考虑",{"key":31,"text":177,"correct":22},"按建设期内支付贷款利息考虑",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},897840,"(2018年)某建设项目工程费用5000 万元，工程建设其他费用1000 万元，基本预备费率为8%，年均投资价格上涨率5%，建设期两年，计划每年完成投资50%，则该项目建设期第二年价差预备费应为（）万元。",[182,184,186,188],{"key":20,"text":183,"correct":22},"160.02",{"key":24,"text":185,"correct":22},"227.79",{"key":28,"text":187,"correct":26},"246.01",{"key":31,"text":189,"correct":22},"326.02",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},897841,"（2019年真题）某新建项目，建设期为2年,分年均衡进行贷款，第一年贷款200万元，第二年贷款300万元，贷款利息只计息不支付，年利率为10%的情况下，该项目应计建设期贷款利息为（）万元。",[194,196,198,200],{"key":20,"text":195,"correct":22},"36.00",{"key":24,"text":197,"correct":26},"46.00",{"key":28,"text":199,"correct":22},"52.00",{"key":31,"text":201,"correct":22},"70.00",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},897842,"（2019年真题）根据我国现行建设项目总投资及工程造价组成，工程概算阶段考虑的对一般自然灾害处理的费用,应包含在（ ）内。",[206,208,210,212],{"key":20,"text":207,"correct":22},"未明确项目准备金",{"key":24,"text":209,"correct":26},"工程建设不可预见费",{"key":28,"text":211,"correct":22},"暂列金额",{"key":31,"text":213,"correct":22},"不可预见准备金",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},897846,"(2013年)下列关于工程计价的说法中，正确的是()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"工程计价包含计算工程量和套定额两个环节",{"key":24,"text":221,"correct":22},"建筑安装工程费=∑基本构造单元工程量×相应单价",{"key":28,"text":223,"correct":26},"工程计价包括工程单价的确定和总价的计算",{"key":31,"text":225,"correct":22},"工程计价中的工程单价仅指综合单价",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},897847,"(2013年)下列工程计价的标准和依据中，适用于项目建设前期各阶段对建设投资进行预测和估计的是()。",[230,232,234,236],{"key":20,"text":231,"correct":22},"工程量清单计价规范",{"key":24,"text":233,"correct":26},"工程定额",{"key":28,"text":235,"correct":22},"工程量清单计量规范",{"key":31,"text":237,"correct":22},"工程承包合同文件",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},897848,"(2014年)下列关于工程计价的说法中，正确的是（）。",[242,244,246,247],{"key":20,"text":243,"correct":22},"工程计价包括计算工程量和套定额两个环节",{"key":24,"text":245,"correct":22},"建筑安装工程费=Σ基本构造单元工程量×相应单价",{"key":28,"text":223,"correct":26},{"key":31,"text":248,"correct":22},"工程计价中的工程单价仅只综合单价",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},897849,"(2015年)根据我国建设市场发展现状，工程量清单计价和计量规范主要适用于( )。",[253,255,257,259],{"key":20,"text":254,"correct":22},"项目建设前提各阶段工程造价的估计",{"key":24,"text":256,"correct":22},"项目初步设计阶段概算的预测",{"key":28,"text":258,"correct":22},"项目施工图设计阶段预算的预测",{"key":31,"text":260,"correct":26},"项目合同价格的形成和后续合同价格的管理",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},897850,"(2016年)关于工程定额，下列说法正确的是()。",[265,267,269,271],{"key":20,"text":266,"correct":22},"劳动定额主要表现形式为时间定额，机械消耗定额主要表现形式为产量定额",{"key":24,"text":268,"correct":22},"企业定额是企业内部使用的预算定额",{"key":28,"text":270,"correct":26},"补充定额只能在指定范围内使用",{"key":31,"text":272,"correct":22},"地区统一定额应根据地区工程技术特点、施工生产和管理水平独立编制",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},897851,"(2015年)依法必须采用工程量清单招标的建设项目，投标人需要采用而招标人不需采用的计价依据是( )。",[277,279,281,283],{"key":20,"text":278,"correct":22},"国家、地区或行业定额资料",{"key":24,"text":280,"correct":22},"工程造价信息、资料和指数",{"key":28,"text":282,"correct":22},"计价活动相关规章课程",{"key":31,"text":284,"correct":26},"企业定额",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},897852,"(2010年)下列工程中，属于概算指标编制对象的是()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"分项工程",{"key":24,"text":292,"correct":26},"单位工程",{"key":28,"text":294,"correct":22},"分部工程",{"key":31,"text":296,"correct":22},"整个建筑物",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},897853,"(2014年)作为工程定额体系的重要组成部分，预算定额是（）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"完成一定计价单位的某一施工过程所需要消耗的人工、材料和机械台班数量标准",{"key":24,"text":304,"correct":26},"完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料、施工机械台班数量及其费用标准",{"key":28,"text":306,"correct":22},"完成单位合格扩大分项工程所需消耗的人工、材料和施工机械台班数量及费用标准",{"key":31,"text":308,"correct":22},"完成一个规定计量单位建筑安装产品的费用消耗标准",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},897854,"(2015年)工程计量工作包括工程项目的划分和工程量的计算，下列关于工程计量工作的说法中正确的是( )。",[313,315,317,319],{"key":20,"text":314,"correct":22},"项目划分须按预算定额规定的定额子项进行",{"key":24,"text":316,"correct":26},"通过项目划分确定单位工程基本构造单位",{"key":28,"text":318,"correct":22},"工程量的计算须按工程量清单计算规范的规则进行计算",{"key":31,"text":320,"correct":22},"工程量的计算应依据施工图设计文件，不应依据施工组织设计文件",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},897855,"(2016年)下列说法中，符合工程计价基本原理的是()。",[325,327,329,330],{"key":20,"text":326,"correct":22},"工程计价的基本原理在于项目划分与工程量计算",{"key":24,"text":328,"correct":22},"工程计价分为项目的分解与组合两个阶段",{"key":28,"text":223,"correct":26},{"key":31,"text":331,"correct":22},"工程单价包括生产要素单价、工料单价和综合单价",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},897856,"(2017年)下列定额中，项目划分最细的计价定额是（）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"材料消耗定额",{"key":24,"text":339,"correct":22},"劳动定额",{"key":28,"text":341,"correct":26},"预算定额",{"key":31,"text":343,"correct":22},"概算定额",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},897857,"(2018年)反映完成一定计量单位合格扩大结构构件需消耗的人工、材料和施工机具台班数量的定额是（ ）。",[348,350,351,352],{"key":20,"text":349,"correct":22},"概算指标",{"key":24,"text":343,"correct":26},{"key":28,"text":341,"correct":22},{"key":31,"text":353,"correct":22},"施工定额",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},897858,"(2018年)关于工程造价的分布组合计价原理，下列说法正确的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"分部分项工程费=基本构造单元工程量×工料单价",{"key":24,"text":361,"correct":22},"工料单价指人工、材料和施工机械台班单价",{"key":28,"text":363,"correct":22},"基本构造单元是由分部工程适当组合形成",{"key":31,"text":365,"correct":26},"工程总价是按规定程序和方法逐级汇总形成的工程造价",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},897859,"（2019年真题）关于工程量清单计价，下列表达式正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"分部分项工程费=∑(分部分项工程量×相应分部分项工程的工料单价)",{"key":24,"text":373,"correct":22},"措施项目费=∑（项目工程量×相应的工料单价)",{"key":28,"text":375,"correct":22},"其他项目费=暂列金额+材料设备暂估价+计日工+总承包服务费",{"key":31,"text":377,"correct":26},"单位工程造价=分部分项工程费+措施项目费+其他项目费+规费+税金",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},897860,"（2019年真题）关于工程定额的应用,下列说法正确的是（）",[382,384,386,388],{"key":20,"text":383,"correct":22},"施工定额是编制施工图预算的依据",{"key":24,"text":385,"correct":22},"行业统一定额只能在本行业范围内使用",{"key":28,"text":387,"correct":22},"企业定额反映了施工企业的生产消耗标准，可直接用于工程计价",{"key":31,"text":389,"correct":26},"工期定额是工程定额的一种类型，但不属于工程计价定额",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},897863,"(2013年)关于工程量清单编制中的项目特殊描述，下列说法中正确的是()。",[394,396,398,400],{"key":20,"text":395,"correct":22},"措施项目无需描述项目特征",{"key":24,"text":397,"correct":26},"应按计量规范附录中规定的项目特征，结合技术规范、标准图集加以描述",{"key":28,"text":399,"correct":22},"对完成清单项目可能发生的具体工作和操作程序仍需加以描述",{"key":31,"text":401,"correct":22},"图纸中已有的工程规格、型号、材质等可不描述",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},897864,"(2013年)招标工程清单编制时，在总承包服务费计价表中，应由招标人填写的内容是()。",[406,408,410,412],{"key":20,"text":407,"correct":26},"服务内容",{"key":24,"text":409,"correct":22},"项目价值",{"key":28,"text":411,"correct":22},"费率",{"key":31,"text":413,"correct":22},"金额",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},897865,"(2014年)招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备价及专业工程金额是（）。",[418,419,421,423],{"key":20,"text":211,"correct":22},{"key":24,"text":420,"correct":26},"暂估价",{"key":28,"text":422,"correct":22},"总承包服务费",{"key":31,"text":424,"correct":22},"价差预备费",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},897866,"(2015年)关于工程量清单的编制，下列说法中正确的是( )。",[429,431,433,435],{"key":20,"text":430,"correct":22},"项目编码以五级全国统一编码设置，用十二位阿拉伯数字表示",{"key":24,"text":432,"correct":22},"编制分部分项工程量清单时，必须对工作内容进行描述",{"key":28,"text":434,"correct":26},"补充项目的编码由计算规范的代码与B和三位阿拉伯数字组成",{"key":31,"text":436,"correct":22},"按施工方案计算的措施费，必须写明“计算基础”、“费率”的数值",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},897867,"(2015年)关于总承包服务费的支付，下列说法中正确的是( )。",[441,443,445,447],{"key":20,"text":442,"correct":26},"建设单位向总承包单位支付",{"key":24,"text":444,"correct":22},"分包单位向总承包单位支付",{"key":28,"text":446,"correct":22},"专业承包单位向总承包单位支付",{"key":31,"text":448,"correct":22},"专业承包单位向建设单位支付",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},897868,"(2016年)对于不能计量工程量的措施项目，当按施工方案计算措施费时，若无“计算基础”和“费率”数值，则()。",[453,455,457,459],{"key":20,"text":454,"correct":22},"以定额基价为计算基础，以国家、行业、地区定额中相应的费率计算金额",{"key":24,"text":456,"correct":22},"以“定额人工费+定额机械费”为计算基础，以国家、行业、地区定额中相应费率计算金额",{"key":28,"text":458,"correct":26},"只填写“金额”数值，在备注中说明施工方案出处或计算方法",{"key":31,"text":460,"correct":22},"以备注中说明的计算方法，补充填写“计算基础”和“费率”",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},897869,"(2016年)根据《建设工程工程量清单计价规范》（GB 50500-2013），下列关于计日工的说法中正确的是()。",[465,467,469,471],{"key":20,"text":466,"correct":22},"招标工程量清单计日工数量为暂定，计日工费不计入投标总价",{"key":24,"text":468,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人可以视情况决定是否执行",{"key":28,"text":470,"correct":26},"计日工表的费用项目包括人工费、材料费、施工机械使用费、企业管理费和利润",{"key":31,"text":472,"correct":22},"计日工金额不列入期中支付，在竣工结算时一并支付",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},897870,"(2010年)采用工程量清单计价方式招标时，对工程量清单的完整性和准确性负责的是()。",[477,479,481,483],{"key":20,"text":478,"correct":22},"编制招标文件的招标代理人",{"key":24,"text":480,"correct":22},"编制清单的工程造价咨询人",{"key":28,"text":482,"correct":26},"发布招标文件的招标人",{"key":31,"text":484,"correct":22},"确定中标的投标人",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},897871,"(2010年)根据《建设工程工程量清单计价规范》(GB50500-2008)的规定，在合同约定之外的或者因变更而产生的、工程量清单中没有的且难以事先商定价格的额外工作，应计列入()之中。",[489,490,491,493],{"key":20,"text":211,"correct":22},{"key":24,"text":420,"correct":22},{"key":28,"text":492,"correct":26},"计日工",{"key":31,"text":494,"correct":22},"措施项目费",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},897872,"(2014年)编制工程量清单出现计算规范附录中未包括的清单项目时，编制人应作补充，下列有关编制补充项目的说法中正确的是（）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"补充项目编码应由B与三位阿拉伯数字组成",{"key":24,"text":502,"correct":22},"补充项目应报县级工程造价管理机构备案",{"key":28,"text":504,"correct":26},"补充项目的工作内容应予以明确",{"key":31,"text":506,"correct":22},"补充项目编码应顺序编制，起始序号有编制人根据需要自主确定",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},897873,"(2014年)在工程量清单中，最能体现部分分项工程项目自身价值的本质是（）。",[511,513,515,517],{"key":20,"text":512,"correct":26},"项目特征",{"key":24,"text":514,"correct":22},"项目编码",{"key":28,"text":516,"correct":22},"项目名称",{"key":31,"text":518,"correct":22},"项目计量单位",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},897874,"(2015年)关于工程量清单中的计日工，下列说法中正确的是( )。",[523,525,527,529],{"key":20,"text":524,"correct":22},"即指零星工作所消耗的人工工时",{"key":24,"text":526,"correct":22},"在投标时计入总价，其数量和单价由投标人填报",{"key":28,"text":528,"correct":22},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":530,"correct":26},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},897875,"(2016年)根据《建设工程工程量清单计价规范》（GB50500—2013），下列关于工程量清单项目编码的说法中，正确的是()。",[535,537,539,541],{"key":20,"text":536,"correct":22},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":538,"correct":26},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":28,"text":540,"correct":22},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":542,"correct":22},"补充项目编码以“B”加上计量规范代码后跟三位数字表示",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},897876,"(2016年)采用工程量清单计价的总承包服务费计价表中，应由投标人填写的内容是()。",[547,548,549,551],{"key":20,"text":409,"correct":22},{"key":24,"text":407,"correct":22},{"key":28,"text":550,"correct":22},"计算基础",{"key":31,"text":552,"correct":26},"费率和金额",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":28,"analysis":33},897877,"(2018年)招标工程量清单的项目特征中通常不需描述的内容是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"材料材质",{"key":24,"text":560,"correct":22},"结构部位",{"key":28,"text":562,"correct":26},"工程内容",{"key":31,"text":564,"correct":22},"规格尺寸",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},897878,"(2018年)关于工程量清单计价建设范围，下列说法正确的是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"达到或超过规定建设规模的工程,必须采用工程量清单计价",{"key":24,"text":572,"correct":22},"达到或超过规定建设数额的工程,必须采用工程量清单计价",{"key":28,"text":574,"correct":22},"国有资金占投资总额不足50%的建设工程发承包,不必采用工程量清单计价",{"key":31,"text":576,"correct":26},"不采用工程量清单计价的建设工程,应执行计价规范中除工程量清单等专门性规定以外的规定",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},897880,"(2013年)已知每平方米砖墙的勾缝时间为8min，则每立方米一砖半厚墙所需的勾缝时间为()min。",[581,583,585,587],{"key":20,"text":582,"correct":22},"12.00",{"key":24,"text":584,"correct":26},"21.92",{"key":28,"text":586,"correct":22},"22.22",{"key":31,"text":588,"correct":22},"33.33",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},897881,"(2013年)通过计时观察，完成某工程的基本工时为6h\u002Fm，辅助工作时间为工序作业时间的8%，规范时间占工作时间的15%，则完成该工程的时间定额是()工日\u002Fm3。",[593,595,597,599],{"key":20,"text":594,"correct":22},"0.93",{"key":24,"text":596,"correct":22},"0.94",{"key":28,"text":598,"correct":22},"0.95",{"key":31,"text":600,"correct":26},"0.96",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":31,"analysis":33},897882,"(2014年)下列对于测时法的特征描述中，正确的是（）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"测时法既适用于测定重复的循环工作时间，也适用于测定非循环工作时间",{"key":24,"text":608,"correct":22},"选择测时法比接续测时法准确、完善，但观察技术也较之复杂",{"key":28,"text":610,"correct":22},"当所测定的各工序的延续时间比较短时，接续测时法较选择测试法方便",{"key":31,"text":612,"correct":26},"测时法的观测次数应该根据误差理论和经验数据相结合的方法来确定",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]