[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":581},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,19,50,2160,[13,34,46,58,70,82,94,104,116,128,140,149,161,170,182,194,206,215,225,233,245,257,269,281,293,305,313,325,337,346,358,366,378,390,402,414,423,435,445,453,461,473,485,497,509,521,533,545,557,569],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},898767,1,"单选题","关于多层民用住宅工程造价与其影响因素的关系，下列说法中正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","层数增加，单位造价降低",false,{"key":24,"text":25,"correct":22},"B","层高增加，单位造价降低",{"key":27,"text":28,"correct":29},"C","建筑物周长系数越低，造价越低",true,{"key":31,"text":32,"correct":22},"D","宽度增加，单位造价上升","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},898768,"关于建设项目总概算的编制，下列说法中正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目总概算应按照建设单位规定的统一表格进行编制",{"key":24,"text":41,"correct":29},"工程建设其他费用概算按国家或地区或部委所规定的项目和标准确定，并按统一格式编制",{"key":27,"text":43,"correct":22},"主要建筑安装材料汇总表只需列出建设项目的钢筋、水泥等主要材料各自的总消耗量",{"key":31,"text":45,"correct":22},"总概算编制说明应装订于总概算文件最后",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},898769,"关于设计概算的调整，下列说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"若设计概算已通过批准，则不得调整",{"key":24,"text":53,"correct":22},"一个工程可多次调整设计概算",{"key":27,"text":55,"correct":29},"因项目建设期价格大幅上涨，可以向国家发展改期委员会申请调整概算",{"key":31,"text":57,"correct":22},"地质条件发生重大变化，不允许调整概算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},898770,"对于技术复杂、设计有难度的工程通常采用三阶段设计，即（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"方案设计、技术设计和施工图设计",{"key":24,"text":65,"correct":22},"总体设计、技术设计和施工图设计",{"key":27,"text":67,"correct":29},"初步设计、技术设计和施工图设计",{"key":31,"text":69,"correct":22},"总平面设计、工艺设计和建筑设计",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},898771,"对于民用建设项目，衡量单元组成、户型设计的结构面积系数是（ ）之比。",[74,76,78,80],{"key":20,"text":75,"correct":29},"住宅结构面积与建筑面积",{"key":24,"text":77,"correct":22},"建筑面积与住宅结构面积",{"key":27,"text":79,"correct":22},"住宅结构面积与房屋平均面积",{"key":31,"text":81,"correct":22},"房屋平均面积与住宅结构面积",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},898772,"当初步设计深度不够，设备清单不完备仅有成套设备重量时，编制单位工程概算宜采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"扩大单价法",{"key":24,"text":89,"correct":22},"概算指标法",{"key":27,"text":91,"correct":22},"类似工程预算法",{"key":31,"text":93,"correct":22},"综合单价法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},898773,"初步设计达到一定深度，建筑结构尺寸比较明确，能按照初步设计的平面图、立面图、剖面图纸计算出楼地面、墙身、门窗和屋面等扩大分项工程（或扩大结构构件）项目的工程量时，此时比较适用的编制概算的方法是（ ）。",[98,100,101,102],{"key":20,"text":99,"correct":29},"概算定额法",{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":103,"correct":22},"综合吨位指标法",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},898774,"单位工程概算按其工作性质可分为单位建筑工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"通风、空调工程概算",{"key":24,"text":111,"correct":29},"工器具及生产家具购置费概算",{"key":27,"text":113,"correct":22},"电气、照明工程概算",{"key":31,"text":115,"correct":22},"弱电工程概算",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},898775,"下列有关建筑结构选择的说法不正确的是（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"对于五层以下的建筑物一般选用砌体结构",{"key":24,"text":123,"correct":22},"对于大中型工业厂房一般选用钢筋混凝土结构",{"key":27,"text":125,"correct":29},"对于多层房屋或大跨度结构，钢筋混凝土结构更优",{"key":31,"text":127,"correct":22},"对于高层或者超高层结构，框架结构和剪力墙结构比较经济",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},898776,"在建设项目各阶段的工程造价中，一经批准将作为控制建设项目投资最高限额的是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"投资估算",{"key":24,"text":135,"correct":29},"设计概算",{"key":27,"text":137,"correct":22},"施工图预算",{"key":31,"text":139,"correct":22},"竣工结算",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},898777,"在建筑工程初步设计文件深度不够、不能准确计算出工程量的情况下，可采用的设计概算编制方法是（ ）。",[144,145,146,148],{"key":20,"text":99,"correct":22},{"key":24,"text":89,"correct":29},{"key":27,"text":147,"correct":22},"预算单价法",{"key":31,"text":103,"correct":22},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},898778,"总平面设计是指总图运输设计和总平面配置，下列内容中均属于总平面设计中影响工程造价的主要因素的有（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":29},"现场条件、占地面积、功能分区",{"key":24,"text":156,"correct":22},"占地面积、功能分区、工艺流程",{"key":27,"text":158,"correct":22},"占地面积、运输方式、工艺流程",{"key":31,"text":160,"correct":22},"现场条件、运输方式、工艺流程",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},898779,"当初步设计深度不够，不能准确地计算出工程量，但工程设计技术比较成熟而又有类似工程概算指标可以利用时，可采用的方法是（ ）。",[165,166,167,168],{"key":20,"text":99,"correct":22},{"key":24,"text":89,"correct":29},{"key":27,"text":91,"correct":22},{"key":31,"text":169,"correct":22},"类似工程概算法",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},898780,"已知某引进设备吨重为50t，设备原价3000万元，每吨设备安装费指标为8万元，同类国产设备的安装费率为15%，则该设备安装费为（ ）万元。",[174,176,178,180],{"key":20,"text":175,"correct":29},"400",{"key":24,"text":177,"correct":22},"425",{"key":27,"text":179,"correct":22},"450",{"key":31,"text":181,"correct":22},"500",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":24,"analysis":33},898781,"在工业项目的工艺设计过程中，影响工程造价的主要因素包括（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":22},"生产方法、工艺流程、功能分区",{"key":24,"text":189,"correct":29},"建设规模、标准和产品方案",{"key":27,"text":191,"correct":22},"工艺流程、功能分区、运输方式",{"key":31,"text":193,"correct":22},"工艺流程、原材料供应、运输方式",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":27,"analysis":33},898782,"在住宅小区规划设计中，其核心问题是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"小区环境优美",{"key":24,"text":201,"correct":22},"经济适用",{"key":27,"text":203,"correct":29},"提高土地利用率",{"key":31,"text":205,"correct":22},"户型设计",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},898783,"当初步设计较深，有详细的设备清单时，可采用的设备安装工程概算编制方法是（ ）。",[210,211,212,213],{"key":20,"text":87,"correct":22},{"key":24,"text":147,"correct":29},{"key":27,"text":103,"correct":22},{"key":31,"text":214,"correct":22},"安装设备百分比法",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},898784,"拟建工程初步设计与已完工程或在建工程的设计相类似而又没有可用的概算指标时采用，但必须对建筑结构差异和价差进行调整，适用于（ ）方法。",[219,220,221,223],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":29},{"key":27,"text":222,"correct":22},"分组计算审查法",{"key":31,"text":224,"correct":22},"标准预算审查法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},898785,"当初步设计有详细设备清单时，可按（ ）编制单位设备安装工程概算。",[229,230,231,232],{"key":20,"text":89,"correct":22},{"key":24,"text":147,"correct":29},{"key":27,"text":87,"correct":22},{"key":31,"text":214,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},898786,"柱网布置是否合理，对工程造价和面积的利用效率都有较大影响。建筑设计中对柱网布置应注意（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":29},"适当扩大柱距和跨度能使厂房有更大的灵活性",{"key":24,"text":240,"correct":22},"单跨厂房跨度不变时，层数越多越经济",{"key":27,"text":242,"correct":22},"多跨厂房柱间距不变时，跨度越大造价越低",{"key":31,"text":244,"correct":22},"柱网布置与厂房的高度无关",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},898787,"下列不属于影响民用住宅建筑设计中影响工程造价的主要因素的是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"建筑物平面形状和周长系数",{"key":24,"text":252,"correct":22},"住宅的层高和净高",{"key":27,"text":254,"correct":29},"建筑物的体积与面积",{"key":31,"text":256,"correct":22},"住宅建筑结构的选择",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},898788,"设计概算的三级概算是指（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"建筑工程概算、安装工程概算、设备及工器具购置费概算",{"key":24,"text":264,"correct":22},"建设投资概算、建设期利息概算、铺底流动资金概算",{"key":27,"text":266,"correct":22},"主要工程项目概算、辅助和服务性工程项目概算、室内外工程项目概算",{"key":31,"text":268,"correct":29},"单位工程概算、单项工程综合概算、建设项目总概算",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},898789,"按照国家有关规定，作为年度固定资产投资计划、计划投资总额及构成数额的编制和确定依据是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"经批准的投资估算",{"key":24,"text":276,"correct":29},"经批准的设计概算",{"key":27,"text":278,"correct":22},"经批准的施工图预算",{"key":31,"text":280,"correct":22},"经批准的工程决算",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},898790,"利用概算指标法编制拟建工程概算，已知概算指标中每100㎡建筑面积中分摊的人工消耗量为500工日。拟建工程与概算指标相比，仅楼地面做法不同，概算指标为瓷砖地面，拟建工程为花岗岩地面。查预算定额得到铺瓷砖和花岗岩地面的人工消耗量分别为37工日\u002F100㎡和24工日\u002F100㎡。拟建工程楼地面面积占建筑面积的65%。则对概算指标修正后的人工消耗量为（ ）工日\u002F100㎡。",[285,287,289,291],{"key":20,"text":286,"correct":22},"316.55",{"key":24,"text":288,"correct":29},"491.55",{"key":27,"text":290,"correct":22},"508.45",{"key":31,"text":292,"correct":22},"845.00",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},898791,"某建设项目由各个单项工程构成，应包含在其中某单项工程综合概算中的费用项目是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":29},"工器具及生产家具购置费",{"key":24,"text":300,"correct":22},"办公和生活用品购置费",{"key":27,"text":302,"correct":22},"研究试验费",{"key":31,"text":304,"correct":22},"基本预备费",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},898792,"当初步设计达到一定深度，建筑结构尺寸比较明确、能结合图纸计算工程量时，编制单位工程概算宜采用（ ）。",[309,310,311,312],{"key":20,"text":87,"correct":29},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":93,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},898793,"在满足住宅功能和质量前提下，（ ）有利于降低造价。",[317,319,321,323],{"key":20,"text":318,"correct":29},"适当加大住宅宽度",{"key":24,"text":320,"correct":22},"增加住宅层数",{"key":27,"text":322,"correct":22},"适当提高层高",{"key":31,"text":324,"correct":22},"提高结构面积系数",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},898794,"建筑结构的选择既要满足力学要求，又要考虑其经济性。对于多层房屋或大跨度结构的项目，应优先选用（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"砌体结构",{"key":24,"text":332,"correct":22},"钢筋混凝土结构",{"key":27,"text":334,"correct":29},"钢结构",{"key":31,"text":336,"correct":22},"框架结构",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},898795,"常用于设备价格波动较大的非标准设备和引进设备的安装工程概算编制方法是（ ）。",[341,342,343,345],{"key":20,"text":147,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":344,"correct":22},"设备价值百分比法",{"key":31,"text":103,"correct":29},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},898796,"工业建筑设计评价中，下列不同平面形状的建筑物，其建筑物周长与建筑面积比K周按从小到大顺序排列正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":29},"正方形→矩形→T形→L形",{"key":24,"text":353,"correct":22},"矩形→正方形→T形→L形",{"key":27,"text":355,"correct":22},"T形→L形→正方形→矩形",{"key":31,"text":357,"correct":22},"L形→T形→矩形→正方形",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},898797,"下列概算编制方法中，用于设备及安装工程概算编制的方法为（ ）。",[362,363,364,365],{"key":20,"text":99,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":87,"correct":29},{"key":31,"text":89,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},898798,"关于建筑设计对民用住宅项目工程造价的影响，下列说法中正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"加大住宅宽度，不利于降低单方造价",{"key":24,"text":373,"correct":29},"降低住宅层高，有利于降低单方造价",{"key":27,"text":375,"correct":22},"结构面积系数越大，越有利于降低单方造价",{"key":31,"text":377,"correct":22},"住宅层数越多，越有利于降低单方造价",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":27,"analysis":33},898799,"下列建筑设计影响工程造价的选项中，属于影响工业建筑但一般不影响民用建筑的因素是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"建筑物平面形状",{"key":24,"text":385,"correct":22},"项目利益相关者",{"key":27,"text":387,"correct":29},"柱网布置",{"key":31,"text":389,"correct":22},"风险因素",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},898800,"当建设项目为一个单项工程时，其设计概算应采用的编制形式是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"单位工程概算、单项工程综合概算和建设项目总概算二级",{"key":24,"text":397,"correct":22},"单位工程概算和单项工程综合概算二级",{"key":27,"text":399,"correct":22},"单项工程综合概算和建设项目总概算二级",{"key":31,"text":401,"correct":29},"单位工程概算和建设项目总概算二级",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},898801,"关于建筑设计因素对工业项目工程造价的影响，下列说法中正确的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"建筑周长系数越高，建筑工程造价越低",{"key":24,"text":409,"correct":29},"多跨厂房跨度不变，中跨数目越多越经济",{"key":27,"text":411,"correct":22},"大中型工业厂房一般选用砌体结构，以降低造价",{"key":31,"text":413,"correct":22},"建筑物面积或体积的增加，一般会引起单位面积造价的增加",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},898802,"当初步设计深度不够，只有设备出厂价而无详细规格、重量时，编制设备安装工程费概算可选用的方法是（ ）。",[418,419,421,422],{"key":20,"text":344,"correct":29},{"key":24,"text":420,"correct":22},"设备系数法",{"key":27,"text":103,"correct":22},{"key":31,"text":147,"correct":22},{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},898803,"在用类似工程预算法编制工程概算时，需用价差公式对类似工程的成本单价进行调整，以下各项中不属于成本单价的是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"人工费",{"key":24,"text":430,"correct":22},"施工机具使用费",{"key":27,"text":432,"correct":22},"企业管理费",{"key":31,"text":434,"correct":29},"规费",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},898804,"有关多层民用住宅工程造价与其影响因素的关系，下列说法中正确的是（ ）。",[439,440,442,444],{"key":20,"text":21,"correct":22},{"key":24,"text":441,"correct":29},"层高增加，单位造价增加",{"key":27,"text":443,"correct":22},"建筑物周长系数越高，造价越低",{"key":31,"text":32,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},898805,"某拟建工程初步设计已达到必要的深度，能够据此计算出扩大分项工程的工程量，则能较为准确地编制拟建工程概算的方法是（ ）。",[449,450,451,452],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":99,"correct":29},{"key":31,"text":103,"correct":22},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},898806,"当初步设计深度较深、有详细的设备清单时，最能精确地编制设备安装工程费概算的方法是（ ）。",[457,458,459,460],{"key":20,"text":147,"correct":29},{"key":24,"text":87,"correct":22},{"key":27,"text":344,"correct":22},{"key":31,"text":103,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":33},898807,"关于建设工程预算，符合组合与分解层次关系的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"单位工程预算、单项工程综合预算、类似工程预算",{"key":24,"text":468,"correct":22},"单位工程预算、类似工程预算、建设项目总预算",{"key":27,"text":470,"correct":29},"单位工程预算、单项工程综合预算、建设项目总预算",{"key":31,"text":472,"correct":22},"单位工程综合预算、类似工程预算、建设项目总预算",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":33},898808,"用全费用综合单价法编制施工图预算，下列建筑安装工程施工图预算计算式正确的是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"∑（子目工程量×子目工料单价）+企业管理费+利润+规费+税金",{"key":24,"text":480,"correct":22},"∑（分部分项工程量×分部分项工程全费用综合单价）",{"key":27,"text":482,"correct":29},"分部分项工程费+措施项目费",{"key":31,"text":484,"correct":22},"分部分项工程费+措施项目费+其他项目费+规费+税金",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},898809,"建设工程预算编制中的总预算由（ ）组成。",[489,491,493,495],{"key":20,"text":490,"correct":22},"综合预算和工程建设其他费、预备费",{"key":24,"text":492,"correct":22},"预备费、建设期利息及铺底流动资金",{"key":27,"text":494,"correct":22},"综合预算和工程建设其他费、铺底流动资金",{"key":31,"text":496,"correct":29},"综合预算和工程建设其他费、预备费、建设期利息及铺底流动资金",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},898810,"未达到固定资产标准的工器具购置费的计算基数一般为（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"工程建设其他费",{"key":24,"text":504,"correct":22},"建筑安装工程费",{"key":27,"text":506,"correct":29},"设备购置费",{"key":31,"text":508,"correct":22},"设备及安装工程费",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},898811,"施工图预算的二级预算编制形式是指（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"编制人编制、审核人审核",{"key":24,"text":516,"correct":22},"建筑安装工程预算，设备工器具购置费预算",{"key":27,"text":518,"correct":29},"单位工程预算、建设项目总预算",{"key":31,"text":520,"correct":22},"单项工程综合预算、建设项目总预算",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},898812,"关于各级施工图预算的构成内容，下列说法中正确的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":29},"建设项目总预算反映施工图设计阶段建设项目的预算总投资",{"key":24,"text":528,"correct":22},"建设项目总预算由组成该项目的各个单项工程综合预算费用相加而成",{"key":27,"text":530,"correct":22},"单项工程综合预算由单项工程的建筑工程费和设备及工器具购置费组成",{"key":31,"text":532,"correct":22},"单位工程预算由单位建筑工程预算和单位安装工程预算费用组成",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},898813,"下列费用项目中，不在单位工程施工图预算编制范围之内的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"构筑物建筑工程费",{"key":24,"text":540,"correct":22},"工业管道安装工程费",{"key":27,"text":542,"correct":29},"照明工程的建设管理费",{"key":31,"text":544,"correct":22},"弱电工程安装工程费",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},898814,"下列内容中，属于三级预算的工程预算文件，但不属于二级预算的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"总预算",{"key":24,"text":552,"correct":29},"综合预算",{"key":27,"text":554,"correct":22},"单位工程预算表",{"key":31,"text":556,"correct":22},"附件",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},898815,"单位建筑工程预算是建筑工程各专业单位工程施工图预算的总称，下列属于按其工程性质划分的是（ ）",[561,563,565,567],{"key":20,"text":562,"correct":22},"煤气工程预算，电气设备安装工程预算、工业管道工程预算",{"key":24,"text":564,"correct":29},"一般土建工程预算，给排水工程预算，采暖通风工程预算",{"key":27,"text":566,"correct":22},"电气设备安装工程预算、工业管道工程预算和热力设备安装工程预算",{"key":31,"text":568,"correct":22},"给排水工程预算，机械设备安装工程预算、电气设备安装工程预算、工业管道工程预算",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},898816,"关于施工图预算文件的组成，下列说法中错误的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"当建设项目有多个单项工程时，应采用三级预算编制形式",{"key":24,"text":576,"correct":22},"三级预算编制形式有建设项目总预算、单项工程综合预算、单位工程预算组成",{"key":27,"text":578,"correct":22},"当建设项目仅有一个单项工程时，可采用二级预算编制形式",{"key":31,"text":580,"correct":29},"二级预算编制形式的施工图预算文件包括综合预算表和单位工程预算表两个主要报表",[582,585,588,591,594,597],{"id":15,"name":583,"category":7,"favorite":584},"领导干部任职前廉政法规知识测试题",92,{"id":586,"name":587,"category":7,"favorite":15},595,"建筑结构与设备",{"id":589,"name":590,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":592,"name":593,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":595,"name":596,"category":7,"favorite":8},534,"BIM工程师",{"id":598,"name":596,"category":7,"favorite":8},535]