[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,18,50,2160,[13,30,42,54,66,78,90,102,114,126,138,150,162,174,186,198,210,222,233,245,255,267,279,291,303,314,326,338,350,362,374,382,394,406,418,430,438,450,461,469,481,493,505,517,528,540,552,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":21},898717,1,"单选题","投资估算有多种方法，下列算式中，属于系数估算法的是（ ）",[19,23,26,28],{"key":20,"text":21,"correct":22},"A","",false,{"key":24,"text":21,"correct":25},"B",true,{"key":27,"text":21,"correct":22},"C",{"key":29,"text":21,"correct":22},"D",{"id":31,"libraryId":5,"type":15,"typeLabel":16,"stem":32,"options":33,"answer":24,"analysis":21},898718,"按照形成资产法编制建设投资估算表，下列费用中可计入无形资产费用的是（ ）。",[34,36,38,40],{"key":20,"text":35,"correct":22},"研究试验费",{"key":24,"text":37,"correct":25},"非专利技术使用费",{"key":27,"text":39,"correct":22},"引进技术和引进设备其他费",{"key":29,"text":41,"correct":22},"生产准备及开办费",{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":24,"analysis":21},898719,"世界银行贷款项目的投资估算采用朗格系数法推算建设项目的静态投资，该方法的计算基数是（ ）。",[46,48,50,52],{"key":20,"text":47,"correct":22},"主体工程费",{"key":24,"text":49,"correct":25},"设备购置费",{"key":27,"text":51,"correct":22},"其他工程费",{"key":29,"text":53,"correct":22},"安装工程费",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":27,"analysis":21},898720,"投资估算的主要工作包括：①估算流动资金；②估算价差预备费和建设利息；③估算工程建设其他费用和基本预备费；④估算各单项工程所需建筑工程费、设备及工器具购置费、安装工程费。其正确的工作步骤是（ ）。",[58,60,62,64],{"key":20,"text":59,"correct":22},"④②①③",{"key":24,"text":61,"correct":22},"③④②①",{"key":27,"text":63,"correct":25},"④③②①",{"key":29,"text":65,"correct":22},"④③①②",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":24,"analysis":21},898721,"下列投资估算方法中，属于以设备费为基础估算建设项目固定资产投资的方法是（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":22},"生产能力指数法",{"key":24,"text":73,"correct":25},"朗格系数法",{"key":27,"text":75,"correct":22},"指标估算法",{"key":29,"text":77,"correct":22},"定额估算法",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":27,"analysis":21},898722,"建设项目规模的合理选择关系到项目的成败，决定着项目工程造价的合理与否。影响项目规模合理化的制约因素主要包括（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"资金因素、技术因素和环境因素",{"key":24,"text":85,"correct":22},"资金因素、技术因素和市场因素",{"key":27,"text":87,"correct":25},"市场因素、技术因素和环境因素",{"key":29,"text":89,"correct":22},"市场因素、环境因素和资金因素",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":27,"analysis":21},898723,"建设项目的建设地区选择应遵循工业项目适当聚集的原则，其原因是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":22},"有利于原材料和产品的运输，缩短流通时间",{"key":24,"text":97,"correct":22},"有利于集中用水，开辟新水源、远距离引水",{"key":27,"text":99,"correct":25},"能为不同类型的劳动者提供多种就业机会",{"key":29,"text":101,"correct":22},"生产排泄物集中排放，降低环境污染",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":29,"analysis":21},898724,"按照生产能力指数法（n=0.6，f=1），若将设计中的化工生产系统的生产能力提高三倍，投资额大约增加（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"200%",{"key":24,"text":109,"correct":22},"300%",{"key":27,"text":111,"correct":22},"230%",{"key":29,"text":113,"correct":25},"130%",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":29,"analysis":21},898725,"在投资估算分析内容中，属于工程投资比例分析的是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"分析工器具购置费占建设总投资的比例",{"key":24,"text":121,"correct":22},"分析引进设备费用占全部设备费用的比例",{"key":27,"text":123,"correct":22},"分析工程建设其他费用占建设总投资的比例",{"key":29,"text":125,"correct":25},"分析装饰工程占总投资的比例",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":29,"analysis":21},898726,"已知某项目各项财务基础数据中，总成本费用为1000万元（其中营业费用为200万元），其中折旧费200万元，摊销费50万元，修理费100万元，人工工资及福利费80万元，利息为20万元，若营业费用中折旧费、摊销费、修理费、人工工资及福利费均为各项费用总额的20%，产成品的年周转次数为10次，则该项目流动资金估算中的产成品为（ ）万元。",[130,132,134,136],{"key":20,"text":131,"correct":22},"58",{"key":24,"text":133,"correct":22},"73",{"key":27,"text":135,"correct":22},"60",{"key":29,"text":137,"correct":25},"61.6",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":21},898727,"在国外项目投资估算中，有初步的工艺流程图、主要生产设备的生产能力及项目建设的地理位置等条件，可套用相近规模厂的单位生产能力建设费用来估算拟建项目所需的投资额。以上投资估算方法适用于（ ）阶段。",[142,144,146,148],{"key":20,"text":143,"correct":22},"项目的投资设想",{"key":24,"text":145,"correct":25},"项目的投资机会研究",{"key":27,"text":147,"correct":22},"项目的初步可行性研究",{"key":29,"text":149,"correct":22},"项目的详细可行性研究",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":21},898728,"关于项目决策和工程造价的关系，下列说法中正确的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"工程造价的正确性是项目决策合理性的前提",{"key":24,"text":157,"correct":25},"项目决策的内容是决定工程造价的基础",{"key":27,"text":159,"correct":22},"投资估算的深度影响项目决策的精确度",{"key":29,"text":161,"correct":22},"投资决策阶段对工程造价的影响程度不大",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":29,"analysis":21},898729,"某地拟于2015年新建一年产60万吨产品的生产线，该地区2013年建成的年产50万吨相同产品的生产线的建设投资额为5000万元。假定2013年至2015年该地区工程造价年均递增5%。则该生产线的建设投资为（ ）万元。",[166,168,170,172],{"key":20,"text":167,"correct":22},"6000",{"key":24,"text":169,"correct":22},"6300",{"key":27,"text":171,"correct":22},"6600",{"key":29,"text":173,"correct":25},"6615",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":21},898730,"建设项目投资估算可以根据主体专业设计的阶段和深度采用混合法，下列方法中两两混合后属于混合法的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"生产能力指数法与系数估算法",{"key":24,"text":181,"correct":25},"系数估算法与比例估算法",{"key":27,"text":183,"correct":22},"单位生产能力估算法与比例估算法",{"key":29,"text":185,"correct":22},"系数估算法与单位生产能力估算法",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":21},898731,"某建设项目达到设计能力后，全场定员1000人，工资和福利费按照每人每年2万元估算。每年的其他费用为1000万元，其中其他制造费600万元，现金的周转次数为每年10次。流动资金估算中应收账款估算额为2000万元，预收账款估算额为300万元，应付账款估算额为1500万元，存货估算额为6000万元，预付账款估算额500万元，则该项目流动资金估算额为（ ）万元。",[190,192,194,196],{"key":20,"text":191,"correct":25},"7000",{"key":24,"text":193,"correct":22},"6400",{"key":27,"text":195,"correct":22},"10000",{"key":29,"text":197,"correct":22},"9960",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":21},898732,"某建设项目投产后，应付账款的最低周转天数为15天，预计年销售收入为12000万元，年经营成本9000万元，其中外购原材料、燃料7200万元，则该项目的应付账款估算额为（ ）万元。",[202,204,206,208],{"key":20,"text":203,"correct":22},"500",{"key":24,"text":205,"correct":22},"375",{"key":27,"text":207,"correct":25},"300",{"key":29,"text":209,"correct":22},"125",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":21},898733,"在国外对投资估算的阶段划分中，项目投资机会研究阶段的投资估算精度要求为误差控制在（ ）以内。",[214,216,218,220],{"key":20,"text":215,"correct":25},"±30%",{"key":24,"text":217,"correct":22},"±20%",{"key":27,"text":219,"correct":22},"±10%",{"key":29,"text":221,"correct":22},"±5%",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":29,"analysis":21},898734,"先求出已有同类企业主要设备投资占项目静态投资的比例系数，然后再估算出拟建项目的主要设备投资，最后按比例系数求出拟建项目的静态投资，这种估算方法称（ ）。",[226,228,230,231],{"key":20,"text":227,"correct":22},"设备系数法",{"key":24,"text":229,"correct":22},"主体专业系数法",{"key":27,"text":73,"correct":22},{"key":29,"text":232,"correct":25},"比例估算法",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":29,"analysis":21},898735,"对于农产品、矿产品等初步加工建设项目，在进行建设地区选择时应遵循的原则是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"靠近大中城市",{"key":24,"text":240,"correct":22},"靠近燃料提供地",{"key":27,"text":242,"correct":22},"靠近产品消费地",{"key":29,"text":244,"correct":25},"靠近原料产地",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":29,"analysis":21},898736,"下列投资估算方法中，精度较高的是（ ）。",[249,250,252,254],{"key":20,"text":71,"correct":22},{"key":24,"text":251,"correct":22},"单位生产能力估算法",{"key":27,"text":253,"correct":22},"系数估算法",{"key":29,"text":75,"correct":25},{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":21},898737,"现有一通用设备，原价3万元，重5t，设备安装费指标为100元\u002Ft，安装费率2%。设备的安装费为（ ）元。",[259,261,263,265],{"key":20,"text":260,"correct":25},"600",{"key":24,"text":262,"correct":22},"700",{"key":27,"text":264,"correct":22},"800",{"key":29,"text":266,"correct":22},"900",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":29,"analysis":21},898738,"关于流动资金估算的计算公式，正确的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"流动资产=应收账款+存货+现金",{"key":24,"text":274,"correct":22},"应收账款=（在产品+产成品）／应收账款周转次数",{"key":27,"text":276,"correct":22},"存货=外购原材料、燃料+在产品+产成品",{"key":29,"text":278,"correct":25},"现金=（年工资及福利费+年其他费用）／现金周转次数",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":21},898739,"项目决策的（ ）是决定工程造价的基础",[283,285,287,289],{"key":20,"text":284,"correct":22},"深度",{"key":24,"text":286,"correct":22},"正确性",{"key":27,"text":288,"correct":25},"内容",{"key":29,"text":290,"correct":22},"建设规模",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":29,"analysis":21},898740,"关于项目建设地区选择原则的说法，正确的是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"应将项目安排在距原料、燃料提供地和产品消费地等距离范围内",{"key":24,"text":298,"correct":22},"各类企业应集中布置，以便形成综合生产能力",{"key":27,"text":300,"correct":22},"工业布局的集聚程度越高越好",{"key":29,"text":302,"correct":25},"相应的生产性和社会性基础设施相配合，以充分发挥其能力和效率",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":21},898741,"某企业全年的销售收入是3000万元，经营成本占全部销售收入的40%，年其他营业费用为600万元，应收账款年周转次数是6次，则应收账款估算额为（ ）万元。",[307,309,311,313],{"key":20,"text":308,"correct":22},"100",{"key":24,"text":310,"correct":25},"200",{"key":27,"text":312,"correct":22},"400",{"key":29,"text":203,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":21},898742,"关于生产技术方案的选择，下列说法中正确的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"应结合市场需要确定建设规模",{"key":24,"text":321,"correct":25},"生产方法应与拟采用的原材料相适应",{"key":27,"text":323,"correct":22},"工艺流程宜具有刚性安排",{"key":29,"text":325,"correct":22},"应选择最先进的生产方法",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":21},898743,"某地2012年拟建年产30万吨化工产品项目。依据调查，某生产相同产品的已建成项目，年产量为10万吨，建设投资为12000万元。若生产能力指数为0.9，综合调整系数为1.15，则该拟建项目的建设投资是（ ）万元。",[330,332,334,336],{"key":20,"text":331,"correct":22},"28047",{"key":24,"text":333,"correct":22},"36578",{"key":27,"text":335,"correct":25},"37093",{"key":29,"text":337,"correct":22},"37260",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":29,"analysis":21},898744,"应用分项详细估算法估算项目流动资金时，流动资产的正确构成是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"应付账款+预付账款+存货+年其他费用",{"key":24,"text":345,"correct":22},"应付账款+应收账款+存货+现金",{"key":27,"text":347,"correct":22},"应收账款+存货+预收账款+现金",{"key":29,"text":349,"correct":25},"预付账款+现金+应收账款+存货",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":21},898745,"下列利用分项详细估算法计算流动资金的公式中，正确的是（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"预收账款=营业收入年金额\u002F预收账款周转次数",{"key":24,"text":357,"correct":25},"应收账款=年经营成本\u002F应收账款周转次数",{"key":27,"text":359,"correct":22},"在产品=（年经营成本-年其他营业费用）\u002F在产品周转次数",{"key":29,"text":361,"correct":22},"预付账款=外购原材料、燃料费用\u002F预付账款周转次数",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":21},898746,"2006年已建成年产20万吨的某化工厂，2010年拟建年产100万吨相同产品的新项目，并采用增加相同规格设备数量的技术方案。若应用生产能力指数法估算拟建项目投资额，则生产能力指数取值的适宜范围是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"0.4～0.5",{"key":24,"text":369,"correct":22},"0.6～0.7",{"key":27,"text":371,"correct":25},"0.8～0.9",{"key":29,"text":373,"correct":22},"0.9～1",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":29,"analysis":21},898747,"根据已知的同类建设项目主要生产工艺设备占整个建设项目的投资比例，先逐项估算出拟建项目主要生产工艺设备投资，再按比例估算拟建项目的静态投资，这种估算方法称（ ）。",[378,379,380,381],{"key":20,"text":227,"correct":22},{"key":24,"text":229,"correct":22},{"key":27,"text":73,"correct":22},{"key":29,"text":232,"correct":25},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":21},898748,"可行性研究阶段投资估算的精确度的要求为：误差控制在±（ ）%以内。",[386,388,390,392],{"key":20,"text":387,"correct":22},"5",{"key":24,"text":389,"correct":25},"10",{"key":27,"text":391,"correct":22},"15",{"key":29,"text":393,"correct":22},"20",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":21},898749,"关于我国项目前期各阶段投资估算的精度要求，下列说法中正确的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"项目建议书阶段，允许误差大于±30%",{"key":24,"text":401,"correct":22},"投资设想阶段，要求误差控制在±30%以内",{"key":27,"text":403,"correct":25},"预可行性研究阶段，要求误差控制在±20%以内",{"key":29,"text":405,"correct":22},"可行性研究阶段，要求误差控制在±15宜以内",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":29,"analysis":21},898750,"关于项目投资估算的作用，下列说法中正确的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"项目建议书阶段的投资估算，是确定建设投资最高限额的依据",{"key":24,"text":413,"correct":22},"可行性研究阶段的投资估算，是项目投资决策的重要依据，不得突破",{"key":27,"text":415,"correct":22},"投资估算不能作为制定建设贷款计划的依据",{"key":29,"text":417,"correct":25},"投资估算是核算建设项目固定资产需要额的重要依据",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":29,"analysis":21},898751,"建设地点选择时需要进行费用分析，下列费用应列入项目投资费用比较的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"动力供应费",{"key":24,"text":425,"correct":22},"燃料运入费",{"key":27,"text":427,"correct":22},"产品运出费",{"key":29,"text":429,"correct":25},"建材运输费",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":21},898752,"总承包工程报价时，承包商大都采用的估算方法是（ ）。",[434,435,436,437],{"key":20,"text":251,"correct":22},{"key":24,"text":71,"correct":25},{"key":27,"text":253,"correct":22},{"key":29,"text":75,"correct":22},{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":27,"analysis":21},898753,"项目决策阶段对环境治理方案进行技术经济比较时，不作为比较内容的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"技术水平对比",{"key":24,"text":445,"correct":22},"管理及监测方式对比",{"key":27,"text":447,"correct":25},"安全生产条件对比",{"key":29,"text":449,"correct":22},"环境效益对比",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":21},898754,"预计某年度应收账款1800万元，应付账款1300万元，预收账款700万元，预付账款500万元，存货1000万元，现金400万元。则该年度流动资金估算额为（ ）万元。",[454,455,457,459],{"key":20,"text":262,"correct":22},{"key":24,"text":456,"correct":22},"1100",{"key":27,"text":458,"correct":25},"1700",{"key":29,"text":460,"correct":22},"2100",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":21},898755,"投资估算的编制方法中，以拟建项目的主体工程费为基数，以其他工程费与主体工程费的百分比为系数，估算拟建项目静态投资的方法是（ ）。",[465,466,467,468],{"key":20,"text":251,"correct":22},{"key":24,"text":71,"correct":22},{"key":27,"text":253,"correct":25},{"key":29,"text":232,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":21},898756,"投资决策阶段对工程造价的影响程度最高，可达到的比例是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"50%～70%",{"key":24,"text":476,"correct":25},"70%～90%",{"key":27,"text":478,"correct":22},"70%",{"key":29,"text":480,"correct":22},"75%～90%",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":21},898757,"技术方案选择的基本原则中，评定技术方案最基本的标准是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"经济合理",{"key":24,"text":488,"correct":25},"先进适用",{"key":27,"text":490,"correct":22},"安全可靠",{"key":29,"text":492,"correct":22},"规模经济",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":21},898758,"当工业集聚带来的（ ）的总和超过生产集聚带来的利益时，综合经济效益反而下降。",[497,499,501,503],{"key":20,"text":498,"correct":25},"“外部不经济性”",{"key":24,"text":500,"correct":22},"“外部不协调性”",{"key":27,"text":502,"correct":22},"“内部不经济性”",{"key":29,"text":504,"correct":22},"“内部不协调性”",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":21},898759,"流动资金的估算中，下列描述正确的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"周转次数=360／流动资金最高周转天数",{"key":24,"text":512,"correct":25},"产成品计算中要扣除年其他营业费用",{"key":27,"text":514,"correct":22},"年其他费用的计算中，应当包含制造费用、管理费用和营业费用中的折旧摊销费",{"key":29,"text":516,"correct":22},"扩大指标估算法精准度高，但是该方法操作较复杂",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":21},898760,"对于技术密集型建设项目，选择建设地区应遵循的原则是()。",[521,523,524,526],{"key":20,"text":522,"correct":25},"选择在大中型发达城市",{"key":24,"text":244,"correct":22},{"key":27,"text":525,"correct":22},"靠近产地消费地",{"key":29,"text":527,"correct":22},"靠近电(能)源地",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":21},898761,"下列有关静态投资部分估算方法的描述，正确的是()。",[532,534,536,538],{"key":20,"text":533,"correct":22},"在条件允许时，可行性研究阶段可采用生产能力指数法编制估算",{"key":24,"text":535,"correct":25},"在条件允许时，项目建议书阶段可采用指标估算法编制估算",{"key":27,"text":537,"correct":22},"在条件允许时，可行性研究阶段可采用系数估算法编制估算",{"key":29,"text":539,"correct":22},"在条件允许时，可行性研究阶段可采用比例估算法编制估算",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":27,"analysis":21},898762,"在可行性研究阶段编制投资估算，当编制建筑工程费用估算时，适合采用100m2断面为单位，套用技术标准、结构形式、施工方法相适应的投资估算指标或类似工程造价资料进行估算的是()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"桥梁",{"key":24,"text":547,"correct":22},"铁路",{"key":27,"text":549,"correct":25},"隧道",{"key":29,"text":551,"correct":22},"围墙大门",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":21},898763,"运用分项详细估算法估算项目存货时，存货的正确构成是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"应付账款+预付账款+在产品+产成品",{"key":24,"text":559,"correct":22},"应付账款+应收账款+在产品+产成品",{"key":27,"text":561,"correct":25},"外购原材料、燃料+其他材料+在产品+产成品",{"key":29,"text":563,"correct":22},"预付账款+现金+在产品+产成品",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":29,"analysis":21},898764,"下列工作内容中，在选择工艺流程方案时需要研究的是()。",[568,570,572,574],{"key":20,"text":569,"correct":22},"主要设备之间的匹配性",{"key":24,"text":571,"correct":22},"生产方法是否符合节能要求",{"key":27,"text":573,"correct":22},"工艺流程设备的安装方式",{"key":29,"text":575,"correct":25},"各工序间是否合理衔接",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":21},898765,"下列对于K周从低到高排序正确的是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"圆形、矩形、L形、T形",{"key":24,"text":583,"correct":25},"圆形、正方形、矩形、L形",{"key":27,"text":585,"correct":22},"矩形、正方形、T形、L形",{"key":29,"text":587,"correct":22},"矩形、长方形、L形、T形",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":21},898766,"通常情况下建筑周长系数越低，设计（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"越昂贵",{"key":24,"text":595,"correct":25},"越经济",{"key":27,"text":597,"correct":22},"与该指标无关",{"key":29,"text":599,"correct":22},"一样",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]