[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,16,50,2160,[13,34,46,58,70,82,94,104,116,128,140,152,164,176,188,199,211,223,231,243,255,267,279,291,303,315,327,336,348,357,369,381,391,403,414,426,438,450,458,470,482,494,506,518,527,539,551,563,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},898617,1,"单选题","在对材料消耗过程测定与观察的基础上，通过完成产品数量和材料消耗量的计算而确定各种材料消耗定额的方法是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","实验室试验法",false,{"key":24,"text":25,"correct":26},"B","现场技术测定法",true,{"key":28,"text":29,"correct":22},"C","现场统计法",{"key":31,"text":32,"correct":22},"D","理论计算法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},898618,"下列对工人工作时间中休息时间的理解，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"在定额时间中不进行计算",{"key":24,"text":41,"correct":22},"休息时间即停工时间",{"key":28,"text":43,"correct":26},"它属于必需消耗的工作时间",{"key":31,"text":45,"correct":22},"休息时间的长短是一定的，即8小时工作时间以外的时间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},898619,"砌筑一砖厚砖墙，灰缝厚度为10mm，砖的施工损耗率为1.5%，场外运输损耗率为1%。砖的规格为240mm×115mm×53mm，则每m3砖墙工程中砖的定额消耗量为（ ）块。",[50,52,54,56],{"key":20,"text":51,"correct":22},"515.56",{"key":24,"text":53,"correct":22},"520.64",{"key":28,"text":55,"correct":26},"537.04",{"key":31,"text":57,"correct":22},"542.33",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},898620,"工人的工作时间中，熟悉施工图纸所消耗的时间属于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"基本工作时间",{"key":24,"text":65,"correct":22},"辅助工作时间",{"key":28,"text":67,"correct":26},"准备与结束工作时间",{"key":31,"text":69,"correct":22},"不可避免的中断时间",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},898621,"下列工人工作时间消耗中，属于有效工作时间的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"因混凝土养护引起的停工时间",{"key":24,"text":77,"correct":22},"偶然停工（停水、停电）增加的时间",{"key":28,"text":79,"correct":22},"产品质量不合格返工的工作时间",{"key":31,"text":81,"correct":26},"准备施工工具花费的时间",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},898622,"关于工序特征的描述，下列说法中正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"劳动者、工作地点不变，劳动工具、劳动对象可变",{"key":24,"text":89,"correct":22},"劳动对象、劳动工具不变，劳动者、工作地点可变",{"key":28,"text":91,"correct":22},"劳动对象、劳动工具、工作地点不变，劳动者可变",{"key":31,"text":93,"correct":26},"劳动者、劳动对象和使用的劳动工具均不发生变化",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},898623,"在工人工作时间分类中，由于材料供应不及时引起工作班内的工时损失应列入（ ）。",[98,100,102,103],{"key":20,"text":99,"correct":26},"施工本身造成的停工时间",{"key":24,"text":101,"correct":22},"非施工本身造成的停工时间",{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},898624,"下列因素中，影响施工过程的技术因素是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"工人技术水平",{"key":24,"text":111,"correct":22},"操作方法",{"key":28,"text":113,"correct":26},"机械设备性能",{"key":31,"text":115,"correct":22},"劳动组织",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},898625,"在确定材料定额消耗量时，利用实验室试验法主要是为了编制（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"材料损耗定额",{"key":24,"text":123,"correct":26},"材料净用量定额",{"key":28,"text":125,"correct":22},"材料消耗定额",{"key":31,"text":127,"correct":22},"劳动定额",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},898626,"根据计时观测资料得知：每平方米标准砖墙勾缝时间为10min，辅助工作时间占工序作业时间的比例为5%，准备结束时间、不可避免中断时间、休息时间占工作班时间的比例分别为3%、2%、15%。则每立方米砌体1标准砖厚的砖墙勾缝的产量定额为（ ）m3／工日。",[132,134,136,138],{"key":20,"text":133,"correct":22},"8.621",{"key":24,"text":135,"correct":26},"8.772",{"key":28,"text":137,"correct":22},"9.174",{"key":31,"text":139,"correct":22},"14.493",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},898627,"在机械工作时间消耗的分类中，由于工人装料数量不足引起的砂浆搅拌机不能满载工作的时间属于（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"低负荷下的工作时间",{"key":24,"text":147,"correct":22},"机械的多余工作时间",{"key":28,"text":149,"correct":22},"违反劳动纪律引起的机械时间损失",{"key":31,"text":151,"correct":22},"有根据地降低负荷下的工作时间",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},898628,"根据计时观察法测定某人工挖基坑二类土1m3的有关数据如下：基本工作时间180min，辅助工作时间占工序作业时间的百分比为10%，规范时间占工作日时间百分比为20%，则挖该基坑1m3的定额时间为（ ）min。",[156,158,160,162],{"key":20,"text":157,"correct":22},"243.0",{"key":24,"text":159,"correct":22},"247.5",{"key":28,"text":161,"correct":26},"250.0",{"key":31,"text":163,"correct":22},"257.1",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},898629,"在各种计时观察法中，精确度最高的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"选择法测时",{"key":24,"text":171,"correct":26},"接续法测时",{"key":28,"text":173,"correct":22},"写实记录法",{"key":31,"text":175,"correct":22},"工作日写实法",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},898630,"测编定额时，需对施工过程进行分解。对比工作过程的特点，工序还应具有的特征是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"人员编制不变",{"key":24,"text":183,"correct":26},"劳动工具不变",{"key":28,"text":185,"correct":22},"工作地点不变",{"key":31,"text":187,"correct":22},"工作时段不变",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},898631,"运输汽车装载保温泡沫板，因体积大但重量不足而引起的汽车在降低负荷的情况下工作的时间属于机器工作时间消耗中的（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"有效工作时间",{"key":24,"text":195,"correct":22},"不可避免的无负荷工作时间",{"key":28,"text":197,"correct":22},"多余工作时间",{"key":31,"text":145,"correct":22},{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},898632,"出料容量为500L的砂浆搅拌机，每循环工作一次，需要运料、装料、搅拌、卸料和中断的时间分别为120s、30s、180s、30s、30s，其中运料与其他循环组成部分交叠的时间为30s。机械正常利用系数为0.8，则500L砂浆搅拌机的产量定额为（ ）m3\u002F台班。（1m3=1000L）",[203,205,207,209],{"key":20,"text":204,"correct":22},"27.43",{"key":24,"text":206,"correct":22},"29.54",{"key":28,"text":208,"correct":26},"32.00",{"key":31,"text":210,"correct":22},"48.00",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},898633,"当确定测时法的观察次数时，通常考虑的因素是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"算数平均值的精确度及数列的稳定系数",{"key":24,"text":218,"correct":22},"算数平均值的精确度及已经达到的功效水平的稳定程度",{"key":28,"text":220,"correct":22},"被测定的工人人数及数列的稳定系数",{"key":31,"text":222,"correct":22},"被测定的工人人数及同时测定不同类型施工过程的数目",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},898634,"根据施工过程工时研究结果，与工人所担负的工作量大小无关的必须消耗时间是（ ）。",[227,228,229,230],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":26},{"key":31,"text":197,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},898635,"经现场观测，完成10m3某分项工程需消耗某种材料2.76m3，其中现场内材料运输及施工操作过程中的损耗量0.095m3，则该种材料的损耗率为（ ）。",[235,237,239,241],{"key":20,"text":236,"correct":22},"3.64%",{"key":24,"text":238,"correct":22},"3.57%",{"key":28,"text":240,"correct":22},"3.44%",{"key":31,"text":242,"correct":26},"3.56%",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":28,"analysis":33},898636,"某土方施工机械一次循环的正常时间为2.2min，每循环工作一次挖土0.5m3，工作班的延续时间为8h，机械正常利用系数为0.85。则该土方施工机械的产量定额为（ ）m3\u002F台班。",[247,249,251,253],{"key":20,"text":248,"correct":22},"7.01",{"key":24,"text":250,"correct":22},"7.48",{"key":28,"text":252,"correct":26},"92.73",{"key":31,"text":254,"correct":22},"448.80",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},898637,"砌筑每立方米一砖厚砖墙，砖（240mm×115mm×53mm）的净用量为529块，灰缝厚度为10mm，砖的损耗率为1%，砂浆的损耗率为2%。则每立方米一砖厚砖墙的砂浆消耗量为（ ）m3。",[259,261,263,265],{"key":20,"text":260,"correct":22},"0.217",{"key":24,"text":262,"correct":22},"0.222",{"key":28,"text":264,"correct":22},"0.226",{"key":31,"text":266,"correct":26},"0.231",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},898638,"确定材料消耗量时，现场技术测定法主要用来测定材料（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"消耗量定额",{"key":24,"text":274,"correct":26},"损耗定额",{"key":28,"text":276,"correct":22},"净用量定额",{"key":31,"text":278,"correct":22},"必需消耗量",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":33},898639,"确定施工机械台班定额消耗量前需计算机械时间利用系数，其计算公式正确的是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"机械时间利用系数=机械纯工作1h正常生产率×工作班纯工作时间",{"key":24,"text":286,"correct":22},"机械时间利用系数=1\u002F机械台班产量定额",{"key":28,"text":288,"correct":26},"机械时间利用系数=机械在一个工作班内纯工作时间\u002F一个工作班延续时间（8h）",{"key":31,"text":290,"correct":22},"机械时间利用系数=一个工作班延续时间（8h）\u002F机械在一个工作班内纯工作时间",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},898640,"通过计时观察，完成某工程的基本工时为6h\u002F㎡，辅助工作时间为工序作业时间的8%。规范时间占工作时间的15%，则完成该工程的时间定额是（ ）工日／㎡。",[295,297,299,301],{"key":20,"text":296,"correct":22},"0.93",{"key":24,"text":298,"correct":22},"0.94",{"key":28,"text":300,"correct":22},"0.95",{"key":31,"text":302,"correct":26},"0.96",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},898641,"已知某挖土机挖土的一次正常循环工作时间是2min，每循环工作一次挖土0.5m3，工作班的延续时间为8h，机械正常利用系数为0.8，则其产量定额为（ ）m3\u002F台班。",[307,309,311,313],{"key":20,"text":308,"correct":26},"96",{"key":24,"text":310,"correct":22},"120",{"key":28,"text":312,"correct":22},"150",{"key":31,"text":314,"correct":22},"300",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},898642,"已知砌筑1m3砖墙中砖净量和损耗量分别为529块、6块，百块砖体积按0.146m3计算，砂浆损耗率为10%。则砌筑1m3砖墙的砂浆用量为（ ）m3。",[319,321,323,325],{"key":20,"text":320,"correct":26},"0.250",{"key":24,"text":322,"correct":22},"0.253",{"key":28,"text":324,"correct":22},"0.241",{"key":31,"text":326,"correct":22},"0.243",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":28,"analysis":33},898643,"在编制材料定额消耗量时，用于确定材料损耗定额的方法主要是（ ）。",[331,332,334,335],{"key":20,"text":32,"correct":22},{"key":24,"text":333,"correct":22},"经验统计法",{"key":28,"text":25,"correct":26},{"key":31,"text":21,"correct":22},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},898644,"下列施工机械消耗时间中，属于机械必需消耗时间的是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"未及时供料引起的机械停工时间",{"key":24,"text":343,"correct":22},"由于气候条件引起的机械停工时间",{"key":28,"text":345,"correct":22},"装料不足时的机械运转时间",{"key":31,"text":347,"correct":26},"因机械保养而中断使用的时间",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},898645,"在必需消耗的时间中，有一类时间与工作量大小无关，而往往和工作内容相关，这一时间应是（ ）。",[352,353,354,356],{"key":20,"text":67,"correct":26},{"key":24,"text":63,"correct":22},{"key":28,"text":355,"correct":22},"休息时间",{"key":31,"text":65,"correct":22},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},898646,"已知人工砌筑1m3标准砖墙的基本工作时间为4.5小时，辅助工作时间占工序作业时间的2％。准备与结束工作时间、不可避免的中断时间、休息时间分别占工作日的3％、2％、15％。则该人工砌筑1m3标准砖墙的时间定额是（ ）工日／m3。",[361,363,365,367],{"key":20,"text":362,"correct":22},"0.704",{"key":24,"text":364,"correct":26},"0.718",{"key":28,"text":366,"correct":22},"0.751",{"key":31,"text":368,"correct":22},"0.807",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},898647,"正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为0.90kg。已知该材料的损耗率为7.20％，则其总消耗量为（ ）kg",[373,375,377,379],{"key":20,"text":374,"correct":22},"13.50",{"key":24,"text":376,"correct":26},"13.40",{"key":28,"text":378,"correct":22},"12.50",{"key":31,"text":380,"correct":22},"11.60",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},898648,"计时观察法中，在我国采用较广的编制定额方法是（ ）。",[385,387,389,390],{"key":20,"text":386,"correct":22},"选择测试法",{"key":24,"text":388,"correct":22},"接续测试法",{"key":28,"text":175,"correct":26},{"key":31,"text":173,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},898649,"已知1m2砖墙的勾缝时间为10min，则每立方米一砖半厚墙所需的勾缝时间为（ ）min。",[395,397,399,401],{"key":20,"text":396,"correct":22},"12.00",{"key":24,"text":398,"correct":22},"21.92",{"key":28,"text":400,"correct":26},"27.40",{"key":31,"text":402,"correct":22},"33.33",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},898650,"通过计时观察，完成某工程的基本工时为4h／m3，辅助工作时间为工序作业时间的8％。规范时间占工作时间的20％，则完成该工程的时间定额是（ ）工日／m3。",[407,409,411,413],{"key":20,"text":408,"correct":22},"0.56",{"key":24,"text":410,"correct":22},"0.67",{"key":28,"text":412,"correct":26},"0.68",{"key":31,"text":302,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},898651,"对于测时法的特征描述，下列说法错误的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"测时法主要适用于测定定时重复的循环工作的工时消耗",{"key":24,"text":421,"correct":26},"选择法测时比接续测时法准确、完善，但观察技术也较之复杂",{"key":28,"text":423,"correct":22},"当所测定的各工序的延续时间较短时，选择测时法较接续测时法方便",{"key":31,"text":425,"correct":22},"测时法的观测次数应该依据误差理论和经验数据相结合的方法确定",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},898652,"下列关于计时观察方法的描述，正确的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"选择测时法的精确度一般可达到0.5s",{"key":24,"text":433,"correct":22},"写实记录法是精确度比较高的计时观察法",{"key":28,"text":435,"correct":22},"图示法写实记录属于工作日写实法",{"key":31,"text":437,"correct":22},"测时法的观察次数与要求的算术平均值精确度及数列稳定系数无关",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},898653,"经现场观测，完成10m3某分项工程需消耗某种材料1.76m3，其中损耗量0.055m3，则该种材料的损耗率为（ ）％。",[442,444,446,448],{"key":20,"text":443,"correct":22},"3.03",{"key":24,"text":445,"correct":22},"3.13",{"key":28,"text":447,"correct":22},"3.20",{"key":31,"text":449,"correct":26},"3.23",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},898654,"以施工现场积累的分部分项工程使用材料数量、完成产品数量、完成工作原材料的剩余数量等统计资料为基础，经过整理分析，获得材料消耗数据的方法是（ ）。",[454,455,456,457],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},898655,"下列（ ）是精度最高的写实记录法。",[462,464,466,468],{"key":20,"text":463,"correct":26},"数示法",{"key":24,"text":465,"correct":22},"图示法",{"key":28,"text":467,"correct":22},"接续法",{"key":31,"text":469,"correct":22},"选择法",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},898656,"施工机械台班单价中的养路费及车船使用税中的保险费是指（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"强制保险费",{"key":24,"text":477,"correct":22},"非强制保险费",{"key":28,"text":479,"correct":22},"强制和非强制保险费",{"key":31,"text":481,"correct":22},"司机危险作业意外伤害保险费",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},898657,"某挖掘机配司机1人，若年制度工作日为245天，年工作台班为220台班，人工工日单价为80元，则该挖掘机的人工费为（ ）元\u002F台班。",[486,488,490,492],{"key":20,"text":487,"correct":22},"71.8",{"key":24,"text":489,"correct":22},"80.0",{"key":28,"text":491,"correct":26},"89.1",{"key":31,"text":493,"correct":22},"132.7",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},898658,"关于施工机械安拆费和场外运费的说法，正确的是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"安拆费指安拆一次所需的人工、材料和机械使用费之和",{"key":24,"text":501,"correct":26},"安拆费中包括机械辅助设施的折旧费",{"key":28,"text":503,"correct":22},"安拆复杂、移动需要起重及运输机械的重型施工机械，其安拆费及场外运费不予计算",{"key":31,"text":505,"correct":22},"固定在车间的施工机械，计算安拆费及场外运费",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},898659,"根据国家相关法律、法规和政策规定，因停工学习、执行国家或社会义务等原因，按计时工资标准支付的工资属于人工日工资单价中的（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"基本工资",{"key":24,"text":513,"correct":22},"奖金",{"key":28,"text":515,"correct":22},"津贴补贴",{"key":31,"text":517,"correct":26},"特殊情况下支付的工资",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},898660,"人工日工资单价的组成中，停工学习时支付的工资属于（ ）。",[522,524,525,526],{"key":20,"text":523,"correct":22},"计时工资",{"key":24,"text":517,"correct":26},{"key":28,"text":513,"correct":22},{"key":31,"text":515,"correct":22},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":28,"analysis":33},898661,"某施工机械耐用总台班为800台班，检修周期数为4，每次检修费用为1200元，则该机械的台班检修费为（ ）元。",[531,533,535,537],{"key":20,"text":532,"correct":22},"7.5",{"key":24,"text":534,"correct":22},"6.0",{"key":28,"text":536,"correct":26},"4.5",{"key":31,"text":538,"correct":22},"3.0",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},898662,"施工机械耐用总台班数，指机械从投入使用至（ ）前的总台班数。",[543,545,547,549],{"key":20,"text":544,"correct":22},"大修",{"key":24,"text":546,"correct":26},"报废",{"key":28,"text":548,"correct":22},"一项工程竣工",{"key":31,"text":550,"correct":22},"满5年",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":31,"analysis":33},898663,"下列费用项目中，应计入建筑安装工程材料单价的是（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"材料一般性鉴定检查费",{"key":24,"text":558,"correct":22},"材料二次搬运费",{"key":28,"text":560,"correct":22},"新结构、新材料试验费",{"key":31,"text":562,"correct":26},"材料工地管理费",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},898664,"按照现行规定，生产工人根据国家法律、法规和政策规定执行国家或社会义务等原因按计时工资标准或计件工资标准的一定比例支付的工资属于（ ）。",[567,568,569,571],{"key":20,"text":523,"correct":22},{"key":24,"text":517,"correct":26},{"key":28,"text":570,"correct":22},"计件工资",{"key":31,"text":515,"correct":22},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":28,"analysis":33},898665,"下列费用项目中，应计入进口材料运杂费中的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"国际运费",{"key":24,"text":579,"correct":22},"国际运输保险费",{"key":28,"text":581,"correct":26},"到岸后外埠中转运输费",{"key":31,"text":583,"correct":22},"进口环节税费",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},898666,"某施工机械原值为50000元，耐用总台班为2000台班，一次检修费为3000元，检修周期为4，台维护费系数为20%，每台班发生的其他费用合计为30元／台班，忽略残值和资金时间价值，除税系数为1，则该机械的台班单价为（ ）元。",[588,590,592,594],{"key":20,"text":589,"correct":26},"60.40",{"key":24,"text":591,"correct":22},"62.20",{"key":28,"text":593,"correct":22},"65.40",{"key":31,"text":595,"correct":22},"67.20",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]