[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,15,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,224,233,245,257,269,281,293,302,310,321,333,345,357,366,376,388,400,412,422,430,442,451,463,474,486,495,507,519,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},898567,1,"单选题","工程量清单计价的基础公式正确的是（ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","分部分项工程费=∑（分部分项工程量×相应分部分项综合单价）",true,{"key":24,"text":25,"correct":26},"B","其他项目费=暂估价+计日工+总承包服务费",false,{"key":28,"text":29,"correct":26},"C","单位工程报价=分部分项工程费+措施项目费+其他项目费+规费",{"key":31,"text":32,"correct":26},"D","建设项目总报价=∑单位工程报价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},898568,"作为工程定额体系的重要组成部分，预算定额是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"完成一定计价单位的某一施工过程所需要消耗的人工、材料和机械台班数量标准",{"key":24,"text":41,"correct":22},"完成一定计量单位合格分项工程和结构构件所需消耗的人工、材料、施工机械台班数量及其费用标准",{"key":28,"text":43,"correct":26},"完成单位合格扩大分项工程所需消耗的人工、材料和施工机械台班数量及费用标准",{"key":31,"text":45,"correct":26},"完成一个规定计量单位建筑安装产品的费用消耗标准",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},898569,"下列工程定额体系中，不属于按照专业划分的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工定额",{"key":24,"text":53,"correct":26},"建筑及装饰工程定额",{"key":28,"text":55,"correct":26},"铁路工程定额",{"key":31,"text":57,"correct":26},"工业管道工程定额",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},898570,"劳动消耗定额主要表现形式是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"产量定额",{"key":24,"text":65,"correct":26},"台班定额",{"key":28,"text":67,"correct":26},"工日定额",{"key":31,"text":69,"correct":22},"时间定额",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},898571,"对定额发布后工程建设中出现的新技术、新工艺、新材料、新设备等情况，应根据工程建设需求及时（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"制定新定额",{"key":24,"text":77,"correct":26},"全面修订定额",{"key":28,"text":79,"correct":26},"局部修订定额",{"key":31,"text":81,"correct":22},"编制补充定额",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},898572,"在工程量清单的编制过程中，下列内容中需要依据施工组织设计、施工规范、验收规范编制的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"项目编码",{"key":24,"text":89,"correct":26},"计量单位",{"key":28,"text":91,"correct":26},"招标文件",{"key":31,"text":93,"correct":22},"计算工程量",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},898573,"预算定额是以（ ）为对象编制的定额。",[98,100,102,104],{"key":20,"text":99,"correct":26},"施工过程或基本工序",{"key":24,"text":101,"correct":22},"分项工程和结构构件",{"key":28,"text":103,"correct":26},"扩大的分项工程或扩大的结构构件",{"key":31,"text":105,"correct":26},"单位工程",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},898574,"有关计日工的表述，下列说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"计日工表中的项目名称、数量和单价应由招标人填写",{"key":24,"text":113,"correct":26},"计日工表通常只对额外消耗的人工工时和单价进行约定",{"key":28,"text":115,"correct":26},"计日工适用的所谓零星工作一般是指变更而产生的、工程量清单中没有相应项目的额外工作，但通常是在合同约定之内",{"key":31,"text":117,"correct":22},"计日工是为了解决现场发生的零星工作的计价而设立的",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},898575,"有关其他项目清单的表述，下列内容中正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"暂列金额能保证合同结算价格不会超过合同价格",{"key":24,"text":125,"correct":22},"投标人应将材料暂估单价计入工程量清单综合单价报价中",{"key":28,"text":127,"correct":26},"专业工程的暂估价一般应是综合暂估价，应当包括管理费、利润、规费、税金在内",{"key":31,"text":129,"correct":26},"计日工适用的所谓零星工作一般是指合同约定之内的因变更而产生的额外工作",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},898576,"下列费用项目中，应由投标人确定额度，并计入其他项目清单与计价汇总表中的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"暂列金额",{"key":24,"text":137,"correct":26},"材料暂估价",{"key":28,"text":139,"correct":26},"专业工程暂估价",{"key":31,"text":141,"correct":22},"总承包服务费",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},898577,"某分部分项工程的清单编码为010302006004，则该分部分项工程的清单项目顺序编码为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"01",{"key":24,"text":149,"correct":26},"02",{"key":28,"text":151,"correct":26},"006",{"key":31,"text":153,"correct":22},"004",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},898578,"编制工程量清单出现计算规范附录中未包括的清单项目时，编制人应作补充，下列有关编制补充项目的说法中正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"补充项目编码应由B与三位阿拉伯数字组成",{"key":24,"text":161,"correct":26},"补充项目应报县级工程造价管理机构备案",{"key":28,"text":163,"correct":22},"补充项目的工作内容应予以明确",{"key":31,"text":165,"correct":26},"补充项目编码应顺序编制，起始序号由编制人根据需要自主确定",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},898579,"措施项目清单编制中，下列适用于以“项”为单位计价的措施项目费是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"已完工程及设备保护费",{"key":24,"text":173,"correct":26},"超高施工增加费",{"key":28,"text":175,"correct":26},"大型机械设备进出场及安拆费",{"key":31,"text":177,"correct":26},"施工排水、降水费",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},898580,"分部分项工程量清单项目编码以五级编码设置，其中第四级编码为（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"工程分类顺序码",{"key":24,"text":185,"correct":26},"专业工程顺序码",{"key":28,"text":187,"correct":26},"分部工程顺序码",{"key":31,"text":189,"correct":22},"分项工程项目名称顺序码",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},898581,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于计日工，下列说法中正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"计日工表包括各种人工，不应包括材料、施工机械",{"key":24,"text":197,"correct":22},"计日工按综合单价计价，投标时应计入投标总价",{"key":28,"text":199,"correct":26},"计日工表中的项目名称由招标人填写，工程数量由投标人填写",{"key":31,"text":201,"correct":26},"计日工单价由投标人自主确定，并按计日工表中所列数量结算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},898582,"根据《建设工程工程量清单计价规范》GB50500-2013，关于暂估价的说法中，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"材料、工程设备暂估价表中只填写原材料、燃料、构配件的暂估价",{"key":24,"text":209,"correct":22},"材料暂估价应纳入分部分项工程量清单项目综合单价",{"key":28,"text":211,"correct":26},"专业工程暂估价指完成专业工程的建筑安装工程费",{"key":31,"text":213,"correct":26},"专业工程暂估价由专业工程承包人填写",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},898583,"对于招标人在招标文件中提供的用于支付必然发生但暂时不能确定价格的材料金额计（ ）。",[218,219,221,223],{"key":20,"text":135,"correct":26},{"key":24,"text":220,"correct":22},"暂估价",{"key":28,"text":222,"correct":26},"计日工",{"key":31,"text":139,"correct":26},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},898584,"根据《建设工程工程量清单计价规范》GB50500—2013，关于材料和专业工程暂估价的说法中，正确的是（ ）。",[228,230,231,232],{"key":20,"text":229,"correct":26},"材料暂估价表中只填写原材料、燃料、构配件的暂估价",{"key":24,"text":209,"correct":22},{"key":28,"text":211,"correct":26},{"key":31,"text":213,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},898585,"若清单计价规范中的项目名称有缺陷，则处理方法是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"招标人作补充，并与投标人协商后执行",{"key":24,"text":240,"correct":26},"投标人作补充，并与招标人协商后执行",{"key":28,"text":242,"correct":26},"投标人作补充，并报当地工程造价管理机构（省级）备案",{"key":31,"text":244,"correct":22},"招标人作补充，并报当地工程造价管理机构（省级）备案",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},898586,"专业工程的暂估价一般应是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":26},"综合暂估价，应当包括的管理费、利润、规费、税金等取费",{"key":24,"text":252,"correct":22},"综合暂估价，应当包括除规费和税金以外的管理费、利润等取费",{"key":28,"text":254,"correct":26},"综合暂估价，应当包括除规费以外的管理费、利润、税金等取费",{"key":31,"text":256,"correct":26},"综合暂估价，应当包括除税金以外的管理费、利润、规费等取费",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},898587,"采用工程量清单计价方式招标时，对工程量清单的完整性和准确性负责的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"编制招标文件的招标代理人",{"key":24,"text":264,"correct":26},"编制清单的工程造价咨询人",{"key":28,"text":266,"correct":22},"发布招标文件的招标人",{"key":31,"text":268,"correct":26},"确定中标的投标人",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},898588,"关于分部分项工程量清单编制的说法，正确的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"工程数量主要通过工程量计算规则计算得到。",{"key":24,"text":276,"correct":26},"在清单项目“工程内容”中包含的工作内容必须进行项目特征的描述",{"key":28,"text":278,"correct":26},"计价规范中就某一清单项目给出两个及以上计量单位时应选择容易记忆的计算的单位",{"key":31,"text":280,"correct":26},"同一标段的工程量清单中含有多个项目特征相同的单位工程时，可采用相同的项目编码",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},898589,"除另有说明外，分部分项工程量清单表中的工程量应等于（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"实体工程量",{"key":24,"text":288,"correct":26},"实体工程量+施工损耗",{"key":28,"text":290,"correct":26},"实体工程量+施工需要增加的工程量",{"key":31,"text":292,"correct":26},"实体工程量+措施工程量",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},898590,"《建设工程工程量清单计价规范》GB50500-2013规定，招标时用于合同约定调整因素出现时的工程材料价款调整的费用应计入（ ）中。",[297,299,300,301],{"key":20,"text":298,"correct":26},"分部分项综合单价",{"key":24,"text":135,"correct":22},{"key":28,"text":137,"correct":26},{"key":31,"text":141,"correct":26},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},898591,"根据《建设工程工程量清单计价规范》GB50500-2013的规定，在合同约定之外的或者因变更而产生的、工程量清单中没有相应的项目的额外工作，尤其是那些难以事先商定价格的额外工作，应计列入（ ）之中。",[306,307,308,309],{"key":20,"text":135,"correct":26},{"key":24,"text":220,"correct":26},{"key":28,"text":222,"correct":22},{"key":31,"text":141,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},898592,"在工程量清单中，最能体现分部分项工程项目自身价值的本质是（ ）。",[314,316,317,319],{"key":20,"text":315,"correct":22},"项目特征",{"key":24,"text":87,"correct":26},{"key":28,"text":318,"correct":26},"项目名称",{"key":31,"text":320,"correct":26},"项目计量单位",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},898593,"关于工程量清单中的计日工，下列说法中正确的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"即指零星工作所消耗的人工工时",{"key":24,"text":328,"correct":26},"在投标时计入总价，其数量和单价由投标人填报",{"key":28,"text":330,"correct":26},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":332,"correct":22},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},898594,"在编制分部分项工程量清单时，通常无须描述的是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":26},"工程结构",{"key":24,"text":340,"correct":26},"使用材质",{"key":28,"text":342,"correct":22},"工作内容",{"key":31,"text":344,"correct":26},"安装位置",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},898595,"招标工程清单编制时，在总承包服务费计价表中，应由招标人填写的内容是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"服务内容",{"key":24,"text":352,"correct":26},"项目价值",{"key":28,"text":354,"correct":26},"费率",{"key":31,"text":356,"correct":26},"金额",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},898596,"招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备单价及专业工程金额是（ ）。",[361,362,363,364],{"key":20,"text":135,"correct":26},{"key":24,"text":220,"correct":22},{"key":28,"text":141,"correct":26},{"key":31,"text":365,"correct":26},"价差预备费",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},898597,"在编制措施项目清单时，关于混凝土模板及支架费项目，应在清单中列明（ ）。",[370,371,373,375],{"key":20,"text":87,"correct":22},{"key":24,"text":372,"correct":26},"计算基础",{"key":28,"text":374,"correct":26},"取费费率",{"key":31,"text":342,"correct":26},{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},898598,"有关社会保障费的计算基础，正确的是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"定额人工费",{"key":24,"text":383,"correct":26},"直接费",{"key":28,"text":385,"correct":26},"人工费+机械费",{"key":31,"text":387,"correct":26},"直接工程费",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":28,"analysis":33},898599,"《建设工程工程量清单计价规范》GB50500-2013规定，分部分项工程量清单项目编码的第三级为表示（ ）的顺序码。",[392,394,396,398],{"key":20,"text":393,"correct":26},"分项工程",{"key":24,"text":395,"correct":26},"扩大分项工程",{"key":28,"text":397,"correct":22},"分部工程",{"key":31,"text":399,"correct":26},"专业工程",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":28,"analysis":33},898600,"在工程量清单的编制过程中，暂列金额通常是由（ ）提供的。",[404,406,408,410],{"key":20,"text":405,"correct":26},"监理人",{"key":24,"text":407,"correct":26},"招标人与投标人协商后",{"key":28,"text":409,"correct":22},"招标人",{"key":31,"text":411,"correct":26},"投标人",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},898601,"某分部分项工程的清单编码为020301008001，则该专业工程的代码为（ ）。",[416,417,419,420],{"key":20,"text":149,"correct":22},{"key":24,"text":418,"correct":26},"03",{"key":28,"text":147,"correct":26},{"key":31,"text":421,"correct":26},"008",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},898602,"在工程量清单中，（ ）是对项目的准确描述，是确定一个清单项目综合单价不可缺少的重要依据。",[426,427,428,429],{"key":20,"text":320,"correct":26},{"key":24,"text":87,"correct":26},{"key":28,"text":318,"correct":26},{"key":31,"text":315,"correct":22},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},898603,"分部分项工程量清单是指表示拟建工程分项实体工程项目名称和相应数量的明细清单，应包括的要件是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"项目编码、项目名称、计量单位和工程量",{"key":24,"text":437,"correct":26},"项目编码、项目名称、项目特征和工程量",{"key":28,"text":439,"correct":26},"项目编码、项目名称、项目特征、计量单位和工程单价",{"key":31,"text":441,"correct":22},"项目编码、项目名称、项目特征、计量单位和工程量",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},898604,"招标工程量清单中，在编制总承包服务费计价表时，应由招标人填写的内容是（ ）。",[446,448,449,450],{"key":20,"text":447,"correct":26},"服务金额",{"key":24,"text":318,"correct":22},{"key":28,"text":354,"correct":26},{"key":31,"text":356,"correct":26},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},898605,"根据《建设工程量清单计价规范》GB50500--2013，下列关于工程量清单项目编码的说法中，正确的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":458,"correct":22},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":28,"text":460,"correct":26},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":462,"correct":26},"补充项目编码以“B”加上计量规范代码后跟三位数字表示",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},898606,"措施项目清单中，下列适用于以“项”为单位计价的措施项目费是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"非夜间施工照明费",{"key":24,"text":470,"correct":26},"脚手架工程费",{"key":28,"text":472,"correct":26},"混凝土模板及支架(撑)费",{"key":31,"text":177,"correct":26},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},898607,"所有清单项目的工程量应以实体工程量为准，投标人在施工中可能的各种损耗和需要增加的工程量应（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"另列清单项目予以报价",{"key":24,"text":481,"correct":22},"考虑在投标报价的单价中",{"key":28,"text":483,"correct":26},"考虑在措施项目报价中",{"key":31,"text":485,"correct":26},"纳入风险费进行报价",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},898608,"根据《建设工程工程量清单计价规范》GB 50500--2013的规定，为合同约定调整因素出现时进行工程价款调整而预备的费用，应列入（ ）之中。",[490,491,492,493],{"key":20,"text":135,"correct":22},{"key":24,"text":220,"correct":26},{"key":28,"text":222,"correct":26},{"key":31,"text":494,"correct":26},"措施项目费",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},898609,"用计时观察法测定时间消耗的诸多方法中，精确度较高的方法是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":26},"数示法",{"key":24,"text":502,"correct":26},"图示法",{"key":28,"text":504,"correct":22},"接续法",{"key":31,"text":506,"correct":26},"选择法",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},898610,"编制材料损耗定额的主要方法是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":26},"实验室试验法",{"key":24,"text":514,"correct":22},"现场技术测定法",{"key":28,"text":516,"correct":26},"现场统计法",{"key":31,"text":518,"correct":26},"理论计算法",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},898611,"已知人工挖某土方1m3的基本工作时间为1个工作日，辅助工作时间占工序作业时间的5%，准备与结束工作时间、不可避免的中断时间、休息时间分别占工作的3%、2%、15%，则该人工挖土的时间定额为（ ）工日\u002F10m3。",[523,525,527,529],{"key":20,"text":524,"correct":26},"13.33",{"key":24,"text":526,"correct":22},"13.16",{"key":28,"text":528,"correct":26},"13.13",{"key":31,"text":530,"correct":26},"12.50",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},898612,"某出料容量750L的混凝土搅拌机，每循环一次的正常延续时间为9min，机械正常利用系数为0.9.按8小时工作制考虑，该机械的台班产量定额为（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"36m3\u002F台班",{"key":24,"text":538,"correct":26},"40m3\u002F台班",{"key":28,"text":540,"correct":26},"0.28台班\u002Fm3",{"key":31,"text":542,"correct":26},"0.25台班\u002Fm3",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},898613,"下列对于测时法的特征描述中，正确的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":26},"测时法既适用于测定重复的循环工作时间，也适用于测定非循环工作时间",{"key":24,"text":550,"correct":26},"选择测时法比接续测时法准确、完善，但观察技术也较之复杂",{"key":28,"text":552,"correct":26},"当所测定的各工序的延续时间比较短时，接续测时法较选择测时法方便",{"key":31,"text":554,"correct":22},"测时法的观察次数应该根据误差理论和经验数据相结合的方法来确定",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},898614,"用水泥砂浆砌筑2m3砖墙，标准砖（240mm×115mm×53mm）的总耗用量为1113块。已知砖的损耗率为5%，则标准砖、砂浆的净用量分别为（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":26},"1057块、0.372m3",{"key":24,"text":562,"correct":26},"1057块、0.454m3",{"key":28,"text":564,"correct":26},"1060块、0.372m3",{"key":31,"text":566,"correct":22},"1060块、0.449m3",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},898615,"正常施工条件下，完成单位合格建筑产品所需某材料的不可避免损耗量为0.90kg，已知该材料的损耗率为7.20%，则其总消耗量为（ ）kg。",[571,573,575,577],{"key":20,"text":572,"correct":26},"13.5",{"key":24,"text":574,"correct":22},"13.4",{"key":28,"text":576,"correct":26},"12.5",{"key":31,"text":578,"correct":26},"11.6",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},898616,"已知每平方米砖墙的勾缝时间为8min，则每立方米一砖半厚墙所需的勾缝时间为（ ）min。",[583,585,587,589],{"key":20,"text":584,"correct":26},"12.00",{"key":24,"text":586,"correct":22},"21.92",{"key":28,"text":588,"correct":26},"22.22",{"key":31,"text":590,"correct":26},"33.33",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]