[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,14,50,2160,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,209,221,230,241,253,265,277,289,301,313,324,336,348,360,372,384,393,404,414,425,433,445,457,469,481,493,505,517,529,541,553,565,577,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},898517,1,"单选题","根据我国现行建设项目投资构成，下列费用项目中属于建设期利息包含内容的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建设单位建设期后发生的利息",false,{"key":24,"text":25,"correct":22},"B","施工单位建设期长期贷款利息",{"key":27,"text":28,"correct":29},"C","国内代理机构收取的贷款管理费",true,{"key":31,"text":32,"correct":22},"D","国外贷款机构收取的转贷费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},898518,"某项目共需要贷款资金900万元，建设期为3年，按年度均衡筹资，第一年贷款为300万元，第二年贷款为400万元，建设期内只计利息但不支付，年利率为10%，则第2年的建设期利息应为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"50",{"key":24,"text":41,"correct":29},"51.5",{"key":27,"text":43,"correct":22},"71.5",{"key":31,"text":45,"correct":22},"86.65",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},898519,"预备费包括基本预备费和价差预备费，其中价差预备费的计算应是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"以编制年份的静态投资额为基数，采用单利方法",{"key":24,"text":53,"correct":22},"以编制年份的静态投资额为基数，采用复利方法",{"key":27,"text":55,"correct":22},"以估算年份价格水平的投资额为基数，采用单利方法",{"key":31,"text":57,"correct":29},"以估算年份价格水平的投资额为基数，采用复利方法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},898520,"一般自然灾害造成的损失和预防自然灾害所采取的措施费用，应计入（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"现场经费",{"key":24,"text":65,"correct":22},"施工企业管理费",{"key":27,"text":67,"correct":22},"价差预备费",{"key":31,"text":69,"correct":29},"基本预备费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},898521,"某建设项目建设期为三年，各年分别获得贷款2000万元、4000万元和2000万元，贷款分年度均衡发放，年利率为6%，建设期利息只计息不支付，则建设期第二年应计利息为（ ）万元。",[74,76,78,80],{"key":20,"text":75,"correct":22},"120.0",{"key":24,"text":77,"correct":22},"240.0",{"key":27,"text":79,"correct":29},"243.6",{"key":31,"text":81,"correct":22},"367.2",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},898522,"关于建设期利息的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"建设期利息包括在建设期内发生的为工程项目筹集资金的融资费用利息",{"key":24,"text":89,"correct":22},"总贷款分年均衡发放时，建设期利息计算可按当年借款在年初支用考虑",{"key":27,"text":91,"correct":22},"建设期利息不包括国外贷款银行以年利率方式收取的各种管理费",{"key":31,"text":93,"correct":22},"建设期利息不包括国内代理机构以年利率方式收取的转贷费和担保费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},898523,"某项目建设期内第一年贷款100万元，第二年贷款200万元，贷款在各年内均衡发放，年利率10%，建设期内利息只计息不支付，则建设期利息为（ ）万元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"30",{"key":24,"text":101,"correct":22},"40",{"key":27,"text":103,"correct":29},"25.5",{"key":31,"text":105,"correct":22},"41",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},898524,"在国内建设项目投资构成中，超规超限设备运输增加的费用属于（ ）。",[110,112,113,115],{"key":20,"text":111,"correct":22},"设备及工器具购置费",{"key":24,"text":69,"correct":29},{"key":27,"text":114,"correct":22},"工程建设其他费",{"key":31,"text":116,"correct":22},"建筑安装工程费",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},898525,"某项目建设期为2年，第一年贷款4000万元，第二年贷款2000万元，贷款年利率10%，贷款的年内均衡发放，建设期内只计息不付息。该项目第二年的建设期利息为（ ）万元。",[121,123,125,127],{"key":20,"text":122,"correct":22},"200",{"key":24,"text":124,"correct":22},"500",{"key":27,"text":126,"correct":29},"520",{"key":31,"text":128,"correct":22},"600",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},898526,"某建设项目建安工程费为1500万元，设备购置费400万元，工程建设其他费300万元。已知基本预备费费率为5%，项目建设前期年限为0.5年，建设期为2年，每年完成投资的50%，年涨价率为7%，则该项目总的预备费为（ ）万元。",[133,135,137,139],{"key":20,"text":134,"correct":22},"273.11",{"key":24,"text":136,"correct":22},"271.18",{"key":27,"text":138,"correct":22},"346.39",{"key":31,"text":140,"correct":29},"358.21",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},898527,"某新建项目，建设期3年，第一年贷款300万元，第二年贷款600万元，第三年没有贷款。贷款在年度内均衡发放。根据贷款协定：年利率为4%，以年利率方式收取的担保费和管理费率共计2%，贷款本息均在项目投产后偿还，则该项目第三年的贷款利息是（ ）万元。",[145,147,149,151],{"key":20,"text":146,"correct":22},"36.00",{"key":24,"text":148,"correct":22},"54.54",{"key":27,"text":150,"correct":29},"56.73",{"key":31,"text":152,"correct":22},"58.38",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},898528,"某建设项目工程费用为7200万元，工程建设其他费用为1800万元，基本预备费为400万元，项目前期年限1年，建设期3年，各年度完成投资计划额的比例分别为20%、40%与40%，年涨价率为6%，则该项目建设期第二年价差预备费为（ ）万元。",[157,159,161,163],{"key":20,"text":158,"correct":22},"451.63",{"key":24,"text":160,"correct":22},"464.74",{"key":27,"text":162,"correct":22},"564.54",{"key":31,"text":164,"correct":29},"589.63",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},898529,"已知某项目建筑安装工程费为2000万元，设备购置费3000万元，工程建设其他费1000万元，若基本预备费费率为10％，项目建设前期为2年，建设期为3年，各年投资计划额为：第一年完成投资20％，其余投资在后两年平均投入，年均价格上涨率为5％，则该项目建设期间价差预备费为()万元。",[169,171,173,175],{"key":20,"text":170,"correct":22},"575.53",{"key":24,"text":172,"correct":22},"648.18",{"key":27,"text":174,"correct":22},"752.73",{"key":31,"text":176,"correct":29},"1311.02",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},898530,"已知某项目设备及工、器具购置费为1000万元，建筑安装工程费1200万元，工程建设其他费用500万元，基本预备费200万元，涨价预备费300万元，建设期贷款利息150万元，项目正常生产年份流动资产平均占用额为350万元，流动负债平均占用额为280万元，则该建设项目静态投资（ ）万元。",[181,183,185,187],{"key":20,"text":182,"correct":22},"3200",{"key":24,"text":184,"correct":22},"3000",{"key":27,"text":186,"correct":22},"3250",{"key":31,"text":188,"correct":29},"2900",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},898531,"按照现行对基本预备费内容的规定，下列费用中不属于基本预备费范围的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"设计变更增加的费用",{"key":24,"text":196,"correct":22},"局部地基处理增加的费用",{"key":27,"text":198,"correct":29},"利率调整增加的费用",{"key":31,"text":200,"correct":22},"预防自然灾害采取的措施费用",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},898532,"不可预见的地下障碍物处理的费用，应计入()。",[205,206,207,208],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":29},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},898533,"某新建项目，建设期2年，第1年贷款500万元，第2年贷款200万元。贷款在年度内均衡发放。根据贷款协定：年利率为10％，每半年计息一次，贷款本息均在项目投产后偿还，则该项目建设期的贷款利息是（ ）万元。",[213,215,217,219],{"key":20,"text":214,"correct":22},"87.50",{"key":24,"text":216,"correct":29},"89.76",{"key":27,"text":218,"correct":22},"71.75",{"key":31,"text":220,"correct":22},"35.88",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":20,"analysis":33},898534,"在我国建设项目投资构成中，利率、汇率调整的费用属于（ ）。",[225,226,227,229],{"key":20,"text":67,"correct":29},{"key":24,"text":69,"correct":22},{"key":27,"text":228,"correct":22},"工程建设费",{"key":31,"text":116,"correct":22},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},898535,"某新建项目建设期为3年，第一年贷款600万元，第二年贷款400万元，第三年贷款200万元，贷款在年内均衡发放，年利率10%。建设期内利息当年支付，则建设期第三年贷款利息为（ ）万元。",[234,236,237,239],{"key":20,"text":235,"correct":22},"110.0",{"key":24,"text":75,"correct":22},{"key":27,"text":238,"correct":29},"121.3",{"key":31,"text":240,"correct":22},"234.3",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":31,"analysis":33},898536,"根据现行建设项目工程造价构成的相关规定，工程造价是指（ ）。",[245,247,249,251],{"key":20,"text":246,"correct":22},"为完成工程项目建造，生产性设备及配合工程安装设备的费用",{"key":24,"text":248,"correct":22},"建设期内直接用于工程建造、设备购置及其安装的建设投资",{"key":27,"text":250,"correct":22},"为完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":31,"text":252,"correct":29},"在建设期内预计或实际支出的建设费用",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":31,"analysis":33},898537,"在世界银行工程造价的构成中，有一项费用有可能发生，有可能不发生，在正常建设条件下可能不动用，只是一种贮备。此项费用是（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"建设成本上升费用",{"key":24,"text":260,"correct":22},"项目间接建设成本",{"key":27,"text":262,"correct":22},"未明确项目准备金",{"key":31,"text":264,"correct":29},"不可预见准备金",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},898538,"关于我国现行建设项目投资构成的说法中，正确的是（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":29},"固定资产投资为建设投资和建设期利息之和",{"key":24,"text":272,"correct":22},"工程费用为直接费、间接费、利润和税金之和",{"key":27,"text":274,"correct":22},"生产性建设项目总投资为建设投资和建设期利息之和",{"key":31,"text":276,"correct":22},"工程造价为工程费用、工程建设其他费用和预备费之和",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":27,"analysis":33},898539,"在国外的项目总建设成本中，未明确项目的准备金的目的是为了（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"用来补偿估算的误差",{"key":24,"text":284,"correct":22},"支付工作范围以外可能增加的项目",{"key":27,"text":286,"correct":29},"支付那些估算时不可能明确的潜在项目",{"key":31,"text":288,"correct":22},"应付天灾、非正常经济情况及罢工等情况",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":27,"analysis":33},898540,"据《建设项目经济评价方法与参数（第三版）》，建设投资由（ ）三项费用构成。",[293,295,297,299],{"key":20,"text":294,"correct":22},"工程费用、建设期利息、预备费",{"key":24,"text":296,"correct":22},"建设费用、建设期利息、流动资金",{"key":27,"text":298,"correct":29},"工程费用、工程建设其他费用、预备费",{"key":31,"text":300,"correct":22},"建筑安装工程费、设备及工器具购置费、工程建设其他费用",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":27,"analysis":33},898541,"为保证工程项目顺利实施，避免在难以预料的情况下造成投资不足而预先安排的费用是（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"流动资金",{"key":24,"text":308,"correct":22},"建设期利息",{"key":27,"text":310,"correct":29},"预备费",{"key":31,"text":312,"correct":22},"其他资产费用",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},898542,"下列费用中，不属于工程造价构成的是（ ）。",[317,319,321,322],{"key":20,"text":318,"correct":22},"用于支付项目所需土地而发生的费用",{"key":24,"text":320,"correct":22},"用于建设单位自身进行项目管理所支出的费用",{"key":27,"text":306,"correct":29},{"key":31,"text":323,"correct":22},"用于委托工程勘察设计所支付的费用",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":27,"analysis":33},898543,"根据世界银行对工程项目总建设成本的规定，下列费用应计入项目间接建设成本的是（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"临时公共设施及场地的维持费",{"key":24,"text":331,"correct":22},"建筑保险和债券费",{"key":27,"text":333,"correct":29},"开工试车费",{"key":31,"text":335,"correct":22},"土地征购费",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},898544,"在建设项目总投资中，为完成工程项目建设，在建设期内投入且形成现金流出的全部费用是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"工程造价",{"key":24,"text":343,"correct":22},"建设项目总投资",{"key":27,"text":345,"correct":29},"建设投资",{"key":31,"text":347,"correct":22},"工程费用",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":27,"analysis":33},898545,"某建设项目建筑工程费2000万元，安装工程费700万元，设备购置费1100万元，工程建设其他费450万元，预备费180万元，建设期利息120万元，流动资金500万元，则该项目的工程造价为（ ）万元。",[352,354,356,358],{"key":20,"text":353,"correct":22},"4250",{"key":24,"text":355,"correct":22},"4430",{"key":27,"text":357,"correct":29},"4550",{"key":31,"text":359,"correct":22},"5050",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":27,"analysis":33},898546,"下列关于工器具及生产家具购置费的表述中，正确的是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"该项费用属于设备费",{"key":24,"text":367,"correct":22},"该项费用属于工程建设其他费用",{"key":27,"text":369,"correct":29},"保证初期正常生产必须购置的没有达到固定资产标准的设备、仪器、工卡模具、器具、生产家具和备品备件等的购置费用",{"key":31,"text":371,"correct":22},"该项费用一般以需要安装的设备费为基数乘以一定费率计算",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},898547,"在某建设项目投资构成中，设备及工器具购置费为2000万元，建筑安装工程费为1000万元，工程建设其他费为500万元，基本预备费为120万元，价差预备费为80万元，建设期贷款1800万元，应计利息为80万元，流动资金400万元，则该建设项目的建设投资为（ ）万元。",[376,378,380,382],{"key":20,"text":377,"correct":22},"3500",{"key":24,"text":379,"correct":29},"3700",{"key":27,"text":381,"correct":22},"3780",{"key":31,"text":383,"correct":22},"4180",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":27,"analysis":33},898548,"根据我国现行建设项目投资构成，建设投资中没有包括的费用是（ ）。",[388,389,391,392],{"key":20,"text":347,"correct":22},{"key":24,"text":390,"correct":22},"工程建设其他费用",{"key":27,"text":308,"correct":29},{"key":31,"text":310,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},898549,"在世界银行规定的项目总建设成本中，属于项目直接建设成本的是（ ）。",[397,399,400,402],{"key":20,"text":398,"correct":29},"临时公共设施的维持费",{"key":24,"text":333,"correct":22},{"key":27,"text":401,"correct":22},"施工管理现场人员的薪金",{"key":31,"text":403,"correct":22},"生产前的勘测费用",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},898550,"反映工程造价估算日期至工程竣工日期之前，工程各个主要组成部分的人工、材料和设备等未知价格增长部分的是（ ）。",[408,410,412,413],{"key":20,"text":409,"correct":22},"直接建设成本",{"key":24,"text":411,"correct":29},"建设成本上升费",{"key":27,"text":264,"correct":22},{"key":31,"text":262,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},898551,"根据国际组织对项目总建设成本的规定，下列费用应计入项目间接建设成本的是（ ）。",[418,420,421,423],{"key":20,"text":419,"correct":22},"服务性建筑费用",{"key":24,"text":331,"correct":22},{"key":27,"text":422,"correct":29},"生产前费用",{"key":31,"text":424,"correct":22},"工艺建筑费",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},898552,"国外建筑工程造价构成中，（ ）用于在估算达到了一定的完整性并符合技术标准的基础上，由于物质、社会和经济的变化，导致估算增加的情况。",[429,430,431,432],{"key":20,"text":409,"correct":22},{"key":24,"text":411,"correct":22},{"key":27,"text":264,"correct":29},{"key":31,"text":262,"correct":22},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},898553,"关于设备及工器具购置费用，下列说法中正确的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"它是由设备购置费和工具、器具及生活家具购置费组成",{"key":24,"text":440,"correct":22},"它是固定资产投资中的消极部分",{"key":27,"text":442,"correct":29},"在工业建设中，它占工程造价比重的增大意味着生产技术的进步",{"key":31,"text":444,"correct":22},"在民用建设中，它占工程造价比重的增大意味着资本有机构成的提高",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},898554,"下列定额中，项目划分最细的计价定额是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"材料消耗定额",{"key":24,"text":452,"correct":22},"劳动定额",{"key":27,"text":454,"correct":29},"预算定额",{"key":31,"text":456,"correct":22},"概算定额",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},898555,"关于工程造价的分部组合计价原理，下列说法正确的是（ ）",[461,463,465,467],{"key":20,"text":462,"correct":22},"分部分项工程费=基本构造单元工程量×工料单价",{"key":24,"text":464,"correct":22},"工料单价指人工、材料和施工机械台班单价",{"key":27,"text":466,"correct":22},"基本构造单元是由分部工程适当组合形成",{"key":31,"text":468,"correct":29},"工程总价是按规定程序和方法逐级汇总形成的工程造价",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},898556,"工程定额是对有关消耗量的数量规定，这种数量关系没有体现出（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"正常的施工条件",{"key":24,"text":476,"correct":22},"合理的施工组织设计",{"key":27,"text":478,"correct":22},"生产要素消耗水平",{"key":31,"text":480,"correct":29},"一定时期的物价平均水平",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},898557,"工程计量工作包括工程项目的划分和工程量的计算，下列关于工程计量工作的说法中正确的是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"项目划分须按预算定额规定的定额子项进行",{"key":24,"text":488,"correct":29},"通过项目划分确定单位工程基本构造单元",{"key":27,"text":490,"correct":22},"工程量的计算须按工程量清单计算规范的规则进行计算",{"key":31,"text":492,"correct":22},"工程量的计算应依据施工图设计文件，不应依据施工组织设计文件",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":27,"analysis":33},898558,"工程量清单计价模式下，企业定额是编制（ ）的依据。",[497,499,501,503],{"key":20,"text":498,"correct":22},"招标控制价",{"key":24,"text":500,"correct":22},"招标文件",{"key":27,"text":502,"correct":29},"投标报价",{"key":31,"text":504,"correct":22},"清单工程量",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},898559,"工程量清单计价中，不是编制投标报价和招标控制价时共同依据的资料是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"资料和指数",{"key":24,"text":512,"correct":22},"国家、地区或行业定额",{"key":27,"text":514,"correct":22},"工程造价信息",{"key":31,"text":516,"correct":29},"投标人拟定的施工组织设计方案",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},898560,"工料单价不包括（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"人工费",{"key":24,"text":524,"correct":22},"材料费",{"key":27,"text":526,"correct":22},"机械费",{"key":31,"text":528,"correct":29},"企业管理费",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},898561,"关于建设工程的分部组合计价，下列说法正确的是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"适用于没有具体图样和工程量清单的建设项目计价",{"key":24,"text":536,"correct":29},"要求将建设项目细分到最基本的构造单元",{"key":27,"text":538,"correct":22},"是利用产出函数进行计价",{"key":31,"text":540,"correct":22},"具有自上而下、由粗到细的计价组合特点",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},898562,"工程计价的基本原理表达式：分部分项工程费=∑[（ ）×相应单价]。",[545,547,549,551],{"key":20,"text":546,"correct":29},"基本构造单元工程量",{"key":24,"text":548,"correct":22},"分项工程量",{"key":27,"text":550,"correct":22},"单位清单工程量",{"key":31,"text":552,"correct":22},"检验批工程量",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},898563,"下面所列工程建设定额中，属于按定额编制程序和用途分类的是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"机械台班消耗定额",{"key":24,"text":560,"correct":22},"行业统一定额",{"key":27,"text":562,"correct":29},"投资估算指标",{"key":31,"text":564,"correct":22},"补充定额",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},898564,"在工程概预算编制时，下列说法正确的是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"工程概预算的形成过程就是依据工程定额、预算价格和取费标准，经过不同层次的计算形成相应造价的过程",{"key":24,"text":572,"correct":29},"工程概预算编制的基本构造要素包括人工、材料和施工机具使用费",{"key":27,"text":574,"correct":22},"工程量计算书是根据施工图编制的",{"key":31,"text":576,"correct":22},"投资估算指标是确定工料单价的依据",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},898565,"下列属于按定额反映的生产要素消耗内容分类的是（ ）。",[581,583,585,586],{"key":20,"text":582,"correct":29},"劳动消耗定额",{"key":24,"text":584,"correct":22},"施工定额",{"key":27,"text":454,"correct":22},{"key":31,"text":587,"correct":22},"企业定额",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},898566,"任何一个建设项目都可以分解为一个或几个（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":29},"单项工程",{"key":24,"text":595,"correct":22},"单位工程",{"key":27,"text":597,"correct":22},"单元工程",{"key":31,"text":599,"correct":22},"分部工程",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]