[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,13,50,2160,[13,34,46,58,70,82,94,104,116,127,139,151,162,174,186,198,210,222,234,245,255,267,279,291,303,315,327,338,350,362,374,386,398,409,421,431,442,452,460,472,483,495,505,517,529,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},898466,1,"单选题","根据我国现行建筑安装工程费用项目组成的规定，下列关于措施项目费用的说法中正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","冬雨季施工费是冬、雨季施工增加的临时设施，防滑处理，雨雪排除等费用",true,{"key":24,"text":25,"correct":26},"B","施工排水、降水费由排水和降水两个独立的费用项目组成",false,{"key":28,"text":29,"correct":26},"C","当单层建筑物檐口高度超过15m时，可计算超高施工增加费",{"key":31,"text":32,"correct":26},"D","已完工程及设备保护费是指分部工程或结构部位验收前，对已完工程及设备采取必要保护措施所发生的费用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},898467,"关于建筑安装工程费用中建筑业增值税的计算，下列说法中正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"当事人可以自主选择一般计税法或简易计税法计税",{"key":24,"text":41,"correct":26},"一般计税法、简易计税法中的建筑业增值税税率均为9%",{"key":28,"text":43,"correct":26},"采用简易计税法时，税前造价不包含增值税的进项税额",{"key":31,"text":45,"correct":22},"采用一般计税法时，税前造价不包含增值税的进项税额",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},898468,"施工企业按规定缴纳的非生产性车船使用税应计入建安工程造价的（ ）",[50,52,54,56],{"key":20,"text":51,"correct":26},"税金",{"key":24,"text":53,"correct":26},"利润",{"key":28,"text":55,"correct":22},"企业管理费",{"key":31,"text":57,"correct":26},"规费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},898469,"按照国外建筑安装工程费用的构成，下列费用中，不属于单项工程开办费的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工人招聘解雇费",{"key":24,"text":65,"correct":26},"施工用水、用电费",{"key":28,"text":67,"correct":26},"临时设施费",{"key":31,"text":69,"correct":26},"驻工地工程师现场办公室及所需设备费用",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},898470,"关于建筑安装工程费用中的规费，下列说法中正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"规费是指由县级及以上有关权力部门规定必须缴纳或计取的费用",{"key":24,"text":77,"correct":22},"规费包括住房公积金",{"key":28,"text":79,"correct":26},"投标人在投标报价时填写的规费可高于规定的标准",{"key":31,"text":81,"correct":26},"社会保险费中包括建筑安装工程一切险的投保费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},898471,"对于不宜计量的措施项目，只能用来作为安全文明施工费的取费基数，而不能作为夜间施工增加费的取费基数的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"定额分部分项工程费+定额中可以计量的措项目费",{"key":24,"text":89,"correct":26},"定额人工费",{"key":28,"text":91,"correct":26},"定额人工费与机械费之和",{"key":31,"text":93,"correct":26},"定额人工费、材料费与机械费之和",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},898472,"因施工场地狭小等特殊情况而发生的二次搬运费用应属于()。",[98,100,102,103],{"key":20,"text":99,"correct":26},"分部分项工程费",{"key":24,"text":101,"correct":22},"措施项目费",{"key":28,"text":57,"correct":26},{"key":31,"text":55,"correct":26},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},898473,"根据国外建筑安装工程费用构成，建筑安装工程一切险投保费应计入（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":26},"开办费",{"key":24,"text":111,"correct":22},"管理费",{"key":28,"text":113,"correct":26},"暂列金额",{"key":31,"text":115,"correct":26},"建设工程其他费",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},898474,"施工现场项目经理的医疗保险费应计入下列（ ）费用。",[120,122,124,126],{"key":20,"text":121,"correct":26},"人工费",{"key":24,"text":123,"correct":22},"社会保险费",{"key":28,"text":125,"correct":26},"劳动保险费",{"key":31,"text":55,"correct":26},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},898475,"下列（ ）属于安全施工费。",[131,133,135,137],{"key":20,"text":132,"correct":26},"施工机械的检验检测费用",{"key":24,"text":134,"correct":26},"砖、混凝土砌块等围挡的维修费用",{"key":28,"text":136,"correct":26},"治安综合治理费用",{"key":31,"text":138,"correct":22},"施工安全防护通道费用",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},898476,"根据我国现行建筑安装工程费用项目组成的规定，下列各项费用中表述正确的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":26},"计算人工费的基本要素是人工工日消耗量",{"key":24,"text":146,"correct":26},"材料费中的材料单价由材料原价、材料运杂费、材料损耗费、采购及保管费五项组成",{"key":28,"text":148,"correct":22},"材料费包含构成或计划构成永久工程一部分的工程设备费",{"key":31,"text":150,"correct":26},"施工机具使用费不包含仪器仪表的租赁费",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},898477,"根据《建筑安装工程费用项目组成》(建标[2013]44号)文件的规定，对构件和建筑安装物进行一般鉴定和检查所发生的费用列入（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":26},"材料费",{"key":24,"text":158,"correct":26},"措施费",{"key":28,"text":160,"correct":26},"研究试验费",{"key":31,"text":55,"correct":22},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},898478,"小规模纳税人提供应税服务适用（ ）计税。",[166,168,170,172],{"key":20,"text":167,"correct":22},"简易计税方法",{"key":24,"text":169,"correct":26},"简单计税方法",{"key":28,"text":171,"correct":26},"一般计税方法",{"key":31,"text":173,"correct":26},"复杂计税方法",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},898479,"根据《房屋建筑与装饰工程计量规范》GB50854--2013的规定，当单层建筑物檐口高度超过（ ）米时，可计算超高施工增加费。",[178,180,182,184],{"key":20,"text":179,"correct":26},"6",{"key":24,"text":181,"correct":26},"10",{"key":28,"text":183,"correct":26},"15",{"key":31,"text":185,"correct":22},"20",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},898480,"混凝土模板及支架(撑)费的计算方法通常是按照（ ）计算。",[190,192,194,196],{"key":20,"text":191,"correct":26},"按照混凝土构件的体积以m3",{"key":24,"text":193,"correct":26},"按照混凝土构件的长度以m",{"key":28,"text":195,"correct":26},"按照混凝土构件的截面面积以m2",{"key":31,"text":197,"correct":22},"按照模板与现浇混凝土构件的接触面积以m2",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},898481,"与一般计税方法相比，简易计税方法下计税基数的差异是()。",[202,204,206,208],{"key":20,"text":203,"correct":26},"税前造价",{"key":24,"text":205,"correct":26},"人工费、材料费、施工机具使用费、企业管理费、利润和规费之和",{"key":28,"text":207,"correct":26},"执行营业税改征增值税试点实施办法",{"key":31,"text":209,"correct":22},"各费用项目均以包含增值税进项税额的含税价格计算",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},898482,"某市属建筑公司收到某县城工程一笔税前1000万元(不包含增值税可抵扣的进项税额)的进度款，当采用一般计税方法时，该工程造价为（ ）万元。",[214,216,218,220],{"key":20,"text":215,"correct":26},"30",{"key":24,"text":217,"correct":26},"110",{"key":28,"text":219,"correct":26},"1030",{"key":31,"text":221,"correct":22},"1090",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},898483,"甲建筑企业为增值税一般纳税人，2016年6月1日以清包工方式承接了某县的住宅楼工程，税前造价为2000万(包含增值税进项税额的含税价格)，若该企业采用简易计税的方法，则应缴纳的增值税为（ ）万元。",[226,228,230,232],{"key":20,"text":227,"correct":26},"220",{"key":24,"text":229,"correct":26},"198.20",{"key":28,"text":231,"correct":26},"58.25",{"key":31,"text":233,"correct":22},"60",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},898484,"以下各项中不能作为企业管理费计算基数的是()。",[238,239,241,243],{"key":20,"text":121,"correct":26},{"key":24,"text":240,"correct":26},"人工费和机具费的合计",{"key":28,"text":242,"correct":22},"人工费、材料费和机具费的合计",{"key":31,"text":244,"correct":26},"直接费",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":28,"analysis":33},898485,"根据我国现行建筑安装工程费用项目组成的规定，下列有关费用的表述中不正确的是（ ）。",[249,251,252,253],{"key":20,"text":250,"correct":26},"人工费是指支付给直接从事建筑安装工程施工作业的生产工人的各项费用",{"key":24,"text":146,"correct":26},{"key":28,"text":148,"correct":22},{"key":31,"text":254,"correct":26},"施工机具使用费包含仪器仪表使用费",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},898486,"在征地补偿费和拆迁补偿费中都可能包含的费用是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"安置补助费",{"key":24,"text":262,"correct":26},"土地补偿费",{"key":28,"text":264,"correct":26},"青苗补偿费",{"key":31,"text":266,"correct":26},"地上附着物补偿费",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},898487,"下列费用中，不属于工程建设其他费用中工程保险费的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":26},"建筑安装工程一切险保费",{"key":24,"text":274,"correct":26},"引进设备财产保险保费",{"key":28,"text":276,"correct":22},"工伤保险费",{"key":31,"text":278,"correct":26},"人身意外伤害险保费",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":20,"analysis":33},898488,"下列费用项目中，应在研究试验费中列支的是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"为验证设计数据而进行必要的研究试验所需的费用",{"key":24,"text":286,"correct":26},"新产品试验费",{"key":28,"text":288,"correct":26},"施工企业技术革新的研究试验费",{"key":31,"text":290,"correct":26},"设计模型制作费",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},898489,"下列费用项目中，属于工程建设其他费中研究试验费的是（ ）。 A.新产品试制费",[295,297,299,301],{"key":20,"text":296,"correct":26},"水文地质勘查费",{"key":24,"text":298,"correct":26},"特殊设备安全监督检验费",{"key":28,"text":300,"correct":26},"委托专业机构验证设计参数而发生的验证费",{"key":31,"text":302,"correct":22},"C项和研究试验费是平行的。",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},898490,"下列费用项目中，属于联合试运转费中试运转支出的是（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"施工单位参加试运转人员的工资",{"key":24,"text":310,"correct":26},"单台设备的单机试运转费",{"key":28,"text":312,"correct":26},"试运转中暴露出来的施工缺陷处理费用",{"key":31,"text":314,"correct":26},"试运转中暴露出来的设备缺陷处理费用",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},898491,"关于征地补偿费用，下列表述正确的是（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"地上附着物补偿应根据协调征地方案前地上附着物的实际情况确定",{"key":24,"text":322,"correct":26},"土地补偿费和安置补助费的总和不得超过土地被征用前三年平均年产值的15倍",{"key":28,"text":324,"correct":26},"征用未开发的规划菜地按一年只种一茬的标准缴纳新菜地开发建设基金",{"key":31,"text":326,"correct":26},"征收耕地占用税时，对于占用前三年曾用于种植农作物的土地不得视为耕地",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},898492,"根据设计要求，在施工过程中对某屋架结构进行破坏性试验，以提供和验证设计数据，则该项费用应在（ ）中支出。",[331,332,334,336],{"key":20,"text":160,"correct":22},{"key":24,"text":333,"correct":26},"施工方的检验试验费",{"key":28,"text":335,"correct":26},"建设单位管理费",{"key":31,"text":337,"correct":26},"勘察设计费",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},898493,"关于联合试运转费，下列说法中正确的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":26},"包括对整个生产线或装置运行无负荷和有负荷试运转所发生的费用",{"key":24,"text":345,"correct":22},"包括施工单位参加试运转人员的工资及专家指导费",{"key":28,"text":347,"correct":26},"包括试运转中暴露的应设备缺陷发生的处理费用",{"key":31,"text":349,"correct":26},"包括对单台设备进行单机试运转工作的调试费",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},898494,"关于土地征用及迁移补偿费的说法中，正确的是（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":26},"征用耕地的土地补偿费标准为该地被征用前三年，平均年产值的4～6倍",{"key":24,"text":357,"correct":22},"拆迁补偿的方式可以实行货币补偿",{"key":28,"text":359,"correct":26},"青苗补偿费归农村集体所有",{"key":31,"text":361,"correct":26},"被征用耕地的安置补助费最高不超过被征用前三年平均年产值的30倍",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":28,"analysis":33},898495,"土地补偿费为该耕地被征用前三年平均年产值的（ ）倍。",[366,368,370,372],{"key":20,"text":367,"correct":26},"2～3",{"key":24,"text":369,"correct":26},"3～5",{"key":28,"text":371,"correct":22},"6～10",{"key":31,"text":373,"correct":26},"8～12",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},898497,"下列费用中应属于建设单位管理费的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":26},"编制项目可行性研究报告的费用",{"key":24,"text":381,"correct":26},"新建项目所需办公设备的购置费用",{"key":28,"text":383,"correct":22},"竣工验收费",{"key":31,"text":385,"correct":26},"建设单位所需临时设施的搭设费用",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},898498,"下列费用项目中，计入工程建设其他费中专利及专有技术使用费的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":26},"专利及专有技术在项目全寿命期的使用费",{"key":24,"text":393,"correct":26},"在生产期支付的商标权费",{"key":28,"text":395,"correct":26},"国内设计资料费",{"key":31,"text":397,"correct":22},"建设期内为取得专利，专有技术所支付的费用",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},898499,"下列属于工程建设其他费用中建设期计列的生产经营费的是（ ）。",[402,404,406,407],{"key":20,"text":403,"correct":26},"引进技术和引进设备其他费",{"key":24,"text":405,"correct":22},"人员培训及提前进场费",{"key":28,"text":335,"correct":26},{"key":31,"text":408,"correct":26},"工程监理费",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},898500,"下列费用中，属于与项目建设有关的其他费用中研究试验费的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"按施工验收规定在施工中必须进行试验所需费用",{"key":24,"text":416,"correct":26},"应在建筑安装费用中列支的施工企业对建筑材料、构件和建筑物进行一般鉴定、检查所发生的费用及技术革新的研究试验费",{"key":28,"text":418,"correct":26},"应由科技三项费用（即新产品试制费、中间试验费和重要科学研究补助费）开支的项",{"key":31,"text":420,"correct":26},"应由勘察设计费或工程费用中开支的项目",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":28,"analysis":33},898501,"编制和评审可研报告的费用属于（ ）。",[425,426,427,429],{"key":20,"text":337,"correct":26},{"key":24,"text":160,"correct":26},{"key":28,"text":428,"correct":22},"可行性研究费",{"key":31,"text":430,"correct":26},"建设管理费",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},898502,"自行组织培训或委托其他单位培训的人员工资、工资性补贴、职工福利费、差旅交通费、劳动保护费、学习资料费等支出应计入（ ）。",[435,437,438,440],{"key":20,"text":436,"correct":26},"建筑安装工程费",{"key":24,"text":335,"correct":26},{"key":28,"text":439,"correct":22},"生产准备",{"key":31,"text":441,"correct":26},"联合试运转费",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":28,"analysis":33},898503,"工程监理费属于（ ）。",[446,447,449,451],{"key":20,"text":160,"correct":26},{"key":24,"text":448,"correct":26},"其他直接费",{"key":28,"text":450,"correct":22},"技术服务费",{"key":31,"text":430,"correct":26},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},898504,"按我国现行投资构成，下列费用中属于项目建设期计列的生产经营费用用的是（ ）。",[456,457,458,459],{"key":20,"text":337,"correct":26},{"key":24,"text":160,"correct":26},{"key":28,"text":408,"correct":26},{"key":31,"text":441,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},898505,"下列费用中，属于生产准备费的是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":26},"专利技术使用费",{"key":24,"text":467,"correct":22},"生产职工培训费",{"key":28,"text":469,"correct":26},"市政公用设施费",{"key":31,"text":471,"correct":26},"工程保险费",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},898506,"下列（ ）不属于建设单位管理费。",[476,478,480,482],{"key":20,"text":477,"correct":26},"工作人员工资",{"key":24,"text":479,"correct":26},"业务招待费",{"key":28,"text":481,"correct":26},"劳动保护费",{"key":31,"text":408,"correct":22},{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},898507,"关于工程建设其他费用中场地准备及临时设施费的内容，下列说法中正确的是()。",[487,489,491,493],{"key":20,"text":488,"correct":26},"施工现场临时供水管道的费用计入建设单位临时设施费",{"key":24,"text":490,"correct":22},"建设单位临时设施费不包括已列入建筑安装工程费用中的施工单位临时设施费用",{"key":28,"text":492,"correct":26},"新建和改扩建项目的场地准备和临时设施费可按工程费用的比例计算",{"key":31,"text":494,"correct":26},"建设场地的大型土石方工程计入场地准备费",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},898508,"下列费用项目中，属于工程建设其他费中市政公用设施费的是（ ）。",[499,501,502,503],{"key":20,"text":500,"correct":26},"新产品试制费",{"key":24,"text":296,"correct":26},{"key":28,"text":298,"correct":26},{"key":31,"text":504,"correct":22},"绿化工程补偿费用",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},898509,"某建设项目在竣工验收时，为了鉴定一项隐蔽工程质量，进行了必要挖掘，则该项挖掘费用应计入（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"涨价预备费",{"key":24,"text":512,"correct":22},"基本预备费",{"key":28,"text":514,"correct":26},"间接费",{"key":31,"text":516,"correct":26},"其他间接费",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":28,"analysis":33},898510,"按现行对基本预备费内容的规定，不属于基本预备费范围的是（ ）费用。",[521,523,525,527],{"key":20,"text":522,"correct":26},"设计变更增加的",{"key":24,"text":524,"correct":26},"局部地基处理增加的",{"key":28,"text":526,"correct":22},"利率调整增加的",{"key":31,"text":528,"correct":26},"预防自然灾害采取的措施",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},898511,"根据我国现行规定，关于预备费的说法中，正确的是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":26},"基本预备费以工程费用为计算基数",{"key":24,"text":536,"correct":22},"实行工程保险的工程项目，基本预备费应适当降低",{"key":28,"text":538,"correct":26},"价差预备费以工程费用和工程建设其他费用之和为计算基数",{"key":31,"text":540,"correct":26},"价差预备费不包括利率、汇率调整增加的费用",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},898512,"某建设项目，经投资估算确定的工程费用为2100万元，工程建设其他费为900万元，项目建设期为2年，每年各完成投资计划50%。年均投资价格上涨率为10%，基本预备费费率为5%，项目建设前期1年。该项目建设期的价差预备费为（ ）万元。",[545,547,549,551],{"key":20,"text":546,"correct":26},"350.67",{"key":24,"text":548,"correct":26},"396.86",{"key":28,"text":550,"correct":26},"443.88",{"key":31,"text":552,"correct":22},"665.83",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":28,"analysis":33},898513,"某建设项目静态投资20000万元，项目建设前期年限为1年，建设期为2年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期价差预备费为（ ）万元。",[557,559,561,563],{"key":20,"text":558,"correct":26},"1006.25",{"key":24,"text":560,"correct":26},"1525.00",{"key":28,"text":562,"correct":22},"2056.56",{"key":31,"text":564,"correct":26},"2601.25",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},898514,"某项目建设期为2年，分年均衡进行贷款，在建设期第一年贷款2000万元，第2年贷款3000万元，贷款年利率为8%，建设期内利息只计息不支付，则该项目第二年的建设期贷款利息估算为（ ）万元。",[569,571,573,575],{"key":20,"text":570,"correct":26},"80.4",{"key":24,"text":572,"correct":22},"286.4",{"key":28,"text":574,"correct":26},"160",{"key":31,"text":576,"correct":26},"240",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},898515,"某新建项目，建设期2年，建设期内贷款分年度均衡发放，且只计息不还款，第1年贷款600万元，第2年贷款400万元，年利率为7%。则该项目的建设期利息为（ ）万元。",[581,583,585,587],{"key":20,"text":582,"correct":26},"77.00",{"key":24,"text":584,"correct":22},"78.47",{"key":28,"text":586,"correct":26},"112.00",{"key":31,"text":588,"correct":26},"114.94",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},898516,"某新建项目，建设期为3年，分年均衡进行贷款，第一年贷款1000万元，第二年贷款1800万元，第三年贷款1200万元，年利率10%，建设期内只计息不支付，则项目建设期贷款利息为（ ）万元。",[593,595,597,599],{"key":20,"text":594,"correct":26},"400.0",{"key":24,"text":596,"correct":26},"580.0",{"key":28,"text":598,"correct":22},"609.5",{"key":31,"text":600,"correct":26},"780.0",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]